ANNUAL
PIPELINE AND
STRUCTURAL
INTEGRITY
REPORT
2019/2020
PE NI NS U L A R M A L A Y S I A A S S E T U PS T R E A M
T A B L E O F C O N T E N T S
02
PIPELINE AND STRUCTURAL SECTION :
ORGANISATION CHART
03
PMA : FACILITIES LAYOUT
04
PMA : PIPELINE ASSET OVERVIEW
05
PMA : OFFSHORE ASSET OVERVIEW
(STRUCTURAL)
06
0 8 1 2 1 4
PMA : ONSHORE ASSET OVERVIEW (CIVIL)
07
ANGSI (PPO-S): PIPELINE AND
STRUCTURAL INTEGRITY REPORT BY FIELD
32
DULANG (PPO-L) : PIPELINE AND
STRUCTURAL INTEGRITY REPORT BY FIELD
48
DUYONG (PPG-D) : PIPELINE AND
STRUCTURAL INTEGRITY REPORT BY FIELD
62
PM9 (PPG-P) : PIPELINE AND STRUCTURAL
INTEGRITY REPORT BY FIELD
3 1 2 3
95
PNLP (PPO-F) : PIPELINE AND STRUCTURAL
INTEGRITY REPORT BY FIELD
108
RESAK & TBC (PPG-D) : PIPELINE AND
STRUCTURAL INTEGRITY REPORT BY FIELD
122
TERMINAL (PPT) : PIPELINE AND
STRUCTURAL INTEGRITY REPORT BY FIELD
136 6 9
5 0
PIPELINE: PTS32 ACHIEVEMENT 2019
137
STRUCTURAL: PTS32 ACHIEVEMENT 2019
137
CIVIL: PTS32 ACHIEVEMENT 2019
THE INFORMATION IN THIS BOOKLET IS INTENDED FOR GENERAL INFORMATION AND
QUICK REFERENCE OF PMA PIPELINES,OFFSHORE PLATFORMS AND ONSHORE
TERMINAL FACILITIES. THE INFORMATION IS DEEM ACCURATE TO A CERTAIN DATE AS
INSPECTION AND MAINTENANCE ACTIVITIES ARE CONTINUOUS ONGOING PROCESS.
HENCE THIS DOCUMENTS SHALL NOT BE USED AS REFERENCE FOR ANY DETAIL
ASSESSMENT IE ENGINEERING AND AUDIT ACTIVITY. LATEST INFORMATION TO THE
EXISTING STATUS OF A PROJECT.
Page 1
PTS32 PIPELINE & STRUCTURAL SECTION
ORGANISATION CHART
M Z A I L A N I B I N I S M A I L
H EAD P IP E LI NE A ND S TRUC TURA L
Z A I D I Z A K A R I A
STAFF CTUR A
( &P P T)
A Z A M S H A U Q I J A L A L U D D I N M D E S A
ST AFF STRUC TURAL A DMIN
N U Z U L I Z A N I PLANNING & CONTROL
S TAFF PIPELIN E (P PO
W A H M A D I Z U D D I N N A D I A I Z Z A T I
SENIOR EXECUTIVE STRUCTURAL
S TAFF P IP ELIN E (P PG P PT
BUDGET
STRUCTURAL PIPELINE N O R ' A I S Y A T U L S A K I N A H
S E CTION PL A NNE R
S I T I N U R S H A M S H I N A Z Z A T U L
B A L Q I S H M A B D U L Y A K I N S I T I A I S H A H
SENIOR TECHNICAL AS SIS TANT EXECUTIVE PIPELINE
SENIOR EXECUTIVE STRUCTURAL
LEAD PIP ELI NE
LEAD S TRUC TURA L (DUL A NG )
I S S A U R A F A T M A W A T I
Q U A I L I D R E Z Z A N O R A I N I W A H A B
TE CH NI CAL D A TA ADMIN
SENIOR EXECUTIVE STRUCTURAL
SENIOR EXECUTIVE PIPELINE
DRT
A NG SI
M A S D U Q I
M F A R I D H A R O N S I T I N O O R F A I R U Z STRUC TURAL INS PE CTOR
SENIOR EXECUTIVE STRUCTURAL SENIOR EXECUTIVE PIPELINE
ANGSI TERMINAL
M K H O S A N I
M A I M A N N O R H I D A Y A H S TRUC TURAL IN SPE CTOR
SENIOR EXECUTIVE STRUCTURAL SENIOR EXECUTIVE PIPELINE
M A Z A H A R I
PM9 SMA LLFI ELD
S ITE REPRE S E NT A TI VE
S A I F U D D I N A Z A M N I K M F I R M A N N
EXECUTIVE STRUCTURAL
