2.0 Project Development

PROJECT
DEVELOPMENT

ALPINE SKI HOUSE

1. Plan requirement and design specification
2. Manage the hardware or software

configurations
3. Develop problem specification and design

ALPINE SKI HOUSE

Plan requirement and design specification

Explain the tasks involved in implementation phase.
a. Hardware build-out
b. Software installation
c. System configuration
d. Customization and development

ALPINE SKI HOUSE

2 Manage the hardware or software configurations

1. Install and implement the devices needed.
2. Specify the configurations that must be done on the

devices.
3. Install the software needed for the project.
4. Use the features of the software or hardware to get desired

output.
5. Specify the version control procedure of the software or

hardware.

ALPINE SKI HOUSE

3 Develop problem specification and design

1. Design the project structure.
2. Apply security mechanism on the project.
3. Develop the project using an appropriate programming

language or development tools/ hardware requirement.
4. Implement the project by integrating all the setup

configurations.

ALPINE SKI HOUSE

5. Review the overall development.
6. Identify the errors by debugging or troubleshooting.
7. Describe policy and practice in system integration to ensure

secure system operation and information assurance.
8. Document and present the report of the progress

development of the project.