TR Bay Trafo#3-GI Padang Sambian

TR Bay Trafo#3-GI Padang Sambian

12345 678

This document is exclusively property of Schneider Electric and shall not be used or copied without authorization =E0x+WR1
Engineering Base Version : 6.3.1 CONTROL & PROT. PANEL

A -F501 -F501 -F501 A
B
-F501 C
D
C1 D1 E1 F11 BACKUP PROTECTION 1 E
E2 FAILURE
C2 OPTO1 + /MD1.3 RELAY RESET 50BF TRIP /FB1.4 RL1 WD1 F12 /RC11.5
C3 OPTO2 /MD1.3 E3
/GA4.6 5A D2 START 50BF E4
IA (EXTERNAL)
- BACKUP PROTECTION 1 F13 BACKUP PROTECTION 1
1A TRIP FAILURE
D3 /PB1.2 RL2 WD2 F14 /RB2.4

+

D4

-

C4 D5 BACKUP PROTECTION 1 E5
TRIP E6
OPTO3 + /MD1.7 CB 150kV CLOSE /PA2.2 RL3
OPTO4 /MD1.7 CB 150kV OPEN E7
5A D6 E8
E9
B /GA4.6 IB -

C5 1A D7

+ BACKUP PROTECTION 1 /PB2.2 RL4
TRIP
C6 D8

-

C7 D9

OPTO5 + /MD2.3 LINE VT HEALTHY
D10
E10

/GA4.6 5A - (PROTECTION CLASS) BACKUP PROTECTION 1 /SB2.4 E11 RL5
IC LINE VT HEALTHY OPERATED (50/51, 50N/ E12
C8 D11
1A 51N)
+
OPTO6 /MD2.3
D12

C9 OPTO7 - /MD2.4 (METERING CLASS) BACKUP PROTECTION 1 /SB2.4 E13 RL6
C10 TRIP E14
D13 CB 150kV (50BF) E15 RL7
5A ALARM SF6 RL8
+ RL9 SK 1
RL10 1
D14 2
RL11 3
- 4
EIA485 / 5
/GA4.6 IN D15 KBUS PORT 6
C C11 7
E16 8 TX
9 RX
1A OPTO8 + /MD2.5 CB 150kV INTERTRIP FROM 20kV /QA9.4 E17
C12 OPERATING SIDE OPERATED E18 SK 2 0V
D16 LOCKOUT SF6 SERIAL PORT 1
CTS
- 10 RTS

C13 D17 16 DATA READY
DATA
5A OPTO9 D18 /MD2.5 TRIP ADJACENT CB BACKUP PROTECTION 1 /RC11.3 B9 17 ACKNOWLEDGE
IN SENSITIVE TRIP /RB3.5 B10 EXTERNAL RESET
B1 (50BF) 2-9 DOWNLOAD
C14 B11 COMMAND
1A + BACKUP PROTECTION 1 B12 11,12,15,13 D0-D7
20,21,23,24
C15 B2 TRIP 19,18,22,25 T0-T7

- 4 0V

(50/51, 50N/51N) NOT CONNECTED

B3 B13
BACKUP PROTECTION 1
OPTO10 + /MD2.6 INTERTRIP FROM TRIP /RB3.6 B14
20kV SIDE (50BF) B15
C19 VA B4
D
-

B5

OPTO11 + /MD2.7 SPARE B16

B6

C20 VB - SPARE /ST1.1 B17 TEST/DOWNLOAD
B18
B7
OPTO12 /MD2.7 SPARE
+

B8

C21 VC -

VN + F18
C22

E + F7 - F17

+ F8 48 VDC F16
- F9 FIELD SCN
VOLTAGE OUT
+ F2
- F10 /DB3.2 AC OR DC FIBER OPTIC RX
AUXILIARY COMMNUNICATION TX
F1 SUPPLY
- (OPTIONAL)

Created with P142 P142

F F

PT. PLN (PERSERO) Customer : PT. SURYA PRIMA ELTRINDO 150/20kV TRAFO BAY CRP (=E0x+WR1) Format Scale Drawn By HENDRA Date Revision
COMPONENT LIST Checked By ARTARTO 2/19/2018 C
TRANSMISI JAWA BAGIAN TIMUR DAN BALI Project Name : GI PAMECUTAN KELOD DAN PADANG SAMBIAN EXT TRAFO BAY BACKUP PROTECTION 1 RELAY A3 NTS Appr. By AZIZ
AREA PELASANA PEMELIHARAAN BALI Customer Order No : 326/IU/L/VI/2017-R4 Sheet Next Sheet
PT. SCHNEIDER INDONESIA Component List Drawing No. : E2010-97682-01-SCH-A ZA8
1 2 3 ZA9
4 5 8
6 7


12345 678

This document is exclusively property of Schneider Electric and shall not be used or copied without authorization =E0x+WR1
Engineering Base Version : 6.3.1 CONTROL & PROT. PANEL

A -F502 -F502 -F502 A
B
-F502 C
D
C1 D1 BACKUP PROTECTION 2 E1 F11 BACKUP PROTECTION 2 E
TRIP E2 FAILURE
C2 OPTO1 + /ME1.3 RELAY RESET /PA2.3 RL1 WD1 F12 /RC11.5
C3 OPTO2 /ME1.3 SPARE BACKUP PROTECTION 2 /PB1.2 E3
/GA5.6 5A D2 TRIP E4
IA
- F13 BACKUP PROTECTION 2
1A FAILURE
D3 RL2 WD2 F14 /RB2.4

+

D4

-

C4 D5 BACKUP PROTECTION 2 E5
TRIP E6
OPTO3 + /ME1.4 SPARE /PB2.3 RL3
OPTO4 /ME1.5 SPARE BACKUP PROTECTION 2 /SB2.5 E7
5A D6 OPERATED E8
E9
B /GA5.6 IB - (50/51, 50N/51N) 20kV

C5 1A D7

C6 + RL4

D8

-

C7 D9 SIDE

OPTO5 + /ME1.5 SPARE
D10
E10

/GA5.6 5A - INTERTRIP TO /QA9.5 E11 RL5
IC CB 20kV E12
C8 D11
1A
OPTO6 + /ME1.6 SPARE

D12

C9 OPTO7 - /ME1.7 SPARE BACKUP PROTECTION 2 /RB3.6 E13 RL6
C10 TRIP E14
D13 E15 RL7
5A (50/51, 50N/51N) 20kV SIDE RL8
+ RL9
RL10 SK 1
D14 1
RL11 2
- 3
EIA485 / 4
/GA5.6 IN D15 KBUS PORT 5
C C11 6
E16 7 TX
8 RX
1A OPTO8 + /ME1.7 SPARE BACKUP PROTECTION 2 E17 9
TRIP 0V
D16 /RB3.7 SERIAL PORTSK 2
1 CTS
C12 - E18 RTS
10
(50BF) 20kV SIDE DATA READY
16 DATA
C13 D17 ACKNOWLEDGE
17 EXTERNAL RESET
5A OPTO9 D18 SPARE BACKUP PROTECTION 2 /SB2.5 B9 DOWNLOAD
IN SENSITIVE TRIP /RC11.3 B10 2-9 COMMAND
B1 D0-D7
C14 (50BF) 20kV SIDE B11 11,12,15,13
1A + B12 20,21,23,24 T0-T7
BACKUP PROTECTION 2 19,18,22,25
C15 B2 0V
TRIP 4
NOT CONNECTED
-

(50BF) 20kV SIDE

OPTO10 B3 SPARE SPARE /ST1.1 B13
OPTO11 SPARE B14
D C19 VA OPTO12 + SPARE B15

/GA5.6 B4 B16
B17
C20 VB - SPARE B18 TEST/DOWNLOAD

/GA5.6 B5

C21 VC +

B6

-

B7

+

B8

-

/GA5.6 VN + F18
C22

E + F7 - F17

+ F8 48 VDC F16
- F9 FIELD SCN
VOLTAGE OUT
+ F2
- F10 /DB3.3 AC OR DC FIBER OPTIC RX
AUXILIARY COMMNUNICATION TX
F1 SUPPLY
- (OPTIONAL)

Created with P142 P142

F F

PT. PLN (PERSERO) Customer : PT. SURYA PRIMA ELTRINDO 150/20kV TRAFO BAY CRP (=E0x+WR1) Format Scale Drawn By HENDRA Date Revision
COMPONENT LIST Checked By ARTARTO 2/19/2018 C
TRANSMISI JAWA BAGIAN TIMUR DAN BALI Project Name : GI PAMECUTAN KELOD DAN PADANG SAMBIAN EXT TRAFO BAY BACKUP PROTECTION 2 RELAY A3 NTS Appr. By AZIZ
AREA PELASANA PEMELIHARAAN BALI Customer Order No : 326/IU/L/VI/2017-R4 Sheet Next Sheet
PT. SCHNEIDER INDONESIA Component List Drawing No. : E2010-97682-01-SCH-A ZA9
1 2 3 ZA10
4 5 8
6 7


12345 678

This document is exclusively property of Schneider Electric and shall not be used or copied without authorization =E0x+WR1
Engineering Base Version : 6.3.1 CONTROL & PROT. PANEL

A -F503 -F503 -F503 A
B
-F503 C
D
C1 D1 E1 F11 BACKUP PROTECTION 3 E
5A E2 FAILURE
OPTO1 + /ME2.3 RELAY RESET SPARE /ST1.5 RL1 WD1 F12 /RC11.6

D2

-

IA D3 E3 F13 BACKUP PROTECTION 3
C2 E4 FAILURE
OPTO2 + /ME2.3 SPARE SPARE /ST1.6 RL2 WD2 F14 /RB2.5
1A
C3 D4

-

C4 OPTO3 D5 /ME2.4 SPARE SPARE /ST1.6 E5 RL3
5A E6
+

D6

-

B IB D7 E7
C5 E8
OPTO4 + /ME2.5 SPARE BACKUP PROTECTION 3
1A OPERATED
D8
/SB2.6 RL4
-
C6 E9
(SBEF)
D9
C7
+
OPTO5 D10 /ME2.5 SPARE
E10

5A - INTERTRIP TO /QA9.5 E11 RL5
IC CB 20kV E12
D11
C8
1A +
OPTO6 /ME2.6 SPARE
D12

C9 OPTO7 - /ME2.7 SPARE BACKUP PROTECTION 3 /RB3.8 E13 RL6
C10 TRIP E14
D13 E15 RL7
5A (SBEF) RL8
+ RL9
RL10 SK 1
D14 1
RL11 2
- 3
EIA485 / 4
IN D15 E16 KBUS PORT 5 TX
6 RX
C C11 + 7
1A 8 0V
OPTO8 D16 /ME2.7 SPARE E17 9
SPARE CTS
- SERIAL PORTSK 2 RTS
C12 E18 1
DATA READY
/GA6.6 C13 5A D17 BACKUP PROTECTION /RC12.7 B9 10 DATA
IN SENSITIVE RELAY 3 TRIP B10 ACKNOWLEDGE
C14 D18 16 EXTERNAL RESET
C15 1A B11 DOWNLOAD
B1 B12 17 COMMAND
OPTO9 SPARE SPARE D0-D7
+ 2-9
T0-T7
B2 11,12,15,13
20,21,23,24 0V
- 19,18,22,25
NOT CONNECTED
B3 B13 4

OPTO10 + SPARE SPARE B14

D C19 VA B4 B15

-

B5

OPTO11 + SPARE B16

B6

C20 VB - SPARE B17 TEST/DOWNLOAD
B18
B7
OPTO12 SPARE
+

B8

C21 VC -

VN + F18
C22

E + F7 - F17

+ F8 48 VDC F16
- F9 FIELD SCN
VOLTAGE OUT
+ F2
- F10 /DB3.4 AC OR DC FIBER OPTIC RX
AUXILIARY COMMNUNICATION TX
F1 SUPPLY
- (OPTIONAL)

