The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.

Tapering Design of Road Diversion-ssm 02 MONTHLY MEETING_rev0

Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by TMO, 2022-05-31 00:34:18

Tapering Design of Road Diversion-ssm 02 MONTHLY MEETING_rev0

Tapering Design of Road Diversion-ssm 02 MONTHLY MEETING_rev0

DEVELOPMENT & UPGRADING OF THE PROPOSED
PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK

SEMATAN TO SG MOYAN BRIDGE + KSR INTERCHANGES
SSM 02

TRAFFIC MANAGEMENT

(Tapering Design of Road Diversion)

Project Delivery Partner for SAMLING RESOURCES SDN BHD
Pan Borneo Highway Sarawak

1

DEVELOPMENT & UPGRADING OF THE PROPOSED PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK

DIVERSION TMP ( TAPPER GUIDELINES) – REAM Table 5.3

FORMULAS FOR TAPER LENGTH FORMULA

POSTED SPEED L= WS2
70KM/H or Under 155

Where, For Posted Speed 30 KM/J For Posted Speed 50 KM/J
L = Taper Length
W= Width Lane or offset (3.5m + 3.5m) L = (7m) x (30km/h)2 L = (7m) x (50km/h)2
S = Posted Speed. 155 155

= 40.6 Meters = 112.9 Meters
= 40 Meters = 100 Meters

Page 1/3

DIVERSION TMP ( TAPPER GUIDELINES) – REAM Table 5.3

100 METERS 50 METERS VARIOUS

SAMPLE OF TYPICAL TMP - DIVERSION

VARIOUS 20 METERS 40 METERS

THANK YOU FOR KIND ATTENTION


Click to View FlipBook Version