Public Transport Plan
eThekwini Municipality
Presentation Overview
Table of Contents
1. Context of the Public Transport Plan
2. The Public Transport Plan
Context of the Public Transport Plan 1. Introduction
2. Transport Vision and Objectives
CITP Requirements 3. Summary of the Transport Register
4. Spatial Development Framework
5. Transport needs assessment
6. Public Transport Plan 7. Transport 8. TDM 9. NMT Plan 10. Freight 11. Other Transport
Infrastructure Strategy Transport
• Policies and Strategies Strategy Strategy Related Strategies
• Overall Network Design
• Commuter Rail Plan • Non-motorised Transport
• Non-Contracted Services Plan • Safety & Security
• Operating Licenses Plan • Road User safety
• Law Enforcement
• Tourism
• Institutional Arrangement
11. Funding 11. Stakeholder
Strategy Consultation
Context of the Public Transport Plan
Policies Overall The PTP incorporates plans, referred to in the Public Transport
and Network Strategy and Action Plan (Department of Transport, 2007) as an
Design Integrated Public Transport Network, and encompasses high-
Strategies quality networks of commuter rail and Bus Rapid Transit (BRT)
PTPThe is a Commuter The CITP
Rail Plan
component of the is developed to
Comprehensive Non- identify long-term
Integrated Transport Contracted vision, objectives and
Services Plan
Plan strategy for the
transport system and
Operating Contracted
Licenses Services plan
Plan
Plan
The Public Transport Plan
Background The Plan Implementation
• Chapter 1 : Introduction • Chapter 4 : Localised Policies and Strategies • Chapter 10 : Management and
• Chapter 5 : Overall Network Plan Regulation
• Chapter 2 : Status Quo • Chapter 6 : Contracted Services Plan
• Chapter 7 : Non Contracted Services Plan • Chapter 11 : Public Transport
• Chapter 3 : Overarching Legislation, • Chapter 8 : Commuter Rail Services Plan Implementation
Policies and Strategies • Chapter 9 : Operating Licences Plan
• Chapter 12 : Finance and Budget
Background
Chapter 1 : Introduction
The focus of the PTP is to integrate the public FUTURE “Provide safe, reliable, effective, efficient and fully integrated
transport network, services and modes and to provide PT SYSTEM transport operations and infrastructure which will best meet
the basis for rationalising and, if necessary, the needs of freight and passenger customers at improving
restructuring the public transport system, designing
public transport operating contracts for contracted levels of service and cost, in a fashion which supports
services and allocating operating licences for both government strategies for economic and social development
contracted and non-contracted services. whilst being environmentally and economically sustainable.”
Timelines 2018 • Limited budget
Challenges • Illegal MBT Operators
• Safety and Security of PT Users
2012 Wall-to- • Regulated movement of people e.g. scholars
wall Plan • Fast declining rail services
• Sporadic Development not aligned to the PTP
2007 – Action Plan
and FIFA WC • 9 Corridors (Rail and Road)
• Core System
2005 - PTP • System Components
• Accelerated Modal Upgrading
• and Integrated Rapid Public Transport
Networks (IRPTNs)
• 2010 FIFA Soccer WC
Year Year Prior 2005 Goal 1: Effective Public Transport Intervention
2000 2004 Goal 2: Efficient Public Transport
• Spatial Planning Goal 3: Sustainable Public Transport
Fundamental ETA Established • Deteriorating PT system & increase in MBT Goal 4: Safe & Secure Public Transport
Restructuring in 2004 • Increasing Pvt Car Usage and Road Goal 5: Black Economic Empowerment
Investment
• Contracting of the Buses
• High Priority PT Network (HPPTN)
Background Organisational Structure since
Chapter 1 : Introduction 2004- ETA
Unit - eThekwini Transport Authority
The eThekwini Transport Road System Strategic Public
Authority was established Management Transport Transport
Planning
in January 2004 to
manage the provision of Urban Traffic Control Transport Planning Public Transport
the full range of transport Infrastructure
services in eThekwini. It
Public Transport
has promoted strong, Services
locally driven and
Public Transport
oriented decision making, Co-ordination
and local accountability
Traffic Engineering Road Safety
Traffic Operations Public Transport
Planning
The Public Transport Plan
Background The Plan Implementation
• Chapter 1 : Introduction • Chapter 4 : Localised Policies and Strategies • Chapter 10 : Management and
• Chapter 5 : Overall Network Plan Regulation
