The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by elysyazwani93, 2019-04-26 23:59:34

AXIANERGY(M) SDN BHD_CORPORATE PROFILE

AXIANERGY(M) SDN BHD_CORPORATE PROFILE

JJK CORPORATE
PROFILE
\

AXIANERGY (M) SDN. BHD. started its journey with its
inception in May 2014 founded by a group of people
who are highly passionate, innovative, committed and
backed with years of experience involved in the
construction industry.
It is with this vision that AXIANERGY (M) SDN. BHD has

AXIANERGY (M) SDN. BHD.since acquired technical expertise and capabilities,

which equips it to provide quality, affordable services to
its clients. We are committed to understanding and
specifically cater to our client’s requirements without
compromising on the quality of its deliverables, thus our
tagline “Diversified Services, Unvarying Quality”.
We guarantee that whatever jobs undertaken by
AXIANERGY, we will continuously strive to meet client’s
outmost satisfaction. We will endlessly keep challenging
ourselves to grow and we remain inspired by the
potential for what we may create tomorrow.
M Shafidz Yasin
Founder / Managing Director

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

Foreword from the

Managing Director

“We need to always remember where we
were from, know where we are now and
forever believe in where we are going”

M Shafidz Yasin

AXIANERGY (M) SDN. BHD.

AXIANERGY (M) SDN. BHD. started its journey with its inception
in November 2014 founded by a group of people who are
highly passionate, innovative, committed and backed with
years of experience involved in the construction industry.

It is with this vision that AXIANERGY (M) SDN. BHD has since
acquired technical expertise and capabilities, which equips it
to provide quality, affordable services to its clients. We are
committed to understanding and specifically cater to our
client’s requirements without compromising on the quality of
its deliverables, thus our tagline “Diversified Services,
Unvarying Quality”.

We guarantee that whatever jobs undertaken by
AXIANERGY, we will continuously strive to meet our client’s
utmost satisfaction. We will endlessly keep challenging
ourselves to grow and we remain inspired by the potential for
what we are creating tomorrow.

M Shafidz Yasin
Founder / Managing Director

DIVERSIFIED SERVICES, UNVARYING QUALITY

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

BOARD OF DIRECTORS

M SHAFIDZ YASIN, MANAGING DIRECTOR

M Shafidz Yasin is the founder of Axianergy (M) Sdn Bhd and has been the Managing
Director since its incorporation on 17 November 2014. With more than 20 years of
experiences in the oil and gas industry, mainly in onshore pipeline, piping installation
and mechanical equipment installation. He started his career as an Estimator for oil &
gas construction industries. During these years he served various reputable oil and
gas clients such as Petronas Gas Berhad, SAFRAN Messier Buggatti Dowty, Technip
Geoproduction, Gas Malaysia, PBJV Group and Petrochemical Plants ie Optimal,
Etylene, CUF, BASF, TCCT and PPMSB. Prior to founding Axianergy he was a Lead
Estimator and Construction Manager. His current achievement in Axianergy was an
awarded contract valued RM 11.0 Million for HA MBD Phase II for Mechanical, Piping,
Painting and Insulation Works, completed in 2-month ahead schedule and
Achievement Awards from Technip. Presently, M Shafidz Yasin is the Managing
Director of Axianergy (M) Sdn Bhd and he also serves as Director on the Board of
Axianergy (M) Sdn Bhd.

DMIREACSTROIRAOWFAANXIGAN, EERXGECY (UMTI)VSEDNDIBRHEDCTOR

M Asri Awang has over 25 years of working experience in oil & gas industry including
petrochemical, general industries environment, civil and structural works for EPCC
project. He started his career as a Junior QC Inspector in fabrication pipe spools at
fabrication yard before joining in the engineering and constructing lines. His last
position is QC Manager prior to forming Axianergy (M) Sdn Bhd in 2014. Majority of his
work experience is in mechanical field mainly plant piping erection and installation
works, gas pipeline and onshore works. He is technically competent especially in
piping erection and inspection in accordance with ASME B31.3, ASME IX and API 1104
code. Presently, Mohd Asri is Executive Director of Axianergy (M) Sdn Bhd and he also
serves as a Director on the Board of Axianergy (M) Sdn Bhd

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

CORPORATE INFORMATION

Company Name AXIANERGY (M) SDN. BHD

Date of 17 November 2014
Incorporation:

Registration Number: 1118150 - U
CIDB Grade:
Paid up Capital: Telephone: 06 – 792 2154
Banker: G7 06 – 792 2451

Business Address: Website: www.axianergy.my

RM 1,500,000 Email: [email protected]

MAYBANK & CIMB BANKS Contact M Shafidz Yasin
Seremban 2, Person: 013 288 6799
70300 Seremban, Managing Director
N. Sembilan
M Asri Awang
No. 18 & 18-1, Persiaran Metro 013 231 4299
Sendayan 1, Sendayan Executive Director
Metropark, Bandar Sri Sendayan,
71950 Seremban, N. Sembilan

