ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =E01
Cable type Internal +C1.C1.20 Cable type
C NYSY 4x4mm²
Device designation -BU1.X11
D Cable designations Target Cable designations Signal
=E01 +C1.C1.10 -F401 Terminal strip External -WG5C103
/D13.D2 UP_BB1_UL1
=E01 +C1.C1.10 -F401 Pin Device designation Pin Placement in/D13.D2 UP_BB1_UL1 B
schematics/D13.D2 UP_BB1_UL2 C
/D13.D3 UP_BB1_UL2
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s E/UK /D13.D3 UP_BB1_UL3
/D13.D3 UP_BB1_UL3
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. URTK/S 1 1 /D13.D3 UP_BB1_ULN
2 /D13.D4 UP_BB1_ULN
URTK/S 2 3
PSBJ3.5/18/6 RD 4
5
URTK/S 6 =DFR +DFR1 -TP11 :2 BU YE
7 =DFR +DFR1 -TP11 :4
:1 3 8
URTK/S 4
PSBJ3.5/18/6 YE
URTK/S 5
URTK/S 6
PSBJ3.5/18/6 BK
URTK/S
:3 7
URTK/S 8
PSBJ3.5/18/6 BU
D-URTK
D
EE
F Based on 18-11-2020 Prepared 18-09-2021 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
A FOR APPROVAL 18-09-2021 KD Approved 18-09-2021 MA Terminal table Resp. dept. +C1.C1.20
B AS BUILT AA Project PT. PLN PERSERO DCC EMA
Date -BU1.X11 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1165
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 n. sheet 1166
1
34 56 7 8
ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =E01
Cable type Internal +C1.C1.20 Cable type
C
Cable designations Device designation -BU1.X21 Target Cable designations Signal
External
=E01 +C1.C1.10 -F402 Terminal strip /D13.D6 UM_BB1_L1
=E01 +C1.C1.10 -F402 Device designation /D13.D7 UM_BB1_L2
Pin Pin /D13.D7 UM_BB1_L3Placement in B
=E01 +C1.U2.17 -X20.1 /D13.D8 UM_BB1_LNschematics C
=E01 +C1.U2.17 -X20.1 :1
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s E/UK =E01 +C1.U2.17 -X20.1 :2
=E01 +C1.U2.17 -X20.1 :3
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. URTK/S 1 1 :4
PSBJ3.5/18/6 RD 2
3
URTK/S 4
:1 PSBJ3.5/18/6 YE 2
URTK/S 3
PSBJ3.5/18/6 BK
URTK/S
:3 PSBJ3.5/18/6 BU 4
D-URTK
DD
EE
F Based on 18-11-2020 Prepared 18-09-2021 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
A FOR APPROVAL 18-09-2021 KD Approved 18-09-2021 MA Terminal table Resp. dept. +C1.C1.20
B AS BUILT AA Project PT. PLN PERSERO DCC EMA
Date -BU1.X21 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1166
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 n. sheet 1167
1
34 56 7 8
ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =E01
Cable type Internal +C1.C1.20 Cable type
C NYSY 4x4mm²
Device designation -BU2.X1
Cable designations Target Cable designations Signal
=E01 +C1.C1.10 -F403 Terminal strip External -WG5C102
=E01 +C1.C1.10 -F403 /D14.C2
=E01 +C1 -PE Pin Device designation Pin Placement in/D14.C2 LINE_2_L1 B
schematics/D14.C3 C
/D14.C3 UP_BB2_ULN
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s E/UK /D14.C3 UP_BB2_ULN
/D14.C4 UP_BB2_ULN
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. URTK/S 1 1
PSBJ3.5/18/6 RD 2
3
URTK/S 4 =E01 +BU21 -S :1a YE RD
5 =E01 +BU21 -S :1n
:2 PSBJ3.5/18/6 YE 2 6
URTK/S 3
PSBJ3.5/18/6 BK
URTK/S
:4 PSBJ3.5/18/6 BU 4
URTK/S 5
URTK/S
:11 6
D-URTK
DD
EE
F Based on 18-11-2020 Prepared 18-09-2021 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
A FOR APPROVAL 18-09-2021 KD Approved 18-09-2021 MA Terminal table Resp. dept. +C1.C1.20
B AS BUILT AA Project PT. PLN PERSERO DCC EMA
Date -BU2.X1 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1167
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 n. sheet 1168
1
34 56 7 8
ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =E01
Cable type Internal +C1.C1.20 Cable type
C NYSY 4x4mm²
Device designation -BU2.X2
Cable designations Target Cable designations Signal
=E01 +C1.C1.10 -F404 Terminal strip External -WG5C102
=E01 +C1.C1.10 -F404 /D14.C6
=E01 +C1 -PE Pin Device designation Pin Placement in/D14.C7 LINE_I_L1 B
schematics/D14.C7 C
/D14.C8 UM_BB2_LN
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s E/UK /D14.C8 UM_BB2_LN
/D14.C8 UM_BB2_LN
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. URTK/S 1 1
PSBJ3.5/18/6 RD 2
3
URTK/S 4 =E01 +BU21 -S :2a BU BK
5 =E01 +BU21 -S :2n
:2 PSBJ3.5/18/6 YE 2 6
URTK/S 3
PSBJ3.5/18/6 BK
URTK/S
:4 PSBJ3.5/18/6 BU 4
URTK/S 5
URTK/S
:10 6
D-URTK
DD
EE
F Based on 18-11-2020 Prepared 18-09-2021 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
A FOR APPROVAL 18-09-2021 KD Approved 18-09-2021 MA Terminal table Resp. dept. +C1.C1.20
B AS BUILT AA Project PT. PLN PERSERO DCC EMA
Date -BU2.X2 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1168
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 n. sheet 1169
1
34 56 7 8
ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =E01
Cable type Internal +C1.C1.20 Cable type
C NYSY 4x4mm²
Device designation -BU2.X11
D Cable designations Target Cable designations Signal
=E01 +C1.C1.10 -F403 Terminal strip External -WG5C104
/D14.D2 UP_BB1_UL1
=E01 +C1.C1.10 -F403 Pin Device designation Pin Placement in/D14.D2 UP_BB1_UL1 B
schematics/D14.D2 UP_BB2_UL2 C
/D14.D3 UP_BB2_UL2
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s E/UK /D14.D3 UP_BB2_UL3
/D14.D3 UP_BB2_UL3
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. URTK/S 1 1 /D14.D3 UP_BB2_ULN
2 /D14.D4 UP_BB2_ULN
URTK/S 2 3
PSBJ3.5/18/6 RD 4
5
URTK/S 6 =DFR +DFR1 -TP13 :2 BU YE
7 =DFR +DFR1 -TP13 :4
:1 3 8
URTK/S 4
PSBJ3.5/18/6 YE
URTK/S 5
URTK/S 6
PSBJ3.5/18/6 BK
URTK/S
:3 7
URTK/S 8
PSBJ3.5/18/6 BU
D-URTK
D
EE
F Based on 18-11-2020 Prepared 18-09-2021 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
A FOR APPROVAL 18-09-2021 KD Approved 18-09-2021 MA Terminal table Resp. dept. +C1.C1.20
B AS BUILT AA Project PT. PLN PERSERO DCC EMA
Date -BU2.X11 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1169
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 n. sheet 1170
1
34 56 7 8
ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =E01
Cable type Internal +C1.C1.20 Cable type
C
Cable designations Device designation -BU2.X21 Target Cable designations Signal
External
=E01 +C1.C1.10 -F404 Terminal strip /D14.D6 UM_BB2_L1
=E01 +C1.C1.10 -F404 Device designation /D14.D7 UM_BB2_L2
Pin Pin Placement in/D14.D7 UM_BB2_L3 B
=E01 +C1.U2.17 -X20.2 schematics/D14.D8 #44474389 C
=E01 +C1.U2.17 -X20.2 :1
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s E/UK =E01 +C1.U2.17 -X20.2 :2
=E01 +C1.U2.17 -X20.2 :3
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. URTK/S 1 1 :4
PSBJ3.5/18/6 RD 2
3
URTK/S 4
:1 PSBJ3.5/18/6 YE 2
URTK/S 3
PSBJ3.5/18/6 BK
URTK/S
:3 PSBJ3.5/18/6 BU 4
D-URTK
E/UK
DD
EE
F Based on 18-11-2020 Prepared 18-09-2021 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
A FOR APPROVAL 18-09-2021 KD Approved 18-09-2021 MA Terminal table Resp. dept. +C1.C1.20
B AS BUILT AA Project PT. PLN PERSERO DCC EMA
Date -BU2.X21 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1170
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 n. sheet 1171
1
34 56 7 8
ID HitachiABB Terminal A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. =E01
B Cable type +C1.C1.30 Cable type
NYSY 19x2.5mm²
C -XQA1 NYSY 19x2.5mm²
D Cable designations Target Terminal strip Target Cable designations Signal
Internal External -WG1C103
E Pin Pin -WG1C101 Placement in B
Device designation Device designation schematics
F Based on
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s A FOR APPROVAL =E01 +C1.C1.30 -XQA1 4 E/UK 1 /Y41.C2 +DCF102
B AS BUILT =E01 +C1.U1.06 -KF1 1 (-X31) 2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E01 +C1.U1.06 -KF1 3 (-X31) M 4/6.SNB 1 3 /Y41.C2 QA1 Close
Rev. Revision note =E01 +C1.C1.30 -XQB1 M 4/6.SNB 2 4
=E01 +C1.A1.10 -K501 1 M 4/6.SNB 3 5 /Y41.C3 QA1 Open
1 =E01 +C1.A1.10 -K501 A1 M 4/6.SNB 4 6
=E01 +C1.U1.06 -KF1 31 M 4/6.SNB 5 7 /Y41.C3 +DCF102
=E01 +C1.U1.06 -KF1 9 (-X31) M 4/6.SNB 6 8
=E01 +C1.U1.06 -KF1 11 (-X31) M 4/6.SNB 7 9 /Y41.C4 CB SF6 Alarm
=E01 +C1.U1.06 -KF1 13 (-X31) M 4/6.SNB 8 10
=E01 +C1.U1.06 -KF1 15 (-X31) M 4/6.SNB 9 11 /Y41.C4 CB _SF6_LCK
1 (-X32) M 4/6.SNB 10 12
M 4/6.SNB 11 13 /Y41.C5 CB Closing Spring Charged C
M 4/6.SNB 12 14 /Y41.C6 CB MOTOR MCB FAIL
M 4/6.SNB 13 61
M 4/6.SNB 14 62 /Y41.C7 HEATING/POWER SOCKT MCB FAIL
M 4/6.SNB 61 63
M 4/6.SNB 62 101 /Y41.C8 CB IN REMOTE
M 4/6.SNB 63 102
M 4/6.SNB101 103 /Y41.C8 CB IN LOCAL
M 4/6.SNB102 104
=E01 +C1.C1.30 -XQB1 61 M 4/6.SNB103 105 /Y61.C2 +DCF204 D
=E01 +C1.A1.10 -KQA1OP1 A1 M 4/6.SNB104 106 /Y61.C2 QA1 Open E
=E01 +C1.A1.10 -KQA1CL A1 M 4/6.SNB105 107 /Y61.C2 QA1 Close
=E01 +C1.A2.20 -XDCF101 104 M 4/6.SNB106 108 /N11.C2 +DCF101
=E01 +C1.U2.17 -K86.1 225 M 4/6.SNB107 109 /N11.C2 +DCF101
=E01 +C1.U1.06 -KF1 10 (-X41) M 4/6.SNB108 110 /N11.C3 QA_TC1
M 4/6.SNB109 111 /N11.C3 QA_TC1
=E01 +C1.U2.17 -K86.1 226 M 4/6.SNB110 112 /N11.C3 QA_TC1