• Chapter 2 : Status Quo • Chapter 6 : Contracted Services Plan
• Chapter 7 : Non Contracted Services Plan • Chapter 11 : Public Transport
• Chapter 3 : Overarching Legislation, • Chapter 8 : Commuter Rail Services Plan Implementation
Policies and Strategies • Chapter 9 : Operating Licences Plan
• Chapter 12 : Finance and Budget
Background 2.1 Public Transport Register
Chapter 2 : Status Quo
MiniBus Taxi Durban Transport People Mover Mynah Bus
Moja Cruise
Dial –A -Ride Metro Rail E-hailing
Long Distance
Background
Chapter 2 : Status Quo
Public transport within the City is provided by different
transport modes listed below
PT Mode Routes Capacity Operations Facilities Source
Durban Transport(Transnat)(450
Bus Service 167 Bus Facilities
peak hour buses
Minibus Taxi Services 338 Mynah Buses (18 Peak hour Buses) 37 Combined Facilities - MBT and Bus CPTR (2012)
Commuter Rail KZN contracted bus services under
Metered Taxis - People Mover (22 peak hour buses)
Long Distance
E-hailing 161 100 Commuters 4537 minibus taxi operators 375 Mini-bus Taxi Ranks CPTR (2012)
during morning peak 106 minibus taxi associations
Dial - a - ride Sukuma 884 37 Combined Facilities - MBT and Bus and PRE
Learner Transport 10 755 registered vehicles
(2020)
PRASA
8 Rail 54 million passenger trips 101 Stations (Including Halts) PRASA
-
Lines p/a
Long Distance coach operators
284 metered taxi --
1280 partner drivers (Uber and Stations in KZN,DNR,PMB - Ladysmith
operators Taxify
and Newcastle
Durban to 3 Return services per 12 midibis taxis and 4 minibus taxis PRE
- -
Jhb week Contracted services
--
- 2400 Passenger trips per --
month --
- 650 Learners per day
Background
Chapter 2 : Status Quo
Current Public Transport Modal Split
Bus Services 17%
Commuter Rail 14%
PRASA 69%
Minibus Taxi
Services
11
Background Current Transport Challenges
Chapter 2 : Status Quo
Bus Services Challenges : Decreases ridership Regular Protest (Vandalised Vehicles)
Month-Month Contract (Durban Transport)
Frequent Trips with low passenger loads Unsubsidised Operators Direct competition with MBT and Rail
Background Current Transport Challenges
Chapter 2 : Status Quo
Mini-bus Taxi Services Challenges :
Limited Amount of Ranking and Holding Over-trading Deteriorated Vehicles
Competing for Routes (Aggressive Confrontations) Reduced Safety and Reliability Lack of supply and demand data
Background Current Transport Challenges
Chapter 2 : Status Quo
Rail Services Challenges :
Availability of Rolling Stock Condition of Rail Infrastructure
Enforcement Challenges
Background Current Transport Challenges
Chapter 2 : Status Quo
Other Services Challenges :
E-Hailing – No Direction in terms of Operating E-Hailing – Lack of guidance from NDOT Growing e-hailing services
License around the city
The Public Transport Plan
Background The Plan Implementation
• Chapter 1 : Introduction • Chapter 4 : Localised Policies and Strategies • Chapter 10 : Management and
• Chapter 5 : Overall Network Plan Regulation
• Chapter 2 : Status Quo • Chapter 6 : Contracted Services Plan
• Chapter 7 : Non Contracted Services Plan • Chapter 11 : Public Transport
• Chapter 3 : Overarching Legislation, • Chapter 8 : Commuter Rail Services Plan Implementation
Policies and Strategies • Chapter 9 : Operating Licences Plan
• Chapter 12 : Finance and Budget
Background Relevant Legislation
Chapter 3 : Overarching Legislation, Policies and Strategies and Policies
National National
Transport Department of
Master Plan
(NATMAP Transport
2050), 2010 Strategic Plan
2015-2020
National The Public National
Public Transport Rural
Transport Plan Transport
Strategy and Strategy,
Action, 2007
2005
KwaZulu-
Natal National Land National Rail
Transport Plan, 2006 and
Provincial Strategic Regional Rail
Growth and Framework
Development Strategic
Plan, 2016- (NLTSF) 2006 Plans 2012
Reviewed 2015
2017
Background Current Strategies
Chapter 3 : Relevant Legislation, Policies and Strategies
• Integrating rail services Strategies • Promoting the use of
for the City Public Transport
• Integrating and planning the rail
services in the area to acceptable • Promoting the use of public transport
standards over private transport with a strong
focus during peak commuting periods
• Seamless public
transport system • Effective, efficient and safe
public transport system
• Providing a seamless public transport
system across various modes within • Providing an effective, efficient, and
the City. safe public transport system –
implementing GO!Durban.
