port as of October 5, 2020
Construction Construction Proposed Aggregate Asphalt Bar Imported Portland Roadway Structural Structural
Allocation Funds Advertise Date Base Concrete Reinforcing Borrow Cement Excavation Concrete Steel
Date (CY) Steel (lbs) Concrete (lbs)
Allocated? (tons) (CY) (CY) (CY)
(CY) 21467
09/15/2020 Yes 11/25/2020 13200 5540 987852 12000 19400 3822
2990
05/18/2017 Yes 10/22/2020
06/30/2020 Yes 10/21/2020 20800 300 61100 63800
03/30/2021 No 07/23/2021
210 665 631271 2920 210 2730
08/16/2021 No 08/16/2021 605 3 178215 501 195251
488 2750
01/15/2021 No 03/15/2021 340 31 510 273
57
06/14/2021 No 09/17/2021 531.6 650 4800
2250
03/31/2021 No 06/14/2021
06/25/2019 Yes 01/15/2021
04/29/2021 No 07/20/2021
06/30/2021 No 08/26/2021
03/30/2021 No 05/27/2021
02/26/2021 No 07/02/2021
02/26/2021 No 06/04/2021
04/09/2021 No 09/24/2021
02/26/2021 No 07/01/2021
04/23/2021 No 09/24/2021 242 568
03/31/2021 No 06/24/2021 27820
12/31/2020 No 03/15/2021 50 95 1388 0 0 120 33 0
06/15/2021 No 08/30/2021
03/31/2021 No 06/24/2021 8330
03/26/2021 No 06/15/2021
05/14/2021 No 09/29/2021 9700
2
03/31/2021 No 06/24/2021
02/26/2021 No 06/02/2021
03/30/2021 No 08/24/2021
10/15/2020 No 01/29/2021 40 7.9 170
11/16/2020 No 03/08/2021
8 of 13
12-Month Look-Ahead Rep
Project ID Dist EA County Route Work Description Bkpm Ahpm Roadway Bridge Capital Ready to List Ready to List C
2.1 18.31 Capital Estimate Finish Date % Complete
Estimate
0716000121 07 32720 LA 010 Upgrade the existing $17,264,000 $0 12/31/2018 100
Transportation Management
System elements to fiber optic
digital communication system
0716000126 07 32730 LA 103 CONSTRUCT LARGER PUMP 0.1 0.1 $22,593,000 $0 02/05/2020 100
PLANT FACILITY INCLUDING
REPLACING UNDERSIZED PUMPS
0716000132 07 32760 LA 039 Upgrade guardrail and end 32.2 38.4 $4,125,000 $0 10/31/2019 100
treatments to current standards.
0716000180 07 32860 LA 105 Remove and install a new type of 14.65 16.39 $1,340,000 $0 10/11/2019 100
joint assemblies at joint locations
of the central cell with drain
0716000183 07 32880 LA 005 REPLACE OFFICE STRUCTURE AND 54.4 54.8 $348,000 $1,014,000 10/14/2019 100
INSPECTION ENCLOSURE.
0716000206 07 32980 LA 110 OVERHEAD GUIDE SIGNS & 0 31.9 $5,365,000 $0 06/29/2020 100
0716000217 07 33070 LIGHTING REHABILITATION 15.6 17.4 $4,190,000 $0 10/31/2019 100
LA 210 Restore existing irrigation to
functionality, upgrade booster
pump and remaining older
irrigation controllers to web
connect smart controllers.
0716000220 07 33100 VEN 101 WEIGH STATION PAVEMENT AND 9 9.2 $2,008,000 $0 06/29/2016 100
STRUCTURE IMPROVEMENT
0716000225 07 33110 VEN 101 Upgrade MBGR and End 0.9 39.18 $10,171,000 $0 03/30/2020 100
0716000270 Treatments 26.4 79.8 $17,834,000 $0 06/19/2019 100
0716000287 07 33250 LA 12.4 14.9 $23,023,000 $0 05/14/2019 100
07 33260 LA 002 Install and upgrade MBGR
0716000301 010 Replace raised island with 0.8 0.8 $2,739,000 $0 06/27/2019 100
07 33320 LA
0716000346 concrete barrier and install high 0.74 8.8 $1,373,000 $0 01/29/2019 100
0716000363 07 33500 LA mast LED lighting system 42.3 48.3 $3,627,000 $0 10/11/2019 100
07 33530 LA 005 INSTALL PILOT SOLAR ENERGY
SYSTEM ON ROADWAY TO
PROVIDE ELECTRIC POWER TO
SRRA.
