• Foreword to BS 5975:2
• The term temporary wo
has been adopted to re
procedural controls of a
to recognise that the ma
already control tempora
• Compliance with the Co
Management) Regulatio
has been incorporated,
the interface between th
Tempora
Has the work been ‘des
Has the design been ind
What checks have been
works have been install
the design?
What involvement has t
ary Works
signed’?
dependently checked?
n made to ensure that the
led in accordance with
the CDM-C had?
Tempora
What do we hope to
ary Works
o see?
Tempora
Attention to temporary w
arrangements and proc
….commensurate with
complexity of the proje
risks involved
Medium / large projects
Small, simple projects –