PROJECT : BLCP TURNAROUND Unit#1:2017 (Continue)

Replace and Repair of Water Wall Tubes

51  SKK Construction & Supply Co., Ltd. 

 

 

PROJECT :Service Tube Of Steam Superheats

Scope of work : Inspection check and repairing

Inspection by visual and PT.

52  SKK Construction & Supply Co., Ltd. 

 

 

Cuting & Beveling Existing Tube

Cutting and preparation befor installation

53  SKK Construction & Supply Co., Ltd. 

 

 

 Fit-up new tube by replacment at
cut out the old tube 

 Weldment at narrow area by use the glass and spacail welder 

54  SKK Construction & Supply Co., Ltd. 

 

 

PROJECT : Service Heat Exchanger Yearly 2016

Scope of work : Inspection check and repairing Tube sheet

 Remove cap and NDT inspection
 Repair defection

 NDT inspection after repairation and reinstall

55  SKK Construction & Supply Co., Ltd. 

 

 

PROJECT : Shut down Boiler Outage 2016

Scope of work :Inspection check and service

 Remove out and check alignment of Boiler Water Circulation pump

56  SKK Construction & Supply Co., Ltd. 

 

 

NDT for check crack defactand water test

Reinstallation

57  SKK Construction & Supply Co., Ltd. 

 

 

PROJECT :Replacement Roof Tube& Water wall NPS # 8

Scope of work :Cut tube damage and install new tube.

58  SKK Construction & Supply Co., Ltd. 

 

 

 Cut and remove tube damage and prepare area for install new tube

PROJECT: TCP NEW GENERATION PB#2

Scope of work :Lifting and installation for air duct cyclone and ESP

TURBINE & GENERATOR

Prepare area for installation turbine

59  SKK Construction & Supply Co., Ltd. 

 

 

Installation turbine

TPC NEW GENERATION PB#2
PROJECT
BOILER

Fit up and welding water wall and black part header.

60  SKK Construction & Supply Co., Ltd. 

 

 

Installation steam drum and stack of boiler

Pre assembly silo

61  SKK Construction & Supply Co., Ltd. 

 

 

SMPC RX PROJECT

Installation and alignment of Column 60tons and Reactor 60 tons - 1

62  SKK Construction & Supply Co., Ltd. 

 

 

Installation and alignment of Column 60tons and Reactor 60 tons -2

SYS II NEW MINI MILL PROJECT

Lifting for installation ladelturred

63  SKK Construction & Supply Co., Ltd. 

 

 

Installation and alignment of column

Installation furnace rekube and ducting

PETROBRAS FPSO CIDADE DE ANGRA DOS REIS MV 22 PROJECT

Structure fabrication and installation piping fabrication and installation
Equipment installation

64  SKK Construction & Supply Co., Ltd. 

 

 

Installation riser pipe, duplex, alloy

Lifting for installation vessel

PETROBRAS FPSO CIDADE DE
ANGRA DOS REIS MV 22 PROJECT (MODEC FPSO TUPI

65  SKK Construction & Supply Co., Ltd. 

 

 

PROJECT)

Structure fabrication and installation piping fabrication and installation
Equipment installation

Lifting and installation compressor pump

Fabrication, Installation Manifold Pipe
(Duplex)

PETROBRAS FPSO CIDADE
DE ANGRA DOS REIS MV 23 PROJECT (MODEC FPSO GRURA

PROJECT)

66  SKK Construction & Supply Co., Ltd. 

 

 

Structure fabrication and installation piping fabrication and installation
Equipment installation

Lifting and installation turbine
Piping fabrication and installation

67  SKK Construction & Supply Co., Ltd. 

 

 

EPCH GUDRUN DECK PROJECT

Structure fabrication and installation piping fabrication and installation
Equipment installation

Piping fabrication and installation manifold pipe (Duplex)
Equipment Installation

68  SKK Construction & Supply Co., Ltd. 

 

 

OSX 3 FPSO - TOPSIDES MODULE PROJECT

Structure fabrication and installation piping fabrication and installation
Equipment installation

Equipment Installation

69  SKK Construction & Supply Co., Ltd. 

 

