PROJECT
DEVELOPMENT
ALPINE SKI HOUSE
1. Plan requirement and design specification
2. Manage the hardware or software
configurations
3. Develop problem specification and design
ALPINE SKI HOUSE
Plan requirement and design specification
Explain the tasks involved in implementation phase.
a. Hardware build-out
b. Software installation
c. System configuration
d. Customization and development
ALPINE SKI HOUSE
2 Manage the hardware or software configurations
1. Install and implement the devices needed.
2. Specify the configurations that must be done on the
devices.
3. Install the software needed for the project.
4. Use the features of the software or hardware to get desired
output.
5. Specify the version control procedure of the software or
hardware.
ALPINE SKI HOUSE
3 Develop problem specification and design
1. Design the project structure.
2. Apply security mechanism on the project.
3. Develop the project using an appropriate programming
language or development tools/ hardware requirement.
4. Implement the project by integrating all the setup
configurations.
ALPINE SKI HOUSE
5. Review the overall development.
6. Identify the errors by debugging or troubleshooting.
7. Describe policy and practice in system integration to ensure
secure system operation and information assurance.
8. Document and present the report of the progress
development of the project.