Open
Open
ATTENDANCE QR CODE Open
AGENDA Open Time (Hours) Agenda Action Party 0830-0900 Arrival of Participants and Registration ' ALL 0900-0915 Safety Briefing and Doa Recitation M Faidhi 0915-0930 Opening Remarks from TA Manager and Operation Rep TAM and Operation 0930-1015 Briefing on TA Overall Activities and Schedule TAC 1015-1045 Briefing on TA Reporting and Planning TAS 1045-1115 Briefing by TA iQAQC TA iQAQC 1115-1145 Briefing on TA HSE Plan SSE 1145-1200 Briefing on Operation House Rules Operatioon 1200-1215 Q&A Session ALL 1215-1230 Adjourn ALL
Open
[Open] 6 Internal Reference: Organizational Learning from Incidents
Open
[VIDEO PENDEK] - Integriti - YouTube
Open
Open
Open
[Open] STRUCTURAL
13 Open
14 Muhammad Hanif B Hasan Nur Hidayatul Nabila Azmi M Faidhi Afiq M Muaz Azhari M Amirul Asraf Ahmad Amirah Zahirah 13 M Hisham M Nasir
15 Open
[Open] Internal • • • • • • • • • • • • • • • • • • • • • • • •
[Open] 17 Internal
[Open] Bintulu (BPA) Loading MK10 MK10 ETA Baram MV Anis Berthing at BPA Loadin g at BPA via MV Anis MV Anis ETA Baram MV Anis Anchor handling MV Anis Anchor handling MV Anis Anchor handlin g Lifting for BA-A jackets shall be completed - due to no gas lift 1. Static 2. Instrument 3. Rotating 4. Construction Labuan (ASB) Loading Kota Belud Kota Belud ETA Baram 1. DESB Bintulu (BPA) Backload via MV Anis 1. Static 2. Instrument 3. Rotating 4. Construction Labuan (ASB) Backload via Dayang Zamrud 1. DESB Loading Backloading Nos UP Vendor Priority LCT DATE ORIGIN DESTINATIO N VENDOR DESCRIPTION LIFT M2 1 UP361135 [sample] BSSB [sample] High - to be at site on 23/7 [sample] Wawasan 8 [sample] 22-Jul-23 [sample] BPA BYP-A [sample] BSSB [sample ] Closed Container, OTT, PAC, N2, Drum and Pallet [sample] 12 [sampl e] 9.38 [sampl e] To submit UP number and payload demand booking by 15 th June 2024 :
19 MATERIAL AND EQUIPMENT MOB PLAN DURING TURNAROUND Onhire, loading & bunkering from Labuan Loading via MK10 Onhire, loading & bunkering from Labuan Anis arrived Baram Water 1 st Mobilization via FCB Alkahfi Comfort MK10 ETA Baram SISO presentation Anchor Handling Anchor Handling Loading via MK10 Gangway Installation MK10 ETA Baram Loading via MK10 MK10 ETA Baram
[Open] 20 Expected POB Accommodation PMA AMA Daily Trippers Discipline BAP-AA Flare cable replacement 2 Daily Trippers Cellar Deck @ BAP-AA 3 x 25 = 75 pax Cellar Deck @ BADP-A 3 x 25 = 75 pax Process Corrosion Monitoring 3 CMPE 9 Flare Boom Inspection 2 Process Corrosion Monitoring 3 Heater PPM and Replacement 10 2Y UPS and battery charger 9 6Y Switchgear 8 Jolac - Flowserve 5 Zamr ud IP – PL288 PL289 25 + 2 Zamrud Expected POB Accommodation PMA AMA POB MV ANIS Discipline Static - RV 10 MV Anis MV Anis Cellar Deck @ BAP-AA 6 x 25 = 150 pax Static – PV Alpha 39 Cons - AIF 50 PL288 and Pl289 10 IP – PL51 and PL352 14+2 Inspection –Flare Tip inspection 2 AB PLC 1 Jet Allied 1 Inspection – PV 8 Inspection - HEX 8 VPAD 3 TA team 1 Total 150 pax Legend LR and RL for MV Anis LR and RL for Daily trippers • Primary Muster Area (PMA) @ MV Anis Comply with SOLAS LSA requirement 200%. • Alternate Muster Area (AMA) from MV Anis • Alternate Muster Area (AMA) for daily trippers • Primary Muster Area (PMA) for daily trippers
