Church Construction Management Services

Company Qualifications

October 31 th, 2018

Company Qualifications

Brief Project Experience

Project Brief Description Project Visuals

Duke Energy Design and build a ?
ONS Stator new facility at the
Assembly Building Oconee Nuclear *Picture courtesy of Charlotte business Journal
Seneca, SC Station for assembly
($2,000,000+) of a replacement
stator required for
the hydroelectric
generator adjacent
to a 525KV switchyard.

Koyo Bearings Excavation and ?
Addition & Furnace Construction of
Installation structural concrete
West Union, SC pit to contain salt
($3,000,000+) holding and salt
quenching tanks.

BASF Construction of new
Filter Press 6 MCC building and a
Installation new facility to house
Seneca, SC the new filter press.

J. Davis Construction 1 Grace Church

Company Qualifications

Staff Project Experience

Project Brief Description Project Visuals

BASF Construction of ?
Nox Scrubber multiple foundations
Installation to support 60,000
Seneca, SC lb process tanks
and installation of
structural steel for
process pipe rack.

Pickens Construction of ?
Railway Company 17,000 SF locomotive
Central Dispatch maintenance facility.
Location
Pickens, SC
(17,000 SF)

Cardinal Glass Construction of
laminated glass 277,000 SF pre-
manufacturing engineered metal
plant building with an
Ocala, FL attached office space.
(277,000 SF)

*Work performed by staff member at previous employer

J. Davis Construction 2 Grace Church

RELEVANT PROJECT Experience

First Baptist church of westminster

Westminster, SC

Brief Description
This 12,500 sf Design-Build
renovation / addition
project was designed by
Good City Architects.

The addition involved Exterior View - Front
almost doubling the
capacity of the sanctuary
by demolishing the
sidewalls and adding a
connecting space to each
side of the building. A rear
two story connecting
addition provided increased
classroom space and a
choir rehearsal room.

Existing classrooms
and offices were fully
renovated and the building
was retrofitted with a new
fire sprinkler system, new
pews, and an audio-visual
system.

Performance Statement Interior View of Building Grace Church
The project was completed Interior View - Learning Area
within budget and on time
for Easter services as 3
planned.

J. Davis Construction

RELEVANT PROJECT Experience

First Baptist church of westminster

Westminster, SC

Noted Elements
-Sidewall Demolition
-Addition of Connecting
Space
-Two-Story Add-On
-Added Classroom Space
-Increased Choir Room Space
-Retrofitted Fire
Sprinkler System

Interior View - Service Area

References
*Owner's Representative*
Pastor Kenny Owens
426 West Oak Highway
Westminster, SC 29693
864-647-2688
kowens@
firstbaptistwestminster.org

Designer
Good City Architects
864-360-9292
[email protected]

Interior View - Hallway

J. Davis Construction 4 Grace Church

Relevant Project Experience

Southern Wesleyan University

Central, SC

Brief Description
This new 67,000 sf four
story student housing
community will provide
comfortable single, dual,
and triple occupancy suites
for 243 students. The
dormitory comes equipped
with classroom and student
gathering spaces.

Exterior View - Front

Performance Statement
The project was completed
on time and on budget.

Site Location

Noted Elements
-Active Campus
-Adjacent to
200 year old church
-multi-level site
-Protected Existing Trees

J. Davis Construction 6 Proposed Site Plan

Grace Church

Relevant Project Experience

Southern Wesleyan University

Central, SC

Noted Elements
-140 New Parking Spaces
-new 12" Water main
-new sewer Main
-Site Work for Future
Development
-15,000 sf devoted to
amenities, social space,
fitness room, theater, and
conference room

Interior View - Social Area

Reference
*Owner’s Representative*
Dr. Todd Voss

907 Wesleyan Dr.,

Central, SC 29630
864-644-5011
[email protected].

J. Davis Construction Interior - PAtio Grace Church

8

Relevant Project Experience

Lake Toxaway Country Club Exterior View - Clubhouse

Lake Toxaway, NC

Brief Description
This 21,000 sf renovation
and expansion of the
existing building involves a
new free-standing Pro Shop
and outdoor dining porch.
Some of the renovations
included updating the
building façade to cedar
shakes and stone accents
to give the building a more
rustic “lakeside lodge”
appeal.

