47

Construction

48

These are the early
working drawings i did
for for the Melville
Koppies project.

49

50

51

52

2nd year work so far

53

Architectural Design

54

Nolly Map URBAN AND SITE

Site Plan/Open Circulation

1731 1730 Urban Co

1737 1736 1735 1734 1733

1742 1741 1740 1739 public
private
1743 density

sub-terranean plan: rifle

range

west block ground floor plan

west block first floor plan programmes

553 public square

offices/squatter rooms
rifle range
art gallery
balcony
double volume

Longitudinal Section

E ANALYSIS: DRILL HALL

Western Elevation

old drill hall roof (before fire) void context

ontext Perspective

urban context legend

pedestrian movement
vehicular movement
surrounding vegetation

uninteractive space
new roof
surrounding urban scale
taxi rank

n

5654

5755

5856

5957

6058

This was a recent project in which we had to design a Pavilion and i designed
mine to be an advocation for agriculture on the site of Constitution Hill.
61 My pavilion is basically a place where diffrent plant based foods from the
diffrent regions of arfrica are grown and unique dish is prepared from those
ingredients which would be served in the pavilion which acts as a platter.

Construction

62

Pedestrian movement
Vehicular movement
Vegetation

6631

During the early 1900s
thesite was used as a mil-
itary fort and primarily as
a prison that was more

Column placement iThe court now operates
under the cocept of ‘Jus-
64 62 tice under a tree’. and
they also demonstrate
the ideas of equality, re-
spect, freedom and
democrcy around the
site.

There are built in
drains on the Afri-
can Steps that col-
lect rainwater
runoff as it runs
down from the
court area.

65

66

67

68

69

Seattle public library

Location: Seattle, Washing- Historical Timeline of the library
ton, USA
Architects: OMA and LMN
architects (Rem Koolhaas)
Built: 1999-2004
Floors: 11

The Public Library in the 1890’s The Public Library moved to the Yesler P. J Weber designed the Carnegie Carnegie Library was replaced for Present day Seattle Public
www.seattlemag.com mansion in 1901 Library in 1903 more space in the 1930’s Library 2004 -
www.seattlemag.com ww.seattlemag.com www.seattlemag.com Archdaily.com

Elevation drop around site

Shear wall with built 5 Main Programmes
in elevator
Diagrid curtain wall ADMINISTRATION

SPIRAL STACK

Building Fenestration MEETING ROOMS

16.2% Roof STAFF
PARKING

83.8% Glass skin

The form of the building’s glass and metal skin Tate raised floor and Floor Finishes
began with the concept of wrapping the entire
building in a layer of transparency concrete red marble Hardwood Bamboo wood Carpet Aluminium plate

Concrete pad L-type Anchor bolt welded wire Cast-in-situ
foundation reinforcing concrete Floor finish
Open atrium Baseplate mesh
space Grout
Ventilation Steel I column
Concrete floor Anchor bolt

Steel profiled decking SteelIbeam

Escalator

Indoor air distribution machine

Escalator Plan

11
10
9
8
7
6
5
4
3
2
1

David Olatunde-Joel 22101496

This was a precedent study on the Seattle Public Library that
we did in construction.

70

Computers

71

www.autodesk.com/revit

Bathroom 8 9 2- Room Legend Consultant Consultant
Store Store A1--0- 4 Address Address
6 Bathroom Address Address
6 7 8 Living Room Bedroom Phone Phone
4 Living Room Fax Fax
Bedroom7 UP e-mail e-mail
1
41 5 Consultant Consultant
A1041 Store Address Address
Address Address
Phone Phone
Fax Fax
e-mail e-mail

BB

1 01 Lower Level Copy 1

1 : 100

No. Description Date

2-
A1--0- 4

B Bedroom 2 Room Legend Owner
2 Entry Revit Brief
B Bedroom
45 1 Entry
B Store
Store DN
14 3
A1014

3

Presentation

2 02 Entry Level Copy 1 Project number 0001
Date Issue Date
1 : 100 Drawn by
Checked by Author
Checker 3/28/2022 9:39:24 AM

A102

Scale 1 : 100

Mark Door Schedule Width Height
Family and Type

8 9 Room Legend 1 M_Door-Curtain-Wall-Double-Glass: 1820 2140
Store Store M_Door-Curtain-Wall-Double-Glass
Bathroom Bathroom 1829 2134
7 8 Bedroom 2 M_Door-Curtain-Wall-Double-Glass:
6 Living Room M_Door-Curtain-Wall-Double-Glass
6 916 2134 www.autodesk.com/revit
1 3 M_Door-Curtain-Wall-Single-Glass:
4 Bedroom7 Living Room M_Door-Curtain-Wall-Single-Glass 850 2000 Consultant Consultant
Presentation 5 4 Store 850 2000 Address Address
4 M_Door-Single-Panel: 850 x 2000mm 762 2134 Address Address
UP 762 2134 Phone Phone
5 M_Door-Single-Panel: 850 x 2000mm 2000 2100 Fax Fax
e-mail e-mail
6 M_Single-Flush: 0762 x 2134mm 2000 2100
Consultant Consultant
7 M_Single-Flush: 0762 x 2134mm Address Address
Address Address
8 Bifold_4-Panel_Door_8080: Phone Phone
Bifold_4-Panel_Door_8080 Fax Fax
e-mail e-mail
9 Bifold_4-Panel_Door_8080:
Bifold_4-Panel_Door_8080