110 INSTALL DETECTION SYSTEM
010 UPGRADE GUIDE SIGNS TO
REFLECTIVE PANELS & REPLACE
OVERHEAD LIGHTING
0717000108 07 33900 VEN 101 Upgrade MBGR and End 0 38.9 $11,556,000 $0 03/30/2020 100
0717000277 100
0718000008 Treatment. 100
0718000042 100
0718000205 07 34240 LA VAR Roof Repair 0 0 $2,510,000 $0 06/29/2017 100
0718000343
0719000068 07 34320 LA 405 REMOVE DEBRIS, REPLACE SLOPE 48 48.54 $14,357,000 $0 02/05/2020 0
0719000097 100
PROTECTION 100
0719000225
07 34400 LA VAR LA-D7 Office Building Boilers 0 0 $2,000,000 $0 10/25/2017 0
Replacement
07 35180 LA 005 Upgrade Traffic Signals and curb 17.936 18.036 $1,312,000 $0 04/03/2020
ramps
07 35460 LA 091 ADD ONE EASTBOUND AUXILIARY 11.8 13.2 $70,000,000 $0 12/31/2020
LANE
07 21062 LA 071 UPGRADE FROM EXPRESSWAY TO 1.6 4.8 $91,697,000 $28,303,000 05/31/2013
FREEWAY
07 35770 LA 210 UC & RTE 134 FR. 0.08 MILE E.OF 25.4 32.2 $25,271,000 $0 05/22/2013
LEDGE AVE UC TO 0.05 MILE
W.OF FORMAN AVE UC,
CONSTRUCT SOUND WALLS
07 35960 LA 001 INSTALL PROTECTED LEFT TURN, 18.871 19.941 $2,487,000 $0 10/23/2020
MODIFY EXISTING TRAFFIC
CONTROL SIGNAL, AND ADA
0812000076 08 0R420 SBD VAR BUILD MAINTENANCE FACILITY $9,319,000 $14,090,000 09/12/2019 100
100
ADJACENT TO SOUTHERN
REGIONAL LAB.
0812000343 08 1C680 RIV 074 BRIDGE RAIL REPLACEMENT, 13.2 34 $3,703,000 $3,466,000 06/28/2019
REPLACE 1 BRIDGE AND EXTEND
ONE CULVERT
Page 9
port as of October 5, 2020
Construction Construction Proposed Aggregate Asphalt Bar Imported Portland Roadway Structural Structural
Allocation Funds Advertise Date Base Concrete Reinforcing Borrow Cement Excavation Concrete Steel
Date (CY) Steel (lbs) Concrete (lbs)
Allocated? (tons) (CY) (CY) (CY)
(CY)
10/21/2020 No 02/26/2021 450 370 4690 570
02/16/2021 No 07/11/2021
03/30/2021 No 08/13/2021 110
12/01/2020 No 03/05/2021 1162
02/26/2021 No 06/18/2021
03/18/2021 No 06/18/2021 0 0 0 0 0 0 0 0
02/25/2021 No 06/21/2021 53
03/30/2021 No 07/22/2021 980 706 3000 56 9060
6600 4060 18900
06/10/2021 No 09/16/2021
03/15/2021 No 08/13/2021 12 26
06/29/2020 Yes 11/13/2020
03/26/2021 No 07/16/2021
12/04/2020 No 04/23/2021 13 110
12/15/2020 No 04/30/2021
06/10/2021 No 09/16/2021 53100 14800 2150451 73600 2630 148000 8125 107511
02/28/2020 Yes 10/07/2020 3 202700 88400 1420 8031
03/18/2021 No 07/02/2021
12/20/2019 Yes 01/22/2021
03/30/2021 No 08/10/2021
08/16/2021 No 09/30/2021
03/26/2020 Yes 10/27/2020
12/31/2020 No 03/25/2021
01/15/2021 No 07/01/2021 4 11
01/31/2020 Yes 10/02/2020 2417 3094 0 0 0000
Yes 10/19/2020 320 1080 128181 500 0 562 891 190
06/11/2020
9 of 13
12-Month Look-Ahead Rep
Project ID Dist EA County Route Work Description Bkpm Ahpm Roadway Bridge Capital Ready to List Ready to List C
97 99.5 Capital Estimate Finish Date % Complete
Estimate
0813000140 08 1E060 SBD 018 WIDEN ROADBED & CONSTRUCT $6,477,000 $0 11/30/2018 100
RAISED MEDIAN CURB