=E01 +C1.U2.17 -K86.2 226 M 4/6.SNB111 113 /N11.C3 QA_TC1
=E01 +C1.U2.17 -K86.3 226 M 4/6.SNB112 /N11.C4 QA_TC1
=E01 +C1.U2.17 -P11 14 M 4/6.SNB113 /N11.C4 QA_TC1
=E01 +C1.C1.30 -XQA1 310 /N11.C5 QA_TC1
=E01 +C1.U1.06 -KF1 13 (-X42) Prepared 18-09-2021 /N11.D3 QA1_LOCAL_ITL
=E01 +C1.U2.17 -P11 15 Approved 18-09-2021 /N11.D5 #44474785
=E01 +C1.U2.17 -P11 16 Project PT. PLN PERSERO /N11.D6 TRIP1
/N11.D6 PRE-CLOSE1
DSS 150KV KIS
18-11-2020 KD ACP20051 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
18-09-2021 AA 34 MA Terminal table Resp. dept. +C1.C1.30
DCC EMA
Date Name -XQA1 PGGA Rev. ind. B Language en
Sheet 1171
2 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 n. sheet 1172
56 7 8
ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B =E01
Cable type +C1.C1.30 Cable type
C NYSY 19x2.5mm²
-XQA1 NYSY 7x2.5mm²
D NYSY 19x2.5mm²
E Terminal strip NYSY 19x2.5mm²
Cable designations Target Pin Target Pin Cable designations Placement in Signal B
Internal 506 External -WG1C101 schematics C
103 -WG1C102 /N11.D2 -DCF101 D
Device designation Device designation -WG2C121 /N21.C2 +DCF201 E
=E01 +C1.A2.20 -XDCF101 -WG2C111 /N21.C2 +DCF201
=E01 +C1.A2.20 -XDCF201 /N21.C3 TRIP2
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s M 4/6.SNB114 114 /N21.C3 TRIP2
=E01 +C1.U2.17 -K86.1 214 M 4/6.SNB201 201 /N21.C3 TRIP2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E01 +C1.U2.17 -K86.2 214 M 4/6.SNB202 202 /N21.C3 TRIP2
=E01 +C1.U2.17 -K86.3 214 M 4/6.SNB203 203 /N21.C4 TRIP2
=E01 +C1.U2.17 -P21 14 M 4/6.SNB204 204 /N21.C4 TRIP2
=E01 +C1.A2.20 -XDCF201 502 M 4/6.SNB205 205 /N21.C5 TRIP2
=E01 +C1.A2.20 -XDCF201 102 M 4/6.SNB206 206 /N21.D2 -DCF201
=E01 +C1.U1.14 -KF2 7 (-X41) M 4/6.SNB207 207 /N21.D2 +DCF201
=E01 +C1.U2.17 -P21 15 M 4/6.SNB208 208 /N21.D5 #44474786
=E01 +C1.U2.17 -P21 16 M 4/6.SNB209 209 /N21.D6 TRIP2
=E01 +C1.A2.20 -XDCF101 102 M 4/6.SNB210 210 /N21.D6 PRE-CLOSE2
=E01 +C1.A2.20 -XDCF101 502 M 4/6.SNB211 211 /M11.D1 +DCF101
M 4/6.SNB212 212 /M11.D1 -DCF101
=E01 +C1.A1.10 -KOE 14 M 4/6.SNB213 213
M 4/6.SNB214 214 /M11.D2 QA1_CLOSE_CMD
=E01 +C1.C1.30 -XQA1 110 M 4/6.SNB301 301 /M11.D2 +DCF101
M 4/6.SNB302 302 /M11.D3 +DCF101
M 4/6.SNB303 303 /M11.D6 +DCF101
M 4/6.SNB304 304 /M11.D6 QA1_LOCAL_ITL
M 4/6.SNB305 305 /M11.D5 QA1_LOCAL_ITL
M 4/6.SNB306 306 /M11.D4 QA1_LOCAL_ITL
M 4/6.SNB307 307 /M11.D3 QA1_LOCAL_ITL
M 4/6.SNB308 308
M 4/6.SNB309 309
M 4/6.SNB310 310
M 4/6.SNB311 311
M 4/6.SNB312 312
FEM62
E/UK
F Based on 18-11-2020 Prepared 18-09-2021 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
A FOR APPROVAL 18-09-2021 KD Approved 18-09-2021 MA Terminal table Resp. dept. +C1.C1.30
B AS BUILT AA Project PT. PLN PERSERO DCC EMA
Date -XQA1 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1172
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 n. sheet 1173
1
34 56 7 8
ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. =E01
B Cable type +C1.C1.30 Cable type
NYSY 19x2.5mm²
C -XQB1 NYSY 19x2.5mm²
D Cable designations Target Terminal strip Target Cable designations Signal
Internal External -WG2C111
E Pin Pin -WG1C103 /Y42.C2 +DCF102Placement in B
Device designation Device designation /Y42.C3 QB1 Closeschematics C
F Based on /Y42.C3 QB1 Open D
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s A FOR APPROVAL =E01 +C1.C1.30 -XQB2 1 E/UK 1 /Y42.C4 DS1 REMOTE
B AS BUILT =E01 +C1.U1.06 -KF1 3 (-X32) 2 /Y42.C5 DS1 MOTOR MCB FAIL
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E01 +C1.U1.06 -KF1 5 (-X32) M 4/6.SNB 1 3
Rev. Revision note =E01 +C1.U1.06 -KF1 7 (-X32) M 4/6.SNB 2 4 /Y61.C4 +DCF204
=E01 +C1.U1.06 -KF1 9 (-X32) M 4/6.SNB 3 5 /Y61.C4 QB1_OPEN
1 M 4/6.SNB 4 6 /Y61.C4 QB1_CLOSE
=E01 +C1.C1.30 -XQA1 61 M 4/6.SNB 5 61 /M21.D1 +DCF203
=E01 +C1.A1.10 -KQB1OP A1 M 4/6.SNB 6 62 /M21.D3 QB1_LOCAL_ITL
=E01 +C1.A1.10 -KQB1CL A1 M 4/6.SNB 61 63 /M21.D2 +DCF203
=E01 +C1.A2.20 -XDCF203 102 M 4/6.SNB 62 101 /M21.D2 QB1_OPEN
=E01 +C1.C1.30 -XQB1 111 M 4/6.SNB 63 102 /M21.D3 QB1_CLOSE
=E01 +C1.U2.06 -S1 7 M 4/6.SNB101 103 /M21.D4 -DCF203
=E01 +C1.U1.06 -KF1 13 (-X41) M 4/6.SNB102 104 /M21.D6 -DCF203
=E01 +C1.U1.06 -KF1 15 (-X41) M 4/6.SNB103 105 /M21.D6 -DCF203
=E01 +C1.A2.20 -XDCF203 502 M 4/6.SNB104 106 /M21.D5 -DCF203
M 4/6.SNB105 107 /M21.D4 QB1_LOCAL_ITL
=E01 +C1.C1.30 -XQB1 102 M 4/6.SNB106 108 /M21.D4 QB1_LOCAL_ITL
M 4/6.SNB107 109
M 4/6.SNB108 110 E
M 4/6.SNB109 111
M 4/6.SNB110 112
M 4/6.SNB111 113
M 4/6.SNB112 114
M 4/6.SNB113 115
M 4/6.SNB114 116
M 4/6.SNB115 117
M 4/6.SNB116 118
M 4/6.SNB117 119
M 4/6.SNB118 120
M 4/6.SNB119
18-11-2020 KD M 4/6.SNB120 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
18-09-2021 AA MA Terminal table Resp. dept. +C1.C1.30
FEM62 DCC EMA
Date Name -XQB1 PGGA Rev. ind. B Language en
Prepared 18-09-2021 Sheet 1173
2 Approved 18-09-2021 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 n. sheet 1174
Project PT. PLN PERSERO
56 7 8
DSS 150KV KIS
ACP20051
34
ID HitachiABB Terminal A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. Target =E01
B Cable type Internal +C1.C1.30 Cable type
Cable designations Device designation -XQB1 Target Cable designations Signal
External
Terminal strip Pin Placement in B
Device designation schematics
Pin
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s
E/UK
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
C C
DD
EE
F Based on 18-11-2020 Prepared 18-09-2021 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
A FOR APPROVAL 18-09-2021 KD Approved 18-09-2021 MA Terminal table Resp. dept. +C1.C1.30
B AS BUILT AA Project PT. PLN PERSERO DCC EMA
Date -XQB1 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1174
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 n. sheet 1175
1
34 56 7 8
ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. =E01
B Cable type +C1.C1.30 Cable type
NYSY 19x2.5mm²
C -XQB2 NYSY 19x2.5mm²
D Cable designations Target Terminal strip Target Cable designations Signal
Internal External -WG2C121
E Pin Pin -WG1C103 /Y42.C5 +DCF102Placement in B
Device designation Device designation /Y42.C6 QB2 Closeschematics C
F Based on /Y42.C6 QB2 Open D
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s A FOR APPROVAL =E01 +C1.C1.30 -XQB1 1 E/UK 1 /Y42.C7 DS2 REMOTE
B AS BUILT =E01 +C1.U1.06 -KF1 11 (-X32) 2 /Y42.C8 DS2 MOTOR MCB FAIL
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E01 +C1.U1.06 -KF1 13 (-X32) M 4/6.SNB 1 3
Rev. Revision note =E01 +C1.U1.06 -KF1 15 (-X32) M 4/6.SNB 2 4 /Y61.C6 +DCF204
=E01 +C1.U1.06 -KF1 1 (-X51) M 4/6.SNB 3 5 /Y61.C6 -QB2 OPEN
1 M 4/6.SNB 4 6 /Y61.C6 -QB2 CLOSE
=E01 +C1.C1.30 -XQB1 61 M 4/6.SNB 5 61 /M22.D1 +DCF203
=E01 +C1.A1.10 -KQB2OP A1 M 4/6.SNB 6 62 /M22.D3 QB2_LOCAL_ITL
=E01 +C1.A1.10 -KQB2CL A1 M 4/6.SNB 61 63 /M22.D2 +DCF203
=E01 +C1.A2.20 -XDCF203 103 M 4/6.SNB 62 101 /M22.D2 QB2_OPEN
=E01 +C1.C1.30 -XQB2 111 M 4/6.SNB 63 102 /M22.D3 QB2_CLOSE
=E01 +C1.U2.06 -S1 11 M 4/6.SNB101 103 /M22.D4 -DCF203
=E01 +C1.U1.06 -KF1 16 (-X41) M 4/6.SNB102 104 /M22.D6 -DCF203
=E01 +C1.U1.06 -KF1 18 (-X41) M 4/6.SNB103 105 /M22.D6 -DCF203
=E01 +C1.A2.20 -XDCF203 503 M 4/6.SNB104 106 /M22.D5 -DCF203
M 4/6.SNB105 107 /M22.D4 QB2_LOCAL_ITL
=E01 +C1.C1.30 -XQB2 102 M 4/6.SNB106 108 /M22.D4 QB2_LOCAL_ITL
M 4/6.SNB107 109
M 4/6.SNB108 110 E
M 4/6.SNB109 111
M 4/6.SNB110 112
M 4/6.SNB111 113
M 4/6.SNB112 114
M 4/6.SNB113 115
M 4/6.SNB114 116
M 4/6.SNB115 117
M 4/6.SNB116 118
M 4/6.SNB117 119
M 4/6.SNB118 120
M 4/6.SNB119
18-11-2020 KD M 4/6.SNB120 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
18-09-2021 AA MA Terminal table Resp. dept. +C1.C1.30
FEM62 DCC EMA
Date Name -XQB2 PGGA Rev. ind. B Language en
Prepared 18-09-2021 Sheet 1175
2 Approved 18-09-2021 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 n. sheet 1176
Project PT. PLN PERSERO
56 7 8
DSS 150KV KIS
ACP20051
34
ID HitachiABB Terminal A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. Target =E01
B Cable type Internal +C1.C1.30 Cable type
Cable designations Device designation -XQB2 Target Cable designations Signal
External
Terminal strip Pin Placement in B
Device designation schematics
Pin
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s
E/UK
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
C C
DD
EE
F Based on 18-11-2020 Prepared 18-09-2021 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
A FOR APPROVAL 18-09-2021 KD Approved 18-09-2021 MA Terminal table Resp. dept. +C1.C1.30
B AS BUILT AA Project PT. PLN PERSERO DCC EMA
Date -XQB2 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1176
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 n. sheet 1177
1
34 56 7 8