• Proactively Planning
• Demand-driven public
• Proactively planning to ensure that transport service
the land-use complements the public
transport system. • Promoting a demand-driven public
transport system
Presentation Outline
Background The Plan Implementation
• Chapter 1 : Introduction • Chapter 4 : Localised Policies and Strategies • Chapter 10 : Management and
• Chapter 5 : Overall Network Plan Regulation
• Chapter 2 : Status Quo • Chapter 6 : Contracted Services Plan
• Chapter 7 : Non Contracted Services Plan • Chapter 11 : Public Transport
• Chapter 3 : Overarching Legislation, • Chapter 8 : Commuter Rail Services Plan Implementation
Policies and Strategies • Chapter 9 : Operating Licences Plan
• Chapter 12 : Finance and Budget
The Plan
Chapter 4 : Localised Policies and Strategies
Strategies of the City
Integrating Land-Use and Transport
Integrated Transport Strategy
Providing an Improved Public Transport System
Creating an enabling environment for all modes of PT
Regulation of public transport system
Provision of infrastructure for public transport
The Plan
Supporting PoliciesChapter 4 : Localised Policies and Strategies
The following supporting policies have been adopted to ensure that goal to achieve a
public transport system that is safe, reliable, effective and efficient is met.
Contracted Services Non-Contracted services Non-Contracted services Lon Distance Transport
Minibus taxi and Bus e-hailing and meterd taxi
The eight road-based corridors In partnership with the private sector
and the associated feeders will • The ETA will negotiate with the non- •The ETA will support Operating Licences and other transport authorities, the
be contracted by the ETA. contracted service industry to based on market demand, and where it ETA will provide and maintain
incorporate their services into the does not compete with GO!Durban. infrastructure for long-distance buses
The vehicle type and fleet size GO!Durban public transport system. •In partnership with the private sector, in proximity to other public transport
will be determined per corridor infrastructure will be provided to enable facilities to enable seamless transfer
by demand. • Operating Licences will be awarded and safe and seamless movement at public between short and long-distance
renewed in areas where the ETA does transport stations, tourist areas, business services.
The trunk rail corridor will be not foresee the IPTN network providing a centres and airports.
contracted by PRASA while the service in the long-term. The ETA will embark on a study
associated feeders will be Non-Contracted services focused on long distance coaches and
contracted by the ETA. • Renewing of Operating Licences in Tuk-tuks (Three Wheelers) minibus taxi services.
areas where GO!Durban Services are
Introduction of interim High operational and where the GO!Durban To provide waiting areas and other Learner Transport
Quality Bus services along supply is not adequate. Once there is infrastructure the municipality deems
future IPTN corridors based on sufficient GO!Durban capacity, there will necessary to ensure that the tuk-tuks can To promote the use of the GO!Durban
agree contracts that can be be no renewals of Operating Licences. safely form part of the transport system.. services where possible for
incorporated in the IPTN transporting of learners..
system. • Provide commercial contracts for a
specified duration in areas where the
IPTN will provide a service in the long-
term.
Presentation Outline
Background The Plan Implementation
• Chapter 1 : Introduction • Chapter 4 : Localised Policies and Strategies • Chapter 10 : Management and
• Chapter 5 : Overall Network Plan Regulation
• Chapter 2 : Status Quo • Chapter 6 : Contracted Services Plan
• Chapter 7 : Non Contracted Services Plan • Chapter 11 : Public Transport
• Chapter 3 : Overarching Legislation, • Chapter 8 : Commuter Rail Services Plan Implementation
Policies and Strategies • Chapter 9 : Operating Licences Plan
• Chapter 12 : Finance and Budget
The Plan The Public Transport Plan Components
Chapter 4 : The Public Transport Plan
Other
9 PT
Corridors Trunk and Services
Feeders
The result of the PTP plan This system in mainly aimed
for eThekwini will be a The trunk corridors and at providing commuter
system that will consist of 9 feeder system will form part transport. Other transport
trunk corridors supported by of the contracted services as services, such as metered
feeder routes. discussed later in the PTP taxi and e-hailing services
plan aimed at a door-to-door and
tourism service, will provide
a niche market service that
is not in competition with
commuter services.