0814000257 08 1F600 RIV 079 CONSTRUCT AND UPGRADE 25.65 26.4 $1,796,000 $0 04/09/2018 100
EXISTING PEDESTRIAN FACILITIES
TO CURRENT ADA STANDARDS
0815000034 08 1F730 SBD 215 REPLACE OVERCROSSING 2.4 3 $8,559,000 $13,437,000 04/18/2018 100
0815000200 08 0R141 SBD 040 REGRADE MEDIAN CROSS SLOPE 0
100 125 $21,150,000 $0 11/25/2020
0815000244 08 0K122 SBD 015 REHABILITATE EXISTING 28.6 37.5 $146,953,000 $1,304,000 05/17/2018 100
MAINLINE AND RAMP PAVEMENT
0816000020 08 1G520 SBD 018 COLD PLANE PAVEMENT & PLACE 100.9 115.9 $16,655,000 $0 10/31/2019 100
HMA & RHMA CONCRETE
0816000035 08 1G550 SBD 040 REPLACE THE EXISTING WIM 28.9 0 $1,750,000 $0 09/30/2019 100
0816000060 WITH A NEW SYSTEM TO MEET 100
0816000087 100
0816000186 CURRENT ASTM 1318 100
STANDARDS
08 1G740 SBD 015 RECONSTRUCT ERODED EARTHEN 110 110 $1,530,000 $0 06/17/2019
DIKE
08 1C082 RIV 010 REHABILITATE MAINLINE 105 134 $271,272,000 $37,756,000 11/15/2019
PAVEMENT, SHOULDERS AND
RAMPS
08 47642 SBD 215 INSTALL TMS FIELD ELEMENTS 4 17.8 $8,713,000 $0 02/28/2019
(8.4 MI FOC BACKBONE SYSTEM, 2
CCTV, 2 CMS, 4 DNC, UPGR 12
CCTV & 8 WVDS & CONNECTING
FOC TO EXISTING TMS ELEMENTS)
0817000075 08 0E33U SBD 060 ADD WB AUX LANE, ADD EB 7.3 10 $28,478,000 $4,353,000 05/14/2019 100
0817000139 DECELERATION LANE, WIDEN I-15 100
S-W CONNECTOR, WIDEN RAMPS 0 2.3 $5,890,000 $0 08/19/2020
& BRIDGES
08 1H830 SBD 138 WIDEN ROADWAY TO PROVIDE
UP TO 4 FOOT MEDIAN, WIDEN
SHOULDERS AND CONSTRUCT
RUMBLE STRIPS
0817000182 08 1J020 RIV 074 INSTALL HORIZONTAL DRAINAGE 48.8 49.2 $2,640,000 $0 11/27/2019 100
0817000237 SYSTEM & REPAIR CLOGGED $0 05/05/2020 100
0817000240 $0 06/03/2020 100
DRAINAGE
0818000117 $0 10/15/2020 0
0819000045 08 1J200 SBD 015 EXTEND DECELERATION LANE AT 21.5 22 $4,074,000 $0 06/10/2020 100
RTE 15 SB OFF-RAMP
08 1J210 SBD 060 IMPROVE FREIGHT CORRIDOR 1.4 1.4 $8,526,000
MOVEMENT BY REMOVING
VERTICAL CLEARANCE
CONSTRAINT
08 1J810 SBD 015 INSTALL MEDIAN BARRIER 174.3 175.7 $1,967,000
08 1K460 RIV 215 CONSTRUCT SOUTHBOUND AND 36.6 37.2 $5,635,000
NORTHBOUND AUXILIARY LANES
0819000102 08 1K780 SBD 259 CONSTRUCT MEDIAN BARRIER, 1.1 1.2 $533,000 $0 10/07/2020 0
MILL AND OVERLAY INSIDE
SHOULDER, REPLACE PAVEMENT
STRIPES, MARKERS, IRRIGATION &
PLANTING
0820000011 08 1L290 SBD 062 RE-STRIPE EXISTING TWO WAY 15.1 28.9 $1,226,000 $0 01/04/2021 0
0820000042 0
0900000030 LEFT TURN LANES AND INSTALL 100
GROUND-IN RUMBLE STRIPS AT
VAR LOCS
08 1L330 SBD VAR INSTALL RETROREFLECTIVE 0 0 $1,917,000 $0 01/04/2021
MARKERS AND UPGRADE
PAVEMENT DELINEATION AT 42
RAMPS
09 21340 INY 395 CONSTRUCT 4 LANE EXPRESSWAY 29.2 41.8 $80,978,000 $3,014,000 06/27/2017
0916000008 09 36660 MNO 395 Improve most frequently used 0 0 $3,560,000 $0 10/28/2019 100
0917000001 09 36770 VAR chain control turnouts 0 0 $2,831,000 $0 10/28/2019 100
VAR Remove and replace end
treatments, guardrail, and
delineators.