BB Room Schedule

Number Name Area

1 Entry 82 m²

01 Lower Level 2 Bedroom 21 m²

1 1 : 100 3 Store 4 m²

4 Living 68 m²

Room

5 Bedroom 33 m²

6 Bathroom 5 m²

7 Store 3 m²

8 Store 3 m²

03 Roof No. Description Date
3050
B Bedroom 2 Room Legend
2 Entry 02 Entry Level
B Bedroom 0
45 1 Entry
B Store 01 Lower Level
Store DN -3050
4 3
Presentation 00 Foundation
-5250
3
03 Roof
2 02 Entry Level 4 Section 1 3050

1 : 100 1 : 100 02 Entry Level
0
4 Owner
Presentation 01 Lower Level Revit Brief
-3050
03 Roof Project Tutorial
3050 00 Foundation
-5250 Project number 0001
02 Entry Level
72 0 Date Issue Date

01 Lower Level Drawn by David Olatunde-Joel
-3050
Checked by Moeketsi Phori
00 Foundation
-5250

5 North 3 East Presentation 3/28/2022 8:33:21 AM

1 : 100 1 : 100

Scale 1 : 100

2-
A1--0- 4

www.autodesk.com/revit

41 Consultant Consultant
A1014 Address Address
Address Address
Door Schedule Copy 1 Phone Phone
Family and Type Fax Fax
e-mail e-mail

Consultant Consultant
Address Address
Address Address
Phone Phone
Fax Fax
e-mail e-mail

1 03 Roof Copy 1 Mark Width Height
1820
1 : 100

14 1 M_Door-Curtain-Wall-Double-Glass: 2140 14
A1014 M_Door-Curtain-Wall-Double-Glass A1041

2 M_Door-Curtain-W033R0ao5o0fll-Double-Glass: 1829 2134 03 Roof
M_Door-Curtain-Wall-Double-Glass 3050
916
3 M_Door-Curtai0n2 E-nWtry Leavelll-Single-Glass: No. Description Date
M_Door-Curtain-Wa0ll-Single-Glass 850
850 2134 02 Entry Level
4 M_Door-Single01-LoPwear Lenveel l: 850 x 2000mm 762 0
5 M_Door-Single-Pa-3n050el: 850 x 2000mm 762
6 M_Single-Flus0h0 F:ou0nd-75a2tio56n0 2 x 2134mm 2000 2000 01 Lower Level
7 M_Single-Flush: 0762 x 2134mm 2000 -3050
8 Bifold_4-Panel_Door_8080: 2000 2134
2134 00 Foundation
2- 2100 -5250

2 East Copy 1 9 A1--0-4 BBiiffoolldd__44--PPaanneell__DDoo5oorrW1__:88e1s0000t88C00o:py 1 2-
Bifold_4-Panel_Door_8080 A1--0- 4
1 : 100
03 Roof 2100
3050
03 Roof Owner
3050 Revit Brief

02 Entry Level 02 Entry Level Unnamed
0 0

01 Lower Level 01 Lower Level Project number 0001
-3050 -3050 Date Issue Date
Drawn by
00 Foundation 00 Foundation Checked by Author
-5250 -5250 Checker

4 South Copy 1 3 North Copy 1 A103 3/28/2022 9:38:50 AM

1 : 100 1 : 100

Scale 1 : 100

73 1 To Building Copy 1

Sustainable
Design

74

7575

This was a precedent study that i did in on the Torre Cube building by
Carme Pinos on sustainability.

76

777

Fisrt year results

78

What i’ve learned in my
journey so far...

My first year in architecture tought me how to enjoy working with new
people and how to make use of the diffrent tools that are given to us
to produce work, despite learning during the peak of the pandemic it was
still an enjoyable learning and experimental proces in my journey of
creativity.
The transition into second year brought about more work ethic and time
time management skills. in contrast to first year, this year has been
more focused on intoducing us to the fast pace that architecture
requires. the subsiding of the pandemic made it possible for us to do
more on campus lectures and it has been a very pleasing experience thus
far...
I look forward to building my skills further in Architecture and
exploring my potential .i am willing to learn from professionals and gain
work experience in the field so i can prepare and develop myself for the
future of architecture.