EXECUTIVE PIPELINE K A M A R U L A B A D I
SMA LL FI E LD
DULANG
S ITE RE PRE S E NT A TIV E
A H M A D S H A F I K W A N S H A R I L
S Y E D N A Z I R U L M U B I N
SENIOR EXECUTIVE STRUCTURAL
EXECUTIVE PIPELINE
TERMIN AL
DRT SITE RE PR E S ENTATIV E
Q I S T I N A Z A W A N I M Z U L K A R N A I N M A D A M
SIMS
EXECUTIVE PIPELINE
SITE E S REPR ENTATIVE
PM9
N O R A Z I E L A
M U H A M M A D Z U N U
S IMS
SITE RE PRESE NTATI VE
PROJECT MANAGEMENT
Z A I D I M A T A L I A M I R S Y A Z U A N M O H A M A D F A R I D
PROJE CT E NG INE E R PROJECT ENGINEE R
MARINE ENGINE E R
P E NI NS UL AR MAL AY S I A AS S E T UP S T RE AM Page 2
T
U
O
Y
A
L
T
E E
S N
S I
A L
A E
I
S P
Y I
A P
L
A &
M
M
R
A R
L O
U F
S
N T
I A
N
E L
P P
Page 3
P M A : P I P E L I N E A S S E T O V E R V I E W
SERVICES
Gas 22 33
Crude
84 Water Injection 8
Condensate 3
PIPELINE Service Gas 0 10 18 20 30 40
AGE POPULATION
TOTAL LENGTH 41-50 3
2081.551 km YEARS 31-40 15 25
21-30
11-20 29
0-10 10
0 5 10 15 20 25
60 4 20
OPERATING SHUT-IN PRESERVED
PIPELINE YEAR PIPELINE YEAR
PMOPL54 2014 PMOPL17 2012
PIPELINE RISK PMOPL59 2019 PMOPL19 2012
STATUS (June 2021) PMOPL66 2010 PMOPL20 2019
PMOPL55 2014 PMOPL21 2012
PMOPL24 2012
High (1) PMOPL25 2006
PMOPL26 2012
Low (55) Medium (4) PMOPL27 2012
PMOPL27A 2016
PMOPL29 2018
PMOPL33 2013
PMOPL34 2013
PMOPL35 2013
PMOPL36 2013
PMOPL37 2013
PMOPL38 2013
PMOPL64 2016
PMOPL65 2016
PMOPL77 2011
PMOPL80 2016
Page 4
P M A : O F F S H O R E A S S E T O V E R V I E W
( S T R U C T U R A L )
43
FIXED
OFFSHORE
PLATFORM
38 5
ACTIVE/ MOTHBALL
PRODUCING
SUBSTRUCTURE SUBSTRUCTURE
CONFIGURATION RISK STATUS
8-Legged 11
Risk as of June 2021
4-Legged 23
3-Legged 6 High (0)
Tarpon 3
0 5 10 15 20 25 Medium
(15)
STRUCTURE AGE
POPULATION
41-50 2 15
YEARS 31-40 5
21-30
11-20 14
0-10 7 Low (31)
0 5 10 15
Page 5
P M A : O N S H O R E A S S E T O V E R V I E W
( C I V I L )
1
OIL TERMINAL
3 1
GAS TERMINAL BUKIT JERUNG
TELECOM POST
TERMINAL AGE
POPULATION
41-50
YEARS 31-40
21-30
11-20
0-10
0 1 2 3
Page 6
ANGSI (PPO-S)
PIPELINE & STRUCTURAL REPORT
BY FIELD 2019/2020
PIPELINE NAME & PRODUCT (SERVICE)
PMOPL40: 32" ANDRA-OSC - DRY GAS (MAIN GAS LINE)
1 .
PMOPL41: 6" ANDRA-ANDPB - DRY GAS (GAS LIFT)
2 .
PMOPL42: 12" ANDRA-ANDPB - TREATED SEAWATER (WATER INJECTION)
3 .
PMOPL43: 16" ANDPB-ANDRA - CRUDE (FULL WELL STREAM)
4 .
PMOPL44: 16" ANDRA-TAP - CRUDE (MAIN OIL LINE)
5 .
PMOPL47: 6" ANDPB-ANDPE - DRY GAS (GAS LIFT)
6 .
PMOPL48: 6" ANDRA-ANDPC - DRY GAS (GAS LIFT)
7 .
PMOPL49: 10" ANDPC-ANDRA - CRUDE (FULL WELL STREAM)
8 .
PMOPL50: 10" ANDPE-ANDRA - CRUDE (FULL WELL STREAM)
9 .
PMOPL51: 10" ANPGA-ANDPC - TREATED SEAWATER (WATER INJECTION)
1 0 .
PMOPL52: 10" ANPGA -ANDPE - TREATED SEAWATER (WATER INJECTION)
1 1 .
PMOPL69: 12" ANDPD-ANDRA - CRUDE (FULL WELL STREAM)
1 2 .
