Disaster Recovery
Exceptional Service – Transparent Cost Management – Dynamic Delivery
Key personnel
Nick Weaver Gary Newport
BUSINESS DEVELOPMENT DIRECTOR DIRECTOR
David Rose Colleen Goodall
UK BUSINESS DEVELOPMENT MANAGER
DIRECTOR OF BUSINESS DEVELOPMENT
2
ANG – Part of global business Artelia Group
ANG Artelia Group comprises three divisions with the
main focus on Insurance Reinstatement
Insurance Reinstatement
Management Contracting Stoke Rochford West Country Manor House
Cost Consultancy
3 South Lodge, Grim’s Dyke Oulton Hall, Norfolk
Introducing Artelia Group
4
The main risks to managing large claims?
Management Risks Additional Cost Risks
o Project leadership o Professional fees
o Inexperienced Consultant team o Alternative accommodation
o Service & fee agreements o Additional cost of working
o Poor customer communication o Business interruption
o Contractor selection o Contents storage and equipment hire
o Inaccurate construction planning o Building cost & VAT
o Delayed procurement o Design fees
Traditional Claims Process versus ANG Artelia Claims Process
Individual or
Appointment process Multi Disciplinary Design & Tender process Construction delivery
Complex Traditional Claims Process
Event
Architect
Insurer
Quantity
Surveyor
Insured Broker Structural
Engineer Contractors
Project
Manager
Loss Adjuster
Consult with
planning
authority
Multiple Contractual Links
ANG360 Streamlined Parallel Process
Architect
Time & Cost Saved
ANG ARTELIA
Event Quantity
Surveyor
Structural
Engineer Parallel Programme
Insured Broker Insurer
Project
Manager
Design delivery
Consult with
planning
authority
Loss Adjuster
Construction delivery
Contractors
Event
The Parallel
Programme
Parallel
6 Programme
Completion saving Initial
Complete transparency.
Loss Insurer, Loss Adjuster &
client agree fees for all
Response
Scheduled disciplines
communications with
Benefits: Broker, Loss Adjuster
and Insurer 5 2
Work commences, ANG ANG appoints
› Immediate claims response procures all subcontractors Major professional team
& suppliers in competition. i.e. architects, engineers Initial 4 week
› Key activities overlap Property in competition programme
Loss delivered by ANG 360
› Reduced contract duration & Regular accurate to eliminate cost &
build costs reporting against programme risk
reserve to Broker,
› Reduced Alternative Loss Adjuster and
Insurer
Accommodation & Business 3
Interruption Claims ANG commences recovery
4 process e.g. emergency
ANG consults Local works salvage, site
Authorities, customer, Loss clearance
Professional & Adjuster & insurer,
construction teams arranges final estimates &
combined early to procurement plan. Recovery on site
develop most efficient & commences in parallel
with professional
8 cost-effective design. appointments and
statutory permissions
Where delivers best value
► Hotels ► Shopping Developments
► Stadiums ► Retail parks
► Historic properties ► Marinas
► Conference venues ► Education
► Ecclesiastical property ► Agricultural
► Commercial property
9
Adding value via Artelia360 remote project monitoring
During these restrictive times and virtual ways of working, Artelia360
offers our clients a remote platform to support business continuity
while keeping safe from the threats of the current pandemic.
Artelia360 offers clients the following:
› Remote decision making with photo, 360 footage & video tours
› Monitor progress remotely online in real time
› Shared visual and written documentation
› Project data analysis to aide decision making
› Reduce the number of site visits
In addition to the visual aspects, Artelia360 also provides
reports and project analytics via Google Data Studio, useful to
track established KPI’s
10
Case study | Regents Park, London
PLANNING & DESIGN
CONSTRUCTION
PARALLEL ACTIVITIES
Case study | Regents Park, London
These services are contractually ‘ring-fenced’ with the client, allowing an early start on site to action urgent establishment
and construction enabling works, whilst allowing planning & design to proceed in parallel. The benefits of this engagement can
be seen below, with many of these critical activities unable to occur this early under a traditional approach, saving time & money.
CONSTRUCTION
ANG site established Enabling works
HSE notified. Protection, soft Scaffolder appointed commence Scaffolding commences
strip, isolations, salvage and Design commences, approvals Opening up work, hard Design complete. Crown
drying out regime commence from Crown Estates requested strip out estates approval granted
PLANNING & DESIGN Design
Design Main works Pre-
ANG appoints and briefs Design & building assessment Planning application design
consultants. Council & Preliminary surveys, Application for Design info received and Planning
Crown Estates investigations & assessments enabling works Initial design review historic statement Main works pre-
application submitted
engagement begins complete. Reports prepared submitted to council & co-ordination drafted to council
Planning
Council consent
received for
enabling works
12 AUG SEP OCT NOV DEC
delivers tangible benefits
Oulton Hall
Reinstatement of fire damaged Grade II Listed
historic hall. Total estimated loss £5m
Time saved
ANG introduced following the removal of the original
building contractor. ANG delivered the project in line
with the proposed contract programme
Costs saved
Saving of £100k on the initial reserve
Reference from insured available on request
13
delivers tangible benefits
Uphill Manor Hotel, Somerset
Reinstatement of fire damaged Grade II Listed
manor house. Total estimated loss circa £4m
Time saved
12 months on an initial 36 month contract
Costs saved
£325k under initial reserve of £4m
“The way they have handled the historic aspect of the project has
been utterly reassuring right from the word go………everything
has to be sourced individually, labour, skills and so on and that
was the other big thing that Austin Newport has handled well”
14 Craig Kennedy, Owner, Uphill Manor
delivers tangible benefits
Commercial client
Reinstatement of interior following ceiling collapse
April 2019.
Time saved
> 6 months, resulting in a reduced BI Claim and a return
to trading to capture ‘Christmas trade’
Costs saved
Significant cost saved against the Insurer’s reserve
and Business Interruption Claim
“It has been a pleasure to be involved with a proactive and
competent team who took any challenges in their stride to result in
a fantastic project”
Client Representative, May 2020
15
ANG Fee Table
Traditional ANG Artelia
PROFESSIONAL FEES
10% Commercial Architect, PM, Planning 8% - 10% Commercial
QS, Structural
12% - 17% High Net Worth 12% - 15% High Net Worth
Contractors profit > 15% CONTRACTORS ANG Management Fee < 10%
16
How delivers better value?
What is the additional cost to Insurer for ANG Artelia service?
› No additional cost
› Our management fee simply replaces the contractor’s profit
› All professional fees are agreed with the appointed Loss Adjuster
The Key benefits?
› Cost control and immediate cost reporting to Adjuster/Insurer
› ‘Best of Class’ claims service and lower Claims cost
› Financial transparency
› Open and rapid communication
› Reduced reinstatement periods
› Reduced exposure to management risks and additional claims costs.
› Higher claims satisfaction ratings and client retention
› Single point of contact
17
Gary Newport, Director Nick Weaver, Business Development Director
E: [email protected] E: [email protected]
M: +44 7774 118 471 M: +44 7891 309 305
David Rose, Director of Business Colleen Goodall, UK Business Development
Development Manager
E: [email protected] E: [email protected]
M: +44 7766 258 061 M: +44 7964 249 772
Birmingham Office London Office
9 Greenfield Crescent High Holborn House
Edgbaston 52 – 54 High Holborn
Birmingham Holborn, London
B15 3AU WC1V 6RL
www.uk.arteliagroup.com