[Open] 21 Expected POB Accommodation PMA AMA Daily Trippers Discipline Elec – 1Y Heater PPM 10 Daily Trippers Cellar Deck @ BAKP-B 3 x 25 = 75 pax Cellar Deck @ BAK-B 3 x 25 = 75 pax 2Y UPS PPM 9 6Y Switchgear 8 BAP-AA Flare cable replacement 2 Ins – CV Flowserve 5 Process Corrosion Monitoring 3 CMPE 9 Flare boom Inspection 3 CEM 4 Jet Allied 1 Transducer Replacement 2 Anis RV Recert 10 Electrical EIC + CER 2 MV Anis AB PLC 1 Total 74 pax Expected POB Accommodation PMA AMA POB DAYANG ZAMRUD Discipline Rotating 14 + 1 Dayang Zamrud Dayang Zamrud Cellar Deck @ BAKP-B 6 x 25 = 150 pax Static - HEX 15 Static - PV 33 + 2 Cons - AIF 60 Pipeline – IP 288 289 7 + 2 MATCO -ABV 19 Ins – DeltaV 2 Ins-Triconnex 1 Fisher CV 10 Masoneilan CV 10 VPAD 2 TA Team 5 Total 148 Legend LR and RL for Dyg Zamrud LR and RL for Daily trippers • Primary Muster Area (PMA) @ Dayang Zamrud. Comply with SOLAS LSA requirement 200% • Alternate Muster Area (AMA) from Dayang Zamrud • Alternate Muster Area (AMA) for daily trippers / MV Anis • Primary Muster Area (PMA) for daily trippers / MV Anis
[Open] 22 Internal Route Duration BA-A > BA-B 30 min BA-B > BA-H 15 min BA-A > BADP-C 15 min BA-A > BAJT-D 10 Min BA-A > BADP-E 15 Min BA-A > BAJT-F 10 Min BA-A > BADP-G 15 min Route Duration ETD ETA Remarks BA-B (ZAMRUD) > BAJTH 10 min 0630hrs 0640hrs Crew from Zamrud to BAJT-H BA-A > FBJT3 20 min 0700hrs 0720hrs Crew from Anis to FBJT3 FBJT3> BA-A (Anis) 20 min 0730hrs 0750hrs En route to Anis BA-A (Anis) > BADP-C 15 min 0800hrs 0815hrs Crew from Anis to BADP-C BADP-C > BADP-E 20 min 0830hrs 0840hrs En route from BADP-C to BADP-E BADP-E > BA-B 30 min 0850hrs 0920hrs En route from BADP-E to BA-B Standby at BA vicinity 0930hrs 1000hrs En route to MV Anis 30 min 1000hrs 1030hrs Pickup lunch pack from MV Anis BA-A(Anis) >FBJT3 20 min 1040hrs 1100hrs Drop lunch pack at FBJT3 FBJT3>BADP-C 20min 1110hrs 1130hrs noon Drop lunch pack at BADP-C BADP-C>BADP-E 15 min 1140hrs 1155hrs Drop lunch pack at BADP-E BADP-E>BA-B 30 min 1200hrs 1230hrs Drop lunch pack at BA-B Standby at BA vicinity 1300hrs 1500hrs BA-B > BA-A 30 min 1515hrs 1545hrs Drop Bravo outstation crew BA>A> En route FBJT3 20 min 1545hrs 1605hrs Pickup outstation crew at FBJT3 FBJT3>BADP-C 20 min 1615hrs 1635hrs Pickup outstation crew at BADP-C BADP-C>BADP-E 15 min 1645hrs 1700hrs Pickup outstation crew at BADP-C BADP-E>BA-A(MV Anis) 15 Min 1717hrs 1730hrs Drop all outstation crew to MV Anis Notes : 1. On 28 Jun – 4 July to prioritize on activity for FBJT-3, BADP-C, BADP-E and BA-B sector. 2. To check if Zamrud can spare lunch pack for BA-B team to avoid late lunch. To focus on the following platform : 1. FBJT-3 2. BADP-C 3. BADP-E 4. BA-B 5. BAJT-H
