PROJECT GUIDELINES & LOG BOOK DCQ50233

QUANTITY SURVEYING PROJECT

Keywords: FINAL YEAR PROJECT

PROJECT GUIDELINES
&

LOG BOOK

DCQ50233
QUANTITY SURVEYING PROJECT

DIPLOMA IN QUANTITY SURVEYING
CIVIL ENGINEERING DEPARTMENT

POLITEKNIK KOTA KINABALU

MOHD NORHAZLI BIN JASMAN
NOR AIZAN BINTI SAARI

PROJECT GUIDELINES
&

LOG BOOK

Managing Editor
Mariati Binti Jaafar

Editor
Norhashimah Binti Jamaludin
Sapturani Bin Ladin
Emelia Joseph
Freddy Bin Pansoi
Yusmah Ag Damit
Muhammad Ihsan Bin Azizan
Noor Izzati Binti Mohmd Yusof

Writer
Mohd Norhazli Bin Jasman
Nor Aizan Binti Saari

Designer
Shairul Bin Ludin

First Print 2021
©Politeknik Kota Kinabalu
All right reserved. No part of this publication may be reproduced, copied, stored in any
retrieval system or transmitted in any from or by any means – electronic, mechanical, photo-
copying, recording or otherwise; without prior permission in writing from the Director of
Politeknik Kota Kinabalu, Jln Politeknik, 88450 Kota Kinabalu

Diterbitkan oleh:
Politeknik Kota Kinabalu,
No. 4, Jalan Politeknik
KKIP Barat
Kota Kinabalu Industrial Park
88460 Kota Kinabalu Sabah

Project Guidelines & Log Book DCQ50233 Quantity Surveying Project

1

CONTENTS PROJECT GUIDELINES
&
Preface
Acknowledgment LOG BOOK
1.0 INTRODUCTION
2.0 OBJECTIVE 3
3.0 COURSE INFORMATION 4
4.0 COURSE SUPERVISOR 5
5.0 ASSESSORS 5
6.0 FORMATION OF STUDENTS’ GROUP 5-6
7.0 PROJECT BRIEF & REQUIREMENT 6
8.0 MASTER WORK PROGRAM 7
9.0 TAKWIM 7
10.0 COURSE ASSESSMENT 8-9
11.0 MANAGEMENT FILE 10
12.0 STUDENTS’ LOG SHEET 11
13.0 EVALUATION AND ASSESSMENT FORMS 12 - 13
14.0 LOG SHEET 14
15.0 RUBRIC FORM 15
16.0 ATTACHMENTS 15
16 – 30
31 – 39
40 - 44

2

PROJECT GUIDELINES
&

LOG BOOK

PREFACE

This guideline is produced as references for lecturers and students to full fill the requirement
of syllabus DCQ6325 Quantity Surveying Project. The topics covered in line with the latest
syllabus prescribed by the Department of Polytechnic Education. This course require student
to prepare and submit a complete Tender Document, Master Work Programmed and log
sheet.

This guideline may help the student to have a clear understanding about the task, provide and
complete the task as per requested and may help the lecturer to monitor and evaluate
student’s work.

This guideline is written in a simple and practical way. Some of the contents are further
summarized in the form of table. This guideline consists of Course Information, Course
Supervisor, Course Assessment Panel, Formation of Students’ Group, Project Brief and
Requirement, Master Work Program, Takwim and Course Assessment.

We hope that this guideline helps students and lecturer to understand the needs of the
syllabus DCQ6325 Quantity Surveying Project well. Suggestions for improving the coverage
and the content of this book are most welcome from the end-users.

3

PROJECT GUIDELINES
&

LOG BOOK

ACKNOWLEDGEMENT

First and foremost, our humble gratitude goes to Allah the Almighty and the Merciful without
whose Grace and Guidance, this book would never have become a reality.
Secondly, to our all Diploma in Quantity Surveying committee that has given to us the
strongest encouragement throughout the preparation and writing of this book.
Last but not the least, we would like to extend our deepest gratitude to all those who have
directly and indirectly guided us in the writing of this book.

4

PROJECT GUIDELINES
&

LOG BOOK

1.0 INTRODUCTION

This Quantity Surveying Project Guideline & Logbook is intended to be used for
students pursuing DCQ50233 Quantity Surveying Project. It provides a clear
illustration to the course. The content is arranged accordingly with comprehensive and
simply explained and supported by a clear illustration text for the used to the course.
By producing this book, the lecturers are easy to monitor the work progress produced
by the students and far more concern; it is much expected to help the students to fulfill
the entire requirement needed by the course.

