Sustainable Development Goals
Kasawari HSE programs towards SDG #12 and #13:
• Managing use of single plastic bottle.
• Going digital on UAUC, HSE Alert & Grievance
Mechanism (paperless)
• PEDMS system (paperless)
• 3R Waste Bin at offices
• Grab Bag replacing conventional plastic bag
• Hand dryer at toilet replacing toilet paper
• Promote usage of recycle paper
• e-MOM (Minutes of Meeting)
• Environmental Campaign i.e Go Green Kasawari
Campaign
108
Waste Management
FACT *Polystyrene & *Plastic *Plastic Fork
Styrofoam Coffee Cup and Knife
Marine plastic litter is gaining
*Plastic take- *Plastic *Plastic Bag
heightened global attention out container Water Bottle * Plastic Straw
as an environmental problem. Each
year, more than 8
million tons of plastic ends up inthe
oceans, wreaking
havoc on marine wildlife, fsheries and
tourism, and costing
at least $8 billion in damage to marine
ecosystems3. World
production of plastic materials in
2016 was 280 million
tonnes, of which about one thirdis
single-use plastic
Waste Management MMHE towards sustainability of biodiversity Q3, 2020
Banned of 2017- Banned of Q4, 2019- Q4, 2019- Banned of single-use plastic
Polystsrene Polystyrene through phases
Malaysia – Awareness Materialize the
toward phase out supply chain of Phase I – MMHE Office
2010 single-use plastic
alternate Phase II – Customer Office
MMHE - 2017 biodegradable
Phase III – Stakeholder
or recycle
material
90 % Facility
daily lives are used onceand
TOWARDS
ZERO SINGLE- then chucked: grocery bags,
USE PLASTIC
MMHE – Q3, plastic wrap, disposable Wean Consider the product-
cutlery, straws, coffee-cup yourself off to-packaging ratio of
2020 disposable items you tend tobuy
lids
Malaysia towards Zero single-use plastic for a cleaner
and healthier environment in Malaysia by 2030 20 Billion plastics
Each year, 20 Billion
plastic bottles are Stop buying Buy in bulk
tossed in the trash. water
Carry a reusable
bottle in your bag 4R
MMHE towards Refuse
sustainability Reduce
of Biodiversity Reuse
Recycle
Little plastic scrubbers Boycott Recycle (4R)
found in so many beauty microbeads
products—facial scrubs,
Purchase New toys and
toothpaste, body items electronic gadgets,
washes—might look especially, come
harmless, but their tiny secondhand
size allows them to slip with all kinds of
plastic packaging
through water-
treatment plants
Waste Management SCRAP METAL SCHEDULED Legal Requirement
WASTE WASTE - to comply
Summary of Process LIDUID
GENERAL WASTE 1.0. Waste Generator shall review in
1.0. Waste Generator shall identify advance disposal legal requirement
type of waste from it process or at Offshore and Onshorefacility.
material datasheet or laboratory
analysis data. CONSTRUCTION 1.Scheduled WasteRegulation
WASTE
1.All scheduled waste and general disposal requirement,
waste shall be segregated from it origin 1) MMHE SCHEDULED WASTE STORAGE 2. Packing and storage as perDOE
into appropriate, adequate and durable 2) MMHE CONSTRUCTION WASTE STORAGE
packaging. WSACSHTEED-2G3U..Su3LOiRdEDLeDSlI2icDnnhdeeS.dcuhleeddu(lLeadb(eNlolintigfication)
Recovery, Landfill at Recovery at Landfill at
2.All scheduled waste shall be label Recycle at Approved Prescribe Approved DOE Requirement)
with valid hazardous signage complete Licensed Landfill facility Premises 4. 5th Schedule (Inventoryrecord)
with scheduled waste information. Facility by by Local Landfill
Appropriate cover for scheduled waste Local Authority Authority Storage quantity 20MTN / SWCode.
shall be use whenever necessary.
5.Storage duration, within180
1.3.0. All construction waste and scrap
waste shall be place at designated area days.
with proper barricade and signage. 6. 4TH Scheduled (Storedwith
Appropriate cover for waste shall be
use whenever necessary. incompatibility waste).
1.4.0. Decide disposal method for all 7.Prescribe Premises License
waste as per Approval from authority
OR Physical condition OR level of Compliance Approval & TWG
contamination OR availability of 8. 6TH Scheduled(E-Consignment
treatment technology.
Note)
9. 7th Scheduled (WasteCard)
1) SCRAP 1) CONSTRUCTI 1) SW – LIQUID 1) SW – LIQUID 1.2.0. Others waste shall follow local
authority legal requirement.
METAL ON WASET - FROM OIL FROM OIL
111
2) CONSTRCTI INERT AND SOLID AND SOLID
ON WASTE – WASTE BASE BASE -
PACKAGING 2) GEN1E1R1AL UNTREATED
WASTE
Scheduled Waste Management Container
105
Scheduled Waste Management Container
106
Scheduled Waste Management Container
Choice of Appropriate Packaging
• The packaging must be robust and capable of withstanding transportation by lorry.
• The packaging must be capable of withstanding normal chemical reaction.
• Packaging should be leak-proof.
• The packaging is not weakened by bulging, corrosion or tear.
All waste must be fastened securely on the good condition pallet. This is to ensure that the
waste is secure during transportation. The pallet size is 120 cm X 120 cm. The number of
container / packaging per pallet is as follows:
Drums - Four drums per pallet
Bag - One bag per pallet
107
Scheduled Waste Management Label
108
UCUA (UNSAFE CONDITION/ UNSAFE
ACT)
109
UCUA
KPI 1:250 1 UCUA per 250
manhours
110
OFFICIAL BREAKS
111
Official Breaks 7.50 AM – 8.00 AM
Toolbox 10.30 AM – 10.45 AM
Briefing
Tea Break 12.45 PM – 1.00 PM
Down Tool Daily : 1.00 PM – 2.00 PM
Friday : 12.30PM – 2.30 PM
Lunch Break
5.15 PM - 5.30 PM
Down Tool
112
HSE ADVISORY CHIT/ HSE SUMMON
CHIT
113
HSE Advisory Chit / HSE Offence Chit HSE Offence Chit
HSE Advisory Chit
114
HSE Advisory Chit / HSE Offence Chit HSE Offence Chit
HSE Advisory Chit
REMINDER
2 SACs = 1 Summon
115
EMPLOYEE GRIEVANCE MECHANISM
116
Employee Grievance Mechanism
117
Employee Grievance Mechanism
Employee fill-up the
Grievance Form or e-
grievance and submit
CONTRACTOR HSE
CONTRACTOR HSE CONTRACTOR HSE to
communicate the result verify and propose
and lesson learn. solution
12
5
127