DIVERSIFIED OUR SERVICES & CAPABILITIES
SERVICES,
UNVARYING o EPPC and Maintenance of Pipelines and Station.
QUALITY
o Fabrication and Installation of Piping up to
150,000 db.

o Maintenance works, including major Plant
Shutdowns and Plant Turnaround.

o Civil Works for Industrial and Petrochemical
Plants, etc.

o Fabrication and Erection of Steel Structure and
Field Storage Tanks with 800 tonnes per month of
workshop production.

o Equipment and Mechanical Installation and
Erection.

o Supply of Skilled Manpower and Qualified
Professional on All areas.

o Painting and Blasting Works of Power Plants

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

CORPORATE STRUCTURE

AXIANERGY (M) SDN BHD

- EPCC & MAINTENANCE OF PIPELINES
- FABRICATION - FABRICATION & INSTALLATION OF PIPING
- FABRICATION & ERECTION OF FIELD STORAGE TANKS
- CIVIL WORKS FOR PETROCHEMICAL PLANTS
FABRICATION AND ERECTION OF STEEL STRUCTURE WORKS
TANKAGE CLEANING, SAND BLASTING & PAINTING WORKS
- SUPPLY OF SKILLED MANPOWER & QUALIFIED PROFESSIONALS ON ALL AREAS

AXIAN PETRO (M) SDN BHD

- INTEGRATED FACILITY MAINTENANCE:
GRASSCUTTING, LANDSCAPPING, OFFICE CLEANING, WASTE COLLECTION,
PEST CONTROL & INFRA CLEANING
- EARTHWORK
BUILDING MAINTENANCE
- CIVIL & STRUCTURE WORK
- MATERIAL MANPOWER SUPPLY
- SAND BLASTING AND PAINTING WORKS

P.T. TEGMA ENGINEERING

- ENGINEERING WORKS:
PROCESS ENGINEERING, MECHANICAL ENGINEERING, PIPELINE
ENGINEERING, INSTRUMENT ENGINEERING, ELECTRICAL ENGINEERING,
CIVIL & STRUCTURAL ENGINEERING
- CONSTRUCTION WORKS:
PIPELINE

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

CORPORATE ORGANIZATIONAL
STRUCTURE

MANAGING DIRECTOR

M. SHAFIDZ YASIN

ACCOUNTING FINANCE

AFIFAH AL HUSNA (ACCOUNT MOHAMAD RADZIB (FINANCE
MANAGER) MANAGER)
NUR AZLIN SHAFIKA (ACC. EXECECUTIVE)

PROCUREMENT EXECUTIVE DIRECTOR /
GENERAL MANAGER
HJ SUHAIMY M YASIN - MANAGER
M. FADZIL SHAHDAN (MAT. M. ASRI AWANG
CONTROLLER)

QUALITY MANAGEMENT HR & ADMIN AND LAISON
REPRESENTATIVE / LICENSING
SHARIDZUAN M. YASIN (ADMIN & HR
SHARIDZUAN M YASIN (QMR) MGR)
SHAFAIZATUL AMIRA (HR & ADMIN
EXEC.)

NUR SYAZWANI (HR & ADMIN EXEC.)
NORASHIKIN (DOCUMENT CONTROLLER)
MOHMAD ABU SAMAH (DRIVER)

PROJECT SUPPORT PLANNING /COST CONTROL

SARIMAH BT RAHMAD (PROJ.SECRETARY) NOR SYAZWANI (PLANNER)
AHMAD TAMIZI ISMAIL (CHARGEMAN)
ROSLINA ITHNAIN (PROJECT ACCOUNT)

ENGINEERING & CONTRACT PROJECT MANAGEMENT QUALITY ASSURANCE AND SAFETY, HEALTH &
CONTROL ENVIRONMENT
IR AMIRUDDIN (ENGR. MANAGER) MOHD ZAZLI ZAKARIA (PM)
KAMRU SYARIF (PM) MOHAMAD FARID (QC/NDT ROSLAN B. OMAR (SHO)
NUR FARHANA (MECHANICAL ENG.) AHMAD KAMAL B. SAHMAN (PM) COORDINATOR) AHMAD TARMIZI HAMID (SAFETY OFF.)
NIK KAMARUKZAMAN (CIVIL & AHMAD BASYIRUDDIN (QC SV.) NURUL SYAZWANI (HSE EXEC.)
STRUCTURE ENG.) ABDUL HADI ABDULLAH (CM) SITI SARAH M ZAINI (QC CLERK) MUHAMAD ZAIHAN (SAFETY SV.)
MOHD FIRDAUS (PROCESS ENG) AHMAD NUR QAMARI (SEN. PE)
NIK MARWAN ARIEF (PE)
RAIHAN MAULA (CIVIL ENG.) MOHD SHAFINI BIN SUDIN (PE)
AMILIZA (LEAD CAD DESIGNER) MOHD FAHMI (CONS. PIPELINE ENG.)
MOHD IKMAN (CIVIL ENG.)
NUR' AMIRAH ANUAR (CONTRACT EXEC)
CHE WAN SUHAIMI (ESTIMATOR)

