PERUNDING PUNCAK ANUGERAH SDN.BHD
________________________________________________________________________________________
NAME : Micheal Liew Yuk Choi
DATE & PLACE OF BIRTH : 18th October 1949, Labuan, Sabah
LANGUAGE SPOKEN : Bahasa Malaysia, English & Bajau
CITIZENSHIP : Malaysian
QUALIFICATION 1968-1976 : National Taiwan University, Taiwan
B.Sc. in Geology
1974-1976 :
Acadia University, Canada,
MEMBERSHIP : M.Sc In Geochemistry
Enrolled in PhD Programme for 2 ½ years. Also working as a teaching
Assistant tutoring in Mineralogy.
Member, Geological Society of Malaysia, Professional Member, geological
Institute of Malaysia (Pending) Fellow, Geological Association of Canada
Career : PERUNDING PUNCAK ANUGERA SDN.BHD
Jan 2010- Present, Engineer Geologist
APPLIED GEOTECHNICS AND APPLIED GEOTECHNICS SABAH)
SDN.BHD.
1990- Founder and Managing Partner/Director
GROUND ENGINEERING (S) SDN. BHD
1979- 1987-Senior Engineering Geologist
EXPERIENCE : PERUNDING PUNCAK ANUGERAH SDN. BHD
Jan 2010- Present
1990 to dated FOUNDER AND MANAGING PARTNER/DIRECTOR OF APPLIED
GEOTECHNICS AND APPLIED GEOTECHNICS (SABAH) SDN.BHD.
1987-1989
1979 to 1987 Looking after the daily administration, financial as well as technical of the
organization. Also involved in mineral, quarry and ground water/mineral water
potential exploration.
Involved in the Beaufort – Menumbok Highway project as a coordinator for the EIA
study.
Soil and material specialist seconded to GCS Sdn. Bhd. A consultant for the Sapi-
Nangoh Road Construction Project. Stationed quality control and all aspects of the
geotechnical problems arose during the construction period.
SENIOR ENNGINEERING GEOLOGIST OF GROUND ENGINEERING (S)
SDN. BHD. In-charge of all geological/geotechnical/ground water aspects of
projects undertaken by the firm.
An authority of the geotechnical environment and geotechnical characteristics of
Kota Kinabalu, Sandakan and Tawau areas through extensive studies and site visit
related to project works location in these areas.
A list of the project personally involved is briefly described below :-
- 43 -
PERUNDING PUNCAK ANUGERAH SDN.BHD
________________________________________________________________________________________
GEOLOGICAL AND MATERIAL INVESTIGATION FOR THE
KIRAGAWAN DAM
• Involved in the studies of cores recovered from all branches, inspection and
logging of all boreholes, trial pits and tenches, mapping and preparation of the
final report submitted to Watson Hawksley, and authority in water supply based
in United Kingdom.
DRAINAGE AND SEWERAGE STUDIES
• Involved in the geotechnical analysis and report preparation for the sewerage
projects undertaken by the firm in Kota Kinabalu, Lahad Datu, Sandakan and
Tawau.
CONSTRUCTION OF PRESSURE RELIFE WELLS AT SILAM. LAHAD
DATU
• Full time site supervision during construction of five (5) numbers of pressure
relied wells.
CONSTRUCTION OF A WATER WELL AT PECKY VALLEY, SANDAKAN
• Involved in the preliminary study, design and construction of the 14” diameter
feet deep water well for JKR.
SAPI-NANGOH ROAD PROJECT
• Working closely with GCS Sdn Bhd., consulting engineers as engineering
geologist for the engineering design of the 34km highway financed by the
World Bank. Duties involved route selection, detailed assessment, of rock
formations exposed along the proposed alignment, evaluation of cut slope
design based on measurement and evaluation of existing slopes. Supervision of
geotechnical and preparation of soils and materials report etc.
SANDAKAN WATER SUPPLY EXTENSION SCEME-STAGE 1
• Involved in all geotechnical aspects of the project, including ground water
potential studies involving drilling of some 10 exploratory water wells,
developing and test pumping etc, also involved in the foundation exploration for
the pump house and treatment plant at Bukit Garam; mapping and supervision
of between Bukit Garam and Sandakan town.
KOTA KONABALU WAYER SUPPLY
• Mapping of the pipeline route and supervision of the insitu field testing for
establishing the bearing capacity of the subsoil as well as rip ability of the
weathered bedrock along the route for the installation of pipes.
LAHAD DATU WATER SUPPLY
• Supervision of sub-surface investigation for this project at Sepagaya Dam,
working closely with the engineer of SSP of Kualah Lumpur, including details
core logging and insitu packer permeability testing etc.