Page 10
port as of October 5, 2020
Construction Construction Proposed Aggregate Asphalt Bar Imported Portland Roadway Structural Structural
Allocation Funds Advertise Date Base Concrete Reinforcing Borrow Cement Excavation Concrete Steel
Date (CY) Steel (lbs) Concrete (lbs)
Allocated? (tons) (CY) (CY) (CY)
(CY) 2350
06/08/2020 Yes 10/23/2020 4490 8800 20100 11000 174
189
06/01/2020 Yes 11/02/2020 410 410 0 0 745 530 0 0
06/02/2020 Yes 10/15/2020 3050 11800 712360 5200 213000 8420 2461 1588
06/03/2021 No 10/01/2021 85000 247000 360 0 439000 380 35800
06/12/2020 Yes 11/05/2020
280 440 0 0 780 1600 00
05/03/2021 No 09/01/2021
10/01/2020 No 02/12/2021
06/05/2020 Yes 10/05/2020 0 0 1600 19930 0 7220 13 0
06/11/2020 Yes 10/22/2020 195000 571000 2078420 1400000 4550 277000 3191 19826
05/04/2020 Yes 10/01/2020 50 73 0 0 0 150 0 0
06/09/2020 Yes 02/08/2021 3300 21900 125752 10000 10800 38200 277 3420
06/01/2021 00
No 08/11/2021 5612 5949 0 0 0 14797
03/01/2021 No 07/01/2021 300 600 30000 0 56 9000 00
52
06/01/2021 No 08/23/2021 10885 131 00
06/01/2021
No 09/21/2021 841 980 517284 0 6578 15657 14 1323
04/06/2021
06/01/2021 No 08/02/2021 6162 5982 13500
No 08/23/2021
05/03/2021
No 08/06/2021
06/02/2021 No 08/03/2021
06/01/2021 No 09/01/2021
06/30/2020 Yes 06/16/2021 174000 213000 190699 15 1340000 607 5408
01/22/2021 No 04/22/2021 1630 1590 0 0 0 4370 00
10/08/2020 No 01/05/2021 0 0 0 0 39 00
0 of 13
12-Month Look-Ahead Rep
Project ID Dist EA County Route Work Description Bkpm Ahpm Roadway Bridge Capital Ready to List Ready to List C
Capital Estimate Finish Date % Complete
1013000009 10 Estimate
1013000244 10
1013000251 10 0X750 ALP 004 UPGRADE BRIDGE RAILINGS 26.15 26.15 $3,902,000 $3,521,000 01/15/2019 100
1013000260 10 0Y600 MPA 140 INSTALL CROSSWALKS AND IN- 21.2 22.8 $2,519,000 $0 05/18/2018 100
1013000266 10
0P540 SJ ROADWAY WARNING LIGHTS 6.2 6.6 $2,700,000 $6,000,000 10/10/2017 100
1014000098 10 0S740 SJ 005 BRIDGE REHABILITATION 13.7 14 $4,222,000 $0 12/14/2018 100
1014000099 10 088 REPLACE DETERIORATED
1014000100 10 46210 TUO 18.9 38.8 $18,100,000 $0 11/13/2019 100
1014000182 10 CULVERTS
1015000037 10 1C200 SJ 108 Near Long Barn, from 0.1 mile 0 5 $2,400,000 $0 10/03/2018 100
1015000038 10 0S750 ALP 0 4.75 $3,850,000 $0 08/30/2018 100
1016000017 10 0S680 ALP east of the east junction of Long 19.48 31.11 $4,400,000 $0 08/30/2018 100
1016000032 10 0Y340 MPA Barn Road to 2.3 miles east of 32.2 32.2 $2,750,000 $0 07/29/2016 100
1C800 Cow Creek Road. Pavement 0 $1,858,000 $3,911,000 08/22/2018 100
SJ rehabilitation. 0
1C810 004 CULVERT REHABILITATION 0 $950,000 $1,327,000 08/22/2018 100
MER 088 CULVERT REHABILITATION 0
1E620 004 CULVERT REHABILITATION 0 $6,440,000 $0 06/28/2019 100
STA 140 SLOPE REPAIR 0
1F170 004 BRIDGE PREVENTIVE 1.11 $11,865,000 $0 06/17/2019 100
SJ MAINTENANCE 1.11
005 BRIDGE PREVENTIVE
MAINTENANCE
099 Replace Drainage Pumps at
Various Locations
026 Increase Bridge Vertical Clearance
1016000046 10 1C790 MER 005 Replace Safety Roadside Rest 0.5 0.8 $9,333,000 $14,544,000 02/06/2019 100
1016000136 10 1C360 AMA Area (SRRA) 100
7.8 65.9 $3,374,000 $172,000 07/07/2020
1016000139 088 Upgrade existing metal beam 100
1017000015 10 1F460 SJ guard rails to midwest guardrail 4.2 4.8 $6,065,000 $807,000 12/03/2018 100
10 1C760 SJ system 14.4 29.4 $2,112,000 $0 12/19/2019
004 SJ Middle River bridge roadway
realignment
099 Provide roadside safety
improvements to reduce the
frequency and duration of
maintenance activities, thus
reducing maintenance personnel
exposure to traffic.