.
Provide for 85% Bus and minibus
of all Commuters
taxi services
This will provide PT for more
than 85% of all commuters. Current bus and minibus taxi
service affected by the
implementation of the trunk
and feeder services will be
absorbed into the new
system and areas not
covered by the trunk and
feeder system will form part
of non-contracted services.
The Plan Overall Network Design
Chapter 5 : The Overall Network
Overarching Plan
The Wall-Wall Plan
The long-term plan for PT in eThekwini is based on the fully developed
“Wall-to-Wall” plan with the IPTN system as the basis. The long-term
plan will allow for integration of all public transport modes and the
rationalisation of services to support the Wall-to-Wall plan.
Key Plans
Inner City and Outer Ring PT Plan Pinetown Hill Street PT Plan
The Inner City-Outer Ring Project aims at the development and The ETA undertook a detailed Public Transport Study of
implementation of appropriate transport interventions that will transform the the Hill Street PT Precinct in Pinetown. The study
area into vibrant and effective nodes or precincts. The implementation of included an investigation on the current PT challenges
the plans for the 2020, 2030 and 2040 horizons is dependent on the at the Hill Street PT node within Pinetown and the
implementation of the City’s IPTN and the relevant public transport demand development of PT solutions to alleviate the congestion
which will be derived from the planned land uses experienced.
The Plan Overall Network Design
Chapter 5 : The Overall Network
Overarching Plan
The Wall-Wall Plan
The long-term plan for PT in eThekwini is based on the fully developed
“Wall-to-Wall” plan with the IPTN system as the basis. The long-term
plan will allow for integration of all public transport modes and the
rationalisation of services to support the Wall-to-Wall plan.
Key Plans
Inner City and Outer Ring PT Plan Pinetown Hill Street PT Plan
The Inner City-Outer Ring Project aims at the development and The ETA undertook a detailed Public Transport Study of
implementation of appropriate transport interventions that will transform the the Hill Street PT Precinct in Pinetown. The study
area into vibrant and effective nodes or precincts. The implementation of included an investigation on the current PT challenges
the plans for the 2020, 2030 and 2040 horizons is dependent on the at the Hill Street PT node within Pinetown and the
implementation of the City’s IPTN and the relevant public transport demand development of PT solutions to alleviate the congestion
which will be derived from the planned land uses experienced.
The Plan The Overall Network
Chapter 5 : The Overall Network Wall-Wall Plan
Tongaat Supporting Feeders
ICDS
From JHB Bridge C9 King Shaka
Hillcrest City International Long Distance
C6a C7 C2 C8 Learner Transport
C3 C1 Metered Taxi/E-Hail
Gateway
Dial-a-Ride
Umhlanga TRAM
NMT
Mpumalanga C6B C4
PT Facilities
Pinetown Pavilion Park and Ride
C5 CBD
Rossburgh
Chatsworth Merebank
Umlazi Prospecton
Galleria Isipingo
The Plan Overall Network Design
Chapter 5 : The Overall Network
Overarching Plan
The Wall-Wall Plan
The long-term plan for PT in eThekwini is based on the fully developed
“Wall-to-Wall” plan with the IPTN system as the basis. The long-term
plan will allow for integration of all public transport modes and the
rationalisation of services to support the Wall-to-Wall plan.
Key Plans
Inner City and Outer Ring PT Plan Pinetown Hill Street PT Plan
The Inner City-Outer Ring Project aims at the development and The ETA undertook a detailed Public Transport Study of
implementation of appropriate transport interventions that will transform the the Hill Street PT Precinct in Pinetown. The study
area into vibrant and effective nodes or precincts. The implementation of included an investigation on the current PT challenges
the plans for the 2020, 2030 and 2040 horizons is dependent on the at the Hill Street PT node within Pinetown and the
implementation of the City’s IPTN and the relevant public transport demand development of PT solutions to alleviate the congestion
which will be derived from the planned land uses experienced.
