505 PROJECT
Apex-S Performance Y-2022
Apex-S Scrap (<0.5%)
1.2% Kick off 505 Project
1.0%
0.8% 0.96% 0.91% 0.84% 0.87% 0.93%
0.6%
0.4% Jul Aug 0.78% 0.73%
0.2% Q3 0.50%
0.0% 0.56% 0.48% 0.61% 0.51% 0.49%
0.49%
Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Q4-2021 Q1-2022 Q2-2022 Q3-2022 Q4-2022
Apex-S Dppm. (<50 Dppm)
140 128 Kick off 505 Project
120 111
120
100 79 77
80 58 12 49 58
Jan Feb Mar 34
60 45 42
40 Q1-2022 Apr May Jun
Q2-2022 24
20 12
0 Jul Aug Sep Oct Nov Dec
Jul Aug Sep Oct Nov Dec Q3-2022 Q4-2022
Q3-2021 Q4-2021
Activity. Jul 2022
Roller at Trimming Machine not Roller at Trimming Roller at Trimming
complete refer as figure Machine not complete Machine complete
(1) Missing Roller
(2) Roller Location Move - Add in Daily Check List.
(3) Roller Broken.
Activity. Jul 2022
Process Etching Found water from water from air condition New Layout and Move
air condition Condense and fall to fall to PCB Air Condition out off
PCB. waiting PCB Area
Activity. Aug 2022
หลงั คาทแ่ี ผนก Cutting มรี รู ว่ั ทาการตรวจสอบ เปลยี นหลงั คา และ ซอ่ ม เพอ่ื
ป้ องกนั นา้ ฝน ตกลงทแ่ี ผน่ งาน
Key Condition Maintain Aug 2022
53 1
6 42
CNC found problem hole shift out standards (1) Feed 2.196 m/min. (1) Feed 1.700 m/min.
(Breakout of annular ring ) (2) Check Point UE didn’t checked, (2) Check Point UE checked.
Jun –Jul Cutting Scrap
Increasing from last 4 month
then check in process found
accident PCB wrong size
happen continue until July.
Uncontrolled Quantity for First Boards. - IPQC Check Program and Confirm
Cutting Program
- IPQC Check first Boards Cut only 1 Sheet.
Customer Internal Data Frequency
Behavior STD,SC,SA,Ins
Data
Synthesis
New Standards For Inspection
Customer
Apex-S Standards
How to keep us going for success
เราไปถงึ เป้ าหมาย และประสบความสาเร็จไดอ้ ยา่ งไร ?
• Team Work • Work Life Balance
• Apex culture
Civilized society (สงั คมอารยะ)
• เสรภี าพ (Liberty/Freedom)
• เสมอภาค(Equality)
• ภาราดรภาพ (Fraternity)