2.0 OBJECTIVE

By having this guideline, it is much expected for the students to:

i. Have a clear understanding about the task

ii. Provides the task as per requested

iii. Produce and submit a complete Company profile, Tender Document, Master
Work Programmed and log sheet by following the ‘Takwim’.

3.0 COURSE INFORMATION

QUANTITY SURVEYING PROJECT course enables students to apply knowledge
and practical works to develop Tender Documentation.

Upon completion of this course, the students should be able to:

i. Organize a work programme to prepare Tender Document accurately. (C2,
PLO1)

ii. Measure quantities for construction works according to Standard Method of
Measurement. (C3, PLO3)

iii. Demonstrate continuous learning and information management skill while
engaging in independent acquisition of new knowledge and skill to develop a
project. (A3, PLO5)

iv. Demonstrate ability to lead a team to complete assigned project. (A3, PLO8)

5

PROJECT GUIDELINES
&

LOG BOOK

The following are the summary of the syllabus for DCQ6253 Quantity Surveying
Project:

i. INTRODUCTION
This topic enables the student to identify project objective

ii. PLANNING OF WORK
This topic enables the students to prepare master work program

iii. PREPARING TENDER DOCUMENT
This topic enables the students to prepare tender document

iv. PROJECT PRESENTATION
This topic enables the students to prepare the project presentation

CONTINUOUS ASSESSMENT WEIGHTAGE (%)

COURSE LEARNING OUTCOME Management Work SLT PROPOSED

Presentation Logbook Report File programme (hours) TOPIC

(2) 30% (1) 5% (1) 35% (1) 25% (1) 5%
● ●
CLO 1: organize a work programme to prepare Tender T1,T2
Document accurately 18 T2

CLO 2: measure quantities for construction works ● T1,T4
according to Standard Method of Measurement (SMM) ● 25

T2

CLO 3: demonstrate continuous learning and information ● ● T3
management skill while engaging in independent acquisition 39
of new knowledge and skill to develop a project
● T3
CLO 4: demonstrate ability to lead a team to complete
assigned project ● T1-T4
39
T4

4.0 COURSE SUPERVISOR

Each group will be supervised by a supervisor that being appointed among the
lecturers of Diploma in Quantity Surveying program. The designated group will be
determined by the course coordinator and approved by head of program.

The roles of the supervisor are as follows:

i. To ensure the students fulfill the project requirement
ii. To guide the student throughout the course
iii. To monitor the students’ progress of work as per ‘takwim’
iv. To held consultation/meeting
v. To produce and abide all quality procedure and documents as required by

Quality Unit

6

PROJECT GUIDELINES
&

LOG BOOK

5.0 ASSESSORS

The panels for assessment are also appointed among the lecturers of Diploma in
Quantity Surveying program that being determined by Course Coordinator and
approved by Head of Program. However, the final portfolio will be assessed by
external assessor that being invited from the representative from Royal Institution
Surveyor Malaysia, any government bodies, contractors and consultant that directly
involved with quantity surveying field.

The following are the expected obligation of the panel during assessment period:

i. To assess the students’ work according to the submission and presentation
requirement

ii. To give comment based on the students’ submission and presentation
iii. To give appropriate marks accordingly

6.0 FORMATION OF STUDENTS’ GROUP

The students are required to form groups that consist of THREE (3) members each.
On a certain circumstances, a group of FOUR (4) members is allowed based on the
approval of course coordinator.

All related works needed for this course must be distributed fairly among group
members and a statement of the distribution work shall be submitted to the supervisor
for approval before proceed with the work.

In addition, each group is required to creatively produce a company profile that
consists of the following scope of work:

i. Name of company
ii. Logo
iii. Mission of Statement
iv. Vision
v. Company Overview
vi. Core Business
vii. Organization structure
viii. Other related information that necessary to be provided

7

PROJECT GUIDELINES
&

LOG BOOK

7.0 PROJECT BRIEF & REQUIREMENT

The project must comply with the minimum project brief requirement as follows:

i. Minimum total gross floor area is 250m2
ii. Minimum 2 story height and not more than 5 story height
iii. Standard drawing is not allowed
iv. The set of drawing shall consist of development plan, architectural drawing,

structural drawing, electrical and mechanical drawing, infrastructure and all
necessary table and schematic diagrams.