SKK’s WPS/PQR List @ YEAR 2020  

Material Carbon Steel Preheat
Min 10 °C
No WPS No. BASE (Mat) Welding Code P. No P. No Groove AWS Brand Name PWHT Min 10 °C
1 WPS-P01-01 SA106 Gr.B Process (BM 1) (BM 2) (Thk MM) - Min 10 °C
2 WPS-P01-02 SA106 Gr.B Min 10 °C
3 WPS-P01-03 SA106 Gr.B GTAW ASME P1 Gr. 1 P1 Gr. 1 1.5-11.8 ER80S-G KOBE TGS-62 NA Min 10 °C
4 WPS-P01-04 SA106 Gr.B IX:2015 P1 Gr. 1 P1 Gr. 1 5.0-21.94 OR EQV. NA Min 10 °C
5 WPS-P01-05 SA106 Gr.B P1 Gr. 1 P1 Gr. 1 5-21.94 ER80S-G+ NA Min 10 °C
GTAW+SMAW ASME P1 Gr. 1 P1 Gr. 1 5-25.08 E7016 KOBE TGS-62 NA Min 10 °C
IX:2015 OR EQV.+ Min 10 °C
ER70S-G+ Min 10 °C
GTAW+SMAW ASME E7018 KOBE LB52 OR Min 10 °C
IX:2015 EQV. Min 10 °C
ER80S-G+ Min 10 °C
GTAW+SMAW ASME E7018 KOBE TG-S50+ Min 10 °C
IX:2015 KOBE LB52-18 Min 10 °C

OR EQV. Preheat
Min 10 °C
KOBE TG-S62+ Min 10 °C
KOBE LB52-18 Min 10 °C
Min 10 °C
OR EQV. Min 10 °C
Min 10 °C
SMAW ASME P1 Gr. 1 P1 Gr. 1 1.5-13.94 E7016 KOBE LB52 OR Min 10 °C
IX:2015 EQV. Min 10 °C

6 WPS-P01-06 SA106 Gr.B SMAW ASME P1 Gr. 1 P1 Gr. 1 1.5-13.94 E7018 KOBE LB52-18 NA
IX:2015 OR EQV.

7 WPS-P01-07 SA106 Gr.B GTAW ASME P1 Gr. 1 P1 Gr. 1 1.5-8.0 ER70S-G KOBE TGS-50 NA
IX:2015 OR EQV.

8 WPS-P01-08 SA516 Gr.70 FCAW ASME P1 Gr. 1 P1 Gr. 1 1.5-20 E71T-1 ESAB Dual NA
IX:2015 Shield 7100 Ultra NA
5-21.94 NA
9 WPS-P01-09 SA106 Gr.B GTAW+SMAW ASME P1 Gr. 1 P1 Gr. 1 ER70S-G KOBE TG-S50 + NA
IX:2015 1.5-20 + KOBE LB52 OR NA

10 WPS-P01-10 SA106 Gr.B + GTAW+FCAW ASME P1 Gr. 1 P1 Gr. 1 1.5-20 E7016 EQV. -
SA516 Gr.70 IX:2015 -
5 -50 ER80S-G KOBE TGS-62 +
11 WPS-P01-11 SA106 Gr.B + GTAW+FCAW ASME P1 Gr. 1 P1 Gr. 1 3 to + E71T-1 ESAB Dual
SA516 Gr.70 IX:2015 Unlimited
5-16 ER70S-G Shield 7100 Ultra
12 WPS-P01-11 SS400+SS400 GTAW+SMAW AWS Unassigned Unassigned + E71T-1 OR EQV.
D1.1
ER70S-G+ KOBE TGS-50
13 WPS-P01-13 SS400 GTAW+SMAW AWS Unassigned Unassigned E7018 ESAB Dual
D1.1:2015
ER70S-G Shield 7100 Ultra
+ OR EQV.

E7016 KOBE TG-S50+
KOBE LB52-18

OR EQV

KOBE TGS-50 +
KOBE LB52

14 WPS-P01-14 SS400 GTAW ASME Unassigned Unassigned ER70S-G KOBE TGS-50
IX:2017 OR EQV.

15 WPS-P01-15 SS400 SMAW ASME Unassigned Unassigned 5-34 E7016 KOBE LB52 OR -
IX:2017 EQV.
Welding
Process Material Stainless Steel
GTAW
No WPS No. BASE (Mat) Code P. No P. No Groove AWS Brand Name PWHT
(BM 1) (BM 2) (Thk MM)

16 WPS-P08-01 SA312 TP304 ASME P8 Gr. 1 P8 Gr. 1 1.6-8.4 ER308L KOBE TG-S308L NA
IX:2015 OR EQV.

17 WPS-P08-02 SA312 TP304 GTAW+SMAW ASME P8 Gr. 1 P8 Gr. 1 5.0-21.94 ER308L+ KOBE TG-S308L NA
IX:2015 P8 Gr. 1 P8 Gr. 1 5.0-21.94 E308L-16 + KOBE NC -38L NA
P8 Gr. 1 P8 Gr. 1 NA
18 WPS-P08-03 SA312 TP316 GTAW+SMAW ASME 1.5-8.4 ER316L+ KOBE TG-S316L
IX:2015 E316L-16 + KOBE NC -36L

OR EQV.