- 44 -
PERUNDING PUNCAK ANUGERAH SDN.BHD
________________________________________________________________________________________
NABAWAN WATER SUPPLY
• Supervised and conducted pioneer ground water exploration within the
Nabawan Basin to assess the possibility of ground water extraction for the
sttelement scheme. Also supervised sub-surface and material investigation for
the Nabawan Impounding Reservoir site.
LABUAN WATER SUPPLY
Site engineering geologist coordinators for the sub-soil investigation for the Labuan
Water Supply site investigation. The project included some 25nos. of boreholes with
piezometer instrumentation, test pits and insitu material testing for three potential
dam sites.
MENGATAL URBAN CENTER DEVELOPMENT SCHEME
GEOTECHNICAL ASSESSMENT OF SUB-SOIL CONDITIONS FOR THE 700
ACRES Kuala Inanam Development Scheme, including field instrumentation and
monitoring of ground settlement and movement etc.
KOTA RAYA DEVELOPMENT, MENGGATAL
• Supervision of drilling of drilling of 10nos. of boreholes, mapping of the entire
site and provision of recommendation on the earthwork.
KUALA INANAM DEVELOPMENT SCHEME
• Geotechnical assessment of sub-soil condition for the 700 acres Kuala Lumpur
Development Scheme, including field instrumentation and monitoring of ground
settlement and movement etc.
SANDAKAN PRE-PLANNING STUDY
• Involving in the geotechnical zoning of Sandakan area for the project, and the
study and location of natural resources i.e. rock, sand and clay etc. in the area.
SIPITANG PULP AND PAPER MILL
• Co-ordination and supervision of insitu testing and geotechnical assessment of
the project site for the client, Sabah Forest Industries Sdn. Bhd., working hand
in hand with the client’s supervising geotechnical engineer, Terratech of Canada.
SIPITANG JETTY
• Involved in the geotechnical assessment of sub soil conditions for the proposed
jetty.
SINAR TRAINING CENTER, KUNDASANG
• Carried out geotechnical mapping of the 150 acre site situated on the Pinusok
Plateau, Kundasang; geotechnical assessment of the sub-soil condutions prior to
and during the development stage of the project. Working closely with engineers
of RMJM of United Kingdom
- 45 -
PERUNDING PUNCAK ANUGERAH SDN.BHD
________________________________________________________________________________________
SABAH RURAL TRUNK ROAD
• Involved in supervision an co-ordination of insitu field testing and drilling at
selected bridges sites and along the Telupid- Sandakan and Lahad Datu road,
working closely with the soil engineer Minco.
SINDUMIN/LONG PA SIA ROAD
• Involved in mapping of the road alignment and supervision of insitu testing and
drilling.
LABUAN SUPPLY BASE, RANCHA-RANCHA
• Geotechnical assessment and supervision of some 15 land-based and 7 marine-
bases boreholes, at Rancaha-Rancha, Labuan.
SAMA TIMBER EXPORT TERMINAL, SEPANGAR BAY
• Supervision and geotechnical assessment of subsoil investigation involving
drilling of 8 nos. boreholes and 20 nos. of insitu Dutch cone penetrometer test
for the client, SAMA.
SEPANGAR POWER STATION
• Co-ordination and supervision of surveying and sub-surface investigation for the
16 acre SEB Sepangar Power Station.