REQUIREMENT STATUS
NO ELEMENTS

COMPULSORY IF NEEDED OPTIONAL

BUILDING WORKS

1 Piling √

Work Below Lower Floor Finish

● Pile Cap / Pad Foundation √

2 ● Column Stump √

● Ground Floor Slab √

● Ground Beam √

● Apron √

Frame

3 ● Column √

● Beam √

4 Upper Floor Slab

5 Staircase

Roofing Works

● Roof Structure √

6 ● Roof Covering √

● Gutter Work √

● RWDP √

7 External Wall √

8 Internal Wall & Partition √

9 Door & Ironmongeries √

10 Window & Ironmongeries √

11 Perimeter Drain √

12 Wall Finishes √

13 Floor Finishes √

14 Ceiling Finishes √

8

PROJECT GUIDELINES
&

LOG BOOK

REQUIREMENT STATUS
NO ELEMENTS

COMPULSORY IF NEEDED OPTIONAL

FURNITURE

15 Furniture & Equipment √

SERVICES

Services

● Hot & Cold Water Supply √

● Sanitary Appliances √

● Sanitary Plumbing √

16 ● Refuse Disposal √

● Electrical Installation √

● Builders Works in Connection √
(BWIC)

● any additional services i.e √
Telephone Installation

Mechanical Installation etc

The students are required to choose any three of the following external and infrastructure works
EXTERNAL WORKS

Site Works ● Demolition Works √
17 ● Site Clearance √

Surface Treatment √
● Paved Area √

18 √
● Turfing

● Landscaping √
19 Gate and Fencing √

Drainage Work

● Foul Drainage √

20 ● Surface Water Drainage √
● Manhole & Sewer Pipe √
● Septic Tank √
EXTERNAL WORKS √

21 Earthworks
22 Retaining Wall
23 Road and Car Parks
24 Drainage and culvert
25 Water Reticulation
26 Sewerage Pipe
27 Mechanical & Electrical Line

9

PROJECT GUIDELINES
&

LOG BOOK

8.0 MASTER WORK PROGRAM

Each group is required to produce master work program that showing in detail each
work that need to be performed starting from the acquisition of drawing until final
submission. Each works must be arranged accordingly in weekly schedule.

The group has to report the weekly progress done by showing the Gantt chart to the
supervisor.

10

PROJECT GUIDELINES
&

LOG BOOK

9.0 TAKWIM

The following is the list of activities and expected week to be held.

WEEK ACTIVITIES NOTES
0  Course registration Briefing will be conducted on
 Setting up group Friday (subject to change)
1  Course briefing by course coordinator
 Distribution of Course Guidelines and Student’s Refer to submission and
presentation requirements
Log Book
 Drawing approval
 Setting up company profile
 Master work program in Gantt chart form
 Measurement excel template

2 - 13  Submission 1 Refer to submission and
14  Updating work progress presentation requirements
 Measurement and BQ development
 Preparation tender document Course coordinator will
conduct a briefing a week
 Presentation 1 (Week 5, Friday) before each assessment
 Presentation 2 (Week 11, Monday)
 Pre-Submission (Week 11, Wednesday) Supervisor are advised to
 CEDIX (Week 12, date to be determined) checked and comment all the
works produced by students.
The correction must be done
by students before presenting
to the external assessor
(CIDEX)

 Binding and compilation Refer to filing requirement
 Final submission (Wednesday)
 Submission of supervisor’s assessment form to the

course coordinator (Friday)

11

PROJECT GUIDELINES
&

LOG BOOK

10.0 COURSE ASSESSMENT

The students will be assessed throughout the semester. The assessment is divided into
two main criteria which are portfolio and presentation. The following table shows the
marks distribution according to those criteria.