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

MANAGEMENT TEAM

NO. NAME POSITION QUALIFICATION

1 MOHD SHAFIDZ B. MOHD YASIN MANAGING DIRECTOR -CERT. IN ADV. MECH. ENG.
EXECUTIVE DIRECTOR DRAFTING
2 MOHD ASRI B. AWANG - CERT IN M.L.V.K
3 AHMAD KAMAL BIN SAHMAN SPM
4 M. ZAZLI B. ZAKARIA
5 KAMRU SYARIF B. ANUAR PROJECT MANAGER
6 MOHD SUHAIMY B. MOHD YASIN
7 MOHD SHARIDZUAN B. MOHD YASIN PROJECT MANAGER B. ENG MECHATRONICS (HONS
8 IR. AMIRUDDIN B. AMKAROMI
9 MOHAMAD RADZIB BIN MOHD YUSOF LEAD PROJECT ENGINEER B. SC. OF PROJECT FACILITIES
10 ABDUL HADI B. ABDULLAH PROCUREMENT MANAGER MANAGEMENT
11 AHMAD NUR QAMARI ENG. ELECTRONIC/COMPUTER
12 MOHD FAHMI B. ABD RAHIM
13 NIK KAMARULZAMAN SYAH B. NIK WAN ADMIN & HR AND LIASON B. OF SCIENCE IN DESIGN
14 MUHAMMAD SHAFINI B. SUDIN MANAGER
15 NIK MARWAN ARIEF B. MAHMOD ENGINEERING MANAGER B. OF ENGINEERING (HONS)
16 RAIHAN MAULA ABD JAMIL MECHANICAL
17 MOHD IKMAN BIN SAUDI FINANCE MANAGER B. DEGREE IN ECONOMICS
18 NUR FARHANA ABD GHANI (BUSINESS)
19 MOHAMAD FIRDAUS B. MOHAMAD A’ZMI SENIOR PROJECT ENGINEER B. OF ENGINEERING
TECHNOLOGY
SENIOR PROJECT ENGINEER B. OF DEGREE (HONS)
MECHANICAL ENGINEER
PIPELINE ENGINEER B. OF ENGINEERING (HONS) IN
MECHANICAL ENGINEERING
CIVIL & STRUCTURE ENGINEER B. DEGREE ENGINEERING
(CIVIL)
PROJECT ENGINEER B. OF CHEMICAL ENGINEERING

PROJECT ENGINEER B. OF DEGREE (HONS)
CIVIL ENGINEER MECHANICAL ENGINEERING
B. IN CIVIL ENGINEERING

CIVIL ENGINEER DIP. IN MANUFACTURING

20 AMILIZA BT ;ABD. WAHAB MECHANICAL ENGINEER B. IN ENGINEERING (HONS.)
21 NUR AMIRAH BT MOHD ANUAR PROCESS ENGINEER MECHANICAL
22 AHMAD BASYIRUDDIN B. HUSSIN MASTER IN ENGINEERING
LEAD CAD DESIGNER (HONS) CHEMICAL
CONTRACT EXECUTIVE ENGINEERING
QC SUPERVISOR DIP. MECHANICAL
ENGINEERING
B. DEGREE (HONS)
ENGINEERING CHEMICAL
INTITUT LATIHAN
PERINDUSTRIAN
(AUTOMOTIF) LEVEL 1&2

AXIANERGY (M) SDN. BHD NAME CORPORATE PROFILE QUALIFICATION

NO. POSITION

23 MOHD FARID BIN ARIFIN QAQC ENGINEER DIP. IN SCIENCE

24 CHE WAN SUHAIMI B. CHE WAN ABU BAKAR ESTIMATOR/SUPERVISOR DIP. IN MECHANICAL
ENGINEERING

25 AHMAD TAMIZI BIN HAMID SAFETY SUPERVISOR SPM

26 MUHD ZAIHAN B. HUSSAIN SAFETY SUPERVISOR DIP IN MECHATRONIC
27 NURUL SYAZWANI BINTI RAZALI HSE EXECUTIVE ENGINEERING
B. SC. (HONS)
28 NURSYAZWANI BT. YUSOP PLANNER/COST CONTROLLER ENVIRONMENTAL
TECHNOLOGY
B. OF ENGINEERING
(PETROLEUM)

29 ROSLINA BT ITHNAIN ACCOUNT EXECUTIVE B. OF SCIENCE (HUMAN
30 NUR AZLIN SHAFIKA BINTI MAHARAM ACCOUNT EXECUTIVE DEVELOPMENT)
B. (HONS) IN ACCOUNTANCY