[Open] 23 Internal Route Duration BA-A > BA-B 30 min BA-B > BA-H 15 min BA-A > BADP-C 15 min BA-A > BAJT-D 10 Min BA-A > BADP-E 15 Min BA-A > BAJT-F 10 Min BA-A > BADP-G 15 min Route Duration ETD ETA Remarks BA-A (Anis) > BAJT-F 15 min 0715hrs 0730hrs Crew from Anis to BAJT-F BAJT-F > BADP-G 15 min 0740hrs 0755hrs En route from BAJT-F to BADP-G BADP-G > BA-B 30 min 0805hrs 0835hrs En route from BADP-E to BA-B Standby at BA vicinity 0900hrs 1000hrs En route to MV Anis 30 min 1000hrs 1030hrs Pickup lunch pack from MV Anis BA-A(MV Anis) > BAJT-F 15min 1040hrs 1055hrs Drop lunch pack at BAJT-F BAJT-F > BADP-G 15 min 1100hrs 1115hrs Drop lunch pack at BADP-G BADP-G>BA-A 30 min 1200hrs 1230hrs Drop lunch pack at BA-B Standby at BA vicinity 1300hrs 1600hrs BA-B > BAJT-F 30 min 1600hrs 1630hrs Pickup bravo crew and en route to BAJT-F BAJT-F > BADP-G 15 min 1635hrs 1650hrs Pickup outstation crew at FBJT3 BADP-G> BA-A (MV Anis) 15 min 1700hrs 1715hrs Drop all outstation crew to MV Anis Notes : 1. On 5 July – 13 July to prioritize on activity for BAJT-F, BADP-G and BA-B. 2. Upon completion BAJT-F and BADP-G – to focus on commute from Alpha to Bravo sector only 3. To check if Zamrud can spare lunch pack for BA-B team to avoid late lunch. To focus on the following platform : 1. BAJT-F 2. BADP-G 3. BA-B
24 Open Description Details Booking Focal Person (TA FCB) M Faidhi Afiq / Nur Hidayatul Booking submission Requirement 1. The booking by contractor need to be submitted to engineer in charge (EIC). The EIC will submit the booking to TA Focal Person (as above) 2. All bookings shall be submitted at least 1 day before, cut off time 12pm to TA Focal Person (as above) prior to mobilization date. 3. Check in time/date will be informed to respective EIC Check in Point MPACCT Check in Time 0600hrs (To be confirmed again) 1) Vendor/3rd party provider to arrange UDAT before crew mobilization. UDAT result/report must be submitted to TA team before booking or latest during booking submission. 2) Vendor/3rd party service provider must prepare and submit draft e-PTW before crew mobilization. e-PTW permit numbers must be submitted to TA team before booking or latest during booking submission • All passenger ensure their OSIS are valid prior to submission. • All passenger must bring IC/passport during check in at BPA. • A copy of work permit is required to be submitted together with FCB booking form for ALL Non Sarawakian personnel. • Non Sarawakian MUST bring original passport with work permit stamp to mob. • All personnel are compulsory to wear life jacket outside main deck, onboard FCB. Open
25
For Internal Use - For Internal Distribution Only Open
For Internal Use - For Internal Distribution Only Open 3 days deoiling + degassing BAJT-H SD (15 days) Bravo Sector (BADPB, BAPB, BAKB, BAKPB) Trigger SD 1000hrs Production Handover 1400hrs Mechanical Completion 1500hrs Start Export 1000hrs Alpha Sector (BADPA, BAPA, BAP-AA, BADPC, BAJTD, BAJTF, BADPE, BADPG) Trigger SD 1000hrs Production Handover 0800hrs Mechanical Completion 1000hrs Start export 1000hrs BAJT-H Trigger SD 1000hrs Production Handover 0800hrs Mechanical Completion 1000hrs Start export 1000hrs Fairley Baram Trigger SD 1000hrs Production Handover 0800hrs Completion of IP91 and IP 352 BN Transit Line SD Notes : FBJT3 TA is until 22 July
For Internal Use - For Internal Distribution Only TA Integrated Sequence Based on Discipline Internal
29 Open
30 Open
31 Open
32 Open
33 Open
34 Open
35 Open
36 Open
37 Open
38 Open
39 Open
40 Open
41 Open
42 Open
43 Open
44 Open
45 Open
46 Open