The Plan Overall Network Design:
Chapter 5 : The Overall Network Key Components
The 2040 Public Transport Network comprises
of the following components:
i. IPTN Trunk Corridors (Road)– C1, C1B, C5, C6, C6A and C8
Corridors
ii. IPTN Trunk Corridor (Rail), associated branch lines – C2 Corridor
iii. Outer Ring Feeder Routes to support the relevant Trunk Corridors
iv. Inner City Distribution System (from 3 People Mover routes to 8 ICDS
Routes and ultimately to a TRAM or Light Rail System)
v. Dedicated non-motorised transport Network – both for pedestrians
and cyclists
vi. Major public transport facilities at Warwick Node and Central CBD
The Plan Overall Network Design:
Chapter 5 : The Overall Network Key Components
IPTN Corridors The trunk corridors provide the primary
public transport for commuters to connect
from outside of the study area to and
within the study area. The corridors
terminate at the Major Public Transport
Hub referred to as the Central Facility in
the CBD and passes through the Major
Warwick Node, where the Berea Rail
Station will be integrated with a new PT
facility for the IPTN corridors.
The Plan Overall Network Design:
Chapter 5 : The Overall Network Key Components
Outer Ring Feeders The Outer Ring Area will be serviced by a
feeder network that links the respective
trunk corridors with surrounding areas.
The feeder service fleet will make use of
mixed traffic lanes with standard public
transport stops with shelters. These stops
will generally be spaced at approximately
400m intervals.
The Plan Overall Network Design:
Chapter 5 : The Overall Network Key Components
Inner City Distribution System (ICDS)
To further support the Inner City, there will
be eight (8) bus routes connecting the
Central Facility across the Inner City
referred to as the Inner City Distribution
Service (ICDS). This service will be an
extension of the 3 current People Mover
routes and will operate in mixed traffic with
bus stops at approximately 400m spacing.
The ICDS Network interacts with both the
Warwick Node and the Central Facility.
The Plan Overall Network Design:
Chapter 5 : The Overall Network Key Components
TRAM System To support this vision, a Public Transport
System in the Inner City will be required to
ensure fast, reliable and convenient
movement of people that also creates a
positive perception of public transport (i.e.
a tram system). The proposed Tram
Network has been strategically identified
on corridors that will see an expansion of
mixed use development within a 500m
distance of the Tram network.
The Plan Overall Network Design:
Chapter 5 : The Overall Network Key Components
Non-Motorised Transport
The Inner City and Outer Ring Public
Transport Plan aligns with the concept of a
Walkable City, where NMT corridors have
been proposed along major feeder routes
within the study area. The NMT network
promotes the concept of walking/cycling to
a BRT station or feeder stop
The Plan Overall Network Design:
Chapter 5 : The Overall Network Key Components
Public Transport Facilities
There will be two (2) Major Public
Transport Facilities namely Warwick and
Central. The Central facility will be the
major transport hub in the Inner City while
the Warwick facility will be a support
facility just outside the Inner City
supporting the Outer Ring area and
beyond.
The Plan Overall Network Design
Chapter 5 : The Overall Network
Overarching Plan
The Wall-Wall Plan
The long-term plan for PT in eThekwini is based on the fully developed
“Wall-to-Wall” plan with the IPTN system as the basis. The long-term
plan will allow for integration of all public transport modes and the
rationalisation of services to support the Wall-to-Wall plan.
Key Plans
Inner City and Outer Ring PT Plan Pinetown Hill Street PT Plan
The Inner City-Outer Ring Project aims at the development and The ETA undertook a detailed Public Transport Study of
implementation of appropriate transport interventions that will transform the the Hill Street PT Precinct in Pinetown. The study
area into vibrant and effective nodes or precincts. The implementation of included an investigation on the current PT challenges
the plans for the 2020, 2030 and 2040 horizons is dependent on the at the Hill Street PT node within Pinetown and the
implementation of the City’s IPTN and the relevant public transport demand development of PT solutions to alleviate the congestion
which will be derived from the planned land uses experienced.
The Plan Overall Network Design:
Chapter 5 : The Overall Network Key Components
The ETA undertook a detailed Public
Transport Study of the Hill Street PT
Precinct in Pinetown. The study
included an investigation on the current
PT challenges at the Hill Street PT
node within Pinetown and the
development of PT solutions to
alleviate the congestion experienced.