1017000021 10 1C960 SJ 120 Upgrade existing communication 0.6 6.1 $4,700,000 $0 09/21/2018 100
infrastructure between field
elements and the District 10
Traffic Management Center.
1017000024 10 1F760 SJ 012 Replace Bridge Bearing Pads 4.44 4.44 $1,810,000 $1,883,000 07/30/2020 100
1017000043 10 1C370 MER 152 COLLISION REDUCTION 26.3 40.65 $2,582,000 $0 09/19/2019 100
1017000074 10 1G990 120 Repair existing Traffic Monitoring 15.7 33 $2,310,000 $0 05/22/2019 100
SJ
Stations (TMS) at various
locations in District 10.
1018000101 10 1J300 MER 152 INTERSECTION CONTROL 21 21 $1,656,000 $0 03/15/2019 100
1112000143 11 41140 SD IMPROVEMENT 9.6 13.2 $4,263,000 $0 06/26/2019 100
1112000144 11 41150 SD 20.7 23.5 $7,356,000 $0 05/16/2019 100
125 ROADSIDE SAFETY
IMPROVEMENTS.
805 RELOCATE APPURTENANCES;
ADD SLOPE/GORE PAVING;MVP;
GATES/FENCING
1112000155 11 41180 SD 052 Construct Maintenance MVPs, 0.4 5.49 $3,724,000 $0 09/13/2019 100
pave slopes under bridge
structures, pave narrow areas,
upgrade irrigation controllers,
replace signs, and pave beyond
gores.
1112000157 11 41190 SD 056 ROADSIDE WORKER SAFETY 0.3 9.7 $2,007,000 $0 05/29/2020 100
1112000160 11 41220 SD 094 ROADSIDE WORKER SAFETY 4.4 7.3 $2,698,000 $0 10/31/2019 100
1115000173 11 42200 SD 008 STORMWATER MITIGATION/ 48.3 48.3 $1,533,000 $0 06/30/2020 100
1115000178 11 42210 DETENTION BASINS 23 61.3 $8,985,000 $0 06/28/2019 100
1116000045 11 26410 SD 008 CULVERT REHABILITATION 100
1116000059 11 42370 SD 008 BRIDGE RAIL UPGRADE. 2.2 2.2 $2,131,000 $426,000 12/23/2019 100
SD 008 PAVEMENT REHABILITATION
31.8 41.7 $41,200,000 $2,568,000 05/01/2019
Page 11
port as of October 5, 2020
Construction Construction Proposed Aggregate Asphalt Bar Imported Portland Roadway Structural Structural
Allocation Funds Advertise Date Base Concrete Reinforcing Borrow Cement Excavation Concrete Steel
Date (CY) Steel (lbs) Concrete (lbs)
Allocated? (tons) (CY) (CY) (CY)
(CY) 236
06/29/2020 Yes 11/16/2020 170 780 31074 100 680 258 3422
12/23/2019 Yes 11/03/2020 490 26 4014 190 790 53
08/31/2020 No 11/13/2020 3010 2220 83414 0 0 5410 8.5 0
01/18/2021 No 04/22/2021 620 1050 4780 4596
02/01/2021 No 04/15/2021 73350 12 480
06/22/2020 Yes 11/13/2020 7 280 0 0 07 0 2148
06/11/2020 Yes 10/01/2020 160 250 3912 870 0 950 21 953
06/12/2020 Yes 12/01/2020 170 99 2826 00
05/14/2021 No 09/10/2021 160 0 0 472
06/29/2020 Yes 11/09/2020 0 00 5 16
20 0
12/18/2020 No 05/03/2021 0 91 597400
2690 2500 104444 2500 125 0 1200
09/09/2020 No 01/11/2021 3530 0 107400 2546 16000
1970 650 0 478
03/30/2021 No 06/14/2021 430 5 5630
0 1900
02/18/2021 No 06/14/2021 4150
04/15/2021 No 07/15/2021