[Open] 47 Internal BADP-B Dept Worklist Description Tag No 1 CMPE TSD PPM 12 units 2 IVA-TCD AIF Findings closure 1 NN 3 Reliability VPAD 2 units BAP-B Dept Worklist Description Tag No 1 CMPE TSD PPM 17 units 2 IVA-TCD AIF Findings closure 20 NN 3 Instrument CV Replacement 5 units BAK-B Dept Worklist Description Tag No 1 Static & Insp PSV RV Recert 5 units 2 PV Cleaning & Inspection 4 units 3 Electrical 1Y Heater 1 unit 5 2Y UPS and Charger PPM 14 units 6 Instrument DeltaV system PM 7 ABV and actuator 8 units 8 Pipeline Degassing and run IP PL288 /PL289 PL288, PL289 9 IVA-TCD AIF Findings Closure 9 NN 10 CMPE TSD PPM 27 NN BAKP-B Dept Worklist Description Tag No 1 Rotating K2400 8K PPM & FMV Installation K2400 2 Static HEX Cleaning & Inspection PV Cleaning & Inspection RV Recert 2 units 1 units 4 units 5 Instrument SIS FGS Triconnex system PM DeltaV system PM AB PLC PM 13 units 6 7 Structural BAKPB Flare Boom Inspection 8 IVA-TCD AIF Findings Closure 53 NN 9 Electrical 1Y Heater,2Y UPS, 6Y switchgear PPM 11 units 1 0 CMPE TSD PPM 17 units BADP-A Dept Worklist Description Tag No 1 Reliability VPAD 5 units 2 Piping AIF Closure 3 NN 3 CMPE TSD PPM 12 units 4 Instrument ABV Replacement 1 unit 5 Electrical 6Y Switchgear PPM 2 units BAP-A Dept Worklist Description Tag No 1 Reliability VPAD 1 unit 2 IVA-TCD AIF Findings closure 1 unit 3 CMPE TSD PPM 10 units 4 Instrumen t ABV and CV replacement 2 units BAP-AA Dept Worklist Description Tag No 1 Static PSV RV Recert 5 units 2 Static PV Cleaning and Inspection 2 units 3 Reliability VPAD 9 units 4 Instrument SIS FGS Triconnex system PM (Trisystem) DeltaV system PM AB PLC PM, CV Replacement 4 units 5 6 7 Pipeline Degassing and run IP PL288 and PL289 PL288, PL289 8 Structural BAPAA Flare Boom Inspection Structural 9 IVA-TCD AIF Findings Closure 1 NN 10 Electrical BAP-AA Flare Cable Replacement 11 Inspection Flare Tip Inspection 1 unit 12 CMPE TSD PPM 11 units BADP-C Dept Worklist Description Tag No 1 Static PSV RV Recert and Vessel Cleaning 4 units 2 Static PV Cleaning & Inspection 1 unit 3 Reliability VPAD 1 unit 4 IVA-TCD AIF Findings Closure 1 NN 5 Instrument ABV Replacement 4 units 6 CMPE TSD PPM 12 units BAJT-D Dept Worklist Description Tag No 1 Reliability VPAD 2 units 2 CMPE TSD PPM 8 units BADP-E Dept Worklist Description Tag No 1 Reliability VPAD 3 units 2 Static RV Recert 1 unit 3 CMPE TSD PM 13 NN BADP-G Dept Worklist Description Tag No 1 Static PSV RV Recert 1 unit 2 Reliability VPAD 5 units 3 IVA-TCD AIF Findings Closure 7 NN 4 CMPE TSD PPM 12 units BADP-H Dept Worklist Description Tag No 1 Static PV Cleaning & Inspection, RV 5 units 2 Reliability VPAD 2 units 3 Instrument DeltaV system PM, SIS FGS 4 CMPE TSD PPM 9 NN 5 Electrical Switchgear, UPS Charger PPM 4 units BAJT-F Dept Worklist Description Tag No 1 Reliability VPAD 2 units 2 Static RV Recert 5 unit 3 CMPE TSD PM 8 NN
For Internal Use - For Internal Distribution Only 48 Internal Fairley Baram Dept Worklist Description Tag No 1 Reliability Non-Intrusive Acoustic Valve Inspection (NAVI) ABV-9010, ABV-030 2 Pipeline PL91, PL352 Intelligent Pigging PL91, PL352