- 46 -
7.0 LIST OF PROJECT
PERUNDING PUNCAK ANUGERAH SDN.BHD
________________________________________________________________________________________
LIST OF PROJECT
NO PROJECT CLIENT PROJECT WORK REMARKS
COST (RM) PROGRESS Completed
1 Cadangan Membina Dan Menyiapkan Lembaga
16,000,000.00 %
100%
Jeti LKIM Dan Kerja-Kerja Berkaitan Kemajuan Ikan
Di Lot 7011 & 7012 (Fasa 1), Kiamsam, Malaysia
Wilayah Persekutuan Labuan. (LKIM)
2 Preparation Of Stormwater Management Department Of 1,734,640.00 100% Completed
(Study Cost) 100% Completed
Drainage Master Plan And Detailed Irrigation and 100% Completed
100% Completed
Design Of Drainage Improvements Drainage Completed
100% Completed
Works For Kota Marudu District, Sabah. (DID) 100%
3 Projek Naik Taraf Jalan Kabunau – Jabatan Kerja 10,098,990.00
Bakara – Batu 4, Kuala Penyu, Sabah. Raya
(JKR)
4 Cadangan Pembangunan Projek Sekolah Kementerian 21,209,667.14
Kebangsaan Tanjung Batu Keramat, Pelajaran
Daerah Tawau, Sabah. Malaysia
(KPM)
5 Projek Pembinaan Rumah Guru Bagi Jabatan 5,467,100.00
Sekolah-Sekolah Luar Bandar Di Pembangunan
Negeri Sabah (Pakej 6). Persekutuan
Sabah
(JPPS)
6 Cadangan Pembinaan Pejabat Stor Dan Lembaga 2,900,000.00
7,000,000.00
Garaj Pertubuhan Peladang Kawasan Pertubuhan
(PPK) Kuala Penyu Dan Pertubuhan Peladang
Peladang Kawasan (PPK) Beluran. (LPP)
Kementerian
7 Projek Bekalan Air Luar Bandar Kemajuan Luar
(BALB) Sistem Retikulasi Negeri Sabah Bandar Dan
2007 – Zon 3 Wilayah
(KKLW)
- 47 -
PERUNDING PUNCAK ANUGERAH SDN.BHD
________________________________________________________________________________________
NO PROJECT CLIENT PROJECT WORK REMARKS
COST (RM) PROGRESS
%
8 Projek Lebuhraya Pan Borneo Sabah Jabatan Kerja 348,331,880.39 Design Stage – Design Stage –
(WP05) dari Donggongon ke Simpang Raya Malaysia 100% 100%
Papar Spur (Pakej 3Bii), Sabah. & Construction Construction Stage –
PDP Highway Stage – 48.6%
Previously known as Sdn Bhd 48.6%
Projek Naiktaraf Jalan Dari
Donggongon Ke Simpang Papar Spur,
Sabah (Pakej 3Bii)-(30% of Pakej 3)
9 The Design Construction, completion, Jabatan Kerja 223,802,250,.00 100% As Checker For
Structural and
Equipping, Commissioning And Raya Geotechnical works
Maintenance Of Nuclear And (JKR) Only
Radiotherapy Medical Centre Likas
Specialist Hospital, Kota Kinabalu,
Sabah
Projek Membina Dan Menyiapkan Kementerian 42,538,800.00 K.I.V by K.I.V by
49,738,271.00 Kementerian Kementerian
10 Sekolah Menengah Kebangsaan Desa Pelajaran
Pelajaran Pelajaran
Wawasan, Tambunan, Sabah Malaysia (KPM) Malaysia(KPM) Malaysia(KPM)
11 Projek Membina Jalan Dua Hala Di Jabatan Kerja 100% Completed
Bandar Keningau, Pakej 1, Sabah. Raya (JKR)
12 Projek Naiktaraf Jalan Labuk Sandakan Jabatan Kerja 25,278,422.58 100% Completed
dari KM 15 Ke KM 26 (Fasa 2). Raya (JKR)
13 Perkhidmatan Perunding Bagi Jabatan 1,961,750.00 100% Completed
(Study Cost)
Penyediaan Pelan Induk Tebatan Banjir Pengairan Dan
Lembangan Moyog, Sabah. Saliran (JPS)
14 Master Plan For Pitas District Flood Jabatan 1,796,375.00 100% Completed
(Study Cost)
Mitigation Project. Pengairan Dan
Saliran (JPS)
15 Projek Jalan Luar Bandar (JALB) Jabatan Kerja 16,800,000.00 100% Completed
Negeri Sabah- Jalan Kiau Nuluh, Kota Raya
Belud, Sabah. (JKR)
- 48 -
PERUNDING PUNCAK ANUGERAH SDN.BHD
________________________________________________________________________________________
NO PROJECT CLIENT PROJECT WORK REMARKS
COST (RM) PROGRESS Completed
16 Projek Jalan Luar Bandar (JALB) Jabatan Kerja
Negeri Sabah (Projek NKRA)- Jalan Raya 12,200,000.00 %
Besanon Ulu Kimanis, Papar. (JKR)
100%
17 Projek Jalan Luar Bandar (JALB) Jabatan Kerja 14,236,035.00 100% Completed
Negeri Sabah- Jalan Mansiang Kolonsi, Raya 20,000,000.00 100% Completed
Kota Kinabalu, Sabah. (JKR)
20,000,000.00
18 Projek Menaiktaraf Sistem Bekalan Air Kementerian 179,800,000.00
Kanibongan, Pitas, Negeri Sabah. Kemajuan Luar
Bandar Dan
Wilayah
(KKLW)
19 Projek Cadangan Pembinaan Ibu Pejabat Jabatan Kerja Design Stage – Completed
Polis Daerah (IPD) Sipitang, Sabah. Raya 100%
Construction
Stage –
100%
20 Projek Pembaikan Cerun Dan Jalan Dari Jabatan Kerja Design Stage – Design Stage –
Ranau Ke Tambunan, Fasa 2B, Sabah. Raya Sabah 100% 100%
Construction Construction Stage –
Stage – 93%
93%
Projek Sistem Bekalan Air Luar Bandar Kementerian 11,790,000.00 Completed Completed
21 (BALB) Tahun 2014 Negeri Sabah, Kemajuan Luar
Zone 3 Daerah Semporna Dan Tawau. Bandar Dan
Wilayah
Projek Cadangan Pembangunan Jabatan Kerja 76,600,969.33 Completed Completed
22 Kompleks Pejabat Kastam Sabah, Jalan Raya Malaysia
Sulaman, Kota Kinabalu Sabah.