Created with P142 P142

F F

PT. PLN (PERSERO) Customer : PT. SURYA PRIMA ELTRINDO 150/20kV TRAFO BAY CRP (=E0x+WR1) Format Scale Drawn By HENDRA Date Revision
COMPONENT LIST Checked By ARTARTO 2/19/2018 C
TRANSMISI JAWA BAGIAN TIMUR DAN BALI Project Name : GI PAMECUTAN KELOD DAN PADANG SAMBIAN EXT TRAFO BAY BACKUP PROTECTION 2 RELAY A3 NTS Appr. By AZIZ
AREA PELASANA PEMELIHARAAN BALI Customer Order No : 326/IU/L/VI/2017-R4 Sheet Next Sheet
PT. SCHNEIDER INDONESIA Component List Drawing No. : E2010-97682-01-SCH-A ZA10
1 2 3 ZA11
4 5 8
6 7


12 34 56 7 8
A
This document is exclusively property of Schneider Electric and shall not be used or copied without authorization =E0x+WR1 B
Engineering Base Version : 6.3.1 CONTROL & PROT. PANEL C
D
A -N90 -N90 -N90
/DB3.7
-N90 /RC11.7
/QC1.4
X120:7 X110:1 /QC1.4 X100:1 L/(+) X110:14
X100:2 L/(-)
/GB3.6 IL1 BI1 X110:2 /RA2.3 TAP CHANGE IN PROGRESS POWER SO1 X110:16 /QC1.4
X100:3 SUPPLY
X100:4 IRF X110:15
X100:5 PO1
X120:8 X110:3 PO2
X120:9 X100:6
BI2 X110:4 /RA2.3 SPARE SO1 X110:17
X100:7 SO2
/GB3.6 IL2 PO3 SO2 X110:19 /QC1.5
X100:8 TCS1
X110:5 PO4 X110:18
BI3 /RA2.4 DS BUS 1 CLOSE X100:9 TCS2
X120:10
X100:10
X120:11 X100:11 X110:20
X100:12
B IL3 X110:6 SO3 X110:22 /RA2.5
X100:13
/GB3.6 BI4 /RA2.5 DS BUS 2 CLOSE
X100:14
/RA2.4 X110:7 X110:21
X100:15
X120:12 X110:8 X100:17 X110:23
X120:13 BI5 /RA2.5 PARAREL X100:16
SO4
/GB3.6 IO X100:19 X110:24

X120:14 X110:9 X100:18

BI6 /RA2.5 X110:10 /RA2.6 AUTO X100:20
X100:21
X100:22 X130:10

SPARE X110:11 X100:23 SO1 X130:12 /ST1.5
BI7 /RA2.7 CB 20kV CLOSE
X120:1 X100:24 X130:11

/GB3.6 X120:2 U1

C SPARE X110:12 X130:13

X120:3 BI8 /RA2.7 X110:13 /RA2.7 CB 150kV CLOSE SO2 X130:15 /ST1.6

/GB3.6 X120:4 U2 X130:14

SPARE

X120:5 X130:16

/GB3.6 X120:6 U3 X130:1 SO3 X130:18 /ST1.6
BI1 /RA1.3 SPARE
X130:17

X130:3

BI2 /RA1.3 X130:2 /RA1.3 SPARE

D X130:4
BI3 /RA1.4 SPARE

X130:5

BI4 /RA1.4 X130:6 /RA1.5 SPARE

X130:7
BI5 /RA1.5 SPARE

X130:8

BI6 /RA1.5 X130:9 /RA1.6 SPARE

E X13 Light sensor input 1 E
X14 Light sensor input 2
X15 Light sensor input 3

Created with REU615 REU615

F F

PT. PLN (PERSERO) Customer : PT. SURYA PRIMA ELTRINDO 150/20kV TRAFO BAY CRP (=E0x+WR1) Format Scale Drawn By HENDRA Date Revision
COMPONENT LIST Checked By ARTARTO 2/19/2018 C
TRANSMISI JAWA BAGIAN TIMUR DAN BALI Project Name : GI PAMECUTAN KELOD DAN PADANG SAMBIAN EXT TRAFO BAY AUTOMATIC VOLTAGE REGULATOR A3 NTS Appr. By AZIZ
AREA PELASANA PEMELIHARAAN BALI Customer Order No : 326/IU/L/VI/2017-R4 Sheet Next Sheet
PT. SCHNEIDER INDONESIA Component List Drawing No. : E2010-97682-01-SCH-A ZA11
1 2 3 ZA12
4 5 8
6 7


12345678

This document is exclusively property of Schneider Electric and shall not be used or copied without authorization -A30 P1 -Dev -A30 O1 -Dev -A30 N1 -Dev
Engineering Base Version : 6.3.1 DI1 /RC3.3 DI1 /RC5.3 DI1
+ + +
DI2 DI2 DI2
CB 150kV OPEN /RC1.3 DS BUS 1 SWITCH MANUAL POSITION TRAFO OLTC SWITCH LOCAL POSITION
DI3 DS BUS 1 SUPPLY MOTOR FAILURE DI3 DI3
A DS BUS 2 OPEN O2 TRAFO OLTC SWITCH REMOTE N2 A
POSITION
P2 + +
TRAFO OIL TEMPERATURE ALARM
+ O3 N3

CB 150kV CLOSE /RC1.3 /RC3.3 - /RC5.3 -
/RC3.4 /RC5.4
P3 O4 N4

- + +

P4

+

CB 150kV SWITCH LOCAL POSITION /RC1.4

P5 O5 N5

+ + +

CB 150kV SWITCH REMOTE POSITION /RC1.5 DI4 DS BUS 2 CLOSE /RC3.5 DI4 TRAFO LV WINDING TEMPERATURE /RC5.5 DI4
DI5
P6 O6 ALARM N6 DI6
DI7
B - - - DI8 B
DI9 C
P7 O7 N7 DI10 D
DI11 E
+ + + DI12
DI13
CB 150kV ALARM SF6 /RC1.5 DI5 DS BUS 2 SWITCH LOCAL POSITION /RC3.5 DI5 TRAFO HV WINDING TEMPERATURE /RC5.5 DI14
DI15
ALARM

P8 O8 N8

+ + +

CB 150kV OPERATING LOCKOUT SF6 /RC1.6 DI6 DS BUS 2 SWITCH REMOTE POSITION /RC3.6 DI6 TRAFO BUCHHOLZ RELAY ALARM /RC5.6

P9 O9 N9

- - -

P10 O10 N10

+ + +

CB 150kV SPRING DISCHARGED /RC1.7 DI7 DS BUS 2 SWITCH MANUAL POSITION /RC3.7 DI7 TRAFO OIL LEVEL MAIN TANK LOW /RC5.7
POSITION
ALARM

C P11 O11 N11
+
+ +

CB 150kV SPRING CHARGED POSITION /RC1.7 DI8 C264 (PART) DS BUS 2 SUPPLY MOTOR FAILURE /RC3.7 DI8 C264 (PART) TRAFO OIL LEVEL MAIN TANK HIGH /RC5.7 C264 (PART)
DIGITAL INPUT UNIT DIGITAL INPUT UNIT DIGITAL INPUT UNIT
P12 O12 ALARM N12
DIU211 - SLOT P DIU211 - SLOT O DIU211 - SLOT N
- - -

P13 O13 N13

+ + +

CB 150kV PROTECTIVE MOTOR /RC2.3 DI9 CB 20kV OPEN /RC4.3 DI9 TRAFO OIL LEVEL OLTC LOW ALARM /RC6.3
SWITCHES

P14 O14 N14

+ + +

CB 150kV CIRCUIT BREAKER HEATING /RC2.3 DI10 CB 20kV CLOSE /RC4.3 DI10 TRAFO OIL LEVEL OLTC HIGH ALARM /RC6.3

P15 O15 N15

- - -

D P16 O16 N16

+ + +

CB 150kV EXCESSIVE MOTOR RUNNING /RC2.4 DI11 CB 20kV SWITCH LOCAL POSITION /RC4.4 DI11 TRAFO AIR BREATHER MAIN TANK /RC6.4
(SPARE)
ERROR ALARM

P17 O17 N17

+ + +

MAIN PROTECTION RELAY /RC2.5 DI12 CB 20kV SWITCH REMOTE POSITION /RC4.5 DI12 TRAFO AIR BREATHER MAIN TANK /RC6.5

P18 O18 HEATING ALARM N18

- - -

P19 O19 N19

+ + +

DS BUS 1 OPEN /RC2.5 DI13 CB 20kV RACKED-OUT /RC4.5 DI13 TRAFO AIR BREATHER OLTC ERROR /RC6.5

ALARM

P20 O20 N20

E+ + +

DS BUS 1 CLOSE /RC2.6 DI14 CB 20kV RACKED-IN /RC4.6 DI14 TRAFO AIR BREATHER OLTC HEATING /RC6.6

P21 O21 ALARM N21

- - -

P22 O22 N22

+ + +

DS BUS 1 SWITCH LOCAL POSITION /RC2.7 DI15 ES 20kV OPEN /RC4.7 DI15 TRAFO OIL TEMPERATURE TRIP /RC6.7

Created with P23 O23 N23

+ + +

DS BUS 1 SWITCH REMOTE POSITION /RC2.7 DI16 ES 20kV CLOSE /RC4.7 DI16 TRAFO LV WINDING TEMPERATURE /RC6.7 DI16
TRIP
P24 O24 N24

- - -

F F

PT. PLN (PERSERO) Customer : PT. SURYA PRIMA ELTRINDO 150/20kV TRAFO BAY CRP (=E0x+WR1) Format Scale Drawn By HENDRA Date Revision
COMPONENT LIST Checked By ARTARTO 2/19/2018 C
TRANSMISI JAWA BAGIAN TIMUR DAN BALI Project Name : GI PAMECUTAN KELOD DAN PADANG SAMBIAN EXT TRAFO BAY BAY CONTROL UNIT A3 NTS Appr. By AZIZ
AREA PELASANA PEMELIHARAAN BALI Customer Order No : 326/IU/L/VI/2017-R4 Sheet Next Sheet
PT. SCHNEIDER INDONESIA Component List Drawing No. : E2010-97682-01-SCH-A ZA12
1 2 3 ZA13
4 5 8
6 7


12345678

This document is exclusively property of Schneider Electric and shall not be used or copied without authorization -A30 M1 -Dev -A30 L1 -Dev -A30 K1 -Dev
Engineering Base Version : 6.3.1 DI1 /RC9.3 DI1 DI1
+ DI2 + DI2 + DI2
DI3 DI3 DI3
TRAFO HV WINDING TEMPERATURE /RC7.3 DI4 TRAFO MOTOR DRIVE MCB TRIP DI4 BACKUP PROTECTION 1 /RC11.3 DI4
DI5 DI5 TRIP DI5
TRIP M2 DI6 TRAFO MOTOR DRIVE HEATER MCB L2 DI6 (50BF) K2 DI6 A
DI7 TRIP DI7 DI7 B
A + + BACKUP PROTECTION 2 +
TRAFO FIRE PROTECTION IN SERVICE TRIP
TRAFO BUCHHOLZ RELAY TRIP /RC7.3 (SPARE) /RC9.3 L3 /RC11.3 K3
/RC9.4 (50BF) 20kV SIDE /RC11.4
M3 TRAFO FIRE PROTECTION OUT OF - CRP MAIN PROTECTION FAILURE -
SERVICE (SPARE)
- L4 CRP BACKUP PROTECTION 1 FAILURE K4
BUS VT MCB TRIP (PROTECTION
M4 CLASS) + CRP BACKUP PROTECTION 2 FAILURE +

+ BUS VT MCB TRIP (METERING CLASS) CRP BACKUP PROTECTION 3 FAILURE

TRAFO PRESSURE RELIEF MAIN TANK /RC7.4 LINE VT HEALTHY (PROTECTION CLASS) CRP AVR FAILURE
TRIP

M5 L5 K5

+ + +

TRAFO PRESSURE RELIEF OLTC TRIP /RC7.5 /RC9.5 L6 /RC11.5 K6
/RC9.5 /RC11.5
B M6 - -

- L7 K7

M7 + +

+

TRAFO PROTECTIVE RELAY OLTC TRIP /RC7.5

TRAFO OLTC END POSITION (TAP 17) /RC7.6 M8 /RC9.6 L8 /RC11.6 K8
TRAFO OLTC END POSITION (TAP 1) /RC7.7 /RC9.7 /RC11.7
+ + +

