with relevant authorities and
oval for the construction
ation of all existing
ffected by construction
y Authorities/Stakeholders.
s and liaison works with
and all relevant
ank guarantees.
nd diversion of traffic from
p during the closure the
ix) Relocation, demolition
reinstatement work as
x) All stakeholder engagem
24/7 emergency respon
xi) Temporary and perman
structures.
xii) Dead man block and an
xiii) Foundations works for
xiv) Make good of existing a
throughout the duratio
maintenance of pavem
the limit of works.
n of existing structures and
necessary
ment including provision of
nse team.
nent earth retaining
nchor sheet piles.
the slip ramp.
adjacent structures
on of the contract which
ment/concrete wharf within
3.256
Current condition of prop
4.025
5.177
posed site for slipway ramp
Current condition of prop
5.177
3.256
posed site for slipway ramp
Existing side
LSD (M)
HAT 1.700 3.4
MHWS 1.120 2.8
MSL 0.000 1.7
MLWS -1.120 0.5
LAT -1.700 0.0
e condition
ACD (M) STRUC
5.177 wharf
4.025 Jetty
400 Step
3.256
820
700
580
000
Level difference at
jetty ramp and the
4.025m – 3.25
Say
t tip of existing
e new ramp
56m = 0.769m
= 0.750m
Water level (ACD) for RORO t
Existing R
Jetty Ramp
High water 3.00m
Low water 1.40m
to berth
Ramp baharu
2.25m
0.65m
Water level (ACD) fo
Existi
Jetty Ra
High water 3.00m
Low water 1.40m
or RORO to berth
ing New proposed
amp Slipway ramp
m 2.25m
m 0.65m
Daily Operational Hour
rs Based on Tide Table
Condition LSD ACD
Ground level 5.177
HAT 1.700 3.482
Step 3.256
MHWS 1.112 2.894
MSL 0.000 1.782
MLWS -1.120 0.662
LAT -1.700 0.082
Reference -1.782 0.000
Sea bed
Benefits of thi
Langkawi Port
• Alternative landi
• Landing is feasib
from 0.65 m t
• Bigger traffic for
3 landing poi
is project to
t Sdn. Bhd.
ing point for RORO
ble for all water depth
to 3.00 m
r Port
int for RORO
Aerial view of proposed
d site for slipway ramp
Relative position of propo
osed site for slipway ramp
Closer plan view of propo
osed site for slipway ramp
View from sea of propos
sed site for slipway ramp
Method of Const
Detection of utilities an
Setting out
Piling
Land side to suppo
Sea side for guide
truction
nd other encroachments,
ort concrete slab
e way
Method of Con
Excavation
Construction of slab
Formwork
Rebar
Concreting
Construction of RC w
Formwork
Rebar
Concreting
Construction of rest
nstruction
b
wall
traint block for guide pile
Method o
Construction
Installation of
Installation of
of Construction
of guideway
f bollard
f fender
TE
ERIMA KASIH
TERIMA KASIH
(435194-P)
LANGKAWI PORT SDN. BHD. (435194-P)
Kompleks Dermaga Tanjung Lembung,
07000 Langkawi, Kedah Darul Aman.
Tel : +604 966 5905 / +604 966 5915
Faks : +604 966 5925
E-mail : [email protected]
Website : http://www.langkawiport.com.my
YOUR EFFICIENT GATEWAY TO LANGKAWI