ID HitachiABB Terminal A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. Target =E01
B Cable type Internal +C1.C2.20 Cable type
NYSY 4x4mm²
C Device designation -XAC NYSY 4x4mm²
NYSY 2x4mm²
D =E01 +C1.C2.10 -F91 Terminal strip NYSY 4x4mm²
=E01 +C1.C2.10 -F92 NYSY 2x4mm²
E =E01 +C1.C2.10 -F91 NYSY 4x4mm²
=E01 +C1.C2.10 -F92
F Based on Cable designations =E01 +C1.C2.10 -F91 Pin Target Pin Cable designations Placement in Signal B
A FOR APPROVAL =E01 +C1.C2.10 -F92 External -WG79C11 schematics C
B AS BUILT =E01 +C1.C2.10 -F91 :1 :R -WG79C16 /G12.B1 ACM_R D
=E01 +C1.C2.20 -XAC :1 Device designation :S -WG79C12 /G12.B2 ACM_R
Rev. Revision note =E01 +C1.C2.10 -F93 :3 :T -WG79C17 /G12.B2 ACM_S
:3 =E00 +EQ3401 -X13 :N -WG79C13 /G12.B2 ACM_S
1 =E01 +C1.C2.10 -F94 :5 :R -WG79C18 /G12.B2 ACM_T
:5 =E00 +EQ3401 -X13 :1 /G12.B2 ACM_T
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s =E01 +C1.C2.10 -F94 :7N E/UK 1 :S /G12.B3 AC_N
:102 2 =E00 +EQ3401 -X13 :T /G12.B3 AC_N
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =E01 +C1.C2.10 -F93 :1 ZS 6 1 3 :N /G15.B1 ACM_R
ZS 6 2 4 =E00 +EQ3401 -X13 :3 /G15.B1 ACM_R
=E01 +C1.C2.10 -F92 :3 ZS 6 3 5 /G15.B2 ACM_S
=E01 +C1.C2.20 -XAC ZS 6 4 6 =E00 +EQ3401 -X15 /G15.B2 ACM_S
=E01 +C1.C2.20 -XAC :5 ZS 6 5 7 =E01 +C1.C2.10 -F96 /G15.B2 ACM_T
=E01 +C1.C2.10 -F93 ZS 6 6 8 =E00 +EQ3401 -X15 /G15.B2 ACM_T
=E01 +C1.C2.10 -F93 :3 ZS 6 7 11 /G15.B3 AC_N
=E01 +C1.C2.10 -F92 ZS 6 8 12 =E00 +EQ3401 -X15 /G15.B3 AC_N
=E01 +C1.C2.20 -XAC 2 ZS 6 11 13
=E01 +C1.C2.20 -XAC 112 ZS 6 12 14 =E00 +EQ3401 -X15
=E01 +C1.C2.10 -F94 ZS 6 13 15 =E01 +C1.C2.10 -F96
=E01 +C1.C2.10 -F94 8 ZS 6 14 16
=E01 +C1.C2.10 -F94 2 ZS 6 15 17 =E01 +QA1 -X1 500 YE RD /G14.D1 ACM_R E
=E01 +C1.C2.10 -F92 4 ZS 6 16 18 =E01 +QA1 -X1 515 YE RD /G14.D2 AC_N
=E01 +C1.C2.20 -XAC 4 ZS 6 17 19 =E01 +QA1 -X1 450 BU BK /G15.D1 ACM_R
=E01 +C1.C2.10 -F95 102 ZS 6 18 20 =E01 +QA1 -X1 460 BK YE RD /G15.D2 AC_N
=E01 +C1.C2.10 -F95 122 ZS 6 19 =E01 +QB1 -X1 20 BU BK /G14.D2 ACM_S
2 ZS 6 20 101 =E01 +QB1 -X1 YE RD /G14.D3 AC_N
18-11-2020 4 102 =E01 +QB1 -X1 21 /G15.D2 ACM_R
18-09-2021 6 ES 4 103 =E01 +QB1 -X1 1 /G15.D3 ACM_S
6 104 =E01 +QB1 -X1 2 /G15.D3 ACM_T
Date 112 ZS 4 101 111 =E01 +QB2 -X1 3 /G14.D4 ACM_T
2 ZS 4 102 112 =E01 +QB2 -X1 20 /G14.D4 AC_N
2 4 ZS 4 103 113 =E01 +QB2 -X1 21 /G15.D4 ACM_R
ZS 4 104 114 =E01 +QB2 -X1 1 /G15.D4 ACM_S
KD ZS 4 111 115 2
AA ZS 4 112 121
ZS 4 113 122
Name ZS 4 114 123
ZS 4 115 124
ZS 4 121
ZS 4 122 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
ZS 4 123 MA Terminal table Resp. dept. +C1.C2.20
ZS 4 124 DCC EMA
-XAC PGGA Rev. ind. B Language en
Prepared 18-09-2021 Sheet 1177
Approved 18-09-2021 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 n. sheet 1178
Project PT. PLN PERSERO
56 7 8
DSS 150KV KIS
ACP20051
34
ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =E01
Cable type Internal +C1.C2.20 Cable type
C NYSY 4x4mm²
Device designation -XAC
Cable designations =E01 +C1.C2.10 -F95 Target Cable designations Signal
=E01 +C1.C2.10 -F96 Terminal strip External BK -WG79C18
=E01 +C1.C2.10 -F96
Pin Device designation Pin Placement in B
=E01 +QB2 -X1 schematics
6 ZS 4 125 =E01 +C1 -AC 3
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s 2 ZS 4 126 125 =E01 +C1 -AC P /G15.D4 ACM_T
4 ZS 4 127 126 N /G15.D6 ACM_R
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 127 /G15.D7 AC_N
ZS 4 128 128
ZS 4 129 129
ZS 4 130 130
ES 4
E/UK
C
DD
EE
F Based on 18-11-2020 Prepared 18-09-2021 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
A FOR APPROVAL 18-09-2021 KD Approved 18-09-2021 MA Terminal table Resp. dept. +C1.C2.20
B AS BUILT AA Project PT. PLN PERSERO DCC EMA
Date -XAC PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1178
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 n. sheet 1179
1
34 56 7 8
ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =E01
Cable type Internal +C1.C2.20 Cable type
C
Cable designations Device designation -XAC1 Target Cable designations Signal
D =E01 +C1.C2.10 -F91 External
=E01 +C1.C2.10 -F91 Terminal strip /G12.D1 ACM_R
=E01 +C1.C2.10 -F91 Device designation /G12.D2 ACM_R
=E01 +C1.C2.10 -F91 Pin =E01 +C1.C2.60 -XG1 Pin Placement in/G12.D2 ACM_R B
=E01 +C1 -E92 =E01 +C1 -XG91 P schematics/G12.D2 ACM_S C
=E01 +C1 -E91 # /G12.D2 ACM_S
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E01+CP1-COUPLER 1-JBTB.056-KIS-EM-E-005-Rev-B_AS BUILT.e3s 2 ZS 4 1 1 =E01 +C1 -XG91 /G12.D2 ACM_S
ZS 4 2 2 # /G12.D2 ACM_T
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 3 =E01 +C1 -XG91 /G12.D2 ACM_T
ZS 4 3 4 =E01 +C1.C2.20 -XAC1 # /G12.D3 ACM_T
5 =E01 +C1.C2.60 -XG1 13 /G12.D3 AC_N
4 ZS 4 4 6 =E01 +C1 -XG91 N /G12.D3 AC_N
ZS 4 5 7 =E01 +C1.C2.20 -XAC1 # /G12.D3 AC_N
8 =E01 +C1.A2.20 -E93 10 /G12.F2 AC_N
ZS 4 6 9 N
10
6 ZS 4 7 11
ZS 4 8 12
13
ZS 4 9 14
15
8N ZS 4 10 16
ZS 4 11 17
18
ZS 4 12
X2 ZS 4 13
X2
ZS 4 14
ZS 4 15
ZS 4 16
ZS 4 17
ZS 4 18
ES 4
E/UK D
EE
F Based on 18-11-2020 Prepared 18-09-2021 AA Title CONTROL & PROTECTION PANEL Doc. kind. Ref.Des. =E01 F
A FOR APPROVAL 18-09-2021 KD Approved 18-09-2021 MA Terminal table Resp. dept. +C1.C2.20
B AS BUILT AA Project PT. PLN PERSERO DCC EMA
Date -XAC1 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-005 Sheet 1179
1
34 56 7 n. sheet
8
ID HitachiABB Title page A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 ABB B
B Customer : PT. PLN (PERSERO) C
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s Order : ACP20051 D
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. C Plant : DSS 150KV KIS
Equipment : 150KV COMMMON DRAWING
D Title : SCHEMATIC DIAGRAM
EE
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 Title page 1
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 10
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 No.sheets
2 34 56
7 8
ID HitachiABB Report frame A3 - Version 01 1 23 4 5 67 8
Sheet n.sh. Description 1 Description 2 Rev. Revision note Sheet n.sh. Description 1 Description 2 Rev. Revision note
© Copyright 2020 ABB A 12
TITLE PAGE B AS BUILT A
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s 2 21 LIST OF CONTENT 1 - 28 B AS BUILT B
21 22 SCHEMATIC DIAGRAM 110V DC SUPPLY FOR CRP/MK B AS BUILT C
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 22 23 SCHEMATIC DIAGRAM 110V DC SUPPLY FOR CRP/MK B AS BUILT
23 24 SCHEMATIC DIAGRAM SAS AC & DC SUPPLY B AS BUILT
20KV SAS AC SUPPLY B AS BUILT
B 24 25 SCHEMATIC DIAGRAM 400/230V AC SUPPLY FOR CRP B AS BUILT
400/230V AC SUPPLY FOR MK B AS BUILT
25 26 SCHEMATIC DIAGRAM 400/230V AC SUPPLY FOR MOTOR B AS BUILT
26 27 SCHEMATIC DIAGRAM MK TEMP SENSOR COMMUNICATION B AS BUILT
27 28 SCHEMATIC DIAGRAM
28 SCHEMATIC DIAGRAM
C
DD
EE
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. LIST OF CONTENT Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA LIST OF CONTENT
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EAB en
22-09-2021 HITACHI 2
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 21
Date Name ACP20051 56
1 Doc. no. JBTB.056-KIS-EM-E-011 Sheet
2 34 n. sheet
78
ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8
© Copyright 2020 ABB 110V DC SUPPLY CRP/MK REF DWG NO: GI-110/KIS-883/2020 SH: 19-18/54 MCB - Q03, 2P , 20A, 15kA A
B
A MCB - Q02, 2P , 20A, 15kA MCB - Q01, 2P , 20A, 15kA C
D
=E00 +EQ3411 E
110V DC DISTRIBUTION PANEL 1
MCB - Q04, 2P , 20A, 15kA
-X04 -X02 -X01 -X03
1+ 1+ 1+ 1+
+DC1 +DC1 +DC1 +DC1
2- 2- 2- 2-
-DC1 -DC1 -DC1 -DC1
=E00 +EQ3412 MCB - Q04, 2P , 20A, 15kA REF DWG NO: GI-110/KIS-883/2020 SH: 21-22/54 MCB - Q01, 2P , 20A, 15kA MCB - Q03, 2P , 20A, 15kA
MCB - Q02, 2P , 20A, 15kA
110V DC DISTRIBUTION PANEL 2
B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s -X04 -X02 -X01 -X03
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 1+ 1+ 1+ 1+
+DC2 +DC2 +DC2 +DC2
2- 2- 2- 2-
-DC2 -DC2 -DC2 -DC2
=E01 +CP1 =E02 +CP1 =E03 +CP1 =E04 +CP1
CRP BUS COUPLER CRP PORONG OHL CRP BANGIL OHL CRP KTT UGC
102 502 102 502 102 502 102 502 102 502 102 502 102 502 102 502
501 501
101 501 101 501 101 501 101 501 101 501 101 101 501 101
-XDC1 -XDC2 -XDC1 -XDC2 -XDC1 -XDC2 -XDC1 -XDC2
C
=E01 +C1 =E02 +C1 =E03 +C1 =E04 +C1
MK BUS COUPLER MK PORONG OHL MK BANGIL OHL MK KTT UGC
D 101 501 101 501 101 501 101 501 101 501 101 501 101 501
101 501 -XDC2 -XDC1 -XDC2 -XDC1 -XDC2 -XDC1 -XDC2
-XDC1
REF DWG: JBTB1.056-KIS-EM-E-005/L11/L12/L13/L14 REF DWG: JBTB1.056-KIS-EM-E-002/L11/L12/L13/L14 REF DWG: JBTB1.056-KIS-EM-E-001/L11/L12/L13/L14 REF DWG: JBTB1.056-KIS-EM-E-003/L11/L12/L13/L14
E
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 110V DC SUPPLY FOR CRP/MK 21
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 22
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 12 34 5 6 7 8