01/29/2021 No 05/17/2021
10/15/2020 No 01/22/2021
06/07/2021 No 09/13/2021 0 0 0 000 00
05/31/2021 No 09/16/2021 35 100 0 80
10/01/2020 No 02/10/2021 0 65 140 6
01/05/2021 No 04/21/2021 00
800
10/13/2020 No 12/01/2020 48 700 0 1820
01/22/2021 0 0 790
05/07/2021 No 03/05/2021 270 180 10400
12/11/2020 No 07/22/2021 240 470
No 03/04/2021 620 420 0
07/16/2021 No 09/23/2021 41 57 0 0 400 491 484
09/11/2020 Yes 01/20/2021 420 680 36300 240
06/18/2021 No 09/03/2021 1500 573
16100 30 9168 40 500 38 42415
04/16/2021 No 07/23/2021 50 3180000 0 25700 9000
05/07/2021 No 07/02/2021 20700
06/30/2021 No 09/14/2021
1 of 13
12-Month Look-Ahead Rep
Project ID Dist EA County Route Work Description Bkpm Ahpm Roadway Bridge Capital Ready to List Ready to List C
1116000061 11 Capital Estimate Finish Date % Complete
Estimate
42380 SD 125 REHABILITATE PAVEMENT BY 12.9 22.3 $33,225,000 $960,000 02/06/2020 100
GRINDING AND REPLACING
CONCRETE SLABS AND COLD
PLANE AND OVERLAY SHOULDERS
WITH RUBBERIZED HOT MIX
ASPHALT (RHMA-G)
1116000075 11 42460 SD VAR GRADING IMPROVEMENTS, 0 0 $4,552,000 $0 04/24/2020 100
1116000076 11 42470 UPGRADE GUARDRAIL, AND END 0 0 $2,660,000 $0 09/19/2018 100
1116000077 11 42510 TREATMENTS. 2.6 11.1 $1,811,000 $0 03/30/2020 100
1116000125 11 42650 30 34.3 $4,190,000 $0 09/30/2019 100
SD VAR UPGRADE END TREATMENTS AND
INSTALL SHOULDER RUMBLE
STRIPS.
SD 094 INSTALL AND/OR UPGRADE
EXISTING CURB RAMPS.
SD 005 CONSTRUCT RUMBLE STRIPS ON
BOTH SHOULDERS, REHABILITATE
BIKE PATH, AND INSTALL FIBER
OPTIC CABLE/CLOSED CIRCUIT
TELEVISION (CCTV).
1116000177 11 42750 SD VAR INSTALL FIBER OPTIC LINE. 0 0 $26,683,000 $0 10/15/2018 100
1117000037 11 42870 5.1 $4,097,000 $0 05/07/2020 100
SD 805 CONVERSION FROM POTABLE 3.4
1117000038 11 42880 100
WATER TO RECYCLED WATER FOR
1117000087 11 05637 100
1117000116 11 43001 ROADSIDE LANDSCAPE 100
IRRIGATION.
SD 805 CONVERSION FROM POTABLE 0.6 3.3 $6,987,000 $0 12/05/2019
WATER TO RECYCLED WATER FOR
ROADSIDE LANDSCAPE
IRRIGATION.
SD 011 CONSTRUCT INTERCHANGE AT 2.2 2.7 $15,624,000 $9,143,000 04/02/2012
70 $5,798,000 $0 02/10/2020
SIEMPRE VIVA ROAD
SD 005 INSTALL HIGH TENSION CABLE 55.6
BARRIER (HTCB) ON SHOULDER
1118000008 11 43021 SD 075 RELINQUISH ROUTES TO LOCAL 11.2 20.7 $20,300,000 $0 05/28/2021 0
1118000115 AGENCY 100
1118000262 100
1119000015 11 43039 SD 805 CONSTRUCT AUXILIARY LANES 24 25 $28,500,000 $0 01/13/2011 100
96.81 96.81 $728,000 $3,435,000 06/30/2020
11 43049 IMP 008 BRIDGE PRESERVATION 24.4 01/29/2020
6 $24,126,000 $0
11 43056 SD 067 RUBBERIZED HOT MIX ASPHALT
(RHMA) OVERLAY WITH STRESS
ABSORBING MEMBRANE
INTERLAYER (SAMI).
