III. Manhole Constuction
all formworks ,rebars,entrance step and manhole fra
Pour concrete for manhole entrance
Uninstall formworks for manhole entrance
Backfill and Restore the road surface
Install manhole cover
Install cable racking pole for 115 KV.
Install manhole grounding
III. Manhole Constuction
all formworks ,rebars,entrance step and manhole fra
Pour concrete for manhole entrance
Uninstall formworks for manhole entrance
Backfill and Restore the road surface
Install manhole cover
Install cable racking pole for 115 KV.
Install manhole grounding
manhole cover
BEFORE
AFTER
III. Manhole Constuction
all formworks ,rebars,entrance step and manhole fra
Pour concrete for manhole entrance
Uninstall formworks for manhole entrance
Backfill and Restore the road surface
Install manhole cover
Install cable racking pole
Install manhole grounding
III. Manhole Constuction : The span between
racking pole should not exceed 1.5 m. or
other which PEA had approved
22 kv.
69,115 kv.
69,115 kv.
III. Manhole Constuction
: racking pole
III. Manhole Constuction : pillow insulator
,Cable hangersteel , round bar
22 kv. 69,115 kv.
III. Manhole Constuction
all formworks ,rebars,entrance step and manhole fra
Pour concrete for manhole entrance
Uninstall formworks for manhole entrance
Backfill and Restore the road surface
Install manhole cover
Install cable racking pole for 115 KV.
Install grounding for manhole
III. Manhole Constuction : Conductors,PVC
insulated Cu 1x50 sq.mm
DB 25 mm. @
200 mm #
SD 30 , SD 40
ป RB 6 mm. @
610 mm
SR 24
คอนกรตี ผสมเสรจ็ กาลงั รบั นา้ หนัก
fc’=180 ksc (cylinder)
fc’=240 ksc (cubic)
Trenchless methods
Typically the method is used in environments
where open trench digging is impossible or
not feasible.
IV. Horizontal Directional Drilling(HDD)
Determination of the bore line :The depth
from road surface to HDPE pipes should
exceed 3 m.
Main components of machine
aration of drill head : Calibrate the receiver and the s
ng fluid :Mix water and some bentonite in the mixing
The pilot bore:Drilling fluid flow test
The pilot bore:Entering the ground
IV. Horizontal Directional
Drilling(HDD):Method of installing HDPE
Pipe horizontally below the ground
surface.
>3 m.
DBReeo/pnRdtdohn:d(xoc%m. .)
IV. Horizontal Directional Drilling(HDD)
Determination of the bore line :The depth
from road surface to HDPE pipes should
exceed 3 m.
Main components of machine
aration of drill head : Calibrate the receiver and the s
ng fluid :Mix water and some bentonite in the mixing
The pilot bore:Drilling fluid flow test
The pilot bore:Entering the ground
IV. Horizontal Directional
Drilling(HDD) : Drill Rig
IV. Horizontal Directional
Drilling(HDD) : Drill Rig
IV. Horizontal Directional
Drilling(HDD) : Power Unit
IV. Horizontal Directional
Drilling(HDD) : Mixing Module
IV. Horizontal Directional
Drilling(HDD) :
sonde housing, Drill Head, Back
Reamer
IV. Horizontal Directional Drilling(HDD) :
Receiver ,Data Sonde
IV. Horizontal Directional
Drilling(HDD) : Bentonite
ทอ่ HDPE
IV. Horizontal Directional Drilling(HDD)
Determination of the bore line :The depth
from road surface to HDPE pipes should
exceed 3 m.
Main components of machine
aration of drill head : Calibrate the receiver and the s
ng fluid :Mix water and some bentonite in the mixing
The pilot bore:Drilling fluid flow test
The pilot bore:Entering the ground
IV. Horizontal Directional Drilling(HDD)
Determination of the bore line :The depth
from road surface to HDPE pipes should
exceed 3 m.
Main components of machine
aration of drill head : Calibrate the receiver and the s
ng fluid :Mix water and some bentonite in the mixing
The pilot bore:Drilling fluid flow test
The pilot bore:Entering the ground
IV. Horizontal Directional Drilling(HDD)
Determination of the bore line :The depth
from road surface to HDPE pipes should
exceed 3 m.
Main components of machine
aration of drill head : Calibrate the receiver and the s
ng fluid :Mix water and some bentonite in the mixing
The pilot bore:Drilling fluid flow test
The pilot bore:Entering the ground
IV. Horizontal Directional Drilling(HDD)
Determination of the bore line :The depth
from road surface to HDPE pipes should
exceed 3 m.
Main components of machine
aration of drill head : Calibrate the receiver and the s
ng fluid :Mix water and some bentonite in the mixing
The pilot bore:Drilling fluid flow test
The pilot bore:Entering the ground
IV. Horizontal Directional Drilling(HDD)
t bore:Locating and directional drilling(changes of d
Back reaming:Disassembly of drill head
Back reaming:The choice of the back reamer
ulling: Immediate pipe pulling(at small backream diam
lling: Immediate pipe pulling(at larger backream dia
ling: connection between back reamer and expande
IV. Horizontal Directional
Drilling(HDD) : Show the drill
head direction
IV. Horizontal Directional
Drilling(HDD) : Show the drill
head position