PIPELINE INTEGRITY STATEMENT
Page 100
PIPELINE INTEGRITY STATEMENT
Page 101
PIPELINE INTEGRITY STATEMENT
Page 102
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
RESAK & TBC (PPG-D)
PIPELINE & STRUCTURAL REPORT
BY FIELD 2019/2020
PIPELINE NAME & PRODUCT (SERVICE)
PMOPL39: 28" RDPA-OGT - GAS SEMI PROCESS (MAIN GAS LINE)
1 .
PMOPL46: 24" BRB-RDPA - DRY GAS (SALES GAS)
2 .
PMOPL74: 16" LHDPA-MLDPA - GAS (FULL WELL STREAM)
3 .
PMOPL75: 24' MLDPA-TBDRA - GAS (FULL WELL STREAM)
4 .
PMOPL76: 24" TBDRA-RDPA - GAS SEMI PROCESS (GAS)
5 .
PLATFORM
NAME
RCPP
1.
RDPA
2.
RFT
3.
MLDP
4.
LHDPA
5.
TBCPA
6.
TBDRA
7.
TBFPA
8.
Page 107
PIPELINE INTEGRITY STATEMENT
Page 108
PIPELINE INTEGRITY STATEMENT
Page 109
PIPELINE INTEGRITY STATEMENT
Page 110
PIPELINE INTEGRITY STATEMENT
Page 111
PIPELINE INTEGRITY STATEMENT
Page 112
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
TERMINAL (PPT)
PIPELINE & STRUCTURAL REPORT
BY FIELD 2019/2020
PIPELINE NAME & PRODUCT (SERVICE)
PMOPL05: 30" HAIRPIN LOOP - GAS SEMI PROCESS (GAS)
1 .
PMOPL54: 24" OGT-GPPA - DRY GAS (SALES GAS)
2 .
PMOPL55: 8" OGT-GPPA - STABILIZED CONDENSATE
3 .
PMOPL56: 42" OGT-GPPA - DRY GAS (SALES GAS)
4 .
PMOPL57: 12" OGT-GPPA - STABILIZED CONDENSATE
5 .
PMOPL62: 36" TCOT-SALM1 - CRUDE
6 .
PMOPL63: 36" TCOT-SALM2 - CRUDE
7 .
PMOPL81A: 24" MRP-PLTS - DRY GAS (MAIN GAS LINE)
8 .
PMOPL81B: 28" PLTS-TGAST - DRY GAS (MAIN GAS LINE)
9 .
PLATFORM
NAME
TCOT
1.
OSC
2.
OGT
3.
TGAST
4.
Page 121
PIPELINE INTEGRITY STATEMENT
Page 122
PIPELINE INTEGRITY STATEMENT
Page 123
PIPELINE INTEGRITY STATEMENT
Page 124
PIPELINE INTEGRITY STATEMENT
Page 125
PIPELINE INTEGRITY STATEMENT
Page 126
PIPELINE INTEGRITY STATEMENT
Page 127
PIPELINE INTEGRITY STATEMENT
Page 128
PIPELINE INTEGRITY STATEMENT
Page 129
PIPELINE INTEGRITY STATEMENT
Page 130
CIVIL INTEGRITY STATEMENT
Page 131
CIVIL INTEGRITY STATEMENT
Page 132
CIVIL INTEGRITY STATEMENT
Page 133
CIVIL INTEGRITY STATEMENT
Page 134
PTS32 ACHIEVEMENT 2019
PIPELINE
HIGH PRESSURE PIPELINE FPSO BUK EXPORT HOSE
ISOLATION AT ANGSI AND OSC REPLACEMENT
Deployment of 4 units of 24 to 32 inch high Periodic change out activity successfully
pressure isolation tools at Angsi & OSC completed within 28hrs execution.
concurrently during integrated TA in August Towing of marine hose for 2days without
2019. To enable valves change-out without any safety issues.
having to depressurize the pipelines.
MULTI-DIAMETER INTELLIGENT I-PIMS (STAGE 1) GO-LIFE: DATA
PIGGING INSPECTION FOR HARVEST
BERGADING-TGAST PIPELINE.
Pipeline integrated
software at
PETRONAS level.
New system
development for
pipeline integrity
management
system for all
PETRONAS pipeline
network.
First in PETRONAS for dual-diameter
intelligent pigging. Collaboration with
HESS in achieving successful and safe
execution
Page 135
PTS32 ACHIEVEMENT 2019
STRUCTURAL
BOAT LANDING
XPP NEW SENSOR CONDUCTOR
INSTALLATION DUYONG IMPACT ANALYSIS STABILIZER
Successfully installed 4
Boatlanding Impact Analysis numbers of conductor
New excess pore pressure successfully completed in- stabilizer at Bekok-B
sensors successfully installed house for 15 platforms to re- outboard conductors (WH
using ROV at Duyong CPP assess the capacity to 12, 14 & 16) to arrest
seabed to monitor shallow gas accommodate PMA vessel conductor movement
presence and provide fleet for personnel transfer. subseaquently ensuring
information for soil study. wellhead piping integrity.
SALM REPAIR
Successfully completed TCOT
SALM 2 refurboshment and
reinstatement activity.
TCOT SALM 2 was parted and
out of service (OOS) for 8month
The completion of reinstatement
works resume back TCOR Crude
offtake activity to normal
operation.
ONSHORE (CIVIL)
TCOT TNB-SSU: HAND OVER TO TNB
TCOT Power Supply Upgrade:
TCOT TNB-SSU Building Construction completion and handover
to TNB
Page 136