Projek Pembinaan Persimpangan Jabatan Kerja 207,000,000.00 100% Completed
23 Bertingkat Dan Lorong Ketiga di Raya Malaysia 100%
Design Stage –
Bandaraya Kota Kinabalu, Sabah 100 %
Consultancy Services for the Detailed Jabatan Construction Stage –
Pengairan & 100%
24 Design of Sandakan Flood Mitigation Saliran Malaysia 40,000,000.00
Project, Sabah (Phase 1) – Sungai Anip
- 49 -
PERUNDING PUNCAK ANUGERAH SDN.BHD
________________________________________________________________________________________
NO PROJECT CLIENT PROJECT WORK REMARKS
COST (RM) PROGRESS
‘Design & Built’ Menaiktaraf Jalan Jabatan Kerja Design Stage –
25 Lintas, Kota Kinabalu termasuk Tiga Raya Malaysia 270,000,000.00 % 100%
Persimpangan Bertingkat (Fasa 2) Jabatan Kerja 567,600,000.00 100% Construction Stage –
Raya Malaysia 60%
Pelaksanaan Projek Lebuhraya Pan Design Stage –
26 Borneo Sabah (WP04) – Menaiktaraf & 100% Design Stage –
PDP Highway 100%
Jalan Dari Bongawan Ke Papar Construction
Sdn Bhd Stage – Construction Stage –
0.16% 0.16%
- 50 -
PERUNDING PUNCAK ANUGERAH SDN.BHD
________________________________________________________________________________________
NO PROJECT CLIENT PROJECT WORK REMARKS
COST (RM) PROGRESS
‘Design & Built’ Menaiktaraf Jalan Jabatan Kerja Design Stage –
25 Lintas, Kota Kinabalu termasuk Tiga Raya Malaysia 270,000,000.00 % 100%
Persimpangan Bertingkat (Fasa 2) Jabatan Kerja 567,600,000.00 100% Construction Stage –
Raya Malaysia 60%
Pelaksanaan Projek Lebuhraya Pan Design Stage –
26 Borneo Sabah (WP04) – Menaiktaraf & 100% Design Stage –
PDP Highway 100%
Jalan Dari Bongawan Ke Papar Construction
Sdn Bhd Stage – Construction Stage –
0.16% 0.16%
Kementerian
Projek Pembinaan 200 Pelajar (100 Pelajaran
Lelaki & 100 Perempuan) Dan Lain- Malaysia
27 Lain Kemudahan Di Sekolah Menengah
Jabatan
Kebangsaan Kota Klias, Beaufort, Pengairan Dan
Sabah
Saliran
Projek Bekalan Air Luar Bandar
28 (BALB) Loji Air Mahua, Tambunan, Kementerian
Pembangunan
Sabah Luar Bandar
Projek Bekalan Air Luar Bandar (KPLB)
29 (BALB) Sitem Retikulasi Tahun Jabatan
2018/2019 Negeri Sabah – Bahagian Pengairan Dan
Tawau Saliran
Rancangan Tebatan Banjir Sungai,
30 Anip, Lembangan Sungai Anip,
Sandakan Sabah
Kementerian
31 Cadangan Pembinaan Projek Balai Perumahan Dan
Bomba Dan Kuarters Merotai Sabah Kerajaan
Tempatan
- 50 -
8.0 APPENDIXES
8.1 COMPANY
REGISTRATION
PERUNDING PUNCAK ANUGERAH SDN.BHD
________________________________________________________________________________________
- 51 -
PERUNDING PUNCAK ANUGERAH SDN.BHD
________________________________________________________________________________________
- 52 -
PERUNDING PUNCAK ANUGERAH SDN.BHD
________________________________________________________________________________________
- 53 -
8.2 COMPANY LOCATION
PLAN
PERUNDING PUNCAK ANUGERAH SDN.BHD
________________________________________________________________________________________
HOSPITAL
LIKAS
- 55 -
8.3 BERDAFTAR DENGAN
ePERUNDING