Performance Statement
The project was completed
on time and on budget.

J. Davis Construction Interior View - Fireplace Lounge Grace Church

9

Relevant Project Experience

Lake Toxaway Country Club

Lake Toxaway, NC

Elements Included
-High Level Finishing
-Wood and Natural
Materials
-Clubhouse of the Year
by Golf Inc.

Interior View - Wine Cellar

Reference
*Owner’s Representative*
Reg Heinitsh Jr.
4366 West Club Blvd. Lake
Toxaway, NC 28747
828-966-4260

J. Davis Construction Exterior - PAtio Grace Church

10

Project Experience

Sapphire Valley Country Club

Sapphire, NC

Brief Description
Partially destroyed by a
propane explosion, this 18,000 sf
country club is currently being
rebuilt and re-attached to the
existing facility. The rebuild and
renovation consisted of new
dining facilities, administrative
facilities, freezer facilities, as
well as the guest areas, dining
room, kitchen, lobby, and stage
area.

Before Renovation - courtesy of Asheville Citizen Times

References
* Owner’s Representative*
Larry Smith
800-440-1951

[email protected]

J. Davis Construction After Renovation Grace Church

7

RELEVANT PRoJECT EXPERIENCE

Centerville Church of god

Anderson, SC

Brief Description Exterior View - Front
The Centerville Church
of God was commissioned
in 2012 to accommodate
a growing congregation.
The Sanctuary is 5,700 sf
in size with an additional
1,600 sf making up the
covered drive-thru canopy.
Completed in 2013, the job
required preliminary site
work and more parking was
added to accommodate
weekly services.

Performance Statement
The project was completed
on time and on budget.

Noted Elements Exterior View - Side Grace Church
-Site Preparation
-Worship Hall 5
-Offices
-Kitchen
-Recreation Building

Reference
*Owner's Representative*
Pastor Terry
2211 Whitehall Rd.
Anderson, SC
864-224-2066

J. Davis Construction

Relevant Project Experience

Starbucks in Cooper Library

Clemson, SC

Brief Description Interior View - Front
Awarded in August of 2016,
the Starbucks project in the
Cooper Library involved a
two-story renovation of the
existing space on the library’s
fifth floor. Possessing a
difficult schedule, the work
required extensive temporary
walls for sound and dust
control while the library
was in use. The project
also involved strategic
coordination between the
owners, Starbucks, their
design team, and equipment
suppliers. The project was
completed ahead of schedule.

Performance Statement Interior View - Front Grace Church
The project was completed
on time and on budget. 11

Noted Elements
-Inside Active Library
-Student Safety was top
priority
-Construction During Exams
-Exceeded Clemson Standards

Reference
*Owner's Representative*
John R. Gambrel
310 Klugh Avenue
Clemson, SC 29634
864.643.6074
[email protected]

J. Davis Construction

Relevant Project Experience

BroadWay Lake Community Center

Anderson, SC

Brief Description
This new 6,000 sf Community
and Multi-Purpose Building
was originally contracted
by and constructed for
Anderson County in South
Carolina. The interior
wood and stonework were
all completed by skilled
craftsmen working under
J. Davis Construction. The
Project was completed on
time and on budget leaving
the owner happy with the
final result.

Exterior View - Front

Performance Statement
The project was completed
on time and on budget.

Noted Elements
-Multi-Use Community Building
-Timber and Natural Materials
-Calming, Peaceful Setting
-Religious & Wedding Services

Reference Interior View - Gathering Area Grace Church
*Owner's Representative*
Robert E. Carroll 12
101 South Main Street
Anderson, S.C. 29624
864.260.4340
rcarroll@andersoncountysc.
org

J. Davis Construction

Past Performance

Letter of recommendation

CLemson University Housing & Dining (Cooper Library)

J. Davis Construction 13 Grace Church

PAST PErformance

Letter of recommendation

Sapphire Valley Country Club

J. Davis Construction 14 Grace Church

Past Performance

Letter of recommendation

Westminster Baptist Church

J. Davis Construction 15 Grace Church

Past Performance

Letter of recommendation