ASSESSMENT

Presentation Log Book Report Management Work Assessor
(2) (1) Program (1)
30% 5% (1) File (1) Supervisor
10% 5%
35% 25% Internal Panel
(Progress) 5% Internal Panel
Submission 1 10% (Progress) External Panel
10% Supervisor
Presentation 1
Presentation 2 5% 10% 25%
CIDEX (Progress) 25%
Final
Submission

In addition, the students are required to fulfill the following submission and
presentation requirement:

ASSESSMENT PRESENTATION SUBMISSION RUBRIC
Submission 1 REQUIREMENT FORM
i. Company profile REQUIREMENT
Presentation 1 ii. Project brief t.b.d
iii. Masterwork program i. A slide presentation
iv. Measurement template t.b.d
consist of as per
i. Company profile
ii. Project brief presentation outline
iii. Masterwork program to
ii. Master copy of
be updated up to week 5
iv. Log sheet to be updated masterwork program

up to week 5 iii.Proposed measurement
v. Measurement and bill of
template
quantities
iv. Complete set of drawing

(softcopy or hardcopy)

i. A slide presentation

consist of as per

presentation outline

ii. Masterwork program up to

week 5

iii.Log sheet up to week 5

iv. Drawing, measurement

form and bill of quantities

up to :

12

PROJECT GUIDELINES
&

LOG BOOK

-Preliminaries

-Piling

-WBLFF

-Frame

-Upper Floor Slab

-Staircase

-Roof Works

Presentation 2 i. Masterwork program to i. Masterwork program up to t.b.d
CIDEX be updated up to week 5 t.b.d
Final Submission week 11 t.b.d
ii. Log sheet to be updated
up to week 5 ii. Log sheet up to week 11

iii. Measurement and bill of iii.Drawing, measurement
quantities
form and bill of quantities
i. Company profile
ii. Project brief up to :
iii. Complete measurement
- External Wall
and bill of quantities
iv. Tender document -Internal Wall and

Partition

-Window

-Door

-Ironmongeries

-Finishes

-Painting

-Sanitary Fitting

-Cold water supply

-Sanitary plumbing

-BWICS

-Electrical

i. A slide presentation

consist of as per

presentation outline

ii. Drawing, measurement

form and bill of quantities

up to :

-Preliminaries, piling

works, building works,

electrical and additional

minimum two

infrastructure / external

works

iii. Tender document

Management file consists of

the following :

13

PROJECT GUIDELINES
&

LOG BOOK

i. Company profile
ii. Course takwim
iii. Masterwork program to

be updated up to week
14
iv. Measurement form
v. Bill of quantities
vi. Drawing to be used in
measurement
vii. Tender document
iv. Log sheet to be updated
up to week 14

11.0 MANAGEMENT FILE

The students are required to creatively produce their work in a proper filing method.
The measurement forms and bill of quantities draft must be produced in two different
file and arranged in accordance of building elements. Each group must produce the
work according to the following filing requirement:

i. Company profile
ii. Takwim
iii. Work Program
iv. Measurement form
v. Bill of Quantities
vi. Drawing
vii. Tender Document
viii. Log sheet
ix. Others

LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4

14

PROJECT GUIDELINES
&

LOG BOOK

12.0 STUDENTS’ LOG SHEET

The students are required to observe their consultation hours as per academic
schedule. Each meeting with the supervisor shall be recorded and verified by the
supervisor. The review to the log books will be conducted by course coordinator
during week 5 and 15. The warning and barring letter will be released to those group
who fail to achieve minimum consultation hours as per required.

13.0 EVALUATION AND ASSESSMENT FORMS

The students will be evaluated based on four criteria which are portfolio, presentation,
management skills and teamwork skill. Those criteria will be evaluated on individual
basis except for portfolio that will be evaluated on group works performance. The
following tables show the rubric of designated criteria.

