YOUR BUILDING PROPOSAL February 2023
INTRODUCTION JAMIE SOUTHAM Head of Sports and Specialist Structures 10+ years of instant building experience Involved with: The Ryder Cup, Farnborough Air Show, Goodwood Festival of Speed, Wimbledon Keen sportsman Understands education and sports sector
ABOUT SMART - SPACE Established 30+ years UK-wide service Flexible and transparent Growing, ambitious business UK supply chain In-house specialists Compliance, health and safety Planning permission management Directly employed on-site crews Experienced in many sectors
UNDERSTANDING YOUR BRIEF From our telephone call and by looking at the initial designs you have shared, I understand that St. George’s Hill Tennis Club is looking to extend its current offering by including padel within the existing facility. The aim is to provide an enclosed building to house 3 padel courts which will allow year-round use, whilst also incorporating glazed panels around the perimeter to maximise the natural light. Smart-Space is keen to be included in the process and is able to demonstrate its ability to provide exactly what you need, within budget and on time.
QUOTE TO FOLLOW… INDOOR PADEL FACILITY 22m x 36m Maxi-Space building 6m eaves with solid panelled roof
TECHNICAL SPECIFICATION: Specification : 3 court padel facility Frame: Maxi-Space, 22m x 36m steel framed building 6m eaves height A-frame steel profiles with steel galvanized purlins, inserts and baseplates (manufactured to Building Regulation Code BS 6399 wind and snow using a set of generic calculations Roof: 40mm insulated panels in goosewing grey (other colour options available) with anti-condensation Steel wall cladding: Insulated panels in goosewing grey (other colour options available) with anti-condensation North elevation :- 40mm composite panel South elevation :- 40mm composite panel East elevation :- 40mm composite panel West elevation :- 40mm composite panel Glazing: 116m¹ of glazed panels – 2500 x 1000 Access: 4 x single access doors (1m x 2m); steel, lockable, pedestrian fire doors with portal hole Guttering: 170mm fast-flow system with downspouts to drainage points (TBC)
COSTINGS: Materials Complete Maxi-Span building £162,756.00 Single access doors £3,900.00 Glazed panels £72,000.00 Gutter system £3,375.00 Installation Approximately 3 week install Labour £36,414.00 Working away allowance £4,851.00 Hotel costs £7,560.00 Transport to site Included Plant and crane hire £22,832.00 Netting, edge protection and access tower £6,234.00 Total £319,922.00
INDOOR PADEL FACILITY These images show a structure with solid panels to the roof and walls, together with a 360° glazed panel section in the top of all 4 elevations.
VISUAL REPRESENTATION
VISUAL REPRESENTATION
VISUAL REPRESENTATION
TEMPORARY HIRE PERMANENT BUILD INSTANT SPORTS HALLS
MAKING SPACE FOR… SPORTS HALLS I ASSEMBLY HALLS I CLASSROOMS I SKILLS BUILDINGS
CASE STUDY: KINGSBURY SCHOOL Brand new school and community sports facility Used for: school sports lessons community sports use refectory Built: as complete turn-key project with planning permission managing utilities/groundworks managing external suppliers for specialist flooring and equipment “We’d recommend Smart-Space. We’d recommend them because of their honesty and their straight speaking. They are down to earth guys who provided exactly what we were looking for – not what they thought we were looking for. And because they’ve done the job they said they were going to do and as quickly as they said they would” Simon Cotton, Head Teacher, Kingsbury School
CASE STUDY: TREETOPS Brand new school building Used for: classrooms and 1 sports hall during the build of the whole school Built: permanent with multi-use solutions currently fully equipped classrooms will become 100% sports use on completion of the main school build worked with Tier-1 contractor “I’d definitely work with Smart-Space again. For this part of the project I was very much here in a managerial capacity, I didn’t have to do anything directly with the build. The project took five weeks and it went smoothly and efficiently. All the health and safety issues were well covered and the team were on top of everything.” Kelvin Gray, Site Manager, Treetops School
CASE STUDY: STRATFORD PADEL CLUB Dedicated sports club Used for: padel courts gym bar, showers and toilets Built: as a successful sports club as part of east London regeneration close to Olympic site recently extended, plans for more “You guys have a great balance between big and therefore professional but, as well, family run and able to carry on being friendly and close to people” Javier Fernandez, owner Stratford Padel Club
ADDITIONAL SERVICES SPECIALIST FLOORING SPORTS EQUIPMENT REBOUND BOARDS HEATING / LIGHTING EXTERNAL CLADDING
BUILD CHOICES BUILDING ONLY BUILDING AND GROUND PREPARATION TURNKEY SOLUTIONS MULTI - PARTNER BUILDS, TIER 1 CONTRACTORS
FLEXIBILITY IS KEY HIRE OR PURCHASE SWITCH FROM HIRE TO PURCHASE AT ANY POINT OFF - HIRE WITH JUST 7 DAYS’ NOTICE EXTEND OR REDUCE YOUR UNIT RELOCATE A TEMPORARY BUILDING NO MINIMUM RENTAL PERIOD
OUR TEAMS ARE YOUR TEAMS GROWING, SPECIALIST TEAMS TRAINED AND EXPERIENCED RELIABLE PROJECT MANAGEMENT DIRECTLY EMPLOYED CREWS EFFICIENT AND HELPFUL FOCUSED COMPLIANCE TEAM PLANNING PERMISSION MANAGEMENT PROJECT PLANS AND DRAWINGS
ALWAYS STRIVING HIGHER Education Today Magazine WINNER SME News WINNER SAPCA Awards 2023 SHORTLISTED
IN GOOD COMPANY
WE WOULD BE VERY PLEASED TO WORK WITH YOU JAMIE SOUTHAM Head of Sports and Specialist Structures [email protected] 07595 432590