31 AFIFAH AL HUSNA BINTI DOL HAMID ACCOUNT OFFICER B. OF ACCOUNTING
32 SHAFAIZATUL AMIRA BINTI MUKHTARUDDIN ADMIN & HR EXECUTIVE (INFORMATION SYSTEM)
33 NUR SYAZWANI BINTI MOHD ASRI ADMIN & HR EXECUTIVE B. DEGREE (HONS) HUMAN
RESOURCES
DIP. IN EDUCATION (TESL)

34 NOR HASHIKIN BT KAMAROLZAMAN DOCUMENT CONTROLLER B. DEGREE (HONS)
35 SITI SARAH BT MOHD ZAINI QC CLERK MECHANICAL ENGINERING
36 MOHD FADZIL B. SHAHDAN MATERIAL CONTROLLER DIP. IN TOURISM
MANAGEMENT
37 MUHAMAD TARMIZI BIN ISMAIL CHARGEMAN A1 SKILL PROFICIENCY
CERTIFICATE (BASIC MOTOR
VEHICLE ENG.)
SPM

38 SARIMAH BINTI RAHMAD PROJECT SECRETARY DIP. OF ELECTRONIC
39 MOHMAD BIN ABU SAMAH DRIVER ENGINEERING
SRP

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

COMMITMENT TO QUALITY

QUALITY POLICY

AXIANERGY (M) SDN. BHD provides procurement,
fabrication, installation and commissioning of pipeline
and process piping; and installation of mechanical
equipment. Others scope: engineering, construction
and maintenance on civil and structural of mainline
valve station, blasting and painting of power plants
and onshore landscping works. We are fully commited
to our core values including ’get it right first time’.

Our company goal is to grow the business throught
excellence in project delivery and satisfying our customers. AXIANERGY (M) SDN. BHD
undertakes to provide the necessary resources and management support to achieve
this goal.
In particular, we have established and will maintain, review and continually our
programme for management of quality as applied to the provision of our activities.
This programme requires us to;

Ensure that all personnel are competent to undertake assigned tasks.
Understand customer requirement and measure customer satisfaction.
Provide adequate information, and supervision to employees and
contractors.
Plan project delivery processes to minimize risk and realise budget and
schedule objective.
Take timely action to prevent occurrence or of nonconformity.
Continually improve all areas of the business, to the benefit of all
interested parties.

4 JUNE 2018

In particular, we have established and will maintain, review and continually our
M Shafidz Yasin
Managing Director
AXIANERGY (M) SDN BHD

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

COMMITMENT TO HEALTH, SAFETY
AND ENVIRONMENT

SHE POLICY

SAFETY , HEALTH AND ENVIRONMENTAL

AXIANERGY (M) SDN. BHD, committed to ensure effective safety, health and
environmental management to be a prime importance to its business and continuous
in improvement of performance in all area.

AXIANERGY (M) SDN. BHD. shall:-

 Comply with all requirements of legislations related to safety, health and
environment including approved regulation and codes of practices.

 Treat safety, health and environment with the highest priority and demonstrate

visible leadership in all and our business activities by providing adequate resources
necessary to manage and communicate safety, health and environment
commitment, expectations and accountability in the same manner as any
other criteria business function.
 Develop, implement and maintain a SHE management system consistently
with AXIANERGY (M) SDN. BHD business intentions.
 Identify and assesses the SHE risk associated with our activities and provide control
measure that mitigate, eliminate or reduce the risks to a level as low as
reasonable practicable.
 Ensure that contractor’s HSE performance meets AXIANERGY (M) SDN. BHD
standards.
 Monitor our HSE performance and implementation of available program to
achieve improvement on a continual basis.
The Managing Director has overall responsibility for implementing this policy. AXIANERGY
(M) SDN BHD has appointed a director to be responsible for SHE. It is responsibility off all
employees to implement this policy together with their collective and individual
responsibility.

M SHAFIDZ YASIN
Managing Director
AXIANERGY (M) SDN BHD
4 June 2018

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

COMMITMENT AGAINSTS TO DRUG
AND ALCOHOL

DRUG AND ALCOHOL POLICY

This drug and alcohol policy to ensure that AXIANERGY(M) SDN BHD have personnel
responsible motivated themselves to refuse any drug and alcohol. In accordance
to our Health, Safety and Environment Policy,
AXIANERGY(M) SDN, BHD Will

 Promote a conductive environment and work culture that does not tolerate to use
of drugs, alcohol or other intoxicants

 Take action and refuse any drug and alcohol abuse that can affect the company
operation and employees work performance.

 It is our company policy to ensure our manpower and work places are free from
drug and alcohol abuse in line with Malaysian Standard Code of Practices &
Guidelines for Safety and Health of Work.

 This policy shall be enforced through drug and alcohol free programmes of
prevention. The employees who are found to be positive of the said guideline shall
be subject to disciplinary action including dismissal from project and the
Company.

An employee may be required to undergo a test if suspected to involve alcohol or
drug abuse. All employees, Sub Contractors and others to strictly adhere to this policy
at all the time.