M9 L9 K9

- - -

M10 L10 K10

+ + +

C M11 L11 K11 C
+
+ +
TRAFO TAP CHANGE INCOMPLETE /RC7.7 DI8 C264 (PART) LINE VT HEALTHY (METERING CLASS) /RC9.7 DI8 C264 (PART) CRP AC POWER SUPPLY FAILURE /RC11.7 DI8 C264 (PART)
DI9 DIGITAL INPUT UNIT CRP SWITCH MIMIC POSITION /RC10.3 L12 DI9 DIGITAL INPUT UNIT CRP DC POWER SUPPLY FAILURE /RC12.3 K12 DI9 DIGITAL INPUT UNIT
M12
DIU211 - SLOT M - DIU211 - SLOT L - DIU211 - SLOT K
-
L13 K13
M13
+ +
+

TRAFO COOLING FANS IN SERVICE /RC8.3

M14 L14 K14

+ + +

TRAFO COOLING FANS FAILURE /RC8.3 DI10 CRP SWITCH BCU POSITION /RC10.3 L15 DI10 MK MCBs TRIP /RC12.3 K15 DI10
DI11 OLTC SWITCH MIMIC MODE /RC10.4 DI11 /RC12.4 DI11
M15 DI12 - DI12 PREV. CRP AC POWER SUPPLY - DI12
DI13 OLTC SWITCH AVR MODE DI13 FAILURE DI13
- DI14 CRP LOCKOUT RELAY 1 OPERATED L16 DI14 K16 DI14
DI15 CRP LOCKOUT RELAY 2 OPERATED DI15 PREV. CRP DC POWER SUPPLY DI15
D M16 + FAILURE + D
CRP TCS 1 FAILURE E
+ PREV. CRP BCU FAILURE

TRAFO COOLING FANS GROUP 1 /RC8.4 PREV. CRP ETH. SW. FAILURE
FAILURE (SPARE)
CB BUS COUPLER CLOSE
M17 L17 K17

+ + +

TRAFO COOLING FANS GROUP 2 /RC8.5 /RC10.5 L18 /RC12.5 K18
FAILURE (SPARE) /RC10.5 /RC12.5
M18 - -

- L19 K19

M19 + +

+

TRAFO COOLING FANS MANUAL MODE /RC8.5
(SPARE)

M20 L20 K20

E+ + +

TRAFO COOLING FANS AUTO MODE /RC8.6 /RC10.6 L21 /RC12.6 K21
(SPARE) /RC10.7 /RC12.7
M21 - -

- L22 K22

M22 + +

+

TRAFO DC POWER SUPPLY TRIP /RC8.7

Created with M23 L23 K23

+ + +

TRAFO AC POWER SUPPLY TRIP /RC8.7 DI16 CRP TCS 2 FAILURE /RC10.7 DI16 BACKUP PROTECTION RELAY 3 TRIP /RC12.7 DI16

M24 L24 K24

- - -

F F

PT. PLN (PERSERO) Customer : PT. SURYA PRIMA ELTRINDO 150/20kV TRAFO BAY CRP (=E0x+WR1) Format Scale Drawn By HENDRA Date Revision
COMPONENT LIST Checked By ARTARTO 2/19/2018 C
TRANSMISI JAWA BAGIAN TIMUR DAN BALI Project Name : GI PAMECUTAN KELOD DAN PADANG SAMBIAN EXT TRAFO BAY BAY CONTROL UNIT A3 NTS Appr. By AZIZ
AREA PELASANA PEMELIHARAAN BALI Customer Order No : 326/IU/L/VI/2017-R4 Sheet Next Sheet
PT. SCHNEIDER INDONESIA Component List Drawing No. : E2010-97682-01-SCH-A ZA13
1 2 3 ZA14
4 5 8
6 7


12345 6 78
6 A
This document is exclusively property of Schneider Electric and shall not be used or copied without authorization -A30 J1 -Dev
Engineering Base Version : 6.3.1 B
+

CB NOT CHANGE /RC13.3 DI1

&

A OVER RUNNING J2

+

DS BUS 2 /RC13.3 DI2
CONTROL SUPPLY FAILURE
J3

-

J4

+

ANNUNCIATOR /RC13.4 DI3
SUPPLY FAILURE

J5

+

SPARE /RC13.5 DI4

B J6

-

J7

+

BUSBAR PROTECTION TRIP /RC13.5 DI5

SPARE /RC13.6 J8 DI6
SPARE /RC13.7 DI7
+

J9

-

J10

+

C J11 C
+ D

SPARE /RC13.7 DI8 C264 (PART)
DIGITAL INPUT UNIT
J12
DIU211 - SLOT J
-

J13

+

SPARE /RC14.3 DI9

J14

+

SPARE /RC14.3 DI10

J15

-

D J16

+

SPARE /RC14.4 DI11

SPARE /RC14.5 J17 DI12
SPARE /RC14.5 DI13
+

J18

-

J19

+

J20 E

E+

SPARE /RC14.6 DI14

J21

-

J22

+

SPARE /RC14.7 DI15

Created with SPARE /RC14.7 J23 DI16

+

J24

-

F F

PT. PLN (PERSERO) Customer : PT. SURYA PRIMA ELTRINDO 150/20kV TRAFO BAY CRP (=E0x+WR1) Format Scale Drawn By HENDRA Date Revision
COMPONENT LIST Checked By ARTARTO 2/19/2018 C
TRANSMISI JAWA BAGIAN TIMUR DAN BALI Project Name : GI PAMECUTAN KELOD DAN PADANG SAMBIAN EXT TRAFO BAY BAY CONTROL UNIT A3 NTS Appr. By AZIZ
AREA PELASANA PEMELIHARAAN BALI Customer Order No : 326/IU/L/VI/2017-R4 Sheet Next Sheet
PT. SCHNEIDER INDONESIA Component List Drawing No. : E2010-97682-01-SCH-A ZA14
1 2 3 ZA15
4 5 8
7


12 3 4 5 67 8

This document is exclusively property of Schneider Electric and shall not be used or copied without authorization -A30 DO1 -Q0 OPEN CMD. -A30 DO1 -A30
Engineering Base Version : 6.3.1 DO2 /QA2.4 DO2
F1 DO3 E1 DO3
DO4 E2 DO4
A RELAY RESET /MC1.2 F2 DO5 DO5
DO6 E3 DO6
DO7 E4 DO7 D1 + N A
DO8 DO8 B
EMERGENCY STOP F3 DO9 -Q0 CLOSE CMD. E5 DO9 TRAFO OIL LEVEL OLTC VALUE /RT1.2 AI5 C
F4 E6 D
/QC1.7 DO10 /QA2.4 DO10 D2 - mA E
E7
E8 #

F5 E9 D3 + N
F6 E10
GENERAL ALARM INTERNAL TRAFO /RB2.6 -Q1 OPEN CMD. /QA5.4 TRAFO OIL TEMPERATURE AI1
E11 VALUE #
E12 /RT1.2 D4 - mA

OLTC LOWER CMD. /QC1.5 F7 -Q1 CLOSE CMD. /QA5.4 E13
F8 E14

F9 E15 D5
E16 D6

OLTC RAISE CMD. /QC1.5 F10 -Q2 OPEN CMD. /QA7.4 E19
E20
B C264 (PART) E21 C264 (PART)
DIGITAL OUTPUT UNIT DIGITAL OUTPUT UNIT
OLTC AUTO MODE /RA2.5 F11 -Q2 CLOSE CMD. /QA7.4 E22 D7 + N
F12 DOU201 - SLOT F E23 DOU201 - SLOT E
E24
SPARE /RT1.3 AI6

F13 D8 - mA
F14
OLTC MANUAL MODE /RA2.6 CB 20kV OPEN CMD. /QA8.7 #

D9 + N

SPARE /ST1.6 F15 CB 20kV CLOSE CMD. /QA8.3 TRAFO LV WINDING /RT1.4 D10 - mA AI2
F16 TEMPERATURE VALUE #

F19

SPARE /ST1.6 F20 SPARE /ST1.5 D11
D12
C F21

SPARE /ST1.7 F22 SPARE /ST1.6 C264 (PART)
F23 ANALOG INPUT UNIT
F24 D13 + N
AIU211 - SLOT D
SPARE /RT1.5 AI7

D14 - mA

#

D15 + N

TRAFO HV WINDING /RT1.6 D16 - mA AI3
TEMPERATURE VALUE #

D D17
D18

D19 + N

SPARE /RT1.7 AI8

D20 - mA

#

D21 + N

TRAFO OIL LEVEL MAIN TANK /RT1.7 D22 - mA AI4
VALUE #

E

D23
D24

Created with

F F

PT. PLN (PERSERO) Customer : PT. SURYA PRIMA ELTRINDO 150/20kV TRAFO BAY CRP (=E0x+WR1) Format Scale Drawn By HENDRA Date Revision
COMPONENT LIST Checked By ARTARTO 2/19/2018 C
TRANSMISI JAWA BAGIAN TIMUR DAN BALI Project Name : GI PAMECUTAN KELOD DAN PADANG SAMBIAN EXT TRAFO BAY BAY CONTROL UNIT A3 NTS Appr. By AZIZ
AREA PELASANA PEMELIHARAAN BALI Customer Order No : 326/IU/L/VI/2017-R4 Sheet Next Sheet
PT. SCHNEIDER INDONESIA Component List Drawing No. : E2010-97682-01-SCH-A ZA15
1 2 3 ZA16
4 5 8
6 7


1 2 3 4 5 67 8
A
B This document is exclusively property of Schneider Electric and shall not be used or copied without authorization -A30 N1/N2 -A30 -A30
C Engineering Base Version : 6.3.1 /GB2.5
D /GB2.5 1 C1/C2 A23 A
/GB2.5 5A 2 +
/GB2.5 B1/B2 /DB3.6
3 - A24
/GB2.5 1A 4 A1/A2
/GB2.5 V-BUS2 A22 PORT 01
/GB2.5 5 VA
5A 6 VB /DB3.6
VC
7 V-BUS1 /SS1.4D
1A 8
A1 PORT 02
9 A2
5A 10 /SA2.2 A3 DO1/2 B

11 A5 WD
1A 12 A4
A6 DI1
13
5A 14 A7 DI2 RS232 C264 (PART)
# CPU & LEGACY PORT
15 + RS232/
1A 16 RS485 RS232 CPU270 - SLOT B
1 (DCD) #
19 C264 (PART) A9 # C264 (PART) 2 (RxD/T-)
20 TRANSDUCERLESS MEASUREMENTS UNIT RS232/ POWER AUXILIARY SUPPLY & LEGACY PORT 3 (TxD/T+)
+ RS485/ 5 (GND)
21 TMU220 - SLOT Q RS422 BIU241 - SLOT A 7 (RTS)
22 A8 8 (CTS)
#
23 - 1 (DCD)
24 2 (RxD/T-)
/SS1.2 A12(B) 3 (TxD/T+) C
25 A13(GND) 5 (GND) D
26 A14(A) 7 (RTS)
8 (CTS)
27
28

A15 (GND)
A16 (CTS)
A17 (B)
A18 (A)
A19 (RB)
A20 (RA)
A21 (DCD)

E E

Created with

F F

PT. PLN (PERSERO) Customer : PT. SURYA PRIMA ELTRINDO 150/20kV TRAFO BAY CRP (=E0x+WR1) Format Scale Drawn By HENDRA Date Revision
COMPONENT LIST Checked By ARTARTO 2/19/2018 C
TRANSMISI JAWA BAGIAN TIMUR DAN BALI Project Name : GI PAMECUTAN KELOD DAN PADANG SAMBIAN EXT TRAFO BAY BAY CONTROL UNIT A3 NTS Appr. By AZIZ
AREA PELASANA PEMELIHARAAN BALI Customer Order No : 326/IU/L/VI/2017-R4 Sheet Next Sheet
PT. SCHNEIDER INDONESIA Component List Drawing No. : E2010-97682-01-SCH-A ZA16
1 2 3 ZA17
4 5 8
6 7


