The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by SITI ASMIZA BINTI MUZAFAR (PSAS), 2023-02-20 22:27:54

Introduction DCQ40182

Introduction DCQ40182

DCQ40182 PROFESSIONAL PRACTICE 2 SESSION II: 2022/2023 07th of Feb 2023 DR. SITI ASMIZA BINTI MUZAFAR


DCQ30154 PRE-REQUISITE NONE CREDIT VALUE = 2 PROFESSIONAL PRACTICE 2 course gives students applied knowledge and skills on the task of a quantity surveyor in a project. The course emphasizes on the definition, purpose, and task of a quantity surveyor in the preparation of prime cost sum and provisional sum, preliminaries work, preparation of interim payment, variations, and final account. SYNOPSIS


1. Analyse the procedure for preparation of prime cost sum, provisional sum, and payments to a construction project according to PWD and PAM Standard Form of Contract. (C4, PLO2) COURSE LEARNING OUTCOME (CLO)


2. Demonstrate communication and oral presentation on assigned topic. (A3, PLO4) COURSE LEARNING OUTCOME (CLO)


3. Complete assignment on relevant topic with quantity surveying profession and ethics. (A3, PLO8) COURSE LEARNING OUTCOME (CLO)


1. PRIME COST SUM & PROVISIONAL SUM 3. INTERIM PAYMENT 4. VARIATION ORDERS 5. FINAL ACCOUNT TOPICS 2. PRELIMINARIES WORKS


CONTINUOUS = 50% FINAL EXAMINATION = 50% FIGHTING !!! ASSESSMENT


TOTAL = 50% 1. QUIZ (2) = 5% 2. THEORY TEST (2) = 10% 3. ASSIGNMENT (1) = 25% 4. PRESENTATION (1) = 10% CONTINUOUS ASSESSMENT


REFERENCES Ir. Harbans Singh K. S. (2002). Engineering and Construction Contracts Management: PostCommencement Practice. LexisNexis. Public Work Department (PWD) Standard Form of Contract. Jabatan Kerja Raya Malaysia. Abd. Aziz, A. R. (2006). Pengurusan Projek: Perspektif Industri Pembinaan. Penerbit USM. Pertubuhan Arkitek Malaysia (PAM) Standard Form of Contract. Pertubuhan Arkitek Malaysia. Ashworth, A. et. al. (2013). Willis’s Practice and Procedure for the Quantity Surveyor. 13th Ed. Wiley-Blackwell. Ismail, M. N. (2008). Pengenalan Kepada Pentadbiran Kontrak (Berdasarkan Borang Kontrak JKR203A). Pusat Penerbitan Universiti (UPENA). UiTM. Pejabat Pengarah Kanan Cawangan Kontrak dan Ukur Bahan (2010). Buku Panduan Pentadbiran Kontrak Kerja Raya (Edisi Ketiga). Ketua Pengarah Kerja Raya. Ibu Pejabat JKR Malaysia. Philips, L. et. al. (2009). Practical Guide to Engineering and Construction. CCH Australia Limited.


THANK YOU… ANY QUESTIONS?


Click to View FlipBook Version