Refer to attachment

15

PROJECT GUIDELINES
&

LOG BOOK

LOG SHEETS

16

PROJECT GUIDELINES
&

LOG BOOK

LAPORAN AKTIVITI MINGGUAN

MINGGU TARIKH MASA

LAPORAN KEMAJUAN PROJEK

CADANGAN TUGASAN / PERTEMUAN SETERUSNYA

ULASAN PENYELIA

DISAHKAN OLEH
TANDATANGAN

17

PROJECT GUIDELINES
&

LOG BOOK

LAPORAN AKTIVITI MINGGUAN

MINGGU TARIKH MASA

LAPORAN KEMAJUAN PROJEK

CADANGAN TUGASAN / PERTEMUAN SETERUSNYA

ULASAN PENYELIA

DISAHKAN OLEH
TANDATANGAN

18

PROJECT GUIDELINES
&

LOG BOOK

LAPORAN AKTIVITI MINGGUAN

MINGGU TARIKH MASA

LAPORAN KEMAJUAN PROJEK

CADANGAN TUGASAN / PERTEMUAN SETERUSNYA

ULASAN PENYELIA

DISAHKAN OLEH
TANDATANGAN

19

PROJECT GUIDELINES
&

LOG BOOK

LAPORAN AKTIVITI MINGGUAN

MINGGU TARIKH MASA

LAPORAN KEMAJUAN PROJEK

CADANGAN TUGASAN / PERTEMUAN SETERUSNYA

ULASAN PENYELIA

DISAHKAN OLEH
TANDATANGAN

20

PROJECT GUIDELINES
&

LOG BOOK

LAPORAN AKTIVITI MINGGUAN

MINGGU TARIKH MASA

LAPORAN KEMAJUAN PROJEK

CADANGAN TUGASAN / PERTEMUAN SETERUSNYA

ULASAN PENYELIA

DISAHKAN OLEH
TANDATANGAN

21

PROJECT GUIDELINES
&

LOG BOOK

LAPORAN AKTIVITI MINGGUAN

MINGGU TARIKH MASA

LAPORAN KEMAJUAN PROJEK

CADANGAN TUGASAN / PERTEMUAN SETERUSNYA

ULASAN PENYELIA

DISAHKAN OLEH
TANDATANGAN

22

PROJECT GUIDELINES
&

LOG BOOK

LAPORAN AKTIVITI MINGGUAN

MINGGU TARIKH MASA

LAPORAN KEMAJUAN PROJEK

CADANGAN TUGASAN / PERTEMUAN SETERUSNYA

ULASAN PENYELIA

DISAHKAN OLEH
TANDATANGAN

23

PROJECT GUIDELINES
&

LOG BOOK

LAPORAN AKTIVITI MINGGUAN

MINGGU TARIKH MASA

LAPORAN KEMAJUAN PROJEK

CADANGAN TUGASAN / PERTEMUAN SETERUSNYA

ULASAN PENYELIA

DISAHKAN OLEH
TANDATANGAN

24

PROJECT GUIDELINES
&

LOG BOOK

LAPORAN AKTIVITI MINGGUAN

MINGGU TARIKH MASA

LAPORAN KEMAJUAN PROJEK

CADANGAN TUGASAN / PERTEMUAN SETERUSNYA

ULASAN PENYELIA

DISAHKAN OLEH
TANDATANGAN

25

PROJECT GUIDELINES
&

LOG BOOK

LAPORAN AKTIVITI MINGGUAN

MINGGU TARIKH MASA

LAPORAN KEMAJUAN PROJEK

CADANGAN TUGASAN / PERTEMUAN SETERUSNYA

ULASAN PENYELIA

DISAHKAN OLEH
TANDATANGAN

26

PROJECT GUIDELINES
&

LOG BOOK

LAPORAN AKTIVITI MINGGUAN

MINGGU TARIKH MASA

LAPORAN KEMAJUAN PROJEK

CADANGAN TUGASAN / PERTEMUAN SETERUSNYA

ULASAN PENYELIA

DISAHKAN OLEH
TANDATANGAN

27

PROJECT GUIDELINES
&

LOG BOOK

LAPORAN AKTIVITI MINGGUAN

MINGGU TARIKH MASA

LAPORAN KEMAJUAN PROJEK

CADANGAN TUGASAN / PERTEMUAN SETERUSNYA

ULASAN PENYELIA

DISAHKAN OLEH
TANDATANGAN

28

PROJECT GUIDELINES
&

LOG BOOK

LAPORAN AKTIVITI MINGGUAN

MINGGU TARIKH MASA

LAPORAN KEMAJUAN PROJEK

CADANGAN TUGASAN / PERTEMUAN SETERUSNYA

ULASAN PENYELIA

DISAHKAN OLEH
TANDATANGAN

29

PROJECT GUIDELINES
&

LOG BOOK

LAPORAN AKTIVITI MINGGUAN

MINGGU TARIKH MASA

LAPORAN KEMAJUAN PROJEK

CADANGAN TUGASAN / PERTEMUAN SETERUSNYA

ULASAN PENYELIA

DISAHKAN OLEH
TANDATANGAN

30

PROJECT GUIDELINES
&

LOG BOOK

RUBRIC FORMS

31

PROJECT OBJECTIVE SUBMISSION 1 (10

Project Requirement Company Profile and WORK
Task Arrangement Provides a detailed
Management
breakdown of tasks

Structure

Fulfil project The company is form The task is Provides a detailed

mandatory/brief and with reasonable job distributed fairly list of tasks

manage to get designation and well among group necessary to

drawing approval explanation of each members complete the design.

within stipulated designation Tasks are specific to

time the project and

encompass active

design milestones as

well as course

deliverables.