A
© Copyright 2020 ABB A 110V DC SUPPLY CRP/MK B
=E00 +EQ3411 REF DWG NO: GI-110/KIS-883/2020 SH: 19-18/54 MCB - Q13, 2P , 20A, 15kA C
MCB - Q11, 2P , 20A, 15kA
110V DC DISTRIBUTION PANEL 1 D
MCB - Q05, 2P , 20A, 15kA E
-X05 -X11 -X13
1+ 1+ 1+
+DC1 +DC1 +DC1
2- 2- 1-
-DC1 -DC1 -DC1
=E00 +EQ3412 MCB - Q05, 2P , 20A, 15kA REF DWG NO: GI-110/KIS-883/2020 SH: 21/54 REF DWG NO: GI-110/KIS-883/2020 SH: 22/54
MCB - Q10, 2P , 20A, 15kA MCB - Q13, 2P , 20A, 15kA
110V DC DISTRIBUTION PANEL 2
B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s -X05 -X10 -X09
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 1+ 1+ 1+
+DC2 +DC2 +DC2
2- 1- 1-
-DC2 -DC2 -DC2
=E05 +CP1 =E00 +CM1 =E00 +DFR1 =E00 +DFR2
CRP TRAFO-1 ENERGY METER PANEL DFR PANEL1 DFR PANEL2
102 502 102 502 101 501 101 501 + - + -
501
101 501 101 -XDC1 -XDC2 -TP31 -TP31
-XDC1 -XDC2
C
REF DWG: JBTB1.056-KIS-EM-E-011/L11 REF DWG: JBTB1.056-KIS-EM-F-001/ SH 03 OF 15 REF DWG: JBTB1.056-KIS-EM-F-001/ SH 08 OF 15
=E05 +C1
MK TRAFO-1
D 101 501 101 501
-XDC1 -XDC2
REF DWG: JBTB1.056-KIS-EM-E-004/L11/L12/L13/L14
E
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 110V DC SUPPLY FOR CRP/MK 22
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 23
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8
© Copyright 2020 ABB A REF DWG NO: GI-110/KIS-845/2020 SH: 17 OFF 54 -X07 A
MCB - Q07, 2P , 20A, 15kA B
+EQ3411 C
1+ 2- D
110V DC DISTRIBUTION PANEL 1
MCB - Q07, 2P , 20A, 15kA
+EQ3412 REF DWG NO: GI-110/KIS-883/2020 SH: 22 OF 54
110V DC DISTRIBUTION PANEL 2 1+ 2-
B RN
-X02
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E00 +Inverter -X01 -X07
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. INVERTER SUPPLY =E00 +EQ3421 MCB - Q04,2P , 20A, 15kA
REF DWG NO: GI-48/TTY-XXX/2020 SH:XX
RN 48V DC DISTRIBUTION PANEL
=E00 +EQ3401-X06 N -X04
ACM_N
C 400/230V AC DISTRIBUTION PANELS 1+
ACM_S +48V DC
REF DWG NO: GI-400/KIS-882/2020 SH: 12 OF27 1-
MCB - Q11 ,3P , 20A, 15kA -48V DC
=E00 +CX1 =E00 +CX2
SAS PANEL - 1 SAS PANEL - 2
D
E E
12 3 4 5 6 7 8 1 2 101 102 501 502 101 501 101 501 12 3 4 5 6 7 8 1 2 101 501 101 102 501 502
-XAC. -XAC3 -XDC1 -XDC2 -XDC3 -XAC -XAC3 -XDC1 -XDC2 -XDC2
REF DWG: JBTB1.056-KIS-EM-E-012/21/22 REF DWG: JBTB1.056-KIS-EM-E-013/21/22
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 SAS AC & DC SUPPLY 23
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 24
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 2 34 56 78
© Copyright 2020 ABB A REF DWG NO: GI-110/KIS-845/2020 SH: 17 MCB - Q01,2P , 20A, 15kA MCB - Q05, 2P , 20A, 15kA A
MCB - Q04, 2P , 20A, 15kA REF DWG NO: GI-48/KIS-XXX/2020 SH:XX B
+EQ3413 -X04 -X05 C
1+ 2- =J00 +C1 D
110V DC DISTRIBUTION PANEL 3 1+ E
20kV MERGING UNIT MK +DC1
=E00 +EQ3401 2-
-DC1
400/230V AC DISTRIBUTION PANEL REF DWG NO: GI-400/KIS-882/2020 SH: 12 OF27
-X21 -X21
B
R N
MCB - Q11 ,3P , 20A, 15kAACM_R ACM_N
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E00 +Inverter -X03RN
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. INVERTER SUPPLY -X011+ 2-
+EQ3422
C 48V DC DISTRIBUTION PANEL 2
=J00 +CX1
20KV SAS PANEL
D
12 3 4 5 6 7 8 1 2 101 501 101 501 12 3 4 5 6 7 8 101 501
-XAC. -XAC3 -XDC1 -XDC3 -XAC. -XDC1
REF DWG: JBTB1.056-KIS-EM-E-014/21/22 REF DWG: JBTB1.056-KIS-EM-E-011/22
E
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 20KV SAS AC SUPPLY 24
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 25
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 12 34 5 67 8
A
© Copyright 2020 ABB 230V AC SUPPLY FOR CRP
-X02
-X02 A
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E00 +EQ3401 =E02 +CP1 =E03 +CP1 B
C
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 400/230V AC DISTRIBUTION PANEL PORONG OHL BANGIL OHL D
E
REF DWG NO: GI-400/KIS-882/2020 SH: 12 OF27 REF DWG: JBTB1.056-KIS-EM-E-002/G11 REF DWG: JBTB1.056-KIS-EM-E-0011/G11
MCB - Q02 ,2P , 20A, 15kA
RN
B
=E01 +CP1
BUS COUPLER
REF DWG: JBTB1.056-KIS-EM-E-005/G11
C 12 34 56 78 1 2 34 56 78 1 2 34 56 78
-XAC. -XAC. -XAC.
=E04 +CP1 =E00 +CM1 =E05 +CP1
KTT BAY ENERGU METERING PANEL TRAFO-1
REF DWG: JBTB1.056-KIS-EM-E-003/G11 REF DWG: JBTB1.056-KIS-EM-E-009/G11 REF DWG: JBTB1.056-KIS-EM-E-004/G11
D
1 2 34 56 78 1 2 34 56 78 1 2 34 56 78
-XAC. -XAC. -XAC.
E
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 400/230V AC SUPPLY FOR CRP 25
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 26
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 12 3 45 67 8
© Copyright 2020 ABB A AC SUPPLY MARSHALLING KIOSK REF DWG: GI-400/KIS-882/2020 SH 12 OF 27 A
HEATING/LIGHTING MCB - Q01,3P , 40A, 15kA B
=E00 +EQ3401 C
REF DWG: GI-400/KIS-882/2020 SH 12 OF 27 D
400/230V AC DISTRIBUTION PANEL MCB - Q05,3P , 20A, 15kA
REF DWG: GI-400/KIS-882/2020 SH 13 OF 27
MCB - Q13,3P , 20A, 15kA
-X13 -X05 -X01
R R R
ACM_R ACM_R ACM_R
S S S
ACM_S ACM_S ACM_S
T T T
ACM_T ACM_T ACM_T
N N N
AC_N AC_N AC_N
B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E01 +C1 =E02 +C1 =E03 +C1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. MK BUS COUPLER PORONG OHL BANGIL OHL
12 34 56 78 1 2 34 56 78 1 2 34 56 78
C -XAC -XAC -XAC
REF DWG: JBTB1.056-KIS-EM-E-005/G12 REF DWG: JBTB1.056-KIS-EM-E-002/G14/G12 REF DWG: JBTB1.056-KIS-EM-E-001/G14/G12
=E00 +EQ3401 REF DWG: GI-400/KIS-882/2020 SH 13 OF 27 REF DWG: GI-400/KIS-882/2020 SH 14 OF 27 REF DWG: GI-400/KIS-882/2020 SH 16 OF 27
MCB - Q10,3P , 20A, 15kA MCB - Q18,3P , 20A, 15kA MCB - Q34,3P , 32A, 15kA
400/230V AC DISTRIBUTION PANEL
D
-X10 -X18 -X34
R R R
ACM_R ACM_R ACM_R
S S S
ACM_S ACM_S ACM_S
T T N
ACM_T ACM_T ACM_T
N N T
AC_N AC_N AC_N
=E04 +C1 =E05 +C1 =E05 +T1.C1
KTT BAY TRAFO-1 TRAFO-1 MK
E E
1 2 34 56 78 1 2 34 56 78 -X1
-XAC -XAC L1
ACM_R
-X1
L2
ACM_S
-X1
L3
ACM_T
-X1
N
AC_N
REF DWG: JBTB1.056-KIS-EM-E-003/G12 REF DWG: JBTB1.056-KIS-EM-E-004/G12 DRAWING NO. PS-PX-070-FOMB SH: 14 OF 19
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 400/230V AC SUPPLY FOR MK 26
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 27
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 123 45 67 8
© Copyright 2020 ABB A AC SUPPLY MARSHALLING KIOSK TRAFO MK MOTOR/HEATING/LITGHTING/TAP CHANGER DRIVE A
CB/DS MOTOR SUPPLY B
=E00 +EQ3401 REF DWG: GI-400/KIS-882/2020 SH 12 OF 27 C
REF DWG: GI-400/KIS-882/2020 SH 12 OF 27 MCB - Q03,3P , 40A, 15kA
400/230V AC DISTRIBUTION PANEL MCB - Q08,3P , 20A, 15kA
REF DWG: GI-400/KIS-882/2020 SH 13 OF 27-X15 -X08 -X03RSTN
MCB - Q15,3P , 20A, 15kA RSTN
RSTN
B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E01 +C1 =E02 +C1 =E03 +C1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. MK BUS COUPLER PORONG OHL BANGIL OHL
11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18
C -XAC -XAC -XAC
REF DWG: JBTB1.056-KIS-EM-E-005/G14 REF DWG: JBTB1.056-KIS-EM-E-002/G14/G14 REF DWG: JBTB1.056-KIS-EM-E-001/G14/G14
=E00 +EQ3401 REF DWG: GI-400/KIS-882/2020 SH 13 OF 27 REF DWG: GI-400/KIS-882/2020 SH 14 OF 27
MCB - Q11,3P , 20A, 15kA MCB - Q19,3P , 20A, 15kA
400/230V AC DISTRIBUTION PANEL
RSTN D
D
-X11RSTN -X19
=E04 +C1 =E05 +C1
KTT BAY TRAFO-1
E E
11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18
-XAC -XAC
REF DWG: JBTB1.056-KIS-EM-E-003/G14 REF DWG: JBTB1.056-KIS-EM-E-004/G14
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 400/230V AC SUPPLY FOR MOTOR 27
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 28
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 23 4 56 7 8
A
© Copyright 2020 ABB A MK TEMPERATURE SENSOR MONITORING SIGNAL TO RTU B
=E00 +CX1 -KF21.81 C
SAS PANEL - 1 RTU560 D
E
RTU(DAISY CHAIN)
CP2
D+
#
D-
#
GND
#
Shld
-XCOM
B 12 3 4
REF DWG: JBTB1.056-KIS-EM-E-012 SH 39
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E01 +C1 =E04 +C1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. MK BUS COUPLER KTT BAY
-XCOM -XCOM
12 3 4 12 3 4
C REF DWG: JBTB1.056-KIS-EM-E-005 SH L24
=E02 +C1 =E05 +C1
PORONG OHL TRAFO-1
D -XCOM -XCOM
12 3 4 12 3 4
=E03 +C1 -XCOM
BANGIL OHL 12 3 4
E
F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) MA SCHEMATIC DIAGRAM DCC EFS en
22-09-2021 28
Rev. Revision note DSS 150KV KIS MK TEMP SENSOR COMMUNICATION Resp. dept. PGGA Rev. ind. B Language
Date Name ACP20051 Sheet
1 HITACHI Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34
56 7 8
ID HitachiABB Title page A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. B
B Customer : PT. PLN (PERSERO) C
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s Order : ACP20051 D
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. C Plant : DSS 150KV KIS
Equipment : 150KV ENERGY METER PANEL
D Title : SCHEMATIC DIAGRAM
EE
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 Title page 1