12345678

=E0x+WR1
CONTROL & PROT. PANEL

AA

DIGITAL ENERGY METER
SCHNEIDER
ION 7400
This document is exclusively property of Schneider Electric and shall not be used or copied without authorization
Engineering Base Version : 6.3.1 I1 I2 I3 V1 V2 V3 Vref AS
ION 7400
10
-P51 11/GB1.6/GB1.6 /DB3.5
12
B 13 B
14
15
V1
V2
V3
VN

L/+
N/-
CC
DD

EE

Created with

F F

PT. PLN (PERSERO) Customer : PT. SURYA PRIMA ELTRINDO 150/20kV TRAFO BAY CRP (=E0x+WR1) Format Scale Drawn By HENDRA Date Revision
COMPONENT LIST Checked By ARTARTO 2/19/2018 C
TRANSMISI JAWA BAGIAN TIMUR DAN BALI Project Name : GI PAMECUTAN KELOD DAN PADANG SAMBIAN EXT TRAFO BAY DIGITAL ENERGY METER A3 NTS Appr. By AZIZ
AREA PELASANA PEMELIHARAAN BALI Customer Order No : 326/IU/L/VI/2017-R4 Sheet Next Sheet
PT. SCHNEIDER INDONESIA Component List Drawing No. : E2010-97682-01-SCH-A ZA17
1 2 3 ZA18
4 5 8
6 7


123456 7 8
A
=E0x+WR1This document is exclusively property of Schneider Electric and shall not be used or copied without authorization
CONTROL & PROT. PANELEngineering Base Version : 6.3.1 B

A ANNUNCIATOR
MINILEC
32 WAY + P.B
40B32SPO
RATED VOLTAGE :24 VDC
32 NOS

COM F1 F2 F3 F4 F5 F6 F7 F8

COM F1 F2 F3 F4 F5 F6 F7 F8

B -H500 /RB1.3 /RB1.4 /RB1.4 /RB1.5 /RB1.6 /RB1.6 /RB1.7 /RB1.8

COM F9 F10 F11 F12 F13 F14 F15 F16

C C
D
COM F9 F10 F11 F12 F13 F14 F15 F16
/RB2.3 /RB2.4 /RB2.4 /RB2.5 /RB2.6 /RB2.6 /RB2.7 /RB2.8
-H500

D
COM F17 F18 F19 F20 F21 F22 F23 F24

COM F17 F18 F19 F20 F21 F22 F23 F24
/RB3.3 /RB3.4 /RB3.4 /RB3.5 /RB3.6 /RB3.6 /RB3.7 /RB3.8
-H500

E E

COM F25 F26 F27 F28 F29 F30 F31 F32

Created with COM F25 F26 F27 F28 F29 F30 F31 F32
/RB4.3 /RB4.4 /RB4.4 /RB4.5 /RB4.6 /RB4.6 /RB4.7 /RB4.8
-H500

F F

End Customer : Customer : PT. SURYA PRIMA ELTRINDO 150/20kV TRAFO BAY CRP (=E0x+WR1) Format Scale Drawn By HENDRA Date Revision
COMPONENT LIST Checked By ARTARTO 2/19/2018 C
PT. PLN (PERSERO) Project Name : GI PAMECUTAN KELOD DAN PADANG SAMBIAN EXT TRAFO BAY ANUNNCIATOR A3 NTS Appr. By AZIZ
Customer Order No : 326/IU/L/VI/2017-R4 Sheet Next Sheet
TRANSMISI JAWA BAGIAN TIMUR DAN BALI PT. SCHNEIDER INDONESIA Component List Drawing No. : E2010-97682-01-SCH-A ZA18 ZA19
AREA PELASANA PEMELIHARAAN BALI
23 4 5 6 7 8
1


1234 5 6 7 8
SW A
=E0x+WR1 ANNUNCIATOR B
CONTROL & PROT. PANEL MINILEC C
32 WAY + P.B D
A 40B32SPO E
This document is exclusively property of Schneider Electric and shall not be used or copied without authorization RATED VOLTAGE :24 VDC
Engineering Base Version : 6.3.1 -H500 32 NOS

+COM TEST MUTE ACK RST
E
SCNCOMTEST MUTE ACK RST A1 M A2 U/M

B -H500 `- /RB5.3 /RB5.4 /RB5.5 /RB5.5

RS485 RL1 RL2 RL3
/SS1.3
C I1 C1 I2 C2 I3 C3
I3 C3
-H500 I1 C1 I2 C2
D /RB5.6 /RB5.6 /RB5.7 /RB5.7

AUXILIARY SUPPLY

VE+ VE- VE+ VE- E

E

VE+ VE- VE+ VE- E

-H500 /RB1.2 /RB1.2 /RB1.1 /RB1.2 /RB1.1

Created with

F F

End Customer : Customer : PT. SURYA PRIMA ELTRINDO 150/20kV TRAFO BAY CRP (=E0x+WR1) Format Scale Drawn By HENDRA Date Revision
COMPONENT LIST Checked By ARTARTO 2/19/2018 C
PT. PLN (PERSERO) Project Name : GI PAMECUTAN KELOD DAN PADANG SAMBIAN EXT TRAFO BAY ANUNNCIATOR A3 NTS Appr. By AZIZ
Customer Order No : 326/IU/L/VI/2017-R4 Sheet Next Sheet
TRANSMISI JAWA BAGIAN TIMUR DAN BALI PT. SCHNEIDER INDONESIA Component List Drawing No. : E2010-97682-01-SCH-A ZA19 ZA20
AREA PELASANA PEMELIHARAAN BALI
23 4 5 6 7 8
1


1234567This document is exclusively property of Schneider Electric and shall not be used or copied without authorization 8
Engineering Base Version : 6.3.1 A
=E0x+WR1 B
CONTROL & PROT. PANEL C
D
A

F1 F2 F9 F10 BACKUP F17 F18 F25 F26
CB OPERATING CB ALARM SF6 MAIN PROTECTION PROTECTION MAIN PROTECTION MAIN PROTECTION OIL TEMPERATURE LV WINDING
LOCKOUT SF6 RELAY 1 TRIP
RELAY FAILURE TRIP TRIP TEMPERATURE

FAILURE (87T) (REF HV) TRIP

F3 F4 F11 BACKUP F12 BACKUP F19 F20 BACKUP F27 F28

CB NOT CHANGE DS SUPPLY PROTECTION PROTECTION MAIN PROTECTION PROTECTION 1 HV WINDING BUCHHOLZ RELAY

& TRIP TEMPERATURE
MOTOR FAILURE RELAY 2 RELAY 3 TRIP TRIP
OVER RUNNING (REF LV) TRIP
FAILURE FAILURE (50/51, 50N/51N)
BACKUP
B F5 F6 F13 F14 F21 BACKUP F22 F29 F30

CRP AC/DC MK AC/DC SUPPLY GENERAL ALARM BUSBAR PROTECTION 1 PROTECTION 2 PRESSURE RELIEF PRESSURE RELIEF

SUPPLY FAILURE INTERNAL TRAFO PROTECTION TRIP TRIP MAIN TANK TRIP OLTC TRIP

FAILURE TRIP (50/51, 50N/51N)
(50BF)
20kV SIDE
F7 F8 F15 F16 F23 SPAREBACKUP F24 BACKUP F31 F32

TCS LOCKOUT 1 LOCKOUT 2 PROTECTION 2 PROTECTION 3 PROTECTIVE

FAILURE SPARE TRIP TRIP TRIP TRIP RELAY SPARE

(50BF) 20kV SIDE (SBEF) OLTC TRIP

TEST MUTE ACK RST

C

D

EE

Created with

F F

End Customer : Customer : PT. SURYA PRIMA ELTRINDO 150/20kV TRAFO BAY CRP (=E0x+WR1) Format Scale Drawn By HENDRA Date Revision
COMPONENT LIST Checked By RATIH 2/19/2018 C
PT. PLN (PERSERO) Project Name : GI PAMECUTAN KELOD DAN PADANG SAMBIAN EXT TRAFO BAY ANUNNCIATOR A3 NTS Appr. By AZIZ
Customer Order No : 326/IU/L/VI/2017-R4 Sheet Next Sheet
TRANSMISI JAWA BAGIAN TIMUR DAN BALI PT. SCHNEIDER INDONESIA Component List Drawing No. : E2010-97682-01-SCH-A ZA20 ZB1
AREA PELASANA PEMELIHARAAN BALI
23 4 5 6 7 8
1


12345678This document is exclusively property of Schneider Electric and shall not be used or copied without authorization
Engineering Base Version : 6.3.1
=E0x+S1
MARSHALLING KIOSK

AA
21 21
43 43 21 21
65 65

12 12
11 14 11 14

22 22
21 24 21 24
I> I> I> I> I> I>

-F100 /DA2.3 /SA3.1 /SA3.5 -F300 /DA3.6 /SA3.4 /SA3.7 -S101 /DA4.2 -H101 /DA4.2

MCCB MCCB -S102 /DA4.2 -H102 /DA4.2
SCHNEIDER
SCHNEIDER iC60N + iOF/OF LIMIT SWITCH TL LAMP
MCB 3 POLE, 100A, C CURVE TEND (OR EQUAL) PHILIPS
iC60N + iOF/OF TM 1307 TLD super 80
1 C/O CONTACT 30 W, 220/230VAC 50Hz B
MCB 3 POLE, 160A, C CURVE

B

21 21 12 11 21
43 43
65
12
12 11 14
11 14
22
22 21 24
21 24
I> I> I> I> I>

Θ

-F102 /DA2.4 /SA3.2 /SA3.5 -F202 /DB2.3 /SA3.3 /SA3.7

MCB -B101 /DA4.2 -R101 /DA4.2

-F104 /DA2.6 /SA3.3 /SA3.6 THERMOSTAT HEATER
C SCHNEIDER STEGO STEGO (OR EQUAL)
KTO 001 HG 140 C
-F200 /DA3.3 /SA3.3 /SA3.6 iC60H-DC + iOF/OF D
MCB 2 POLE, 10A, C CURVE E

-F201 /DA3.4 /SA3.3 /SA3.7 0..60OC, 1 NC CONTACT 45 W, 110-250VDC/VAC 50Hz

MCB L1
SCHNEIDER L2
iC60N + iOF/OF Ph L3
MCB 3 POLE, 16A, C CURVE NN
PE PE
D
21
43
65

12
11 14

22
21 24
21
43

12
11 14

22
21 24
I> I> I> I> I> -X101 /DA4.3 -X102 /DA4.6

-F301 /GA1.5 /MD2.3 -F101 /DA2.3 /SA3.2 /SA3.5 SOCKET OUTLET SOCKET OUTLET
-F302 /GA1.6 /MD2.3 -F103 /DA2.5 /SA3.2 /SA3.6 LEGRAND (OR EQUAL) -
PLEXO 55 -
1 PHASE + PE 3 PHASE + PE

MCB MCB
SCHNEIDER SCHNEIDER
iC60N + iOF/OF iC60N + iOF/OF
MCB 3 POLE, 1A, C CURVE MCB 2 POLE, 6A, C CURVE

E

Created with

F F

PT. PLN (PERSERO) Customer : PT. SURYA PRIMA ELTRINDO 150/20kV TRAFO BAY MK (=E0x+S1) Format Scale Drawn By HENDRA Date Revision
COMPONENT LIST Checked By ARTARTO 2/19/2018 C
TRANSMISI JAWA BAGIAN TIMUR DAN BALI Project Name : GI PAMECUTAN KELOD DAN PADANG SAMBIAN EXT TRAFO BAY MARSHALLING KIOSK A3 NTS Appr. By AZIZ
AREA PELASANA PEMELIHARAAN BALI Customer Order No : 326/IU/L/VI/2017-R4 Sheet Next Sheet
PT. SCHNEIDER INDONESIA Component List Drawing No. : E2010-97682-01-SCH-A ZB1
1 2 3 -
4 5 8
6 7


1 23 4567 8
A A
B NOTE:
C NO REVISION BY: CHECKED
D DATE: DATE:
E
PT. PLN ( PERSERO ) B

UIT JBM

PROJECT

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA,
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI

C

MAIN CONTRACTOR

PT. BISETTA

DRAWING TITLE

D

BUSBAR PROTECTION 150kV
( 9 BAY + 4 SPARE )

LOCATION

E

GI. PADANG SAMBIAN

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. A00
SCALE NTS
DSGN BY: PCS ENG BA PWT COVER F