19 WPS-P08-04 SA213 TP347H GTAW ASME ER347 KOBE TG-S347
IX:2015 OR EQV.

20 WPS-P08-05 SA312 TP316 GTAW ASME P8 Gr. 1 P8 Gr. 1 1.5-8.0 ER316L KOBE TG-S316L NA
IX:2015 OR EQV.

21 WPS-P08-06 SA312 TP316 SMAW ASME P8 Gr. 1 P8 Gr. 1 1.5-13.94 E316L-16 KOBE NC -36L NA
IX:2015 OR EQV.

22 WPS-P08-07 SA312 TP304 SMAW ASME P8 Gr. 1 P8 Gr. 1 1.5-13.94 E308L-16 KOBE NC -38L NA
IX:2015 OR EQV.

23 WPS-P08-08 Code Case 2328-2 GTAW ASME Unassigned Unassigned 1.5-10.4 ER347 WEL TIG 347H NA
IX:2015 or EQV.

70  SKK Construction & Supply Co., Ltd. 

 

Material Alloy steel  

No WPS No. BASE (Mat) Welding Code P. No P. No Groove AWS Brand Name PWHT Preheat
24 WPS-P03-01 SA209-T1 Process (BM 1) (BM 2) (Thk MM) Min 80 °C
25 WPS-P04-01 SA213 T11 GTAW Min 120 °C
26 WPS-P04-02 SA213 T11 ASME P3 Gr. 1 P3 Gr. 1 5-11.08 ER80S-G KOBE TG-SM - Min 120 °C
GTAW+SMAW IX:2015

GTAW ASME P4 Gr. 1 P4 Gr. 1 5-38.10 ER80S-G+ KOBE TG-S1CM 650-750
IX:2015 E8016-B2 +

KOBE CMA96

ASME P4 Gr. 1 P4 Gr. 1 1.5-12.00 ER80S-G KOBE TG-S1CM 650-750
IX:2015

27 WPS-P04-03 SA213 T11 SMAW ASME P4 Gr. 1 P4 Gr. 1 5-26.10 E8016-B2 KOBE CMA96 650-750 Min 120 °C
28 WPS-P04-04 SA213 T11 IX:2015 P4 Gr. 1 P4 Gr. 1 1.5-16.00 Min 120 °C
29 WPS-P04-05 SA213 T11 P4 Gr. 1 P4 Gr. 1
30 WPS-P04-06 SA213 T11 GTAW+SMAW ASME P4 Gr. 1 P4 Gr. 1 ER80S-G+ KOBE TG-S1CM NA
31 WPS-P05-01 SA335 P22 IX:2015 P5A Gr. 1 P5A Gr. 1 E8016-B2 +
32 WPS-P05-02 SA335 P22 P5A Gr. 1 P5A Gr. 1
KOBE CMA96

GTAW+SMAW ASME 1.5-12.00 ER80S-G KOBE TG-S1CM NA Min 120 °C
IX:2015

GTAW+SMAW ASME 1.5-16.00 ER80S-G+ KOBE TG-S1CM NA Min 120 °C
IX:2015 5-36.52 E8016-B2 + 675-760 Min 205 °C

GTAW+SMAW ASME ER90S-G+ KOBE CMA96
IX:2015 E9016-B3
KOBE TG-S2CM
+ KOBE
CMA106

GTAW ASME 1.5-12.00 ER90S-G KOBE TG-S2CM 675-760 Min 150 °C
IX:2015

33 WPS-P05-03 SA335 P22 SMAW ASME P5A Gr. 1 P5A Gr. 1 5-24.52 E9016-B3 KOBE CMA106 675-760 Min 205 °C
34 WPS-P05-04 SA335 P22 IX:2015 P5A Gr. 1
35 WPS-P05-05 SA335 P22 P5A Gr. 1
GTAW+SMAW ASME P5A Gr. 1 1.5-16.00 ER90S-G+ KOBE TG-S2CM NA Min 205 °C
IX:2015 E9016-B3 + KOBE
CMA106