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language 48
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 No.sheets
2 34 56
7 8
IDABB Report frame A3 - Version 03 1 2 34 5 67 8
Description 2 Rev. Revision note
© Copyright 2020 Hitachi P Sheet n.sh. Description 1 Description 2 Rev. Revision note Sheet n.sh. Description 1
A 12 =E00+CM1 B AS BUILT
TITLE PAGE B AS BUILT 1005 1101 PARTS LIST =E00+CM1-PE B AS BUILT A
2 8 LIST OF CONTENT =E00+CM1.A.30-XDC1 B AS BUILT B
8 21 SYMBOL LEGENDS 1 - 1117 B AS BUILT 1101 1102 TERMINAL TABLE =E00+CM1.A.30-XDC2 B AS BUILT C
21 22 CUBICLE LAYOUT =E00+CM1.A.30-XDCF101 B AS BUILT D
22 23 CUBICLE LAYOUT B AS BUILT 1102 1103 TERMINAL TABLE =E00+CM1.A.30-XDCF102 B AS BUILT
=E00+CM1.A.30-XDCF103 B AS BUILT
B 23 24 CUBICLE LAYOUT FRONT VIEW WITH DOOR B AS BUILT 1103 1104 TERMINAL TABLE =E00+CM1.A.30-XDCF104 B AS BUILT
=E00+CM1.A.30-XDCF105 B AS BUILT
24 25 CUBICLE LAYOUT SECTION VIEW INCL. LOCATION DESIGNATION B AS BUILT 1104 1105 TERMINAL TABLE =E00+CM1.A.30-XDCF201 B AS BUILT
25 26 CUBICLE LAYOUT =E00+CM1.A.40-BI1.X1 B AS BUILT
26 D11 CUBICLE LAYOUT FIXED FRAME VIEW B AS BUILT 1105 1106 TERMINAL TABLE =E00+CM1.A.40-BI1.X2 B AS BUILT
D11 D12 SCHEMATIC DIAGRAM =E00+CM1.A.40-BI1.X3 B AS BUILT
D12 D13 SCHEMATIC DIAGRAM INSIDE VIEW B AS BUILT 1106 1107 TERMINAL TABLE =E00+CM1.A.40-BI1.X4 B AS BUILT
D13 D14 SCHEMATIC DIAGRAM =E00+CM1.A.40-BU1.X1 B AS BUILT
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s INSIDE REAR VIEW B AS BUILT 1107 1108 TERMINAL TABLE =E00+CM1.A.40-BU1.X2 B AS BUILT
C =E00+CM1.A.40-X811 B AS BUILT
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. LIST OF LABELS B AS BUILT 1108 1109 TERMINAL TABLE =E00+CM1.A.40-XAC B AS BUILT
D14 G11 SCHEMATIC DIAGRAM
G11 L11 SCHEMATIC DIAGRAM ENERGY METER MAIN P51.1=E04 B AS BUILT 1109 1110 TERMINAL TABLE
L11 L12 SCHEMATIC DIAGRAM
L12 L16 SCHEMATIC DIAGRAM ENERGY METER CHECK P51.2=E04 B AS BUILT 1110 1111 TERMINAL TABLE
L16 Y21 SCHEMATIC DIAGRAM
Y21 Y23 SCHEMATIC DIAGRAM ENERGY METER MAIN P51.3=E05 B AS BUILT 1111 1112 TERMINAL TABLE
D ENERGY METER CHECK P51.4=E05 B AS BUILT 1112 1113 TERMINAL TABLE
Y23 Y24 SCHEMATIC DIAGRAM CRP AC POWER SUPPLY B AS BUILT 1113 1114 TERMINAL TABLE
Y24 Z11 SCHEMATIC DIAGRAM
Z11 Z12 SCHEMATIC DIAGRAM 110V DC1 SUPPLY B AS BUILT 1114 1115 TERMINAL TABLE
Z12 Z13 SCHEMATIC DIAGRAM
Z13 Z14 SCHEMATIC DIAGRAM 110V DC2 SUPPLY B AS BUILT 1115 1116 TERMINAL TABLE
Z14 Z21 SCHEMATIC DIAGRAM
IED PSM B AS BUILT 1116 1117 TERMINAL TABLE
E Z21 Z22 SCHEMATIC DIAGRAM
COMMON ALARM B AS BUILT 1117 TERMINAL TABLE
Z22 1001 SCHEMATIC DIAGRAM
1001 1002 PARTS LIST COMMUNICATION INTERFACE B AS BUILT
1002 1003 PARTS LIST
1003 1004 PARTS LIST COMMUNICATION INTERFACE B AS BUILT
1004 1005 PARTS LIST
DEVICE OVERVIEW - P51.1 B AS BUILT
F Based on
A AS MANUFACTURED DEVICE OVERVIEW - P51.2 B AS BUILT
B AS BUILT
DEVICE OVERVIEW - P51.3 B AS BUILT
Rev. Revision note
DEVICE OVERVIEW - P51.4 B AS BUILT
1
DEVICE OVERVIEW - ESW1 B AS BUILT E
DEVICE OVERVIEW - ESW2 B AS BUILT
=E00+CM1 B AS BUILT
=E00+CM1 B AS BUILT
=E00+CM1 B AS BUILT
=E00+CM1 B AS BUILT
Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. LIST OF CONTENT Ref.Des. =E00 F
Approved 22-09-2021 MA LIST OF CONTENT
25-03-2021 KD Project PT. PLN (PERSERO) DCC EAB en
22-09-2021 MR HITACHI 2
DSS 150KV KIS 56 Resp. dept. - Rev. ind. B Language 8
Date Name ACP20051
Doc. no. JBTB.056-KIS-EM-E-006 Sheet
2 34 n. sheet
78
© Copyright 2020 Hitachi Power Grids. 12 3 4 5 6 7 8
SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION
A TERMINAL IN GENERAL OPTOCOUPLER OPERATED BY CIRCUIT BREAKER THREE PHASE A
BINARY INPUT TURNING STAR WINDING B
N/O CONTACT
(NORMALLY OPEN)
N/C CONTACT TERMINAL WITH PLUG BINARY OUTPUT OPERATED BY CRANK DISCONNECTOR THREE PHASE WINDING
(NORMALLY CLOSED) WITH NEUTRAL
B PROTECTIVE EARTHING FO CONNECTOR OPERATED BY LEVER EARTH SWITCH THREE PHASE
ZIG-ZAG WINDING
CHANGE-OVER CONTACT
Print: 9/27/2021 150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT TEST CONTACT BLOCK, AUXILIARY RELAY PLUG CONNECTOR M OPERATED BY MOTOR WAVE TRAP THREE PHASE DELTA
SHORT CIRCUIT BEFORE (1 COIL) & OPEN DELTA WINDING
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. OPENING
N/C CONTACT BISTABLE RELAY ANALOG INPUT TRANSFORMER WITH LIGHTNING ARRESTOR CONNECTOR
(SET AND RESET COIL) TWO WINDING EARTH
(LATE OPENING)
TRANSFORMER WITH C
C THREE WINDING
N/O CONTACT MINIATURE CIRCUIT POWER SUPPLY
(PASSING WHEN ACTUATED) BREAKER
N/O CONTACT LAMP FAN AUTO TRANSFORMER DIODE
(EARLY CLOSING) RESISTANCE CAPACITOR
HEATING RESISTOR D
D CHANGE-OVER CONTACT
HOR REACTOR
(MAKE BEFORE BREAK) N
SIGNAL SOURCE / DESTINATION SEMAPHORE DIRECT CURRENT M MOTOR
FOR CONNECTION BETWEEN
DIFFERENT PAGES
1 SWITCH, 2 POSITIONS ALTERNATING G GENERATOR DOOR SWITCH
0 CURRENT LINK
E CT TERMINAL E
DISCONNECTABLE
WITH BRIDGE SEPARABLE, 0
4 POLES 1
2 KEY SWITCH, CURRENT
OPERATED BY KEY TRANSFORMER
3 POSITIONS
VT TERMINALS CONDUCTOR OPERATED BY VOLTAGE FUSE
DISCONNECTABLE PUSHING TRANSFORMER
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SYMBOL LEGENDS
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 HITACHI 8
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language 21
Date Name ACP20051 56 Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34
7 8
ID HitachiABB Layout A3 - Version 01 1 2 3 4 5 67 8
A
© Copyright 2020 Hitachi Power Grids. 150KV ENERGY METER PANEL =E00+CM1 A
BI B
I REFERENCE DOCUMENTS: - C
FRAME TYPE FIXED D
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s FIXED FRAME HIGH 43U E
OPENING ANGLE 90°
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ACCESS DOOR FRONT AND REAR
TECHNICAL DATA:
HEIGHT X WIDTH X DEPTH 2200MM H X 800MM W X 800MM D
WEIGHT APPROX. - 350KG
PROTECTION CLASS IP42
DOOR LOCK 5MM HANDLING PIN, DOUBLE WEB
CUBICLE COVER SHEETS COLOUR (OUTSIDE/INSIDE) RAL7032, TEXTURED
COVER PLATE COLOUR (MOUNTED ON FIXED FRAME) RAL7032, SMOOTH
C RATED SUPPLY VOLTAGE AC 400/230V, 50HZ
RATED SUPPLY VOLTAGE DC 220V
CUBICLE ILLUMINATION 60W
HEATING WITH INTEGRATED THERMOSTAT 55W
HEATING CONTROL THERMOSTAT & HYGROSTAT
VENTILATION EXHAUST FILTERS AND FANS
AC POWER OUTLET 1PHASE, 10A, TYPE SCHUKO
CABLE DUCT PVC
WIRE INSULATION
2100 WIRE END SLEEVE PVC 70°C
2200 WIRE MARKING
WITH PLASTIC SLEEVE
CONDUCTOR MATERIAL
2100 KTH/Q, WHITE WITH BLACK INSCRIPTION, 12MM
-K1:A2 -K1:A2 / -X1:51 -K1:A2 / -X1:51 -X1:51
COPPER PLAIN MULTISTRANDED FLEXIBLE
D WIRE COLOUR, CONDUCTOR CROSS SECTION AC MULTICORE CABLE, 1.5MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION CONTROL/SIGNAL DC GREY, 1.5MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION DC MAIN GREY, 4MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION VT CIRCUITS RED, YELLOW, BLACK, BLUE - 2.5MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION CT CIRCUITS RED, YELLOW, BLACK, BLUE - 4MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION EARTHING GREEN / YELLOW, 4MM²
CONDUCTOR CROSS SECTION EMC EARTHING 16MM²
E TERMINAL ABB ENTRELEC/PHOENIX CONTACT
TERMINAL VT URTK/S
II TERMINAL CT URTK/S WITH SHORTING FACILITY
TERMINAL AC/DC MAIN INPUT ZS 6
F Based on TERMINAL AC/DC DISTRIBUTION ZS 4
A AS MANUFACTURED TERMINAL PROTECTION/REMOTE INTERFACE M 4/6.SNB
B AS BUILT TERMINAL GROUND (ON EARTHING BAR) AZK35
TERMINAL PRIMARY PROCESS M 4/6.SNB
Rev. Revision note
II
1
100.00 100.00
800.00 Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
KD Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
25-03-2021 MR Project PT. PLN (PERSERO) DCC ELU
22-09-2021 FRONT VIEW WITH DOOR
DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 21
Doc. no. JBTB.056-KIS-EM-E-006 n. sheet 22
2 34 56
7 8
ID HitachiABB Layout A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. B Drawing Pocket 800 B
800
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s C 540mm BOTTOM VIEW 800 C
90° +A +C FIXED FRAME
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. D 90° +V D
E 800 +U E
CROSS SECTIONAL VIEW II - II
FIXED FRAME
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC ELU
22-09-2021 SECTION VIEW INCL. LOCATION DESIGNATION
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 22
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet 23
2 34 56
7 8
ID HitachiABB Layout A3 - Version 01 1 23 4 56 7 8
A A
© Copyright 2020 Hitachi Power Grids. B +U FRONT VIEW FIXED FRAME +W SIDE VIEW
B
C -CM1 -CM1
D U -KC1
E 01 -KC1 -KC2
02
03 -KC2
04
05
06 -P51.1 -P51.2
07
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s 08 EDMI Mk6N
09
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. BILLING
RESET
SELECT
PULSE 1 PULSE
Wh varh
10
11
12
13
14
15 -X1.1 -X1.2 -X2.1 -X2.2