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

SUMMARY REGISTRATION

PERAKUAN PENDAFTARAN ISO 9001 : 2015 SIJIL AKUAN PENDAFTARAN
CERTIFICATE NO : 10157932 CERT NO : K22174710101683722
CERTIFICATE NO :
0120151229-SL 169139 EXPIRE DATE : 10 JAN 2022 EXPIRE DATE : 16 NOV 2019
EXPIRE DATE : 7 JAN 2020

PETRONAS LICENSE SIJIL PENDAFTARAN SPKK PERAKUAN PENDAFTARAN
CERTIFICATE NO :
LICENSE NO : 1118150-U 0120151229-SL169139 CERTIFICATE NO : BP 21/535
EXPIRE DATE : 14 NOV 2019 EXPIRE DATE : 4 JAN 2020
EXPIRE DATE : 7 JAN 2020

SIJIL SCORE CIDB SIJIL TARAF BUMIPUTERA
CERTIFICATE NO : CERTIFICATE NO : 210850
0120151229-SL169139

EXPIRE DATE : 21 JAN 2021

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

FABRICATION YARD FACILITIES AT KUALA LUKUT NEGERI SEMBILAN

ACTIVITY : WPQT, WQT, fabrication works, testing, painting

LOCATION : Lot 3426 Kg Kecil Kuala Lukut, Batu 3 ½ , Port Dickson,
Negeri Sembilan.

DOSH REGISTRATION NUMBER. : NS/19/22/134404

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

NEW FABRICATION YARD

@ ALOR GAJAH, MELAKA

NEW FABRICATION YARD AT ALOR GAJAH, MELAKA

TOTAL AREA : 22 KM

LOCATION : Mukim Sungei Baru Ilir, Tanah Paya Mengkuang, Alor Gajah,

Melaka

REMARKS : Available in August 2018

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

PCC PENGERANG PIPELINE, JOHOR BAHRU

 YEAR : NOVEMBER 2014
 OWNER : PETRONAS GAS

BERHAD
 CLIENT : CPM CONSTRUCTION
 SCOPE : SERVICES SUPPORT TO

CPM CONSTRUCTION SDN. BHD
 NDT
 HEAVY MACHINERY
 THIRD PARTY INSPECTOR
 DIESEL SUPPLY
 PERFORM WQT
 INSPECTION SITE BOOM
 SITE CLEARING 32 KM

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

ACCESS PLATFORM AT V1 AREA & UTILITY AREA, HA– MBD PROJECT,
NEGERI SEMBILAN

 YEAR : NOVEMBER 2014
 OWNER : SAFRAN- MESSIER

BUGGATTI DOWTY MALAYSIA
SDN. BHD
 CLIENT : TECHNIP
GEOPRODUCTION (M) S/B
 SCOPE : INSTALLATION OF
STEEL STRUCTURES AT V1 AREA
& UTILITY AREA

MODIFICATION WORKS TO ROOF REPAIR, HA– MBD PROJECT,
NEGERI SEMBILAN

 YEAR : NOVEMBER 2014
 OWNER : SAFRAN LANDING

SYSTEMS MALAYSIA SDN BHD
 CLIENT : TECHNIP

GEOPRODUCTION (MALAYSIA)
SDN. BHD.
 SCOPE : PIPING INSTALLATION
& MODIFICATION WORKS TO
ROOF REPAIR

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

0

NEW INSTRUMENT AIR LINE PANEL TO ANDRITZ, HA- MBD PROJECT
NEGERI SEMBILAN

 YEAR : JANUARY 2015
 OWNER : SAFRAN LANDING

SYSTEMS MALAYSIA SDN BHD
 CLIENT : TECHNIP

GEOPRODUCTION
(MALAYSIA) SDN. BHD.
 SCOPE : INSTALLATION OF
INSTRUMENT AIR TUBING &
EQUIPMENT TO ANDRITZ AT
PERFORM AREA

TOX-2 (FLARE) PIPING MODIFICATION, HA- MBD PROJECT NEGERI SEMBILAN

 YEAR : FEBRUARY 2015
 OWNER : SAFRAN LANDING

SYSTEMS MALAYSIA SDN BHD
 CLIENT : TECHNIP

GEOPRODUCTION
(MALAYSIA) SDN. BHD
 SCOPE : PROCUREMENT,
CONSTRUCTION, PRE-
COMMISSIONING FOR CIVIL,
STRUCTURE, PIPING
INSTALLATION, &
MECHANICAL WORKS.