GTAW ASME P5A Gr. 1 1.5 - 12.00 ER90S-G KOBE TG-S2CM NA Min 150 °C
IX:2015

36 WPS-P05-06 SA335 P22 SMAW ASME P5A Gr. 1 P5A Gr. 1 1.5 - 10.26 E9016-B3 KOBE CMA106 NA Min 150 °C
IX:2015

37 WPS-P05-07 Code Case 2199-1 GTAW ASME Unassigned Unassigned 1.5-10.4 ER80S-G KOBE TG- NA Min 205 °C
GTAW IX:2015 S2CW
GTAW
38 WPS-P43-01 SB619 UNS GTAW ASME IX P43 P43 1.5 - 10.98 ERNiCrMo- Oxfordally (C- - Min 10 °C
39 WPS-P43-02 No.N10276 + 2017 4 276)
SB619 UNS
No.N10276 ASME IX P43 P8Gr.1 1.5 - 6.10 ERNiCrMo- Oxfordally (C- - Min 10 °C
2017 4 276)
SA312TP316L +
SB626 UNS
No.N10276

40 WPS-P51-01 SB862 Gr.2 ASME P51 P51 1.5 - 6.10 ERTi-2 Oxfordalloy / Ti- NA Min 10 °C
IX:2015 1/2

41 WPS-P91-01 SA335 P91 GTAW ASME P15E Gr. 1 P15E Gr. 1 1.5-9.1 ER90S-G KOBE TGS-9Cb 730-775 Min 150 °C
IX:2015 OR EQV.

42 WPS-P91-02 SA335 P91 GTAW+SMAW ASME P15E Gr. 1 P15E Gr. 1 5-36.52 ER90S-G+ KOBE TGS-9Cb 730-775 Min 205 °C
IX:2015 E9016-G + KOBE CM-96b

43 WPS-P91-03 SA335 P91 GTAW ASME P15E Gr. 1 P15E Gr. 1 1.5-12.00 ER90S-G KOBE TGS-9Cb 730-775 Min 150 °C
IX:2015

44 WPS-P91-04 SA335 P91 SMAW ASME P15E Gr. 1 P15E Gr. 1 5-24.52 E9016-G KOBE CM-96b 730-775 Min 205 °C
IX:2015
No WPS No. BASE (Mat) Welding Preheat
45 WPS-DI-01 SA312 TP304+ Process Material Dissimilar / Compound Min 10 °C
46 WPS-DI-02 GTAW+SMAW Min 10 °C
SA106 Gr.B Code P. No P. No Groove AWS Brand Name PWHT
(BM 1) (BM 2) (Thk MM) -
SA312 TP304+ ER309L+ KOBE TG-S309L -
SA106 Gr.B ASME P1 Gr. 1 P8 Gr. 1 5.0-21.94 E309L-16 + KOBE NC -39L
IX:2015
ER309L OR EQV.
GTAW ASME P1 Gr. 1 P8 Gr. 1 1.5-8.0
IX:2015 KOBE TG-S309L
OR EQV.

47 WPS-DI-03 SA312 TP304+ SMAW ASME P1 Gr. 1 P8 Gr. 1 1.5-13.94 E309L-16 KOBE NC -39L - Min 10 °C
SA106 Gr.B IX:2015 OR EQV.

71  SKK Construction & Supply Co., Ltd. 

 

 

48 WPS-DI-04 SA213 GTAW+SMAW ASME P4 Gr. 1 P1 Gr. 1 1.5-16.00 ER80S-G+ KOBE TG-S1CM - P1 = Min 10
T11+SA106Gr.B IX:2015 E8016-B2 + °C, P4 = Min

KOBE CMA96 120°C

49 WPS-DI-05 SA213 GTAW ASME P4 Gr. 1 P1 Gr. 1 1.5-12.00 ER80S-G KOBE TG-S1CM P1 = Min 10
T11+SA106Gr.B IX:2015 - °C, P4 = Min

120°C

50 WPS-DI-06 SA213 SMAW ASME P4 Gr. 1 P1 Gr. 1 1.5-10.26 E8016-B2 KOBE CMA96 P1 = Min 10
T11+SA106Gr.B IX:2015 - °C, P4 = Min

120°C

51 WPS-DI-07 SA335 P22 + GTAW+SMAW ASME P5A Gr. 1 P4 Gr. 1 1.5-16.00 ER90S-G+ KOBE TG-S2CM - P4 = Min 120
SA213 T11 IX:2015 E9016-B3 + KOBE °C, P5 = Min
CMA106
205°C

