DEVELOPMENT & UPGRADING OF THE PROPOSED
PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK
SEMATAN TO SG MOYAN BRIDGE + KSR INTERCHANGES
SSM 02
TRAFFIC MANAGEMENT
(Tapering Design of Road Diversion)
Project Delivery Partner for SAMLING RESOURCES SDN BHD
Pan Borneo Highway Sarawak
1
DEVELOPMENT & UPGRADING OF THE PROPOSED PAN BORNEO HIGHWAY IN THE STATE OF SARAWAK
DIVERSION TMP ( TAPPER GUIDELINES) – REAM Table 5.3
FORMULAS FOR TAPER LENGTH FORMULA
POSTED SPEED L= WS2
70KM/H or Under 155
Where, For Posted Speed 30 KM/J For Posted Speed 50 KM/J
L = Taper Length
W= Width Lane or offset (3.5m + 3.5m) L = (7m) x (30km/h)2 L = (7m) x (50km/h)2
S = Posted Speed. 155 155
= 40.6 Meters = 112.9 Meters
= 40 Meters = 100 Meters
Page 1/3
DIVERSION TMP ( TAPPER GUIDELINES) – REAM Table 5.3
100 METERS 50 METERS VARIOUS
SAMPLE OF TYPICAL TMP - DIVERSION
VARIOUS 20 METERS 40 METERS
THANK YOU FOR KIND ATTENTION