The project looked at the development
of an ultimate public transport plan for
the precinct, as well as immediate
solutions to address current challenges
in the area
The Plan Overall Network Design:
Chapter 5 : The Overall Network Public Transport Infrastructure
Road Based Rail Infrastructure Universal Access
infrastructure
PRASA is implementing a plan to transform and All new transport infrastructure, facilities
The ETA plans and implements modernise passenger rail over a 10 year period at and public transport vehicles must be
transport (incl. road) accessible by persons with mobility
an estimated investment of R170 Billion. The
infrastructure over all spheres of emphasis is on replacement rather than challenges, such as the elderly, partially
government in a holistic strategy sighted or those in wheelchairs.
refurbishment to bring the infrastructure and
to ensure that all roads in the services up to modern standards.
municipality supports and
benefits all of its citizens in the
municipality.
Presentation Outline
Background The Plan Implementation
• Chapter 1 : Introduction • Chapter 4 : Localised Policies and Strategies • Chapter 10 : Management and
• Chapter 5 : Overall Network Plan Regulation
• Chapter 2 : Status Quo • Chapter 6 : Contracted Services Plan
• Chapter 7 : Non Contracted Services Plan • Chapter 11 : Public Transport
• Chapter 3 : Overarching Legislation, • Chapter 8 : Commuter Rail Services Plan Implementation
Policies and Strategies • Chapter 9 : Operating Licences Plan
• Chapter 12 : Finance and Budget
The Plan Role of Contracted Services in the City
Chapter 6 : Contracted Services
The City is a rapidly New Public Transport Additional public
growing metropolitan Services in Greenfields transport services
area, resulting in an capacity to cater for
developments: growing demand levels
ongoing need for: in existing and densified
areas
Restructuring of existing
services as part of the
implementation of the
IPTN
The Plan Summary of Current Contracted Services
Chapter 6 : Contracted Services Plan
Operational Stats
NO Contr contract tYpe service service contract period Fleet No of No of Monthly kms Rate per No of Pax Fare Revenue Subsidy R/C Pax
act RaTio Boarding
no provider authority of size Routes* Trips claimed km* Boarding pm pm Cost pm** per trip
13% 45.1
contract OpeRated 15% 43.3
44.5
(yR) PM 42.8
41.6
1 ZNT Tender Net Combined Inanda KZN DoT 19 59 11 286 11,581 R43.90 12,892 R78,374 R508,348 37.4
1101 Net 63.2
Net Transport Services 51.6
2 ZNT Tender Net 78.0
1102 Net Services KZN DoT 19 15 382 20,267 R21.78 16,536 R78,033 R441,407 40.3
Net
3 ZNT Tender Net KZN DoT 19 20 548 18,235 R22.61 24,383 R137,841 R412,226 25% 42.7
1103 Net
Net KZN DoT 19 12 310 10,065 R16.49 13,264 R81,602 R166,027 33%
4 ZNT Tender Net
1104 KZN DoT 18 30 1,422 56,091 R21.43 59,115 R342,219 R1,202,255 22%
5 ZNT Tender KKC Metro Metrobu KZN DoT 6 25 24 1,494 43,065 R23.80 55,906 R332,998 R1,025,033 25%
1162 45 53 2,490 90,837 R30.03 157,368
s 408 18,768 R27.01 21,045
6 CT Tender 10
1117 KZT Bus Hammer KZN DoT 18 R1,127,423 R2,728,055 29%
7 ZNT1 Tender Services s-dale
158
(Pty) Ltd KZN DoT 18 R135,408 R506,854 38%
8 ZNT1 Tender
159 Two Line Amoatan KZN DoT 18 13 11 846 30,380 R24.92 66,028 R281,051 R757,192 27%
Trading a 39 39 1,923 108,379 R24.19 77,465
9 ZNT1 Tender KZN Valley of KZN DoT 18 R1,104,731 R2,622,142 30%
160 Country Thousan
Cruiser d Hills
10 ZNT1 Tender (Pty) Ltd
161
Total 810 1,138 71,326 2,068,569 R24.62 3,051,438 R20,942,903 R49,449,93 30%
2
The Plan Summary of Current Contracted Services
Chapter 6 : Contracted Services Plan
Operational Stats
NO Contr contract tYpe service service contract period of Fleet No of No of Trips Monthly kms Rate per No of Pax Fare Revenue Subsidy Cost R/C RaTio Pax
act no provider
authority contract size Routes* OpeRated claimed km* Boarding pm pm pm** Boarding
(yR) PM per trip
11 Durba Tender Net Tansnat Mynah / The Dept / 7 495 835 41,717 1,391,845 R22.81 2,192,728 R1,390,000 R3,174,665 30% 52.6
n (Muvo Durban
Trans )+ Aqualine KZN DoT
port
12 ICDS Tender Net Copper People The Dept 7 33 12,704 70,974 125,000 R696,630 R3,045,211 19% 9.8
8
13 Interi Tender (Muvo Sunset Mover
m
Contr )+
act
Net South Coast Isipingo & KZN DoT 31 31 3,802 94,916 R19.94 80,557 R923,096 R1,892,617 33% 21.2
14 Interi Tender
m Bus Service surrounds
Contr
act Net Marinpine Ndengezi KZN DoT 6 44 44 2,994 103,166 R21.13 149,151 R1,543,498 R2,179,902 41% 49.8
Bus Service &
Total surrounds
810 1,138 71,326 2,068,569 R24.62 3,051,438 R20,942,903 R49,449,932 30% 42.7
* Includes separate forward and reverse Most of the contracts shown have been operating for a significant
directions number of years, ranging from 6 years to as many as 19 years.