0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 3 78
56


1 23 4 56 7 8

DRAWING TITLE SHEET NO. REVISI INDEX

A COVER A00 X A
LIST OF DOCUMENT
LIST OF DOCUMENT A01 X B
LIST OF DOCUMENT A02 X
GENERAL BOX SPESIFICATION A03 X C
GENERAL MARKS & WIRRING SPECIFICATION A04 X
A05 X D
B GRAPICHAL SYMBOL A06 X
LAYOUT PANEL BUSBAR PROTECTION A07 X E
LAYOUT PANEL BUSBAR PROTECTION A08 X
LAYOUT PANEL MK BUSPRO A09 X
LAYOUT BOX CT A10 X
MATERIAL LIST BUSBAR PROTECTION PANEL B01 X
B02 X
C MATERIAL LIST BUSBAR PROTECTION PANEL B03 X
MATERIAL LIST BUSBAR PROTECTION PANEL B04 X
MATERIAL LIST OF PROTECTION AUXILIARY RELAY BUS A B05 X
MATERIAL LIST OF PROTECTION AUXILIARY RELAY BUS B B06 X
MATERIAL LIST OF MARSHALLING KIOSK B07 X
SINGGLE LINE DIAGRAM B08 X
SINGGLE LINE DIAGRAM L01 X
L02 X
D L03 X
L04 X
LIGHTING AND HEATER MARSHALLING KIOSK BUSPRO D01 X
LIGHTING AND HEATER BUSBAR PROTECTION PANEL D02 X
COMUNICATION RELAY D03 X
110V DC POWER SUPPLY DISTRIBUTION D04 X
CURRENT CIRCUIT BUSBAR PROTECTION D05 X
CURRENT CIRCUIT BUSBAR PROTECTION D06 X
E CURRENT CIRCUIT BUSBAR PROTECTION
CURRENT CIRCUIT BUSBAR PROTECTION
CURRENT CIRCUIT BUSBAR PROTECTION
CURRENT CIRCUIT BUSBAR PROTECTION

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. A01
SCALE NTS
DSGN BY: PCS ENG BA PWT LIST OF DOCUMENT F

0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 3 78
56


1 23 4 56 7 8

DRAWING TITLE SHEET NO. REVISI INDEX

A M01 A A
M02
VOLTAGE CIRCUIT FOR BUSPRO BUS.A AND BUS.B M03 X B
DIGITAL INPUT OF STATUS DS,A DAN DS,B M04 X
DIGITAL INPUT OF STATUS DS,A DAN DS,B M05 X C
DIGITAL INPUT OF STATUS DS,A DAN DS,B M06 X
DIGITAL INPUT OF STATUS CB, DS,A DAN DS,B M07 X D
B DIGITAL INPUT OF STATUS DS,A DAN DS,B M08 X
DIGITAL INPUT OF STATUS DS,A DAN DS,B N01 X E
POWER SUPPLY RELAY BUSPRO N02 X
SELECTOR BLOCK ARAH TRIP N03 X
LOCKOUT TRIPPING N04 X
LOCKOUT TRIPPING N05 X
LOCKOUT TRIPPING S01 X
S02 X
C S03
S04 X
LOCKOUT TRIPPING AND INDICASI ALARM SCADA S05 X
S06 X
STATUS OF DS,A AND DS,B S07 X
STATUS OF DS,A AND DS,B S08 X
STATUS OF DS,A AND DS,B S09 X
STATUS OF DS,A AND DS,B S10 X
STATUS OF DS,A AND DS,B S11 X
S12 X
D X
X
STATUS OF DS,A AND DS,B X

BLOCK BUSPRO AND RESET RELAY
INTER TRIPPING BUSBAR PROTECTION
INTER TRIPPING BUSBAR PROTECTION
INTER TRIPPING BUSBAR PROTECTION
MASTER TRIP AND DC SUPPLY TO SCADA
E MASTER TRIP OF FAULT TELECONTROL

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. A02
SCALE NTS
DSGN BY: PCS ENG BA PWT LIST OF DOCUMENT F

0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 3 78
56


1 23 4 56 7 8

DRAWING TITLE SHEET NO. REVISI INDEX

A Z01 A A
Z02
DETAIL COMPONENT TEST BLOCK ALARM MMLG 01 Z03 X B
DETAIL COMPONENT TEST BLOCK ALARM MMLG 01 Z04 X
DETAIL COMPONENT TEST BLOCK ALARM MMLG 01 Z05 X
DETAIL COMPONENT LOCK OUT ALSTOM MVAJ 05 Z06 X
DETAIL COMPONENT LOCK OUT ALSTOM MVAJ 05 Z07 X
B DETAIL COMPONENT RELAY ALSTOM P746 Z08 X
DETAIL COMPONENT RELAY ALSTOM P746 Z09 X
DETAIL COMPONENT RELAY ALSTOM P746 X
DETAIL COMPONENT RELAY ALSTOM P746 X

C C

DD

EE

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. A03
SCALE NTS
DSGN BY: PCS ENG BA PWT LIST OF DOCUMENT F

0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 3 78
56


1 2 34 567 8
A
NAME OF PANEL APPLICABLE TYPE STYLE OF PANEL PLATE THICKNESS (mm) COLOR CODE OF
NO FACE REAR SIDE FINISHING PAINTING
OF PANEL INSTALL A
OF PANEL
LINE AUX.
CABLE
VOLTAGE VOLTAGE ENTRY SURFACE PLATE
INSIDE PLATE
B QUANTITY IP CODE OF PANEL INDOOR NAME PLATE REMARK B
AC 20 KV OUTDOOR FRAME FOR METER & RELAY C
1 PANEL BUSBAR PROTECTION AC 6.6 KV DOOR SWITCH HANDLE
2 PANEL MARSHALLING KIOSK BUSPRO AC 380 V PANEL EMERGENCY STOP
3 PANEL JUNCTION BOX CT AC 220 V DOOR INTERIOR LIGHTING
AC 110 V PANEL RECEPTACLE
C DC 110 V PLATE (HANGING) SPACE HEATER
METAL CLAD TYPE DOOR
COMPARTEMENT TYPE PANEL
METAL AND CLOUSURE PLATE
BOTTOM
TOP
PLATE MATERIAL
DOOR
FLOOR PLATE
END ( SIDE ) PLATE
MOUNTING PLATE
REAR PANEL
ROOF PANEL

1 IP41
1
1

STEEL
2.5 mm
2.0 mm
2.0 mm
2.0 mm
2.0 mm
2.0 mm
RAL 7032
RAL 7032
BLACK LETTERS ON WHITE BACKGROUND
NOT PROVIDED
Munsell N1.5 ( Black )
Munsell 7.5R4.5/14 ( Red )
PROVIDED

N/A
PROVIDED
DD

EE

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. A04
SCALE NTS
DSGN BY: PCS ENG BA PWT GENERAL BOX SPESIFICATION F

0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 3 78
56


1 23 45 67 8

ITEM OF CIRCUIT CABLE SIZE ITEM END OF TERMINAL 1234 A
(NYAF) B
A PHASE COLOUR CODE OF WIRING AC3ø COLOURED PORTION RED 1234 1234 C
2,5 mm2 AC 110V YELLOW D
VT SECONDARY CIRCUITWIRING SIZE 4 mm2 AC CONTROL PHASE 1 (R) BLACK WIRE NUMBER E
CT SECONDARY CIRCUIT PHASE 2 (S) MARK LABEL
CONTROL CIRCUIT 1.5 mm2 DC PHASE 3 (T) BLUE
PROTECTIVE RELAY 1.5 mm2 AC1ø NEUTRAL (N) RED 1234
INSTRUMENT 1.5 mm2 PHASE 1 (R) BLUE
SIGNAL LAMP 1.5 mm2 DC NEUTRAL (N) YELLOW WIRING NUMBER WILL BE MADE
4 mm2 CIRCUIT OTHER RED BY HOT PRINTED VINYL TUBE
B 2.5 mm2 POSITIVE (P) BLUE
1.5 mm2 NEGATIVE (N) SECONDARY OF CT
EARTHING CIRCUIT 1.5 mm2
SPACE HEATER 1.5 mm2 EARTHING CIRCUIT GREEN SOLDERLESS SECONDARY OF VT
OTHER OTHER (NOT SPECIFIED) WHITE TERMINAL
MOTOR VCB COLOUR OF WIRE
DC 48V METHOD OF PHASE COLOUR AT TERMINALS CONTROL CIRCUIT
RED
ITEM OF CIRCUITSECONDARY YELLOW MAIN BUSBAR COLORED VINYL SEAL WIRING TO BE USED VINYL DUCT
OF VT BLACK H.V. POWER CIRCUIT WIRING N/A MOUNTED AND
C L.V. POWER CIRCUIT WIRING COLORED VINYL CAP
BLUE CT VT SECONDARY CIRCUIT COLORED VINYL CAP METHOD TO BE BOUND BY A BAND
FHASE 1 R RED CONTROL CIRCUIT COLORED VINYL CAP
FHASE 2 SCOLOUR OF WIRINGSECONDARYYELLOW MAIN CONDUCTOR MATERIAL
FHASE 3 TOF CT BLACK
FHASE N BLUE MATERIAL CU
FHASE 1 R RED PHASE ROTATION ARRANGEMENT (SEEING FROM FRONT) CONNECTED PART SILVER PLATING
FHASE 2 S YELLOW INSULATION (MAIN) NOTHING
FHASE 3 TAC CONTROL BLACK FROM LEFT TO RIGHT N-R-S-T INSULATION (BRANCH) NOTHING
FHASE NCIRCUIT YELLOW FROM TOP TO BOTTOM R-S-T-N
GREY DC AC FROM FAR TO NEAR N-T-S-R SMALL WIRING MATERIAL
D DC CONTROL GREY FROM LEFT TO RIGHT MATERIAL
CIRCUIT GREY FROM TOP TO BOTTOM P-N PLATTING POLY VINYL COVERED STRANDED WIRE
NO. 1 PHASE FROM FAR TO NEAR P-N NOTHING OR TIN PLATING
NO. 2 PHASE GREEN-YELLOW N-P
NO. 3 PHASE BLACK
OTHER MATERIAL BOLT, NUTS & WASHER MATERIAL
(NOT SPECIFIED) MFG STD
POSITIVE
NEGATIVE
OTHER
(NOT SPECIFIED)

E

EARTHING CIRCUIT
MAIN CIRCUIT
NOTE :

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. A05
SCALE NTS
DSGN BY: PCS ENG BA PWT GENERAL MARKS & WIRING SPECIPICATION F

0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 3 78
56


1 23 4567 8

SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION

A TRANSFORME WITH TWO FUSE THERMAL EFFECT SIGNAL LAMP A
SPARATIP WINDING FUSE SWITCH B
DIRECT CURRENT LIGHTING ARESTER ELECTROMAGNETIC EFFECT FLAG INDICATOR C
TRANSFORME WITH THREE WITHORAWABLE JUNCTION ELECTRO MECHANICAL D
CONDUCTOR SPARATIP WINDING RELAY COIL E
TERMINAL RELAY COIL OF A SLOW POSITION INDICATOR
n CONDUCTORS AUTO TRANSFORMER BELT
n OPERATING RELAY
REACTOR RELAY COIL OF A SLOW BU//FR
CONDUCTORS
N NETRAL CONDUCTORS THREE PHASE WINDING RELEASING RELAY
DELTA OPEN DELTA

B CONDUCTORS THREE PHASE WINDING RELAY COIL OF A HIGHT INDICATOR INSTRUMENT
WITHIN SCREEN STAR SPEED RELAY
CONNECT POINT

OPERATED BY POUSHING M THREE PHASE WINDING LINK IMPULSE CONTER TRANDUCER
STAR WITH NEUTRAL INTEGRATING METER
OPERATED BY KEY LINK WITH TEST RECICLE RELAY DISTURBANCE RECORDER
OPERATED BY TURNING THREE PHASE WINDING LINK WITH SWITCHING PASSING CONTACT RELAY
ZIG - ZAG
LOCKED
MOTOR