16 C
17
18
19
20 -P51.3 -P51.4
21
22 EDMI Mk6N
BILLING
RESET
SELECT
PULSE 1 PULSE
Wh varh
23
24
25
26
27 D
28 -X3.1 -X3.2 -X4.1 -X4.2
29
30
31
32
33
34
35
36
37
38 E
39
40
41
42
43
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC ELU
22-09-2021 FIXED FRAME VIEW
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 23
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet 24
2 34 56
7 8
ID HitachiABB Layout A3 - Version 01 1 2 34 5 67 8
© Copyright 2020 Hitachi Power Grids. A +V BACK VIEW FIXED FRAME -F91 6A AC SUPPLY A
B
+C RIGHT SIDE -F101 10A P51.1 EM POWER SUPPLY +A LEFT SIDE C
(VIEWED FROM FRONT DOOR / +U) -F102 10A P51.2 EM POWER SUPPLY (VIEWED FROM FRONT DOOR / +U) D
-CM1 -F103 10A P51.3 EM POWER SUPPLY E
75x75x460Internal U -F104 10A P51.4 EM POWER SUPPLY -F91 Internal
+C.10 75x75x1925 01 -F105 10A ESW KC1 SUPPLY -F101 75x75x1925
75x50x460 Internal 02 -F201 10A ESW KC2 SUPPLY -F102
03 -F103
B 04 -P1 SLOT 1 -P2 -P5 SLOT 3 -P6 SLOT 5 SLOT 7 SLOT 9 GND N L 12 -F104
05 -P1 -R1 -F105
+C.20 06
07 Tx PORT 1 Rx Tx PORT 2 Rx PORT 5 RJ45 RJ45 PORT 6 PORT 9 PORT 10 PORT 13 PORT 14 PORT 17 PORT 18
C 08
09 RJ45
10
11 -KC1 -P3 SLOT 2 -P4 -P7 SLOT 4 -P8 SLOT 6 SLOT 8 SLOT 10 PE PE 75x75x460
12 -KC2
13 Tx PORT 3 Rx Tx PORT 4 Rx PORT 7 RJ45 RJ45 PORT 8 PORT 11 PORT 12 PORT 15 PORT 16 PORT 19 PORT 20
14
15 75x50x450mm External AFS670-EREEAATTEEEEEEEENZEX08.0
16
17 11 11 11 11 11 11
18 13
19 13 13 13 13 13
20
21 Internal -F201 6A 10A
22 10A
23 -P1 SLOT 1 -P2 -P5 SLOT 3 -P6 SLOT 5 SLOT 7 SLOT 9 GND N L 12 +A.10 10A
24 -P1 -R1 10A
25 10A
26 Tx PORT 1 Rx Tx PORT 2 Rx PORT 5 RJ45 RJ45 PORT 6 PORT 9 PORT 10 PORT 13 PORT 14 PORT 17 PORT 18 -K101
27 -K201
28 RJ45
29
30 -P3 SLOT 2 -P4 -P7 SLOT 4 -P8 SLOT 6 SLOT 8 SLOT 10
31
32 Tx PORT 3 Rx Tx PORT 4 Rx PORT 7 RJ45 RJ45 PORT 8 PORT 11 PORT 12 PORT 15 PORT 16 PORT 19 PORT 20
33
34 AFS670-EREEAATTEEEEEEEENZEX08.0 2 4 12 2 4 12 2 4 12 2 4 12 2 4 12 2 4 12
35 14 14 14 14 14 14
36 75x50x450mm
37
38 Internal
39
40 75x50x460 31 21 11 31 21 11 -B91 -B93
41 34 24 14 34 24 14
42 1110A 32 22 12 32 22 12
43 13
+A.20
2 4 12
14 12
213
A2 A1 A2 A1 -MO.A40
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s -P51.2 -P51.1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. C4ZC4KC4YC3ZC3KC3YC2ZC2KC2YC1ZC1KC1Y S1 S2 S3SCOM -IRIG-B
+-
-XDCF105 -XDCF103 -XDCF101-XDC1 E -BU1.X1 -BI1.X3 -BI1.X1-XAC - -XXAACC
502 501 102 101 502 501 102 101 E EE E E E -XDCF201 -XDCF104 -XDCF102 -XDC2 E E E E E E E E E EE E 110 109 108 107 106 105 104 103 102 101 110 109 108 107 106 105 104 103 102 101
SH + - 502 501 102 101 502 501 102 101 E EE E E E
-COM1
504 503 502 501 104 103 102 101 504 503 502 501 104 103 102 101 E
SH + -
-COM4 E EE E E E E E E E
ETH PE -TB2 -TB3 -TB4 -TB5 -TB6 -TB7 -TB8
L
N
G
-TB12 E
-TB1
I31 I21 I11 V1 V3 -TB10 -TB11 11 13 504 503 502 501 104 103 102 101 504 503 502 501 104 103 102 101 E EE E E E E E E E E E E EE 4321 4321
2 579
I32 I22 I12 -Vref V2 1 3 4 6 8 10 12 14 -BI1.X4 -BI1.X2
E
504 503 502 501 104 103 102 101 504 503 502 501 104 103 102 101 E EE E E E E E E E External E E E EE 4321 4321
Internal E
External
External -X1.2 75-Xx510.1x450mm 504 503 502 501 104 103 102 101 504 503 502 501 104 103 102 101 E EE E E E E E E E E E E EE 4321 4321
-X2.2 -X2.1 1234 EEEE 4321E 4321
1234
1 3 01 03 1 3 01 03 502 501 102 101 502 501 102 101 E EE E E E E
2 4 02 04 2 4 02 04
E E E E E E E EE
01 02 03 04 01 02 03 04 87654321 87654321
502 501 102 101 502 501 102 101 EE E E E
Internal External/Internal -BU1.X2 E
External 75x50x450mm
E E E E E E E EE 87654321 87654321
-P51.4 -P51.3
E
C4ZC4KC4YC3ZC3KC3YC2ZC2KC2YC1ZC1KC1Y S1 S2 S3SCOM -IRIG-B
+-
SH + - E 87654321 87654321 -X811
-COM1 EEEEEEEE
SH + - E
-COM4
E
-TB2 -TB3 -TB4 -TB5 -TB6 -TB7 -TB8 ETH PE
-TB12 L
-TB1 N
G
-TB10 -TB11 11 13 I31 I21 I11 V1 V3
2 579
1 3 4 6 8 10 12 14
I32 I22 I12 -Vref V2
D
75x50x450mm External
Internal
-X4.2 -X4.1 -X3.2 -X3.1
1234 1234 1 3 01 03
2 4 02 04
1 3 01 03 01 02 03 04
2 4 02 04
01 02 03 04
Internal -CM1
75x50x450mm
E
75x75x1925 75x100x1925 Internal 75x100x1800 External P PE N
Internal -XG1
+C.30 L PE -E93
75x100x1250
External N Internal
+C.40
+A.30
1 2 3 4 5 6 7 8 9 10
NOTE: FOR SECTION LEGEND REFER SHEET 32.
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
A AS MANUFACTURED Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
B AS BUILT 25-03-2021 KD Project PT. PLN (PERSERO) DCC ELU
22-09-2021 MR INSIDE VIEW
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 24
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet 25
2 34 56
7 8
ID HitachiABB Layout A3 - Version 01 1 2 3 4 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. +B REAR PLANE B
-CM1 C
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s B Internal D
75x100x1925
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 75x75x460 75x75x1925
+B.10 Internal
75x50x460
+B.20
C 75x50x460
+B.30
75x50x460
+B.40
75x50x460
D
E E
NOTE: FOR SECTION LEGEND REFER SHEET 32.
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
A AS MANUFACTURED Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
B AS BUILT 25-03-2021 KD Project PT. PLN (PERSERO) DCC ELU
22-09-2021 MR INSIDE REAR VIEW
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 25
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet 26
2 34 56
7 8
ID HitachiABB Layout A3 - Version 01 1 2 34 5 67 8
A
© Copyright 2020 Hitachi Power Grids. ABB TYPE NUMBER: 1KHF601226R0016 ABB TYPE NUMBER: 1KHF601226R0015 A
B MATERIAL, COLOUR GROUND / INSCRIPTION: PVC BLACK/WHITE MATERIAL, COLOUR GROUND / INSCRIPTION: PVC BLACK/WHITE
37.00
C 150KV ENERGY METER PANEL =E00+CM1
D 105.00 B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s E 210.00 42
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. F Based on 86
A AS MANUFACTURED
B AS BUILT 28 14
Rev. Revision note MATERIAL, COLOUR GROUND / INSCRIPTION: PVC WHITE/BLACK
1 MATERIAL, COLOUR GROUND / INSCRIPTION: PVC WHITE/BLACK
+U.02 -KC1 +U.15 -X1.1 -X1.2 -X2.1 -X2.2 C
+U.04 ETHERNET SWITCH +U.28 D
+U.08 CT TEST BLOCK VT TEST BLOCK CT TEST BLOCK VT TEST BLOCK
+U.08 -KC2
+U.20 ETHERNET SWITCH -X3.1 -X3.2 -X4.1 -X4.2
+U.20
-P51.1 CT TEST BLOCK VT TEST BLOCK CT TEST BLOCK VT TEST BLOCK
ENERGY METER MAIN
E
(OHL KTT)
-P51.2
ENERGY METER CHECK
(OHL KTT)
-P51.3
ENERGY METER MAIN
(TRAFO-1)
-P51.4
ENERGY METER CHECK
(TRAFO 1)
Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
KD Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
25-03-2021 MR Project PT. PLN (PERSERO) DCC ELU
22-09-2021 LIST OF LABELS
DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 26
Doc. no. JBTB.056-KIS-EM-E-006 n. sheet D11
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 2 3 4 5 67 8
© Copyright 2020 Hitachi Power Grids. A HV Current IL1 HV Current IL3 HV Voltage UL1 HV Voltage UL3
>=E04 +C1 HV Current IL2 HV Voltage UL2 A
MARSHALLING KIOSK B
KTT
B
REF DWG:JBTB1.056-KIS-EM-E-003 REF DWG:JBTB1.056-KIS-EM-E-003
SH D14 SH D14
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s -BI1.X5 -BU1.X2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 1 2
IL1 UL1
2 4
IL2 UL2
3 6
IL3 UL3
4 8
ILN ULN
C C
D
+CM1 E
ENERGY METER PANEL 1
12 3 4 12 3 4 5 6 7 8
-BI1.X1 -BU1.X1
-X1.1 -X1.2
Test Test
D Normal 01 Normal 01 UL1 UL2 UL3 ULN
1 /D11.D2 1 /D11.D6 +U.15-X2.2:1 +U.15-X2.2:2 +U.15-X2.2:3 +U.15-X2.2:4
+U.15 -X1.1 2 02 2 02 +U.15 -X1.2
/D11.D2 /D11.D7
TEST BLOCK CT 3 03 3 03 TEST BLOCK VT /D12.D6 /D12.D7 /D12.D7 /D12.D7
/D11.D3 /D11.D7
CC-E-VA-6.6 1 2 3 4 TC-DS-VL 1 2 3 4
4 04 4 04
/D11.D3 /D11.D7
/D11.D4 01 /D11.D4 02 /D11.D4 03 /D11.D4 04 CURRENT TEST BLOCK VOLTAGE TEST BLOCK /D11.D5 01 /D11.D5 02 /D11.D5 03 /D11.D5 04
+U.08 -P51.1
EDMI, Mk6N -TB1 1 -TB1 4 -TB1 8 -TB1 2 -TB1 5 -TB1 9
MULTIFUNCTION METER Ib Ic Va Vb Vc
#UL1 #UL2 #UL3
Ia
VT: VT: VT:
E #IL1 #IL2 #IL3 57-240V 57-240V 57-240V
/Z11.C3 /Z11.D3 /Z11.D3 Vn
CT: CT: CT:
13
1A 1A 1A
/Z11.B3 Ia /Z11.C3 Ib /Z11.C3 Ic
3 6 10
IL1 IL2 IL3 ILN
+A.40-BI1.X2:1 +A.40-BI1.X2:2 +A.40-BI1.X2:3 +A.40-BI1.X2:4
/D12.C2 /D12.C2 /D12.C3 /D12.C3
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 ENERGY METER MAIN P51.1=E04 D11
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language D12
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 2 3 4 5 67 8
A
© Copyright 2020 Hitachi Power Grids. HV Current IL1 HV Current IL3 HV Voltage UL1 HV Voltage UL3
HV Current IL2 HV Voltage UL2 A
B B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s C /D11.F2 /D11.F2 /D11.F3 /D11.F3 C
D
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. +CM1 E
ENERGY METER PANEL 1
IL1 IL2 IL3 ILN /D11.D8 /D11.D8 /D11.D8 /D11.D8
+U.08-P51.1:3 (-TB1) +U.08-P51.1:6 (-TB1) +U.08-P51.1:10 (-TB1) +U.15-X1.1:04