Marks Allocation

55 55

3

0%) SUPERVISOR PROJECT GUIDELINES
&
PLANNING (GANTT CHART)
LOG BOOK
Appropriate timeline Clear arrangement of
Marks
and time estimates tasks

Timeline and time The task is arranged
estimates are realistic according to the
sequence of work,
and reflect course take into the
deadlines. Timeline
spans the length of consideration of each
pre-requisite of the
project
task

Marks gained Total

5 5 30 100%

32

PRESENTATION 1 (10%

PRESENTATION

Submission Presentation Student's
Requirement
Able to submit all Requirement Presentation
submission
requirement Able to fulfil all Student are able to

10 presentation present, response,

requirement intrepret

information, and

communicate

appropriately as

well as particiate

in group

presentation

effectively and

confidently

Marks Allocation

ID NO Names 10 10

3

%) INTERNAL PANEL PROJECT GUIDELINES
&
Presentation Tools Communication Attire
LOG BOOK
Use effective and Communicate Observing
creative visuals and effectively to team Politechnic's Marks
media to enhance Dress Code
members.
presentations.

Marks gained Total

10 5 5 50 100%

33

PRESENTATION 2 (10%

PRESENTATION

Submission Presentation Student's
Requirement
Able to submit all Requirement Presentation
submission
requirement Able to fulfil all Student are able to

10 presentation present, response,

requirement intrepret

information, and

communicate

appropriately as

well as particiate

in group

presentation

effectively and

confidently

Marks Allocation

ID NO Names 10 10

3

%) INTERNAL PANEL PROJECT GUIDELINES
&
Presentation Tools Communication Attire
LOG BOOK
Use effective and Communicate Observing
creative visuals and effectively to team Politechnic's Marks
media to enhance Dress Code
members.
presentations.

Marks gained Total

10 5 5 50 100%

34

LOG BOOK (5%

LOG BOOK

Log Book Log S

Able to interpret the Able to interpret the Log sheet is updated weekly

submission requirement presentation requirement and submitted to the

supervisor during

consultation

10 10 15

3

%) SUPERVISOR PROJECT GUIDELINES
&
Sheet
14 weeks of log sheet LOG BOOK

submitted and verified by Marks
supervisor
50 100%
15

35

Description REPORT (BILL OF QUAN

BILL OF QUANTITIES
Unit Format

All element and necesssary All unit are stated precisely. Data are presented with
information are appropriate format.

included.Words chosen are
clear, accurate and
appropriate.

15 15 10

Description REPORT (BILL OF QUANT

BILL OF QUANTITIES
Unit Format

All element and necesssary All unit are stated precisely. Data are presented with
information are appropriate format.

included.Words chosen are
clear, accurate and
appropriate.

15 15 10

3

NTITIES) (5%) EXTERNAL PROJECT GUIDELINES
&
Neatness, tidiness and
uniformity. LOG BOOK

All work are very neat, tidy MARKS
and uniform

10 50 100%

TITIES) (20%) SUPERVISOR

Neatness, tidiness and
uniformity.

All work are very neat, tidy
and uniform

MARKS

10 50 100%

36

REPORT (TENDER DOCUM

TENDER DOCUMENT

Format Neatness, tidiness and uniformity. Tender D
Data are presented with appropriate
All work are very neat, tidy and Provide sufficient
format.
uniform document with c
10
arrange in pr

10 3

3

PROJECT GUIDELINES
&

LOG BOOK

MENT) (10%) SUPERVISOR

Document MARKS
t content of tender
correct form and 50 100%
roper content
30

37

MANAGEMENT FILE (MEASU

MEASUREMENT

Standard Metrhod Accuracy Dimension Form
Measurement 2
All elements are All dimension are Data are p
All elements are measured accuretely written in parallel with with app
measured according to
correct unit form
SMM2.

15 15 10 5

MANAGEMENT FILE (MEASUR

MEASUREMENT

Standard Metrhod Accuracy Dimension Form
Measurement 2
All elements are All dimension are Data are p
All elements are measured accuretely written in parallel with with app
measured according to
correct unit form
SMM2.