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

RFPC, HA MBD PROJECT, NEGERI SEMBILAN

 YEAR : FEBRUARY 2015
 OWNER : SAFRAN LANDING SYSTEMS MALAYSIA SDN BHD
 CLIENT : TECNIP GEOPRODUCTION (M) SDN BHD
 SCOPE : PROCUREMENT, CONSTRUCTION, PRECOMMISSIONING FOR CIVIL,
STRUCTURE, PIPING INSTALLATION & MECHANICAL WORKS.
 TOTAL DB: 630 DB PIPING, 10 AND 20 METRIC TONNES STRUCTURE

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

PROCUREMENT, FABRICATION, AND COMMISSIONING OF PIPELINE AND
PROCESS PIPING – HA MBD PHASE 2, NEGERI SEMBILAN

 YEAR : AUGUST 2015
 OWNER : SAFRAN LANDING SYSTEMS MALAYSIA SDN BHD
 CLIENT : TECHNIP GEOPRODUCTION (M) SDN BHD
 SCOPE : PROCUREMENT, FABRICATION, INSTALLATION AND
COMMISSIONING OF PIPELINE AND PROCESS PIPING WITH
 TOTAL DB: CERTIFIED ISO9001:2008
38,000 DIA-INCH PIPING

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

PROJECT HIGHLIGHTS

INSTALLATION OF MECHANICAL EQUIPMENT – HA MBD PHASE 2,
NEGERI SEMBILAN

 YEAR : AUGUST 2015 – AUGUST 2016
 OWNER : SAFRAN LANDING SYSTEMS MALAYSIA SDN BHD
 CLIENT : TECHNIP GEOPRODUCTION (M) SDN BHD
 SCOPE : INSTALLATION OF MECHANICAL EQUIPMENT
WITH CERTIFIED ISO 9001:2008
 TOTAL : 128.6 TONNES OF MECHANICAL EQUIPMENT INSTALLATION
WEIGHT

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

PROJECT HIGHLIGHTS

C&S WORKS – MAINLINE VALVE STATION & SCADA BUILDING AT
PENGERANG, JOHOR

 YEAR : SEPTEMBER 2015
 OWNER :
 CLIENT : PETRONAS GAS BERHAD
 SCOPE :
PBJV GROUP
 TOTAL :
STATION C&S WORKS AT MAINLINE VALVE STATION FOR PROCUREMENT
CONSTRUCTION AND COMMISSIONING (PCC) OF PENGERANG
GAS PIPELINE (PGP) PROJECT
TOTAL OF 9 STATIONS INCLUDING SCADA BUILDING

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

MARINE SERVICES @ PENGERANG,
JOHOR

 YEAR : NOVEMBER 2016
 OWNER : ZIKING LOGISTIC SDN BHD
 SCOPE : MARINE SERVICES @ PENGERANG, JOHOR

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

PROJECT HIGHLIGHTS

PIPE SLEEPER AND UNDER GROUND SELRVICE PACKAGE (BINA PURI)

YEAR : FEB 2017

OWNER : PETROLIUM NASIONAL
BERHAD

CLIENT : BINA PURI SDN BHD

SCOPE : PIPE SLEEPER AND UNDER
GROUND SERVICES PACKAGE – 22
AT RAPID PROJECT (CIVIL &
PIPELINE)

EPCC OF KLUANG CITY GATE UPGRADING

YEAR : JUNE 2017
OWNER : PETRONAS GAS BERHAD
CLIENT : TRANSWATER API SDN BHD
SCOPE : REPAIR OF EXISTING DRAINAGE,
AND CONSTRUCT OF NEW ACCESS ROAD.
ALSO HACKING AND REMOVING OF
EXISTING SUPPORT FOUNDATION AND
SLAB.

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

PROJECT HIGHLIGHTS

GBEST PROJECT

YEAR : JUNE 2017
OWNER : PETRONAS GAS BERHAD
CLIENT : TRANSWATER API SDN BHD
SCOPE : MECHANICAL FABRICATION AND INSTALLATION WORKS INCLUSIVE STEEL

STRUCTURE.

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

PROJECT HIGHLIGHTS

FLAME ARRESTOR INSTALLATION AT SEGAMAT RO

YEAR : OCT 2017

OWNER : PETRONAS GAS
BERHAD

CLIENT : PETRONAS GAS
BERHAD

SCOPE : INSTALLATION
OF FLAME ARRESTOR

EXPORT TERMINAL SCRAPPER STATION PROJECT (NETSS)

YEAR : NOV 2017
OWNER : PETRONAS GAS BERHAD
CLIENT : PETRONAS GAS BERHAD
SCOPE : CIVIL WORK AND
UPGRADING WORK

JLJNGGF

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

vcEXqPOSE PIPE REPAIR & SECURITY SERVICE FOR PGPP

YEAR : 2018
OWNER : PETRONAS GAS BERHAD
CLIENT : PETRONAS GAS BERHAD
SCOPE : CIVIL WORK

REMAINING WORKS FOR PENGERANG GAS PIPELINE PROJECT (REINITE) –
PACKAGE A

YEAR : JUNE 2018
OWNER : PETRONAS GAS

BERHAD
CLIENT : PETRONAS GAS

BERHAD
SCOPE : CIVIL WORK

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

PROJECT HIGHLIGHTS

EPCC OF TEBONG CITY GATE STATION UPGRADING PROJECT, (TURBO)