UL1 UL2 UL3 ULN
+A.40-BU1.X1:2 +A.40-BU1.X1:4 +A.40-BU1.X1:6 +A.40-BU1.X1:8
12 3 4 -X2.1 -X2.2
D -BI1.X2 Test Test
Normal 01 Normal 01
1 /D12.D2 1 /D12.D6
+U.15 -X2.1 2 02 2 02 +U.15 -X2.2
/D12.D2 /D12.D7
TEST BLOCK CT 3 03 3 03 TEST BLOCK VT
/D12.D3 /D12.D7
CC-E-VA-6.6 1 2 3 4 TC-DS-VL 1 2 3 4
4 04 4 04
/D12.D3 /D12.D7
/D12.D4 01 /D12.D4 02 /D12.D4 03 /D12.D4 04 CURRENT TEST BLOCK VOLTAGE TEST BLOCK /D12.D5 01 /D12.D5 02 /D12.D5 03 /D12.D5 04
+U.08 -P51.2
ION8650 I11 I21 I31 V1 V2 V3
MULTIFUNCTION METER
E #I1 #I2 #I3 #V1 #V2 #V3
VT: VT: VT:
CT: CT: CT: 57-277V 57-277V 57-277V
/Z12.B5 - /Z12.B5 /Z12.B5
1-5A 1-5A 1-5A
-Vref
/Z12.C5 /Z12.C5 /Z12.C5
I12 I22 I32
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 ENERGY METER CHECK P51.2=E04 D12
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language D13
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 2 3 4 5 67 8
© Copyright 2020 Hitachi Power Grids. A HV Current IL1 HV Current IL3 HV Voltage UL1 HV Voltage UL3
>=J12 +S1 HV Current IL2 HV Voltage UL2 A
20kV INCOMING SWITCHGEAR
REF DWG: (3)G77541-K1585-S014-C REF DWG: (3)G77541-K1585-S014-C
SH B2/B3 SH B2/B3
B B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s -X1 -X2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 35 5
IL1 UL1
36 6
IL2 UL2
37 7
IL3 UL3
38 8
ILN ULN
C C
D
+CM1 E
ENERGY METER PANEL 1
12 3 4 12 3 4 5 6 7 8
-BI1.X3 -BU1.X2
-X3.1 -X3.2
Test Test
D Normal 01 Normal 01 UL1 UL2 UL3 ULN
1 /D13.D2 1 /D13.D6 +U.28-X4.2:1 +U.28-X4.2:2 +U.28-X4.2:3 +U.28-X4.2:4
+U.28 -X3.1 2 02 2 02 +U.28 -X3.2
/D13.D2 /D13.D7
TEST BLOCK CT 3 03 3 03 TEST BLOCK VT /D14.D6 /D14.D7 /D14.D7 /D14.D7
/D13.D3 /D13.D7
CC-E-VA-6.6 1 2 3 4 TC-DS-VL 1 2 3 4
4 04 4 04
/D13.D3 /D13.D7
/D13.D4 01 /D13.D4 02 /D13.D4 03 /D13.D4 04 CURRENT TEST BLOCK VOLTAGE TEST BLOCK /D13.D5 01 /D13.D5 02 /D13.D5 03 /D13.D5 04
+U.20 -P51.3
ION8650 I11 I21 I31 V1 V2 V3
MULTIFUNCTION METER
E #I1 #I2 #I3 #V1 #V2 #V3
VT: VT: VT:
CT: CT: CT: 57-277V 57-277V 57-277V
/Z13.B5 - /Z13.B5 /Z13.B5
1-5A 1-5A 1-5A
-Vref
/Z13.C5 /Z13.C5 /Z13.C5
I12 I22 I32
IL1 IL2 IL3 ILN
+A.40-BI1.X4:1 +A.40-BI1.X4:2 +A.40-BI1.X4:3 +A.40-BI1.X4:4
/D14.C2 /D14.C2 /D14.C3 /D14.C3
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 ENERGY METER MAIN P51.3=E05 D13
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language D14
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 2 3 4 5 67 8
A
© Copyright 2020 Hitachi Power Grids. HV Current IL1 HV Current IL3 HV Voltage UL1 HV Voltage UL3
B
HV Current IL2 HV Voltage UL2 A
B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s C /D13.F2 /D13.F2 /D13.F3 /D13.F3 C
D
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. +CM1 E
ENERGY METER PANEL 1
IL1 IL2 IL3 ILN /D13.D8 /D13.D8 /D13.D8 /D13.D8
+U.20-P51.3:I12 +U.20-P51.3:I22 +U.20-P51.3:I32 +U.28-X3.1:04
UL1 UL2 UL3 ULN
+A.40-BU1.X2:2 +A.40-BU1.X2:4 +A.40-BU1.X2:6 +A.40-BU1.X2:8
12 3 4 -X4.1 -X4.2
D -BI1.X4 Test Test
Normal 01 Normal 01
1 /D14.D2 1 /D14.D6
+U.28 -X4.1 2 02 2 02 +U.28 -X4.2
/D14.D2 /D14.D7
TEST BLOCK CT 3 03 3 03 TEST BLOCK VT
/D14.D3 /D14.D7
CC-E-VA-6.6 1 2 3 4 TC-DS-VL 1 2 3 4
4 04 4 04
/D14.D3 /D14.D7
/D14.D4 01 /D14.D4 02 /D14.D4 03 /D14.D4 04 CURRENT TEST BLOCK VOLTAGE TEST BLOCK /D14.D5 01 /D14.D5 02 /D14.D5 03 /D14.D5 04
+U.20 -P51.4
EDMI, Mk6N -TB1 1 -TB1 4 -TB1 8 -TB1 2 -TB1 5 -TB1 9
MULTIFUNCTION METER Ib Ic Va Vb Vc
#UL1 #UL2 #UL3
Ia
VT: VT: VT:
E #IL1 #IL2 #IL3 57-240V 57-240V 57-240V
/Z14.C3 /Z14.D3 /Z14.D3 Vn
CT: CT: CT:
13
1A 1A 1A
/Z14.B3 Ia /Z14.C3 Ib /Z14.C3 Ic
3 6 10
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 ENERGY METER CHECK P51.4=E05 D14
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language G11
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 2 3 45 6 7 8
A
© Copyright 2020 Hitachi Power Grids. A CRP HEATING/LITGHTING >=E05 +CP1 REF DWG:JBTB1.056-KIS-EM-E-004
SH G11 B
>=E04 +CP1 CONTROL AND PROTECTION PANEL
TRAFO-1 BAY
CONTROL AND PROTECTION PANEL
KTT BAY REF DWG:JBTB1.056-KIS-EM-E-003
SH G11
B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s -XAC -XAC
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 102 108
PH_R PH_N
-XAC
108
PH_N
-XAC
102
PH_R
+CM1 101 102 103 104 105 106 107 108
ENERGY METER PANEL 1 -XAC
C C
D
-F91 E
11 12 /G11.D2
/Y21.C5 34 /G11.D2
CRP AC MCB TRIP AC SUPPLY
13 +A.20 -B91
-F91 HYGROSTAT
KTS 011
D 6A /G11.D4 2 /G11.D4 4 14
12 <φ
1
2
3
21
-S91
+A.40 -XG1 P AC -E91 22 +A.20 -B93
X1
OUTLET 3 LAMP THERMOSTAT1
SD-D/SC SP-20W
KTS 011 (L)
E
0-60°C
<ϑ
HEAT
2
PE N X2
-XAC +A.30 -E93 L -E94 L1 -E95 L1
110 HEATING FAN FAN
FL200 FL200
-PE 2 PE N
-PE 1 -PE 3 PE N-PE 4 PE N
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 CRP AC POWER SUPPLY G11
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language L11
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 123 4 5 6 7 8
A
© Copyright 2020 Hitachi Power Grids. P51.1 EM POWER SUPPLY P51.2 EM POWER SUPPLY P51.3 EM POWER SUPPLY P51.4 EM POWER SUPPLY ESW KC1 SUPPLY
A -X11 REF DWG: GI-110/KIS-883/2020 SH 17 OF 33
MCB - Q11, 2P (20A)
+EQ3411 + REF DWG NO: JBTB1.056-KIS-EM-A-015, SH 22
+DC1
110V DC DISTRIBUTION PANEL 1 110V DC-
-DC1
+CM1
ENERGY METER PANEL 1
101 102
B -XDC1 501 502 B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s -K101 A1 DC1 SUPERVISION
A2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
13 11 14 -F102 13 11 14 -F103 13 11 14 -F104 13 11 14 -F105 13 11 14 C
12 /L11.E3 2 /L11.E3 4 12 /L11.E5 2 /L11.E5 4 12 /L11.E6 2 /L11.E6 4 12 /L11.E7 2 /L11.E7 4 12
C -F101 10A 10A 10A 10A
/Y21.C2 /Y21.C2 /Y21.C3 /Y21.C3 /Y21.C3
10A
/L11.E2 2 /L11.E2 4
-XDCF101 -XDCF102 -XDCF103 -XDCF104 -XDCF105
101 101 101 101 101
102 103 104 102 103 104 102 103 104 102 103 104
102
501 501 501 501
502 503 504 502 503 504 502 503 504 502 503 504 501
502
D +DCF101 -DCF101 +DCF102 +DCF103 +DCF104 -DCF104 D
+U.08-P51.1:7 (-TB1) +U.08-P51.1:11 (-TB1) +U.08-P51.2:L (AUX 1) +U.20-P51.3:L (AUX 1) +U.20-P51.4:7 (-TB1) +U.20-P51.4:11 (-TB1) E
-DCF102 -DCF103 +DCF105 -DCF105
+U.08-P51.2:N +U.20-P51.3:N +U.01-KC1:L (-P1) +U.01-KC1:N (-P1)
/L16.B2 /L16.C2 /L16.B4 /L16.C4 /L16.B5 /L16.C5 /L16.B6 /L16.C6 /L16.D2 /L16.E2
-F101 -F102 -F103 -F104 -F105
12 12 12 12 12
E /L11.C2 /L11.C3 /L11.C4 /L11.C5 /L11.C7
34 34 34 34 34
/L11.C2 /L11.C3 /L11.C4 /L11.C6 /L11.C7
P51.1 EM POWER SUPPLY P51.2 EM POWER SUPPLY P51.3 EM POWER SUPPLY P51.4 EM POWER SUPPLY ESW KC1 SUPPLY
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 110V DC1 SUPPLY L11
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language L12
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 123 4 5 67 8
A
© Copyright 2020 Hitachi Power Grids. A ESW KC2 SUPPLY REF DWG: GI-110/KIS-883/2020 SH 21 OF 33 B
110V DC MCB - Q10, 2P (20A)
+EQ3421 C
REF DWG NO: JBTB1.056-KIS-EM-A-015, SH 22
110V DC DISTRIBUTION PANEL 2 D
502 E
-X10
+
+DC2
-
-DC2
+CM1 102
ENERGY METER PANEL 1 501
101
B -XDC2
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s -K201 A1 DC2 SUPERVISION
A2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
13 11 14
12
C -F201
/Y21.C4
10A
/L12.D2 2 /L12.D2 4
-XDCF201
101
102
501
502
D /L16.D4 +U.03-KC2:L (-P1)
/L16.E4 +U.03-KC2:N (-P1)
-F201
12
/L12.C2
34
/L12.C2
ESW KC2 SUPPLY
E
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 110V DC2 SUPPLY L12
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language L16
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. P51.1 EM POWER SUPPLY P51.2 EM POWER SUPPLY P51.3 EM POWER SUPPLY P51.4 EM POWER SUPPLY B
+CM1
/L11.D2 +DCF101 /L11.D3 +DCF102 /L11.D4 +DCF103 /L11.D6 +DCF104 C
ENERGY METER PANEL 1 +A.30-XDCF101:102 +A.30-XDCF102:102 +A.30-XDCF103:102 +A.30-XDCF104:102
D
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s B +U.08 -P51.1 +U.08 -P51.2 +U.20 -P51.3 AUX 1 L +U.20 -P51.4 E
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. C EDMI, Mk6N ION 8650 ION 8650 EDMI, Mk6N
MULTIFUNCTION METER
D MULTIFUNCTION METER -TB1 7 MULTIFUNCTION METERAUX 1 L MULTIFUNCTION METER -TB1 7
E + + + +
- -
57-240V 65-120VAC 65-120VAC 57-240V
80-160VDC 80-160VDC
/Z11.B1 /Z14.B1
/Z12.B1 /Z13.B1
- PE G N PE G N -
11 11
-PE 9 -PE 10
/L11.D2 -DCF101 /L11.D3 -DCF102 /L11.D5 -DCF103 /L11.D6 -DCF104
+A.30-XDCF101:502 +A.30-XDCF102:502 +A.30-XDCF103:502 +A.30-XDCF104:502
ESW-1 SUPPLY ESW-2 SUPPLY
/L12.D2 +A.30-XDCF201:102
/L11.D7 +DCF105
+A.30-XDCF105:102
+U.01 -KC1 -P1 L +U.03 -KC2 -P1 L
AFS670 AFS670
ETHERNET SWITCH-1 ETHERNET SWITCH-2
77-300VDC + 77-300VDC +
90-265VAC - 90-265VAC -
/Z21.B1 /Z22.B1
PE GND N PE GND N
-PE 7 -PE 8
/L11.D7 -DCF105 /L12.D2 +A.30-XDCF201:502
+A.30-XDCF105:502
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 IED PSM L16
