φ = φ 196.725 kN/m Need Check
/φ 0.000 kN/m / 196.725 kN/m = 0.000 < 1.000
2) Check y-Direction
Neg. Member Isolated Footing-52 Need Check
Moment Combination LCB1 (1.40D) OK
/φ 0.000 kN.m/m / -251.907 kN.m/m = 0.000 < 1.000
ρ = 0.00475 < ρ = 0.01031 < ρ = 0.02162 Need Check
Pos. ρ , ρ, ρ Isolated Footing-52 OK
Moment Member LCB1 (1.40D)
Combination 0.000 kN.m/m / 251.907 kN.m/m = 0.000 < 1.000 OK
Shear /φ ρ = 0.00475 < ρ = 0.01031 < ρ = 0.02162 Need Check
ρ , ρ, ρ Isolated Footing-52
Member LCB1 (1.40D)
Combination 0.000 kN/m < 950.950 kN/m
, , 183.706 kN/m
φ = φ 0.000 kN/m / 183.706 kN/m = 0.000 < 1.000
/φ
3) Check 2-way Shear Capacity LCB1 (1.40D) Need Check
0.000 kN / 1,070.958 kN = 0.000 < 1.000
Column-14 Combination
2 /φ
4) Check Pile 2-way Shear Capacity
Sub Point - Combination LCB2 (1.20D+1.60L) Need Check
10 /φ 204.662 kN / 805.449 kN = 0.254 < 1.000
D. Check Pile Bearing Capacity
Pile Member Isolated Footing-52 Not Check
Bearing Combination NONE
Comp. / 0.000 kN / 0.000 kN = 0.000 < 1.000
Engineer Midas ONE
บริษัท 51รายการคำนวณ / รายการประกPอaบgแeบ:บ / 53
สํานกั งาน
Engineer Midas ONE
บริษัท 52รายการคำนวณ / รายการประกPอaบgแeบ:บ / 53
สํานกั งาน
Engineer Midas ONE
บริษัท 53รายการคำนวณ / รายการประกPอaบgแeบ:บ / 53
สํานกั งาน
Engineer Midas ONE