PMOPL70: 10" ANDRA-ANDPD - TREATED SEAWATER (WATER INJECTION)
1 3 .
PMOPL71: 6" ANDRA-ANDPD - DRY GAS (GAS LIFT)
1 4 .
PMOPL77: 24 ANDRA-TCOT - CRUDE (MAIN OIL LINE)
1 5 .
PMOPL82: 20" BSDPA-ANDRA - GAS (FULL WELL STREAM)
1 6 .
PLATFORM
NAME
ANPGA
1.
ANDRA
2.
ANDPB
3.
ANDPC
4.
ANDPD
5.
ANDPE
6.
BSDPA
7.
Page 7
PIPELINE INTEGRITY STATEMENT
Page 8
PIPELINE INTEGRITY STATEMENT
Page 9
PIPELINE INTEGRITY STATEMENT
Page 10
PIPELINE INTEGRITY STATEMENT
Page 11
PIPELINE INTEGRITY STATEMENT
Page 12
PIPELINE INTEGRITY STATEMENT
Page 13
PIPELINE INTEGRITY STATEMENT
Page 14
PIPELINE INTEGRITY STATEMENT
Page 15
PIPELINE INTEGRITY STATEMENT
Page 16
PIPELINE INTEGRITY STATEMENT
Page 17
PIPELINE INTEGRITY STATEMENT
Page 18
PIPELINE INTEGRITY STATEMENT
Page 19
PIPELINE INTEGRITY STATEMENT
Page 20
PIPELINE INTEGRITY STATEMENT
Page 21
PIPELINE INTEGRITY STATEMENT
Page 22
PIPELINE INTEGRITY STATEMENT
Page 23
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
DULANG (PPO-L)
PIPELINE & STRUCTURAL REPORT
BY FIELD 2019/2020
PIPELINE NAME & PRODUCT (SERVICE)
PMOPL06: 6" DLB-FSO - DRY GAS (GAS)
1 .
PMOPL07: 6" DLB-DLA - DRY GAS (GAS LIFT)
2 .
PMOPL08: 6" DLB-DLC - DRY GAS (GAS LIFT)
3 .
PMOPL09: 6" DLB-DLD - DRY GAS (GAS LIFT)
4 .
PMOPL10: 8" DLB-DLA - TREATED SEAWATER (WATER INJECTION)
5 .
PMOPL11: 10" DLC-DLD - TREATED SEAWATER (WATER INJECTION)
6 .
PMOPL12: 10" DLB-FSO - CRUDE
7 .
PMOPL13: 12" DLA-DLB - CRUDE (FULL WELL STREAM)
8 .
PMOPL14: 12" DLC-DLB - CRUDE (FULL WELL STREAM)
9 .
PMOPL15: 12" DLB-DLC - TREATED SEAWATER (WATER INJECTION)
1 0 .
PMOPL16: 14" DLD-DLB - CRUDE (FULL WELL STREAM)
1 1 .
PLATFORM
NAME
DLA
1.
DLB
2.
DLC
3.
DLD
4.
Page 31
PIPELINE INTEGRITY STATEMENT
Page 32
PIPELINE INTEGRITY STATEMENT
Page 33
PIPELINE INTEGRITY STATEMENT
Page 34
PIPELINE INTEGRITY STATEMENT
Page 35
PIPELINE INTEGRITY STATEMENT
Page 36
PIPELINE INTEGRITY STATEMENT
Page 37
PIPELINE INTEGRITY STATEMENT
Page 38
PIPELINE INTEGRITY STATEMENT
Page 39
PIPELINE INTEGRITY STATEMENT
Page 40
PIPELINE INTEGRITY STATEMENT
Page 41
PIPELINE INTEGRITY STATEMENT
Page 42
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
STRUCTURAL INTEGRITY STATEMENT
DUYONG (PPG-D)
PIPELINE & STRUCTURAL REPORT
BY FIELD 2019/2020
PIPELINE NAME & PRODUCT (SERVICE)
PMOPL01:14" DDPA-CPP - GAS (FULL WELL STREAM)
1 .
PMOPL02: 14" DDPC-CPP - GAS (FULL WELL STREAM)
2 .
PMOPL03: 24" CPP-SCPA - GAS SEMI PROCESS (GAS)
3 .
PMOPL04: 30" SCPA-OGT - GAS SEMI PROCESS (GAS)
4 .
PMOPL53: 18"WNAT-CPP - DRY GAS (GAS)
5 .
PLATFORM
NAME
DCPP
1.
DDPA
2.
DDPB
3.
DDPC
4.
DFT
5.
DGCP
6.
DLQ
7.
SCPA
8.
Page 47
PIPELINE INTEGRITY STATEMENT
Page 48
PIPELINE INTEGRITY STATEMENT
Page 49