52 WPS-DI-08 SA335 P22 + GTAW+SMAW ASME P5A Gr. 1 P1 Gr. 1 1.5-16.00 ER90S-G+ KOBE TG-S2CM - P1 = Min 10
SA106 Gr.B IX:2015 E9016-B3 + KOBE °C, P5 = Min
CMA106
205°C

53 WPS-DI-09 SA335 P22 + GTAW ASME P5A Gr. 1 P4 Gr. 1 1.5-12.00 ER90S-G KOBE TG-S2CM - P4 = Min 120
SA213 T11 IX:2015 °C, P5 = Min

150°C

54 WPS-DI-10 SA335 P22 + SMAW ASME P5A Gr. 1 P4 Gr. 1 1.5-11.00 E9016-B3 KOBE CMA106 P4 = Min 120
SA213 T11 IX:2015 - °C, P5 = Min

150°C

55 WPS-DI-11 SA335 P22 + GTAW ASME P5A Gr. 1 P1 Gr. 1 1.5-12.00 ER90S-G KOBE TG-S2CM - P1 = Min 10
SA106 Gr.B IX:2015 °C, P5 = Min

150°C

56 WPS-DI-12 SA335 P22 + SMAW ASME P5A Gr. 1 P1 Gr. 1 1.5-11.26 E9016-B3 KOBE CMA106 P1 = Min 10
SA106 Gr.B IX:2015 - °C, P5 = Min

150°C

57 WPS-DI-13 SA210-C+ SA209- GTAW ASME P1 Gr. 1 P3 Gr. 1 1.5-11.08 ER80S-G KOBE TG-SM P1 = Min 10
T1 GTAW IX:2015 P5A Gr.1 - °C, P3 = Min
KOBE TG-
58 WPS-DI-14 SA312 TP347H ASME IX P8 Gr.1 1.5-11.08 ERNiCr-3 S70NCb 80°C
+SA213-T22 2017
P1 = Min 10
- °C, P5A =

Min 150°C

Overlays and Repair of Pressure Part of Boiler

No WPS No. BASE (Mat) Welding Process Code P. No (BM 1) P. No (BM 2) Groove AWS Brand Name PWHT Preheat
59 WPS-OL-01 (Thk MM) - Min 10 °C
SA210 Gr.C+ KOBE TG-S309L - Min 10 °C
Clading SS304 ASME P1/P8 Weld Build OR EQV. - Min 120 °C
IX:2015 (Clading) - Min 120 °C
GTAW - up Max. 5.1 ER309L ESAB OK 83.28 - Min 150 °C
Or EQV.
mm.
KOBE TGS-50
ASME Weld Build Class DIN OR EQV.
IX:2015
60 WPS-OL-02 SA210 Gr.C SMAW P1 - up Max. 5.1 8555, E1- KOBE TGS-62
OR EQV.
mm. UM-300
KOBE TG-S1CM
ASME Weld Build
IX:2019
61 WPS-OL-03 SA213-A1 GTAW P1 - up Max. 6 ER70S-G

mm.

ASME Weld Build
IX:2019
62 WPS-OL-04 SA213-A1 GTAW P1 - up Max. 6 ER80S-G

mm.

ASME Weld Build
IX:2019
63 WPS-OL-05 SA213-T12 GTAW P4 Gr.1 - up Max. 6 ER80S-G

mm.

72  SKK Construction & Supply Co., Ltd. 

 

 

TEST COUPONS (ASME SEC IX)

SAFETY SIGNS

73  SKK Construction & Supply Co., Ltd. 

 

 

CUSTOMER

74  SKK Construction & Supply Co., Ltd.  SKK’s Update Year 2020

 

Filename:  SKK_2021_15032021 

Directory:  D:\JOB\501 SKK Company Profile\2021_Update 

Template:  C:\Users\Dell\AppData\Roaming\Microsoft\Templates\Normal.dotm 

Title:   

Subject:   

Author:  jureerat 

Keywords:   

Comments:   

Creation Date:  3/15/2021 5:09:00 PM 

Change Number:  4 

Last Saved On:  3/15/2021 5:15:00 PM 

Last Saved By:  Hotmail_MPS708_Mr.Thirpahon J 

Total Editing Time:  4 Minutes 

Last Printed On:  3/15/2021 5:30:00 PM 

As of Last Complete Printing 

  Number of Pages:  74 

  Number of Words:  4,690 (approx.) 

  Number of Characters:  26,736 (approx.) 

 


Click to View FlipBook Version