1119000022 11 2E154 SD 005 TO LOWER EXISTING ELEVATIONS 34.7 36.3 $45,000,000 $0 11/16/2018 100
AT THE SAN DIEGUITO LAGOON
(W-19) RESTORATION SITE.
1119000026 11 43060 SD 008 PLACE HIGH FRICTION SURFACE 5.6 5.6 $1,495,000 $0 05/29/2020 100
1119000066 11 43067 TREATMENT 0.3 5 $11,990,000 $0 02/06/2020 100
SD 005 CONVERT POTABLE IRRIGATION
SYSTEM TO RECYCLED WATER,
REPLACE DETERIORATED WATER.
1119000177 11 4116U SD 008 MVP PULLOUTS BEYOND GORE 13.4 20.4 $5,356,000 $0 05/03/2019 100
AREAS, RELOCATE IRRIG
CONTROL AND MODIFY EXISTING
RAMP METERING SYSTEM
1200020328 12 0J340 ORA 055 Increase Capacity & Improve Ops. 6.2 10.3 $144,677,000 $9,377,000 09/11/2017 100
1212000053 12 0H047 ORA 241 NB/SB Resurfacing including 24.5 39 $16,827,000 $0 09/14/2018 100
On/Off Ramps.
1213000097 12 0N060 ORA 3.2 3.6 $5,412,000 $0 09/01/2017 100
133 Widen Roadway To Improve
1215000045 12 0G950 ORA Channelization 8 9.2 $11,189,000 $1,911,000 09/11/2017 100
1215000158 12 0P660 ORA 100
1216000003 12 0P690 ORA 055 Construct Auxiliary lane. 12.2 13.3 $1,700,000 $0 07/01/2019 100
001 Stabilize Bioswales.
1216000046 12 0P900 ORA 001 Upgrade ADA in NB and SB of SR- 5.5 7.9 $5,447,000 $0 03/20/2019 100
1 34.5 36.8 $2,000,000 $0 08/06/2019
005 Relocate facilities away from
traffic, construct roadside paving,
access gates and trails.
Page 12
port as of October 5, 2020
Construction Construction Proposed Aggregate Asphalt Bar Imported Portland Roadway Structural Structural
Allocation Funds Advertise Date Base Concrete Reinforcing Borrow Cement Excavation Concrete Steel
Date (CY) Steel (lbs) Concrete (lbs)
Allocated? (tons) (CY) (CY) (CY)
(CY)
08/17/2021 No 09/13/2021
06/30/2020 Yes 11/02/2020 280 230
600 3540
06/19/2020 Yes 11/17/2020 470 310 310
01/22/2021 No 03/25/2021 150
12/14/2020 No 02/10/2021 390
06/24/2020 Yes 12/07/2020 590 280 510
03/26/2021 No 05/06/2021
12/11/2020 No 02/22/2021 15 290 3340
04/15/2020 Yes 11/09/2020 10200 4590 714000 244000 2510 16547
11/16/2020 No 02/22/2021 980 270
08/12/2021 No 09/24/2021 3050 98900 190 9800 319 5706
04/09/2021 No 09/30/2021 3220 3670
04/09/2021 No 09/03/2021
12/11/2020 No 01/07/2021
10/30/2020 No 11/09/2020
05/14/2021 No 07/20/2021
05/28/2021 No 08/13/2021 0 0 0 0 0 400 0 0
10/22/2020 No 12/03/2020 290 340 2169
05/03/2021 No 08/05/2021 50900 205000 794816 7050 344000 7327 127044
05/07/2021 No 07/15/2021 2480 2850 800 0 0 4230 0 0
0 0 0 2 0 2 0 2000
06/17/2020 Yes 11/02/2020
05/03/2021 No 08/23/2021
07/31/2020 Yes 12/01/2020
06/07/2021 No 09/15/2021
09/30/2020 Yes 02/01/2021
2 of 13
12-Month Look-Ahead Rep
Project ID Dist EA County Route Work Description Bkpm Ahpm Roadway Bridge Capital Ready to List Ready to List C
Capital Estimate Finish Date % Complete
Estimate
1216000047 12 0P910 ORA 005 Relocate facilities away from 36.8 38.5 $2,000,000 $0 09/19/2019 100
traffic. Construct roadside paving,
access gates and trails.