YEAR : FEB 2018
OWNER : PETRONAS GAS BERHAD
CLIENT : PETRONAS GAS BERHAD
SCOPE : ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

PROJECT HIGHLIGHTS

EPCC OF TELOK GONG LOOP PIPELINE, MELAKA (TUAH)

YEAR : MARCH 2018
OWNER : PETRONAS GAS BERHAD
CLIENT : PETRONAS GAS BERHAD
SCOPE : ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

LIST OF PROJECT EXPERIENCES 2015-2019

Project Client Scope of Work Period Status
2015 Completed
Pengerang CPM Cutting/Chipping Trees Along 2015 Completed
1 Pipeline CONSTRUCTION ROW 2015 Completed
2015 Completed
Regasification, SDN BHD 2015 Completed
PCC RGT2 2015 Completed
Pengerang CPM Disposal Trees to Dumping 2015 Completed
2 Pipeline CONSTRUCTION Area 2015 Completed
Regasification, 2015 Completed
PCC RGT2 SDN BHD 2015 Completed
Pengerang
3 Pipeline CPM Supply Diesel
Regasification, CONSTRUCTION
PCC RGT2
Pengerang SDN BHD
4 Pipeline
Regasification, CPM Supply 3rd Party Inspection
PCC RGT2 CONSTRUCTION
Pengerang
5 Pipeline SDN BHD
Regasification,
PCC RGT2 CPM MT/UT Inspection
Pengerang CONSTRUCTION
6 Pipeline
Regasification, SDN BHD
PCC RGT2
Pengerang CPM NDT & 3rd Party Production
7 Pipeline CONSTRUCTION
Regasification,
PCC RGT2 SDN BHD
Pengerang
8 Pipeline CPM Equipment Rental - Excavator
Regasification, CONSTRUCTION
PCC RGT2
Pengerang SDN BHD
9 Pipeline
Regasification, CPM Rental 3MT Fuel Truck Diesel
PCC RGT2 CONSTRUCTION
Pengerang
10 Pipeline SDN BHD
Regasification,
PCC RGT2 CPM Supply Gases
CONSTRUCTION
Pengerang
11 Pipeline SDN BHD

Regasification, CPM Supply Welding Set
PCC RGT2 CONSTRUCTION

12 Pengerang SDN BHD
Pipeline
Regasification, CPM Welder Qualification Test 2015 Completed
PCC RGT2 CONSTRUCTION (WQT) & Mechanical Test

SDN BHD

CPM Additional NDT Production 2015 Completed
CONSTRUCTION

SDN BHD

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

No Project Client Scope of Work Period Status
13 Installation of IA SAFRAN,MESSIER Installation of Instrument Air 2015 Completed
BUGATTI DOWTY tubing panel to Andritz, 2015 Completed
Panel to Andritz Safran Preform Area 2015 Completed
(HA-MBD) Procurement, Construction,
14 HA-MBD Projects Pre-Commissioning, Piping 2015 Completed
(PHASE II) RFPC TECHNIP Installation, Mechanical Work 2015 Completed
GEOPRODUCTION and Civil Structure
2015 Completed
(M) SDN BHD
2016 Completed
15 Water Pipe for SAFRAN, Supervision, labor, 2016 Completed
Condensate Coil MESSIERBUGATTI transportation, tools and 2016 Completed
Cleaning consumables and equipment. 2016 Completed
DOWTY Service Test
HA-MBD Projects
16 (PHASE II) TECHNIP Skid Installation and piping
GEOPRODUCTION connection
Recycler Skid
602U2 (M) SDN BHD RGT2 - Pengerang Pipeline -
Station Civil Work (SR500,
17 Pengerang PBJV GROUP SR501,ML502,ML503,ML504,
Pipeline ML505,
Regasification, PBJV GROUP TOV511A,TOV511B and
PCC RGT2 TOV512)
Cutting soil, excavate for
18 Pengerang earth including hard materials
Pipeline and fill to designated
Regasification, proposed level
PCC RGT2
SAFRAN, MESSIER Single Tied Expansion Joint
19 HA-MBD Projects BUGATTI DOWTY
(PHASE II) Civil Detail Engineering
TECHNIP Service For New Transformer
20 HA-MBD Projects GEOPRODUCTION and Switchgear Building
(PHASE II)
(M) SDN BHD HA-MBD PHASE II
21 HA-MBD Projects (Mechanical, Piping, Painting
(PHASE II) TECHNIP & Insulation Package)
GEOPRODUCTION
22 HA-MBD Projects CNC : Final Machining #2 Cell
(PHASE II) (M) SDN BHD Installation Works
TECHNIP

GEOPRODUCTION
(M) SDN BHD

Pengerang Provision of construction of 2 2016 Completed
23 Pipeline Nos of Hardstands, Access
PBJV GROUP Road and Ancillary Works;
Regasification, and
PCC RGT2 For River Crossings at Sungai
Layau and Sungai Lebam for
Pengerang Gas Pipeline (PGP)
Project.