** Escalated to Nov 16 While none of the Contracts were provided for review as part of the
*** As at Nov 16 development of this PTP, through consultation with the KZN DoT it
+ Fare revenue not reported by Operator is understood that all of these initial Contracts have lapsed and
operate on a month-to-month basis.
The Plan Description of Existing Contracts in the
Chapter 6 : Contracted Services Area
Durban Transport People Mover
The largest contracted service operator The People Mover Contract operates the Inner City
within the Municipality with a fleet of Distribution Service within the Durban CBD and
operates 23 buses over 3 routes on 15 minute
approximately 495 vehicles and 338 bus headways. The service is operated from 05:00 to
routes. 22:00 daily and moves 130,000 passengers a month.
South Coast Bus Dial-A-Ride
Service
Two specialised
Operates 31 routes and Marinpine Bus transport services for
Service operates 44 routes. Two Line people with disabilities
are provided in the
Trading operates 11 routes between City.
Amaotana and the Durban CBD only.
Learner Transport
. There is a total of nine (9) Learner
Transport Contracts within the City,
operating 33 routes. These contracts are all
administered by the KZN DoT. Services are
operated in both rural and urban regions of.
The Plan Learner Transport Services
Chapter 6 : Contracted Services Plan
• There is a total of nine (9) Learner Transport Contracts within the City, operating 33 routes.
These contracts are all administered by the KZN DoT. Services are operated in both rural and
urban regions of the Municipality.
• All Learner Transport Contracts are similar in terms of the general conditions of contracts which
stipulates the responsibilities of parties involved.
• Seven (7) contracts commenced on 01 January 2012 and two (2) on 01 November 2013, with a
contract duration of approximately 3 years. These initial contract durations have since lapsed
and contracts were extended to March 2018.
• These services are fully subsidised and learners do not contribute towards the cost of the
services. The total cost of these contracts per annum is R14 532 273.00 (2017 excluding
penalties), to operate approximately 235 754 vehicle kilometres of service and transport
approximately 1 650 learners per day.
• Table 6 2 lists all Learner Transport Services in the Province. A total fleet of 33 rigid bus and 2
minibus taxis operate 70 scheduled services per day to transport 1,649 learners to and from
school. Figure 6 2 illustrates these routes spatially within the City.
The Plan Learner Transport Services
Chapter 6 : Contracted Services Plan
The Plan Contracted Services Contract
Chapter 6 : Contracted Services
• Dube Trade Port (DTP)
• Dube Trade Port/ King Shaka Airport is a rapidly developing commercial and industrial zone and
has a strong demand for public transport services. There aren’t any formal public transport
services to DTP currently. A study undertaken by the ETA identified four major origins of a trip to
DTP and four corresponding routes i.e.:
• Tongaat (2,303 passengers per day, 433 peak hour demand).
• Verulam (2,303 passengers per day, 433 peak hour demand).
• Umdloti (659 passengers per day, 124 peak hour demand).
• South (Durban International Airport) (1,317 passengers per day, 248 peak
hour demand).