1216000059 12 0P940 ORA 133 Widening shoulders for Bikeway 3.3 4.1 $5,662,000 $0 10/01/2018 100
Class III, SCE utilities relocation,
drainage improvements, and
additional lane at El Toro / SR 133
intersection.
1216000124 12 0Q310 ORA 091 Overhead Sign Structure. 1.9 3.4 $3,400,000 $0 10/01/2019 100
1216000133 12 0Q360 ORA 133 Establish a detention basin, 3.2 4.1 $1,874,000 $0 10/02/2018 100
construct trapezoidal concrete
channel along the southbound,
and regrade the flow path to
prevent flooding.
1217000003 12 0Q390 ORA VAR Upgrade to current Seismic 0 0 $14,000,000 $0 04/06/2020 100
1217000080 $0 05/23/2019 100
Standard by strengthening both
bridge substructure and
superstructure components.
12 0Q640 ORA 039 Modify signal, add safety lighting, 9.671 9.671 $743,000
ladder stripes on cross walk,
refresh delineation and ADA if
needed.
1217000082 12 0Q650 ORA 022 Modify signal and lighting, refresh 1.2 1.2 $672,000 $0 09/23/2019 100
striping and pavement markings
1217000104 12 0Q790 ORA 057 Install HFST & refresh pavement 15.6 15.6 $554,000 $0 10/01/2018 100
1217000114 12 0Q830 ORA delineation $0 11/01/2019 100
1218000065 12 0R200 ORA 20.4 23.7 $955,000 $0 12/20/2019 100
001 Upgrade signals and install safety
1218000079 lights 0 2 $25,500,000 $0 06/30/2020 100
1219000090 $0
12 0R340 ORA 005 Slab replacement on inner lanes 12.9 26.8 $3,094,000
12 0S090 ORA and total lane replacement of
truck lanes. 9.19 9.91 $750,000
073 Replace approach slabs and seal
cracks on bridge deck.
091 PEER to construct and upgrade 91
toll system infrastructure
Page 13
port as of October 5, 2020
Construction Construction Proposed Aggregate Asphalt Bar Imported Portland Roadway Structural Structural
Allocation Funds Advertise Date Base Concrete Reinforcing Borrow Cement Excavation Concrete Steel
Date (CY) Steel (lbs) Concrete (lbs)
Allocated? (tons) (CY) (CY) (CY)
(CY) 0
02/01/2021 No 06/08/2021 10 00 0 390 0
0
06/17/2020 Tes 11/02/2020 2560 5670 800 0 0 6270 0 0
10/12/2020 No 11/30/2020 110
06/17/2020 Yes 11/02/2020 0 0 49740 690 0 956 709 0
04/30/2021 No 07/28/2021 4 20
01/04/2021 No 04/01/2021 10
01/29/2021 No 05/24/2021 10 2.35 0 9 41 0 0
1500 0 2900 100
07/23/2020 Yes 11/01/2020 73
12/10/2020 No 03/15/2021 13.5
07/01/2021 No 09/15/2021 8000
04/23/2021 No 07/22/2021 27700 31
10/30/2020 No 11/16/2020
3 of 13
Upcoming Opportunities:
Name ______ Anticipated Construction Start
Kaiser Tenant Improvement - Collaboration Space, Sacramento, CA…...November 2020
Kaiser Tenant Improvement - Family Medicine – Sacramento, CA…………...April 2021
Car Dealership Remodel – Sacramento, CA……………………………………..Jan 2021
Car Dealership Remodel – Roseville, CA……………………………………....June 2021
If you would like to be considered for Construction Services for these opportunities
please send your company’s relevant information, including what scopes of work your
company specializes in, Diversity Status, Union or Non-Union, ability to work on
Prevailing Wage Jobs, contact person to send bid requests to, license number,
demographic area that you can cover to [email protected] so we can get you into
our data base for bid solicitations.
Tim Brown
Pre-Construction Manager
[email protected]
916-276-9841
1450 Halyard Drive 11A
West Sacramento, CA 95691
Event Supporters
Diverse Suppliers are attending this event for free,
thanks to the support of our Event Supporters!
Special Thank You to Headline Sponsor