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language Y21
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 2 3 4 5 6 7 8
A
© Copyright 2020 Hitachi Power Grids. A DC FAIL AC FAIL SWITCH 1 OK SWITCH 2 OK B
+CM1 C
ENERGY METER PANEL 1 D
B +U.01 -KC1 +U.03 -KC2
AFS670 AFS670
ETHERNET SWITCH-1 ETHERNET SWITCH-2
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s -R1 1 -R1 1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 #READY2 #READY2
/Z21.C3 /Z22.C3
-F101 -F102 -F103 -F104 -F105 -F201 -K101 -K201 -F91 2 2
/L11.C2 11 /L11.C3 11 /L11.C5 11 /L11.C6 11 /L11.C7 11 /L12.C2 11 11 11 /G11.D2 11
C
-X811 2 34 5
1
>=E05 +CP1
CONTROL AND PROTECTION PANEL
TRAFO-1
D
-XKF1 -XKF1
1 6
+DCF101 +CM1_KC1 ESW OK
-XKF1 -XKF1
5 7
+CM1_DC_AC MCB FAIL +CM1_KC2 ESW OK
E REF DWG: JBTB1.056-KIS-EM-E-004 SH Y12 E
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 COMMON ALARM Y21
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language Y23
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 23 4 5 67 8
© Copyright 2020 Hitachi Power Grids. A REF DWG:JBTB1.056-KIS-EM-E-003 A
SH Y71 B
>=E04 +CP1 C
D
CONTROL AND PROTECTION PANEL E
KTT BAY
B
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s -KC1
-KC1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
+CM1 +U.03 -KC2
ENERGY METER PANEL 1 AFS670
ETHERNET SWITCH-2
C
+U.08 -P51.1 +U.20 -P51.3 100FX /Z22.B4
D #FO1 ST
EDMI, Mk6N ION 8650
MULTIFUNCTION METER MULTIFUNCTION METER ETHERNET PORT
#COM1 Ethernet port ST
RS485 #ETH
-P1 Tx Rx
/Z11.B7 10/100TX
/Z13.E7
-TB7 RJ45
ETH
SPARE SPARE SPARE SPARE
+U.01 -KC1
AFS670 -P1 Tx Rx -P3 Tx Rx -P4 Tx Rx RJ45 -P5 RJ45 -P6 RJ45 -P7 RJ45 -P8 -P2 Tx Rx
E ETHERNET SWITCH-1 ST
/Z21.D4 /Z21.D4 /Z21.E4
ST ST ST ST ST ST 10/100Tx 10/100Tx 10/100Tx /Z21.E4 ST /Z21.B4
/Z21.C4 #LAN7 10/100Tx
ETHERNET PORT ETHERNET PORT ETHERNET PORT Ethernet port Ethernet port ETHERNET PORT #LAN8 ETHERNET PORT
#FO1 ETHERNET PORT #FO2
100FX /Z21.B4 #FO3 /Z21.C4 #FO4 100FX
100FX 100FX
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 COMMUNICATION INTERFACE Y23
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language Y24
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8
A
© Copyright 2020 Hitachi Power Grids. >=E05 +CP1 A
B B
CONTROL AND PROTECTION PANEL C
+CM1 TRAFO-1 BAY D
E
ENERGY METER PANEL 1 REF DWG:JBTB1.056-KIS-EM-E-004
SH Y71
C
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s +U.08 -P51.2 +U.20 -P51.4
D
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ION 8650 EDMI, Mk6N
+U.03 -KC2 MULTIFUNCTION METER MULTIFUNCTION METER
AFS670 Ethernet port #COM1
#ETH RS485
E ETHERNET SWITCH-2
10/100TX /Z14.B7
/Z12.E7
-TB7 RJ45
ETH
SPARE SPARE SPARE SPARE
-P3 Tx Rx -P4 Tx Rx RJ45 -P5 RJ45 -P6 RJ45 -P7 RJ45 -P8 -P2 Tx Rx
ST
ST ST ST ST /Z22.D4 /Z22.D4 /Z22.E4 /Z22.E4 ST
/Z22.C4 10/100Tx 10/100Tx 10/100Tx 10/100Tx /Z22.B4
ETHERNET PORT ETHERNET PORT #LAN7 #LAN8 ETHERNET PORT
#FO3 Ethernet port Ethernet port ETHERNET PORT ETHERNET PORT #FO2
100FX /Z22.C4 #FO4 100FX
100FX
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 COMMUNICATION INTERFACE Y24
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language Z11
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 123 4 5 67 8
A
© Copyright 2020 Hitachi Power Grids. A Energy meter Energy meter -TB2 Energy meter B
57-240VAC/VDC 57-240VAC/VDC
+CM1.U.08 -P51.1 Mk6N +1 C
#BI01 GND
EDMI, MkN6 57-240VAC/VDC #BI02 +2 D
MULTIFUNCTION METER #BO.01 GND COM E
#BO.02
-TB1 + #BO.03 -TB3 -TB7 /Y23.D4
#BO.04
7 #BO.05 1 RJ45
#BO.06 GND
/L16.C3 - #BO.07 #COM1 RS485
11 #BO.08 2
GND COM
B 57-240V -TB8
-TB4
RJ45
3
GND #COM2 RS485
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s HV Current IL1 -TB1 4 #COM3 RS485 -TB9
#IL1 CT: 1A GND COM
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. HV Current IL2 Ia 1 GND 1
#IL2 CT: 1A /D11.E2 -TB5
Rx- 2
C HV Current IL3 Ia 3 5
Ib 4 GND Rx+ 3
#IL3 CT: 1A
/D11.E2 6 Tx- 4
Ib 6 GND
Ic 8 Tx+ 5
-TB6
HV Voltage UL1 /D11.E3
Ic 10 7
#UL1 VT: 57-240V GND
-TB1
HV Voltage UL2 8
Va 2 GND
#UL2 VT: 57-240V /D11.E6
D HV Voltage UL3 Vb 5
/D11.E7
#UL3 VT: 57-240V
Vc 9
/D11.E7
Vn 13
E
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 DEVICE OVERVIEW - P51.1 Z11
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language Z12
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 12 3 45 67 8
A
© Copyright 2020 Hitachi Power Grids. A Multi function metering device SH Multi function metering device Multi function metering device B
ION8650 -+ ION8650 ION8650
+CM1.U.08 -P51.2 3xVT, 3xCT -- 3xVT, 3xCT 3xVT, 3xCT C
ION 8650 AUX 1 SH HV Voltage UL1 #S1 D
MULTIFUNCTION METER + #V1 VT: 57-277V E
L+ - HV Voltage UL2 #S2
+ #V2 VT: 57-277V /D12.E6 S1
N- - HV Voltage UL3 - #S3 -
#V3 VT: 57-277V
B 65-120VAC HV Current IL1 /D12.E7 S2
G #I1 CT: 1-5A
/L16.C4 80-160VDC HV Current IL2 /D12.E7 S3
#I2 CT: 1-5A -Vref SCOM
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s PE HV Current IL3
#I3 CT: 1-5A I11 C1K
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. #COM1 /D12.E2 #C1 C1Z
C1Y
C I12 #C2 C2K
I21 C2Z
#COM4 C2Y
/D12.E2 C3K
#IRIG-B I22 C3Z
I31 C3Y
D C4K
/D12.E3 C4Z
I32 C4Y
#C3 ETH
/Y24.D4
#C4
Ethernet port
#ETH 10/100TX
E
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 DEVICE OVERVIEW - P51.2 Z12
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language Z13
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 12 3 45 67 8
A
© Copyright 2020 Hitachi Power Grids. A Multi function metering device SH Multi function metering device Multi function metering device B
ION8650 -+ ION8650 ION8650
+CM1.U.20 -P51.3 3xVT, 3xCT -- 3xVT, 3xCT 3xVT, 3xCT C
ION 8650 AUX 1 SH HV Voltage UL1 #S1 D
MULTIFUNCTION METER + #V1 VT: 57-277V E
L+ - HV Voltage UL2 #S2
+ #V2 VT: 57-277V /D13.E6 S1
N- - HV Voltage UL3 - #S3 -
#V3 VT: 57-277V
B 65-120VAC HV Current IL1 /D13.E7 S2
G #I1 CT: 1-5A
/L16.C5 80-160VDC HV Current IL2 /D13.E7 S3
#I2 CT: 1-5A -Vref SCOM
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s PE HV Current IL3
#I3 CT: 1-5A I11 C1K
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. #COM1 /D13.E2 #C1 C1Z
C1Y
C I12 #C2 C2K
I21 C2Z
#COM4 C2Y
/D13.E2 C3K
#IRIG-B I22 C3Z
I31 C3Y
D C4K
/D13.E3 C4Z
I32 C4Y
#C3 ETH
/Y23.D5
#C4
Ethernet port
#ETH 10/100TX
E
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 DEVICE OVERVIEW - P51.3 Z13
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language Z14
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 123 4 5 67 8
A
© Copyright 2020 Hitachi Power Grids. A Energy meter Energy meter -TB2 Energy meter B
57-240VAC/VDC 57-240VAC/VDC
+CM1.U.20 -P51.4 Mk6N +1 C
#BI01 GND
EDMI, MkN6 57-240VAC/VDC #BI02 +2 D
MULTIFUNCTION METER #BO.01 GND COM E
#BO.02
-TB1 + #BO.03 -TB3 -TB7 /Y24.D5
#BO.04
7 #BO.05 1 RJ45
#BO.06 GND
/L16.C6 - #BO.07 #COM1 RS485
11 #BO.08 2
GND COM
B 57-240V -TB8
-TB4
RJ45
3
GND #COM2 RS485
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s HV Current IL1 -TB1 4 #COM3 RS485 -TB9
#IL1 CT: 1A GND COM
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. HV Current IL2 Ia 1 GND 1
#IL2 CT: 1A /D14.E2 -TB5
Rx- 2
C HV Current IL3 Ia 3 5
Ib 4 GND Rx+ 3
#IL3 CT: 1A
/D14.E2 6 Tx- 4
Ib 6 GND
Ic 8 Tx+ 5
-TB6
HV Voltage UL1 /D14.E3
Ic 10 7
#UL1 VT: 57-240V GND
-TB1
HV Voltage UL2 8
Va 2 GND
#UL2 VT: 57-240V /D14.E6
D HV Voltage UL3 Vb 5
/D14.E7
#UL3 VT: 57-240V
Vc 9
/D14.E7
Vn 13
E
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 DEVICE OVERVIEW - P51.4 Z14
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language Z21
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8
ID HitachiABB Frame A3 - Version 01 12 34 5 67 8
© Copyright 2020 Hitachi Power Grids. A AFS670-EREEAATTEEEEEEEENZEX08.0 A
+CM1.U.01 -KC1 COMMUNICATION INTERFACE MODULE -P1
A
AFS670 Rx
ETHERNET SWITCH-1 ETHERNET SWITCH ST
/Y23.E2
AFS670 ETHERNET PORT ST Tx
Single PS 77-300VDC/90-265VAC 100FX
-P2
-P1
Rx
L+
/Y23.E8
N- ST Tx
B /L16.D3 77-300VDC ETHERNET PORT ST B
GND 90-265VAC 100FX
PE
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s ETHERNET PORT RJ45 COMMUNICATION INTERFACE MODULE -P3
#Diagnosis A
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. SWITCH 1 OK -R1 Rx
ST
C #READY2 1 /Y23.E3
/Y21.C6 ETHERNET PORT ST Tx
100FX
2 -P4
ST Rx C
ETHERNET PORT ST /Y23.E3
100FX Tx
D Communication interface module -P5 D
E T E
RJ45
Ethernet port /Y23.E4
10/100Tx
-P6
Ethernet port
10/100Tx RJ45
/Y23.E5
COMMUNICATION INTERFACE MODULE
T
ETHERNET PORT -P7
#LAN7 10/100Tx RJ45
/Y23.E6
ETHERNET PORT
-P8
RJ45
/Y23.E7
#LAN8 10/100Tx
F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 DEVICE OVERVIEW - ESW1 Z21
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language Z22
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8