15 15 10 5

3

UREMENT) (5%) EXTERNAL PROJECT GUIDELINES
&
mat Queery List
LOG BOOK
presented Providing all
propriate assumption item in MARKS
mat proper queery list
50 100%
5 format to be
designated to right

consultant
5

REMENT) (15%) SUPERVISOR

mat Queery List

presented Providing all 50 MARKS
propriate assumption item in 100%
mat proper queery list

5 format to be
designated to right

consultant
5

38

MANAGEMENT FILE (ETHIC AND PR

ETHIC AND PROFESSIONALISM

Time Management Respect Preparedness

Always arrives on time and respectful towards peers, Almost always participates in
stays for entire class; adults, and the learning class discussions;

regularly attends class; all environment contributions reflect
absences are excused; always exceptional preparation and
takes responsibility for work 25 are always substantive, well
missed; no deadlines missed; supported, and persuasively

does not seek exceptions presented
25 25

WORK PROGRAM

WORK PROGRAM

Chart is up to date Progress Consultation
The chart is up to date and
accurate. Adjustments have Student progress is based on Attend consultation

been made when initial work plan according to course timetable
predictions fail to map to
25 25
reality
25

3

PROJECT GUIDELINES
&

LOG BOOK

ROFESSIONALISM) (5%) SUPERVISOR

Quality of Work

Provides work of the highest MARKS
quality that reflects best 50 100%

effort; makes strong effort to
improve work; shows

positive, proactive behavior;
is always honest and
encourages others
25

(5%) SUPERVISOR MARKS
50 100%
Gantt Chart
Total 14 weeks of work
program updated by week

25

39

PROJECT GUIDELINES
&

LOG BOOK

ATTAHCMENTS

40

PROJECT GUIDELINES
&

LOG BOOK

ATTACHMENT 1

(Typical Contents of Tender Document based on PWD203A)

SEKSYEN CONTENTS PAGE
SEKSYEN ‘A’ ARAHAN KEPADA PETENDER
SEKSYEN ‘B’ BORANG TENDER (JKR. 203B-Pind.5/2008)
SEKSYEN ‘C’ SURAT SETUJUTERIMA TENDER (J.K.R 203D-Pind.1/2011)

SEKSYEN ‘D’ FORM AND CONDITIONS OF CONTRACT
-Standard Form of Contract to be used where Bills of Quantities Form part of
the Contract P.W.D Form 203A (Rev.1/2010)
-Special Provisions to the Conditions of Contract
-Addendum to the Conditions of Contract PWD 203/203A (Rev.1/2010)

SEKSYEN ‘E’ STANDARD SPECIFICATIONS
-Standard Specifications for Building Works (2014)
-Specifications for Hard Landscape
(if applicable)
-Specifications for Soft Landscape
(if applicable)

SEKSYEN ‘F’ MECHANICAL AND ELECTRICAL WORKS
SEKSYEN ‘G’ PREAMBLES TO ALL TRADES

SEKSYEN ‘H’ BILLS OF QUANTITIES

-Final Summary

-Bill No 1 - General Conditions And Preliminaries

-Bill No 2 - Piling

-Bill No 3 - Building Works
-Bill No 4 – Electrical Works
-Bill No 5 – Mechanical Works
-Bill No 6 – Infrastructure Works

SEKSYEN ‘I’ APPENDICES
Lampiran A LIST OF MATERIALS OF MALAYSIAN ORIGIN
Lampiran B SCHEDULE OF DAYWORK RATES
Lampiran C1 BORANG JAMINAN BANK/JAMINAN SYARIKAT
KEWANGAN/ JAMINAN INSURANS UNTUK BON PELAKSANAAN
(KONTRAK KERJA)
Lampiran C2 BORANG JAMINAN BANK/JAMINAN SYARIKAT
KEWANGAN/ JAMINAN INSURANS UNTUK BON PELAKSANAAN
(KONTRAK BEKALAN/ PERKHIDMATAN)
Lampiran D BORANG JAMINAN BANK/JAMINAN SYARIKAT
KEWANGAN/ JAMINAN INSURANS UNTUK BAYARAN
PENDAHULUAN (KONTRAKTOR BEKALAN/ PERKHIDMATAN/KERJA)
Lampiran E BORANG – BORANG MAKLUMAT YANG PERLU
DILENGKAPI OLEH PETENDER

SEKSYEN ‘J’ LIST OF DRAWINGS
'- Architectural Drawings
'- Civil & Structural Drawings
'- Mechanical & Electrical Drawings

41