[Open] 49 Internal BADP-B CMPE : 12 NN Valve Replacement : 300-PG-225-3143 check valve replacement VPAD : ABV-911, ABV-9041 Metering : FT-6200 and FT-6300 transducer replacement,. BAP-B CMPE : 17 NN Piping Replacement : (Distribution IA (CS threaded) to V-300], 50-PD-121- 1101X, BAP-B Untagged Line Badly Corroded CV Replacement : PCV-201, LCV-600/610/611, LICV-402, PCV-101 , LICV-202 BAK-B CMPE : 9 NN RV Recert : RV7584, RV5811, RV6912, RV7111, RV7131 PV Cleaning and Inspection : V-7143, S7170, V7144, V-1600 1Y Heater PPM : E-6540 2Y UPS and Charger PPM : BC-201, BC-202, BC-203, BC-204, BC-205, BC-206, BC-207, BC-208, BC-209, BC-210, BC-211, BC-212, BC-101A, BC-101B. DeltaV system PM ABV Replacement : ABV1604, ABV6543, ABV6601, ABV7171, BDV7610, ABV6502, BDV1607, ABV2604 IP : Deoiling, degassing IP PL288, PL289 AIF : BDV1607 dummy spool, 100-PL-0166-1143, PCV2611B valve reinstatement BAKP-B Rotating : K2400 FMV and 8K PPM HEX Cleaning and Inspection : E2460, E2430 Hex Nozzle Replacement : 8” Nozzle E2460 Vessel Cleaning and Inspection : V2440, V1020, V1030 RV Recert : RV5420A, RV5430A, RV5420B, RV5540B BAKPB Flare Boom Inspection SIS FGS Triconnex system PM (Trisystem) DeltaV system PM, AB PLC PM ABV Replacement : SDV1021, SDV2410, SDV6050 CV Replacement : PCV-2490, FCV-1030, PCV-7610, PCV-1020 Heater PPM : F-6030A, F-6080 Heater Replacement : F-6030B 6Y Switchgear PPM : SG-7500, SB-7700, SB-7701, MCC-7800, MCC-7801, MCC-7802 MCC-7803 2Y UPS and Battery Charger : DU-7710 CMPE : 17 NN AIF: 50-FG-6021-11430, 100-DH-6570-11430, 100-VL-6229-11430, 25-AU5421-1143, 25-DC-6447-61450, 25-PG-2460-93430, 50-PG-2433-31450, 50- PG-2434-31450, 50-PG-2454-31430, 0-PG-2459-61450, 50-PG-2475-61450, 50-PG-2477-91430-, 80-DH-6504-11430, 80-PG-3001-31430 BADP-A CMPE : 12 NN VPAD : ABV-9091, ABV-9040, ABV-9081ª, ABV-9051, ABV-9100 ABV Replacement : SDV 202 6Y Switchgear PPM : SB-7750, SB-7760 AIF : 50-PG-503-6101X, 80-P-531-6101X BAP-A CMPE : 10 NN VPAD : ABV Replacement : CV Replacement : 6Y Switchgear PPM : SB-7750, SB-7760 AIF : 50-PG-503-6101X, 80-P-531-6101X BAP-A CMPE : 11 NN VPAD : ABV-9110 ABV Replacement : 6Y Switchgear PPM : SB-7750, SB-7760 AIF : 50-PL-123-1143 Scrubber Reroute BAP-AA CMPE : 11 NN RV Recert : RV1000 , RV6011, RV6350A, RV6360B, RV8431 VPAD : ABV-9110, ABV-9120, ABV-9130, ABV-9140, ABV-9060, ABV-9080, ABV-1301, ABV-9010, ABV-9070 SIS FGS Triconnex system PM DeltaV system PM AB PLC PM : ENCL-01 (FLARE PANEL), LCP-6300, LCP-6310, LCP-6305 CV Replacement : FCV-8010 (4"600#) 6Y Switchgear PPM : SB-7760, SB-7750, LV-301 AIF : 50-PL-123-1143 Scrubber Reroute BAP-AA Flare Tip Inspection BAP-AA Flare Cable Replacement IP PL288 and PL289 BADP-C CMPE : 12 NN RV Recert : RV0700 , RV0702A, RV0803 Vessel Cleaning and Inspection : S700 VPAD :ABV-5060 AIF : 150-V-001-1101X ABV : ABV5060, ABV0700, SDV602, BDV603 BADP-C CMPE : 8 NN BADP-E CMPE : 12 NN RV Recert : RV1969 VPAD : ABV-2511, ABV-2521 AIF : 150-DH-3062-1143, 150-PD-3364-6143, 50-PL-3471-1143 BAJT-F CMPE : 8NN RV Recert :RV3161, RVU1-1, RV9006, S2-2 BADP-G CMPE : 12 NN VPAD : ABV-2521, ABV-2501ª, ABV-2502ª, ABV-2503ª, ABV-2504A RV Recert :RVJT, RV3161 AIF : 50-IG-3552-1149, 25-PD-3388-1143 BADP-G CMPE : 9NN PV Cleaning BADP-H CMPE : 9NN PV Cleaning & Inspection : V6410 RV Recert : RV6520, RV0110-A, RV0110S, RV0111S DeltaV system PM SIS FGS
[Open] BADP-A Internal