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

No Project Client Scope of Work Period Status
2017 Completed
24 Maintenance SAFRAN, MESSIER Supply Of Expansion Joints 2017 Completed
BUGATTI DOWTY
2017 Completed
25 Pipe Sleeper And BINA PURI SDN. BHD. Pipe Sleeper And Under 2017 Completed
Under Ground Ground Services Package-22
2017 Completed
Services Package- At Rapid Project (Civil &
22 At Rapid Pipeline) 2017 Completed
2017 Completed
Project 2017 Completed

Rgt2 - Pengerang Pipeline - 2017 Completed

Prolongation And PBJV GROUP Station Civil Work (Sr500, 2017 Completed
Remobilisation Sr501,Ml502,Ml503,Ml504,Ml 2017 Completed
2018 Completed
26 505,
Codt For Civil And Tov511a,Tov511b And
Structural Works Tov512) – For Period Of Mid

Jan 2017 Until May 2017

27 Maintenance SAFRAN, MESSIER Supply Of Expansion Joints
BUGATTI DOWTY

- Installation Of Cleam-Out

Points For Pipes F601 Until

Piping SAFRAN, MESSIER F606
28 Modification BUGATTI DOWTY - Installation Of Isolation
Valves For F601 & F602
Work - Reinstallation Of Pipeline

Insulation On Vt Lines For

F601 & F602

29 Maintenance SAFRAN, MESSIER Supply Of Material
BUGATTI DOWTY

Modification SAFRAN, MESSIER Installation Of Trunnion
30 Work BUGATTI DOWTY Support

31 GBEST PROJECT TRANSWATER API SDN. MECHANICAL FABRICATION AND
BHD. INSTALLATION WORKS INCLUSIVE

STEEL STRUCTURE

- REPAIR OF EXISTING

DRAINAGE

- REPAIR BATTERY ROOM DOOR

32 EPCC OF KLUANG TRANSWATER API SDN. - TOUCH-UP OF EXTERNAL
CITY GATE BHD. CONTROL BUILDING WALL
UPGRADING
- CONSTRUCT OF NEW ACCESS
ROAD

- HACKING AND REMOVING OF

EXISTING SUPPORT

FOUNDATION AND SLAB

Flame Arrestor PETRONAS GAS - Installation of Flame Arrestor
33 Instalation at BERHAD

Segamat RO

Export Terminal PETRONAS GAS - Civil works
Scrapper Station BERHAD - Upgrading works
34 Project (NETSS) -
Remaining and
Upgrading Work

35 Utilities Installation SAFRAN, MESSIER -Installation of paint booth
RFPC BUGATTI DOWTY -supply electrical material

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

No Project Client Scope of Work Period Status
2018 Ongoing
EPCC OF TEBONG PETRONAS GAS - Underground Utilities
CITY GATE STATION BERHAD Detection, Line Tracing, 2018 Ongoing
36 UPGRADING trial holes for existing
PROJECT (TURBO) utilities/pipeline. 2018 Completed

EPCC OF TELOK PETRONAS GAS - Dismantling ,
37 GONG LOOP BERHAD Packaging, transporting
& relocating of existing
PIPELINE (TUAH) facilities.

REMAINING WORKS PETRONAS GAS - Hot Tap Station
FOR PENGERANG BERHAD - Scraper Launcher

38 GAS PIPELINE Station
PROJECT (REINITE) - Install a new NPS 28 gas
– PACKAGE A
pipeline (Telok Gong
Loop Pipeline)
approximately 22km
from Taboh Naning to
Kuala Sungai Bar u
Melaka.
- Block Valve Station
- Take Off Stations
- Scraper
Receiver/Metering
Station
- Fabrication, supply and
installation of Aerial
Marker and ROW
warning Signanges.
- Supply & Install Drop
Gate
- Supply & Install Drop
Gate

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

Experience with the following list of Client’s
Customers

AXIANERGY (M) SDN. BHD CORPORATE PROFILE

HEAD OFFICE - HQ

NO 18 & 18-1, PERSIARAN METRO SENDAYAN 1,

SENDAYAN METRO PARK

BANDAR SRI SENDAYAN

71950 SEREMBAN, NEGERI SEMBILAN

MALAYSIA

Phone : 06 – 7922154 / 06 – 7922451

Website : www.axianergy.my

Email : [email protected]

FABRICATION YARD – LUKUT HQ OFFICE @ SEREMBAN, NEGERI SEMBILAN

LOT 3426 KG KECIL KUALA LUKUT
BATU 3 ½ JALAN SEREMBAN,
71010 PORT DICKSON, NEGERI SEMBILAN
MALAYSIA

AXIANERGY (M) SDN. BHD CORPORATE PROFILE


Click to View FlipBook Version