OPERATED BY CRANK G GENERATOR CONNECTOR RECORDING INSTRUMENT

C OPERATED BY LEVER CURRENT TRANSFORMER EARTH MAKE CONTACT SYN SYNCRON CHECK DEVICE

OPERATED BY STORED VOLTAGE TRANSFORMER FRAM OR CHASIS BREAK CONTACT /< DISTANCE PROTECTION
MECHANICAL ENERGY CONNECTION F21
WINDING CHANGE OVER CONTACT Id
OPERATED BY HANDWHEEL CIRCUIT BREAKER RESISTOR 3Id/10 DIRECTIONAL EARTH FAULT
MAKE CONTACT DELAYED PROTECTION F67
ELECTROMAGNETIC ISOLATOR HEATING RESISTOR WHEN OPERATING
ACTUATOR DIODE DIRECTIONAL EARTH FAULT
BREAK CONTACT DELAYED PROTECTION F67N
M OPERATED BY MOTOR SWITCH DISCONNECTOR CAPACITOR WHEN OPERATING
SWITCH DELAY TIME OVER CURRENT
D PNEUMATIC OF HYDROULIC SHUNT MAKE CONTACT DELAYED PROTECTION F51
WHEN RELEASING
CONTROL DELAY TIME EARTH FAULT
MAKE CONTACT DELAYED PROTECTION F51N
MECHANICAL INTERLOCK EARTHING SWITCH WHEN RELEASING
MAKE CONTACT OF A DIFRERENTIAL PROTECTION
DEVICE FOR RESTRICTING CONTACTOR LIMIT SWITCH
MOVEMENT TRANSF. DIFFERENTIAL
PROTECTION F87

INHERENT LINEAR DIFFERENTIAL CIRCUIT RECTIFIER MAKE CONTACT OF A UNDER VOLTAGE RELAY
VARIABELITY BREAKER LIMIT SWITCH U < F27

E OVER VOLTAGE RELAY

PRESET ADJUSTMENT DIFFERENTIAL SWITCH BATTERY PASSING CONTACT U> F59

NON INHERENT CONTACTOR WITH METER SWITCH PROTECTIVE DEVICE
VARIABILITY AUTOMATIC RELEASE

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. A06
SCALE NTS
DSGN BY: PCS ENG BA PWT GRAPICHAL SYMBOL F

0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 3 78
56


1 2 3 4 5 67 8
A A
800 800 1100
B 200 200 200 B
BUSBAR PROTECTION 150kV BUSBAR PROTECTION 150kV
GI NUSA DUA GI NUSA DUA

CC 2200 800 800
1100600

DD

EE

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE LAYOUT PROTECTION PANEL JOB. NO. XX SHEET NO.
PWT SCALE NTS
BA LAYOUT PANEL BUSPRO A07
3
DSGN BY: PCS ENG CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI F

0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA PROJECT

4 PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, DRAWING NO.

GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI 004/BSE/040122/BP/PDNGSMBN

12 56 78


12 3 4 5 6 7 8

800 1100 1100

A -H741 A
B B
C Reason S20 Ethernet Switch C
D D
E -X201 -X508
-X202
-X203 -X508
-X204 -X508
-X508
-X508
1234 1 234

-X122 -X162
1234

P40 Agile -F87BB.A P746 -Q9513 -Q9514 -Q9515 -Q9516 -X509
1 234
F6 1 31 31 31 3 -K2108 -K2208 -K2109 -X509
F7 -X509 -X170
F8 1234 -X509 1234
F9 -X509
F10 -X124
F1 iC60 iC60 iC60 iC60
F2
F3 O . OFF O . OFF O . OFF O . OFF O . OFF O . OFF O . OFF O . OFF -X510
F4
F5 OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP -X510 1 234
-X510
-X510 -X190
-X510 1234

1234 2 42 42 42 4

OK -X126

-X511
MICOM ALSTOM 1 234
-X511
-X511 -X189
-X511 1234
-X511

12341234 -X512
1 234
-X128 -X512
-X512 -X188
-X512 1234
-X512

-K9514-K9515-K9516 -K861A -K861A.1 -K2209 -K2110 -K2210 -X513
1 234
-X205 VG-11T VG-11T VG-11T -X513
10A 110V DC 10A 110V DC 10A 110V DC -X513 -X187
-X513 1234
P40 Agile -F87BB.B P746 RPY A 004 110DL RPY A 004 110DL -X513
110V DC 110V DC
F6 1234
F7 SMITT SMITT SMITT CARLO GAVAZZI
F8 -X130 RELAY RELAY RELAY
F9
F10 CARLO GAVAZZI

G11-L-D100 G11-L-D100 G11-L-D100 -X601
110V DC 110V DC 110V DC

F1 OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP -X601 1 234
F2 -X601
F3 -X206 -X601 -X186
F4 -X207 -X601 1234
F5 -X208
1234 -X209 -X602
OK -X210 21 3 4
-X132-X211 -X602
-X212 -X602 -X185
MICOM ALSTOM -X213 -X602 2134
-X602

1234 -X603
21 3 4
-X134 -X603
-X603 -X184
-X603 2134
-X603

-K861B -K861B.1 -KRBST -K2111 -K2211 -K2112

1234 -X604
RPY A 004 110DL RPY A 004 110DL RPY A 004 110DL 21 3 4
-X136 110V DC 110V DC 110V DC -X604
-X604 -X183
-X604 2134
-X604

CARLO GAVAZZI CARLO GAVAZZI CARLO GAVAZZI

P40 Agile -F87BB.C P746 -X605

F6 OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP 21 3 4
F7
F1 F8 1234 -X605 -X182
F2 F9 -X605 2134
F3 F10 -X138 -X605
F4 -X605
F5
-X606
21 3 4
1234 -X606
-X606 -X181
-X149 -X606 2134
-X606

OK

MICOM ALSTOM -X607

-X607
-X607
-X607
-X607
-K2212 -K2113 -K2213 21 3 4
1234 -K2101 -K2201 -K2102
-X180
2134

-X143 -X141 -X608

-X608
-X608
-X608
-X608
BLOCK RELAY BLOCK TRIP INDICATION 21 3 4

BUS A BUS A TRIP BUS A -X179
2134

1234 OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP

OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP

-X609

-X609
-X609
-X609
-X609
-S63 -S64 RESET RELAY RESET LOCKOUT BZR STOP BZR RESET 21 3 4

OFF BLOCK OFF BLOCK -X178
2134

BLOCK RELAY BLOCK TRIP INDICATION

BUS B BUS B TRIP BUS B 1234 -X610

-X145 -X610 21 3 4
-X610
-X610 -X177
-X610 2134

2200 -X103 -X611
-X104 21 3 4
1234 -K2202 -K2103 -K2203 -X611
-X611 -X176
-X158 -X611 2134
-X611

-X612

-X612
-X612
-X612
-X612
1234 1 234
MVAJ 105 MVAJ 105 MVAJ 105 MVAJ 105 MVAJ 105 MVAJ 105 MVAJ 105 MVAJ 105 MVAJ 105
-X157 -X175
1234

OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP

-X613
1 234
-X300 -X613
-X613 -X174
4 -X613 1234
3 -X613
2
1-X147 -X651

ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 -X400 -X651 1 23456789
-X651
12 -X651 -X173
11 -X651 123456789
10 -X651
9 -X651
8 -X651
7 -X651
6 -X651
5
4 -K5207 -K2104 -K2204
3
2 -X652
1
-X652
-X411 -X652
-X652
4 -X152 -X150 1 23
3
2 -X172
1 123

OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP -X654

MVAJ 105 MVAJ 105 MVAJ 105 MVAJ 105 -X654 1 231 2345
-X654
-X654 -X171
-X654 12312345
-X654
-X653
-X653
-X653

-X412 -X154

4
3
2
1

ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 -X413 -X156 -K2105 -K2205 -K2106

2
4
3
1

-X500
1 2 3 4 5 6 7 8 9 10 11 12 13 14
-X500 OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP
-X500 -X159
-X500 1 2 3 4 5 6 7 8 9 10 11 12 13 14
-X500
-X500
-X500
-X500
-X500
-X500
-X500
-X500
-X500
-X500
-X500

MMLG01 MMLG01 MMLG01 MMLG01 MMLG01 MMLG01 MMLG01 MMLG01 MMLG01 -X501

!!!!!!!!! -X501 1 234
-X501
-X501 -X168
-X501 1234

-X502

-X502
-X502
-X502
-X502
1 234 -K2206 -K2107 -K2207

-X167
1234

ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 -X5031 234

-X503 -X166 OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP
-X503 1234
-X503
-X503

-X504

-X504
-X504
-X504
-X504
-X504
-X504
1 23456

-X165
123456

-X505 E

-X505
-X505
-X505
-X505
MMLG01 MMLG01 MMLG01 MMLG01 MMLG01 1 234

-X169
1234

!! ! ! !

-X506
1 234
-X506
-X506 -X164
-X506 1234
-X506

-X507

-X507
-X507
-X507
-X507
ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 ALSTOMMVAJ-105 1 234

-X163
1234

DSGN BY: PCS ENGREV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. A08
100 PWT SCALE NTS
BA LAYOUT PANEL BUSPRO F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


DSGN BY: PCS ENG E 1
100
D C A
800
0 ISSUED FOR APPROVAL 23.02.2022 GTT REV DESCRIPTION 100 1400 B 100

12 DATE DRAWN 2
800

MK BUSBAR PROTECTION
GI NUSA DUA BALI

CHECKED 600 3
100
BA

APPROVED
PWT

3

26929 O . OFF OF-OF iC60-Q9511r e s e t 14
T -Q951r e s e t 14
21 1212
21 91 -Q952r e s e t
11
22 11
22 94

24
24 92

2 1 -Q9511

O . OFF

26929 3

-X-X-4X-41X414414144 -X-X-3X-30X303000 21 O . OFF OF-OF iC60N 11 1212 14
-X300 21 91 T 11 14

4 22
3 22 94
2 4 24
1 24 92

PT. BISETTA 1 23456 -X4111 234561 234561 234561 234561 4 23561 234561 23456 2 -Q951

4 4 O . OFF 13
3
2
1

-X501

-X501
-X501
-X501
-X501
-X501
-X501

-X502

-X502
-X502
-X502
-X502
-X502
-X502

-X503

-X504
-X504
-X504
-X504
-X504
-X504

-X504

-X503
-X503
-X503
-X503
-X503
-X503

-X505

-X505
-X505
-X505
-X505
-X505
-X505

-X506

-X506
-X506
-X506
-X506
-X506
-X506

-X507

-X507
-X507
-X507
-X507
-X507
-X507

-X508

-X508
-X508
-X508
-X508
-X508
-X508
-X102 -X101 -X100 -X99 -X98 -X97 -X96 -X95 -X120 -X119 -X118 -X117 -X90 -X89 -X88 -X87 -X86 -X85 -X84 -X83 26929

21 O . OFF
21 91
5
22
123456 123456 123456 123456 123456 14 2356 123456 123456 22 94 OF-OF iC60N
4 6 24 2
24 92 O . OFF 11 1212 14
T 11 14

O . OFF -Q952

46 O . OFF 1 35

700 4
800

-X5091 23456

-X509
-X509
-X509
-X509
-X509
-X509

-X510

-X510
-X510
-X510
-X510
-X510
-X510

-X511

-X511
-X511
-X511
-X511
-X511
-X511

-X512

-X512
-X512
-X512
-X512
-X512
-X512

-X513

-X513
-X513
-X513
-X513
-X513
-X513

-X651

-X651
-X651
-X651
-X651
-X651
-X651
1 23456 1 23456 1 23456 1 23456 1 23456

-X116 -X115 -X108 -X107 -X106 -X105 -X104 -X103-X113 -X112 -X114 -X111

DWG. TITLE 123456 123456 123456 123456 123456 123456

LAYOUT PANEL MARSHALLING KIOSK -X-2X-02X-702X.-70B2X.-70B2X.-70B2X.-70B2X.70B2.70B.7B.B -X-2X-02X-702X.-70A2X.-70A2X.-70A2X.-70A2X.70A2.70A.7A.A -X-2X-02X-602X-602X-602X-602X-602X602606 -X-2X-02X-502X-502X-502X-502X-502X502505 -X-2X-02X-402X-402X-402X-402X-402X402404 -X-2X-02X-302X-302X-302X-302X-302X302303 -X-2X-02X-202X-202X-202X-202X-202X202202 -X-2X-02X-102X-102X-102X-102X-102X102101 -X-1X-01X-201X201202 -X-1X-01X-101X101101 56
800
CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI 12345678 12345678 12345678 12345678 12345678 12345678 12345678 12345678 1234 1234