• Routes from these origins terminate at a public transport facility within DTP. Feeder services
then facilitate distribution of trips to:
Trade Zone (945 passengers per day, 205 peak hour demand).
King Shaka International Airport (4,853 passengers per day, 824 peak hour
demand).
Agri Zone & Dube City (830 passengers per day, 208 peak hour demand).
The Plan Contracted Services Contract
Chapter 6 : Contracted Services
Cornubia DEMAND HORIZON RESIDENTIAL UNITS COMMERCIAL
BULK (M2)
The Cornubia Development in the northern
region of the City is a flagship project of the Short Term 9,729 693,600
Municipality in partnership with Tongaat Hulett
Development. The Cornubia Development will Medium Term 16,097 693,200
compromise of residential and commercial
land-uses, implemented in multiple phases over Long Term 19,889 1,821,382
the short, medium and long term.
Three major routes have been identified to
serve the development in the short term i.e.
Routes between Cornubia and Bridge City
Intermodal Terminal, Umhlanga Taxi Rank and
Verulam Taxi Rank. Routes following a circular
routing within Cornubia will eliminate the need
for further distribution services. The short-term
implementation will require a fleet of 101
minibus taxis to operate these three routes.
The Plan Contracted Services Contract
Chapter 6 : Contracted Services
Riverhorse Valley
• The Riverhorse Valley Business Estate (RHVBE) accommodates light industrial,
commercial and mixed-use activities. The Estate has reached its development capacity
and needs public transport services to support the land use. The demand requirements
have been evaluated and a service response has been developed.
• It is estimated that approximately 17,000 employment opportunities will be generated by
activities within the RHVBE, 50% of which would be dependent on public transport. It is
estimated that 6,500 public transport trips will enter the Business Estate during the 3-hour
AM peak period.
• Trips attraction distributions are estimated as follows:
Inanda/Ntuzuma/KwaMashu – 32%
Durban North – 17%
Reservoir Hills, Avoca Hills & Newlands – 12%
The rest of City – 40%
The Plan Contracted Services Contract
Chapter 6 : Contracted Services
Riverhorse Valley
The bus was identified as the preferred mode in terms of an
operational and financial analysis, but minibus taxi services were
chosen in the short term to reduce service start-up costs and foster
good relations with the minibus taxi industry. Three option were
formulated:
• Option 1- The first option is to provide “direct routes” from every
major residential area to three distinct sub-areas in RHVBE.
• Option 2- This option comprises of a “semi-direct system”. This
system would provide a direct route from a major transfer facility
i.e. in the North: (Umhlanga Rocks New Town Centre (URNTC))
and from the South (Warwick – CBD) to the sub-areas in RHVBE.
• Option 3- The third option would be to provide a shuttle service.
This shuttle service would transport commuters from the
Effingham Rail station to the various sub-areas within the RHVBE
The Plan Contracted Services Contract
Chapter 6 : Contracted Services
Riverhorse Valley Riverhorse Valley
Implementation
• Phase 1 be implemented incrementally i.e. at implementation stage start the service with 25% of the fleet
and with consistent monitoring and evaluation of the service, ramp up to 50 and 100 percent accordingly.
• Phase 2 be implemented as new formalised direct and semi-direct routes to be broken up into two
categories to allow for easy accessibility to the entire RHVBE development
CATEGORY AREAS OF ATTRACTION DIRECTION AREAS SERVICED
Category 1 INK, Newlands, Reservoir Hills
Minibus taxis entering from the northern side 3,4,5,6
of Queen Nandi Drive and the N2 off-
ramp from the south
Category 2 Durban North, Avoca Hills, North, South Minibus taxis entering from the southern 1,2,3
side of Queen Nandi Drive and the N2
off-ramp from the north
The Plan Operating Depots
Chapter 6 : Contracted Services
• Existing contracted services are currently supported by private and municipal owned depot facilities
throughout the Municipality, which address the needs of vehicle maintenance, repairs, cleaning, deployment,
fuelling management and staff. The ownership of the depots is typically closely linked to the ownership of the
vehicle fleet. The existing Durban Transport Services, People Mover, Dial-a-Ride and Mynah Services vehicle
fleet are owned by the City and are supported by four depots owned by the City:
• Alice Street
• Rossburgh
• Umlazi
• Ntuzuma
• The fleet on other contracted services are typically owned by the contracted operator and are supported by
privately owned depots which are typically owned by the bus operator as well.