PROJECT -X101
-X102
PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, -X201
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI -X202
-X203
56 -X204
-X205
-X206
-X207
-X208
-X50 -X51 -X52 -X53 -X54 -X55 -X56 -X57 -X58 -X59 -X60 -X61 -X62 -X63 -X64 -X65 -X49 -X48 -X47 -X46

700 -H100

1 2 PE

-X-2X-12X-312X-312X-312X-312X-312X312313 -X-2X-12X-212X-212X-212X-212X-212X212212 -X-2X-12X-012X-012X-012X-012X-012X012010 -X-2X-02X-902X-902X-902X-902X-902X902909 -X-2X-02X-802X-802X-802X-802X-802X802808 -X-1X-01X-401X401404 -X-1X-01X-301X301303

12345678 12345678 12345678 12345678 12345678 1234 1234

-X103
-X104
-X209
-X210
-X211
-X212
-X213
-X80 -X79 -X78 -X77 -X76 -X75 -X74 -X73 -X72 -X71 -X70 -X69 -X68 -X67

-H01

78 DRAWING NO. JOB. NO. 7
SCALE 100
004/BSE/040122/BP/PDNGSMBN
XX
NTS

SHEET NO. D 8
500 600 100 A
A09 C B
E
F


1 23 4567 8
A A
B 500 B
C 325 500 C
D D
JUNCTION BOX CT

12345678
DSGN BY: PCS ENG
FRONT DOOR FRONT DOOR
250IS CLOSEDIS OPENED
400
500 300
400250

E E

BOTTOM VIEW

REV DESCRIPTION DATE DRAWN CHECKED APPROVED SIDE VIEW JOB. NO. XX SHEET NO. A10
PWT SCALE NTS
BA DWG. TITLE F

1 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA LAYOUT PANEL BOX CT

4 CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI DRAWING NO.

PROJECT 004/BSE/040122/BP/PDNGSMBN

1 23 PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 78
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI

56


1 23 4567 8

DESCRIPTION COMPONENT DESCRIPTION BRAND TYPE SPECIFICATION REF.PAGE

-F87BB.A RELAY BUSBAR PROTECTION ALSTOM Micom P746 In= 5A, Un= 57.7V,Uaux=110VDC /Z06.B1 A
A -F87BB.B RELAY BUSBAR PROTECTION ALSTOM Micom P746 In= 5A, Un= 57.7V,Uaux=110VDC /Z06.B3 B
ALSTOM Micom P746 In= 5A, Un= 57.7V,Uaux=110VDC /Z06.B6 C
-F87BB.C RELAY BUSBAR PROTECTION ALSTOM 14 POLE 28 PIN /Z01.B1
-X87B.1 RELAY TEST BLOCK, MMLG01 ALSTOM MMLG01 14 POLE 28 PIN /Z01.B2
-X87B.2 RELAY TEST BLOCK, MMLG01 ALSTOM MMLG01 14 POLE 28 PIN /Z01.B3
-X87B.4 RELAY TEST BLOCK, MMLG01 ALSTOM MMLG01 14 POLE 28 PIN /Z01.B4
-X87B.5 RELAY TEST BLOCK, MMLG01 ALSTOM MMLG01 14 POLE 28 PIN /Z01.B6
B -X87B.3 RELAY TEST BLOCK, MMLG01 ALSTOM MMLG01 14 POLE 28 PIN /Z01.B7
-X87B.6 RELAY TEST BLOCK, MMLG01 ALSTOM MMLG01 14 POLE 28 PIN /Z02.B1
-X87B.7A RELAY TEST BLOCK, MMLG01 ALSTOM MMLG01 14 POLE 28 PIN /Z02.B2
-X87B.7B RELAY TEST BLOCK, MMLG01 ALSTOM MMLG01 14 POLE 28 PIN /Z02.B3
-X87B.8 RELAY TEST BLOCK, MMLG01 ALSTOM MMLG01 14 POLE 28 PIN /Z02.B4
-X87B.9 RELAY TEST BLOCK, MMLG01 ALSTOM MMLG01 14 POLE 28 PIN /Z02.B6
C -X87B.10 RELAY TEST BLOCK, MMLG01 ALSTOM MMLG01 14 POLE 28 PIN /Z02.B7
-X87B.11 RELAY TEST BLOCK, MMLG01 ALSTOM MMLG01 14 POLE 28 PIN /Z03.B1
-X87B.12 RELAY TEST BLOCK, MMLG01 ALSTOM MMLG01 14 POLE 28 PIN /Z03.B2
-X87B.13 RELAY TEST BLOCK, MMLG01 MMLG01

D D

EE

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. B01
PWT SCALE NTS
DSGN BY: PCS ENG BA MATERIAL LIST F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI

12 456 78


1 23 4567 8

DESCRIPTION COMPONENT DESCRIPTION BRAND TYPE SPECIFICATION REF.PAGE

-F86.1 Lockout 110V DC ALSTOM MVAJ-105 110V DC /Z04.B1
ALSTOM MVAJ-105 110V DC /Z04.C1
A -F86.2 Lockout 110V DC ALSTOM MVAJ-105 110V DC /Z04.C1 A
ALSTOM MVAJ-105 110V DC /Z04.D1 B
-F86.3 Lockout 110V DC ALSTOM MVAJ-105 110V DC /Z04.E1 C
ALSTOM MVAJ-105 110V DC /Z04.B5
-F86.4 Lockout 110V DC ALSTOM MVAJ-105 110V DC /Z04.C5
ALSTOM MVAJ-105 110V DC /Z04.C5
-F86.5 Lockout 110V DC ALSTOM MVAJ-105 110V DC /Z04.D5
ALSTOM MVAJ-105 110V DC /Z04.E5
-F86.6 Lockout 110V DC ALSTOM MVAJ-105 110V DC /Z05.B1
ALSTOM MVAJ-105 110V DC /Z05.B1
-F86.7 Lockout 110V DC ALSTOM MVAJ-105 110V DC /Z05.C1

B -F86.8 Lockout 110V DC

-F86.9 Lockout 110V DC

-F86.10 Lockout 110V DC

-F86.11 Lockout 110V DC

-F86.12 Lockout 110V DC

-F86.13 Lockout 110V DC

C

DD

EE

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. B02
PWT SCALE NTS
DSGN BY: PCS ENG BA MATERIAL LIST F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI

12 456 78


1 23 4567 8

DESCRIPTION COMPONENT DESCRIPTION BRAND TYPE SPECIFICATION REF.PAGE

-Q9513 MINIATURE CIRCUIT BREAKER 2P 6A iC60N 6kA/10kA SCHNEIDER A9F74206 2P, 6A iC60N 6kA/10kA /L02.C5
SCHNEIDER A9F74206
A -Q9514 MINIATURE CIRCUIT BREAKER 2P 6A iC60N 6kA/10kA SCHNEIDER A9F74206 2P, 6A iC60N 6kA/10kA A
G11-L-D110 B
-Q9515 MINIATURE CIRCUIT BREAKER 2P 6A iC60N 6kA/10kA SMITT G11-L-D110 2P, 6A iC60N 6kA/10kA C
SMITT G11-L-D110 D
-K9514 AUXILIARY RELAY SMITT RHTS-100W 110VDC, 4C/4O /L04.D3 E
YOUNGSUNG
-K9515 AUXILIARY RELAY PHILIPS TL 110VDC, 4C/4O /L04.D4
YOUNGSUNG YSL2215GWB
-K9516 AUXILIARY RELAY STEGO 110VDC, 4C/4O /L04.D6
LEGRAND KTO-011
-E103 HEATER 100W 220VAC PHILIPS 697.33 220VAC 100W /L02.E4
PHILIPS
B -H101 FLOURESENCE LAMP 11W 220VAC KACON TL LED 11W, 250VAC, 50/60Hz /L02.E3
CARLO GAVAZZI TL
-S3507 DOOR SWITCH LEVER FLANGE 15A 250VAC CARLO GAVAZZI KMB-P80D1 DOOR SWITCH 250VAC 15A /L02.D3
CARLO GAVAZZI RPY A004
-S3508 THERMOSTAT 0-60 DEGREE CELCIUS CARLO GAVAZZI RPY A004 0 to 60 C Deg. Max 250VAC /L02.D4
CARLO GAVAZZI RPY A004
-X101 STOP CONTACT 1P 16A 220VAC IP55 K&N RPY A004 STOP CONTACT 220VAC 1P-16A /L02.E3
K&N RPY A004
-H91 FLOURESENCE LAMP 11W 220VAC IDEC IZUMI CA10 LED 11W, 250VAC, 50/60Hz /N05.E2
IDEC IZUMI CA10
-H92 FLOURESENCE LAMP 11W 220VAC CARLO GAVAZZI APS-199-R LED 11W, 250VAC, 50/60Hz /N05.E2
CARLO GAVAZZI APS-199-R
C -H741 BUZZER ( TRIP BUSPRO ) 110V DC RPY A004 Vaux 110 VDC 5W, Sound Max 1 W /N05.E1
RPY A004
-K861A AUXILIARY RELAY 110VDC, 4C/O /N05.E5

-K861A.1 AUXILIARY RELAY 110VDC, 4C/O /N05.E5

-K861B AUXILIARY RELAY 110VDC, 4C/O /N05.E7

-K861B.1 AUXILIARY RELAY 110VDC, 4C/O /N05.E7

-KRBST AUXILIARY RELAY 110VDC, 4C/O /N05.E3

D -S63 Selector Switch Block Trip -

-S64 Selector Switch Block Trip -

-H01 PILOT LAMP BLOCK BUS A 25mm 220VAC AMBER /S08.C2

-H02 PILOT LAMP BLOCK BUS B 25mm 220VAC AMBER /S08.C5

-K741 AUXILIARY RELAY 110VDC, 4C/O /N05.E1

-K52C AUXILIARY RELAY 110VDC, 4C/O

E

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. B03
PWT SCALE NTS
DSGN BY: PCS ENG BA MATERIAL LIST OF PROTECTION F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI

12 456 78


1 23 4567 8

DESCRIPTION COMPONENT DESCRIPTION BRAND TYPE SPECIFICATION REF.PAGE

-K2101 AUXILIARY RELAY OMRON MM4XKP 110VDC, 2C/4O /M02.D2
OMRON MM4XKP 110VDC, 2C/4O /M02.D6
A -K2102 AUXILIARY RELAY OMRON MM4XKP 110VDC, 2C/4O /M03.D2 A
OMRON MM4XKP 110VDC, 2C/4O /M03.D5 B
-K2103 AUXILIARY RELAY OMRON MM4XKP 110VDC, 2C/4O /M04.D2 C
OMRON MM4XKP 110VDC, 2C/4O /M04.D5
-K2104 AUXILIARY RELAY OMRON MM4XKP 110VDC, 2C/4O /M05.D3
OMRON MM4XKP 110VDC, 2C/4O /M05.D6
-K2105 AUXILIARY RELAY OMRON MM4XKP 110VDC, 2C/4O /M06.D2
OMRON MM4XKP 110VDC, 2C/4O /M06.D6
-K2106 AUXILIARY RELAY OMRON MM4XKP 110VDC, 2C/4O /M07.D2
OMRON MM4XKP 110VDC, 2C/4O /M07.D6
-K2107 AUXILIARY RELAY OMRON MM4XKP 110VDC, 2C/4O /M08.D2
OMRON MM4XKP 110VDC, 2C/4O /M05.D2
B -K2108 AUXILIARY RELAY

-K2109 AUXILIARY RELAY

-K2110 AUXILIARY RELAY

-K2111 AUXILIARY RELAY

-K2112 AUXILIARY RELAY

-K2113 AUXILIARY RELAY

C -K5207 AUXILIARY RELAY

DD

EE

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. B04
PWT SCALE NTS
DSGN BY: PCS ENG BA MATERIAL LIST OF PROTECTION AUX RELAY BUS A F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI

12 456 78


1 23 4567 8

DESCRIPTION COMPONENT DESCRIPTION BRAND TYPE SPECIFICATION REF.PAGE

-K2201 AUXILIARY RELAY OMRON MM4XKP 110VDC, 2C/4O /M02.D3
OMRON MM4XKP 110VDC, 2C/4O /M02.D7
A -K2202 AUXILIARY RELAY OMRON MM4XKP 110VDC, 2C/4O /M03.D3 A
OMRON MM4XKP 110VDC, 2C/4O /M03.D6 B
-K2203 AUXILIARY RELAY OMRON MM4XKP 110VDC, 2C/4O /M04.D3 C
OMRON MM4XKP 110VDC, 2C/4O /M04.D7
-K2204 AUXILIARY RELAY OMRON MM4XKP 110VDC, 2C/4O /M05.D3
OMRON MM4XKP 110VDC, 2C/4O /M05.D7
-K2205 AUXILIARY RELAY OMRON MM4XKP 110VDC, 2C/4O /M06.D3
OMRON MM4XKP 110VDC, 2C/4O /M06.D7
-K2206 AUXILIARY RELAY OMRON MM4XKP 110VDC, 2C/4O /M07.D3
OMRON MM4XKP 110VDC, 2C/4O /M07.D7
-K2207 AUXILIARY RELAY OMRON MM4XKP 110VDC, 2C/4O /M08.D3

B -K2208 AUXILIARY RELAY

-K2209 AUXILIARY RELAY

-K2210 AUXILIARY RELAY

-K2211 AUXILIARY RELAY

-K2212 AUXILIARY RELAY

-K2213 AUXILIARY RELAY

C

DD

EE

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. B05
PWT SCALE NTS
DSGN BY: PCS ENG BA MATERIAL LIST OF PROTECTION AUX RELAY BUS B F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI

12 456 78


1 23 4567 8

DESCRIPTION COMPONENT DESCRIPTION BRAND TYPE SPECIFICATION REF.PAGE

-Q951 MINIATURE CIRCUIT BREAKER 3P 3A iC60N 6kA/10kA SCHNEIDER A974303 iC60N / A9F74306 /M01.B4
SCHNEIDER A974303 iC60N / A9F74306 /M01.E3
A -Q952 MINIATURE CIRCUIT BREAKER 3P 3A iC60N 6kA/10kA SCHNEIDER A9F74206 2P, 6A iC60N 6kA/10kA /L01.C3 A
YOUNGSUNG RHTS-100W 220VAC 100W /L01.E3 B
-Q9511 MINIATURE CIRCUIT BREAKER 2P 6A iC60N 6kA/10kA LEGRAND 697.33 STOP CONTACT 220VAC 1P-16A /L01.E1
LED 11W, 250VAC, 50/60Hz /L01.E2
-E102 HEATER 100W 220VAC PHILIPS TL LED 11W, 250VAC, 50/60Hz /L01.E2
PHILIPS TL DOOR SWITCH 250VAC 15A /L01.D2
-H01 STOP CONTACT 1P 16A 220VAC IP55 YOUNGSUNG YSL2215GWB DOOR SWITCH 250VAC 15A /L01.D2
YOUNGSUNG YSL2215GWB 0 to 60 C Deg. Max 250VAC /L01.D3
-H100 FLOURESENCE LAMP 11W 220VAC STEGO KTO-011

-H102 FLOURESENCE LAMP 11W 220VAC

B -S3504 DOOR SWITCH LEVER FLANGE 15A 250VAC

-S3505 DOOR SWITCH LEVER FLANGE 15A 250VAC

-S3506 THERMOSTAT 0-60 DEGREE CELCIUS

CC

DD

EE

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. B06
PWT SCALE NTS
DSGN BY: PCS ENG BA MATERIAL LIST OF MARSHALLING KIOSK F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI

12 456 78


1 2 3 45 6 7 8

BAY LINE EXISTING SINGLE LINE DIAGRAM GI.PADANG SAMBIAN BAY TRAFO 3 BAY CAPASITOR SPARE 1
KAPAL 2 B&D
A BAY LINE BAY LINE BAY LINE BAY TRAFO 2 BAY TRAFO 1 BAY KOPEL A & B A
PEMECUTAN KELOD KAPAL 1 PESANGGARAN UNINDO HYUNDAI

=SWTCHGEARD

-Q21 -Q22 -Q21 -Q22 -Q21 -Q22 -Q21 -Q22 -Q21 -Q22 -Q21 -Q22 -Q21 -Q22 -Q21 -Q22 -Q21 -Q21 -Q22 B
C
B P1 D

T5.1

DSGN BY: PCS ENGM M M M M M T5.2 M M M
2000/1A CL PX T5.3
-Q50 -Q50 -Q50 -Q50 -Q50 -Q50 -Q50 -Q50 -Q50

P1 P1 P1 P1 P1 P1 T5.4 P1 P1 P1

T5.1 T5.1 T5.1 T5.1 T5.1
C
T5.2 T5.2 T5.1 T5.5 M T5.1 T5.1 T5.1
T5.2 -Q50
T5.3 T5.3 T5.2 T5.2

T5.2 P2 T5.2 T5.2 T5.2

T5.3 T5.3 2000/5A CL PX

T5.3 2000/1A CL PX T5.4 T5.4 2000/1A CL PX T5.3 2000/1A CL PX T5.4 T5.4 T5.3 2000/5A CL PX T5.3 T5.3

T5.5 2000/1A CL X T5.5 T5.5 T5.5

T5.4 T5.4 T5.4 T5.4 2000/1A CL X T5.4
T5.6 2000/5A CL PX
T5.6

P2 P2 P2 P2 P2 P2 P2 P2 P2

D

=MK BUSPRO -X201

-X202 -X203 -X204 -X205 -X206 -X207.A -X207.B --X208 -X209 -X210

=PANEL BUSPRO -X207.A -X207.B -X209 -X210 E
E -X201 -X87B.9 -X87B.10
-X202 -X203 -X204 -X205 -X206 -X87B.7A -X87B.7B --X208
-X87B.1 -X87B.2 -X87B.3 -X87B.4 -X87B.5 -X87B.6 -X87B.8

3 X MICOM P746

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. B07
SCALE NTS
BA PWT SINGGLE LINE DIAGRAM F

0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 3 78
56


1 2 3 45 6 7 8

A SPARE 2 EXISTING SINGLE LINE DIAGRAM GI. PADANG SAMBIAN VT BUS A VT BUS B
=SWTCHGEARD
SPARE 3 SPARE 4 A

3xPT BUS A
150kV/ 3/100/ 3

-Q21 -Q21 -Q21 3xPT BUS B
150kV/ 3/100/ 3
B B

M M M

-Q50 -Q50 -Q50

P1 P1 P1

T5.1 T5.1 T5.1 C
C

T5.2 T5.2 T5.2

T5.3 T5.3 T5.3

T5.4 2000/1A CL X T5.4 2000/1A CL X T5.4 2000/1A CL X

P2 P2 P2 D
E
D

=MK BUSPRO -X101 -X103 =MK BUSPRO
-Q950 -Q951
-X211 -X212 -X213
3P4A 3P4A
E =PANEL BUSPRO -X211 -X212 -X213
-X102 -X104

-X102 -X104

-X87B.11 -X87B.12 -X87B.13

3 X MICOM P746

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. B08
SCALE NTS
DSGN BY: PCS ENG BA PWT SINGGLE LINE DIAGRAM F

0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 3 78
56


1 2 34 5 6 7 8
A =AC DSTRIBUTION A
R B
380/220V AC N C
D
-Q1.2 1
2
1P.16A

B -X30-X0300 -X30-X0300
=MK BUSPRO
12 34
C
-Q9511 1 3 -Q9511
2 4 OF /S12.C5
/B06.A8 OF

2P, 6A

1 1 1
>Ï‘
-S3505 Contact will open -S3504 Contact will open -S3506
if door closed if door closed c
2 /B06.B8
2

D

-H01 L 1

Receptacle L L

-H102 -H100 -E102

E LED LED /B06.A8 E

NN N 2

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. L01
PWT SCALE NTS
DSGN BY: PCS ENG BA LIGHTING AND HEATER MARSHALLING KIOSK BUSPRO F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


1 2 3 456 7 8
A
A B
=AC DSTRIBUTION C
380/220V AC D

-Q1.1 1
2
1P.16A

B 1 2
=BUSBAR PROTECTION
-X301 34
C
12

+S1.BP 1 3
2 4
-Q9513

/B03.A8

2P, 6A

-S3507 1 1
>Ï‘
Cif odnotoarcctlwosilel dope-nS3508
c
2 /B03.B8

D

-X101 L 1

E Receptacle L E

-H101 -E103

LED /B03.B8
N N2

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. L02
PWT SCALE NTS
DSGN BY: PCS ENG BA LIGHTING AND HEATER BUSBAR PROTECTION PANEL F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


1 23 4567 8
A A
B
-F87BB.A -F87BB.B -F87BB.C
IRIG B IRIG B C
IRIG B RJ45 RJ45 RJ45
B RX TX RX TX
RX TX RX TX RX TX RX TX

C

D D

ETHERNET SWITCH

BBF+ BBF- GND

POWER SUPPLY

110VDC

EE

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. L03
PWT SCALE NTS
DSGN BY: PCS ENG BA COMMUNICATION RELE + ETHERNET SWITCH F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


1 23 4567 8

A =DCDB PANEL 110V DC + A
B
11V DC 110V DC -

B 1 3 1 3 1 3
4 4 4
BUSBAR PROTECTION -DC.BP.1 2 -DC.BP.2 4 -DC.BP.3 6

2P, 20A 2 2P, 20A 2 2P, 20A 2

1 3 5

-X400 -X400 -X400 -X400 -X400 -X400

12 34 56 78 9 10 11 12

13

-Q9514 +S1 1 3 +S1 1 3

C 2P, 6A 2 4 -Q9515 -Q9516 C

2P, 6A 2 4 2P, 6A 2 4

-K9514 A1 -K9514 -K9515 A1 -K9515 -K9516 A1 -K9516
1st /S12.C2 1st /S12.C3 1st /S12.C3
110VDC 2nd 110VDC 2nd 110VDC 2nd
/B03.B1 A2 3rd /B03.B1 A2 3rd /B03.B1 A2 3rd

D SUPPLY + S1 + TRIP + D

/M10.A1 /N05.A1

SUPPLY - S1 - TRIP -
/M10.F1 /M02.E1 /N01.F1

-X411 -X411 -X412 -X412 -X413 -X413

12 34 12 34 12 34

E E
=MK BUSPRO

-X41-X4414 -X41-X4414

12 34

S1 +
/M02.A1

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. L04
PWT SCALE NTS
DSGN BY: PCS ENG BA 110V DC POWER SUPPLY DISTRIBUTION F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


1 23 4 56 7 8
A
=HV SWITCGEAR =MK BUSPRO =BUSBAR PROTECTION B
A BAY LINE C
BUS A -F87BB.A D
PEMECUTAN KELOD BUS B E
/Z06.B1
-Q21 -Q22
D24
-X87B.1 IA(1)

/Z01.E1 D23

B 1x3P -Q50.R -Q50.S -Q50.TCORE 3, 2000/1A CL PX 21 -F87BB.B
23
P1 3s1 -X201 -X201 25 /Z06.B4 IA(1)
-X201 27
3s3 -X201 1 -X201 1 22
-X201 2
P2 P1 3s1 2 3 D24 D23
3
24 -F87BB.C
3s3 -X201 /Z06.B7
P2 P1 3s1 -X201 IA(1)
4
5 26 D24 D23

3s3 -X201 -X201

P2 6 4 28

-X201
C7

-X201

8

BAY LINE BUS A
KAPAL 1 BUS B

-Q21 -Q22 -F87BB.A

-X87B.2 /Z06.B1 IA(2)

D /Z01.E3 D26 D25

1x3P -Q50.R -Q50.S -Q50.T 21 -F87BB.B
P1 3s1 23
CORE 5 2000/1A CL X -X202 -X202 25 /Z06.B4 IA(2)
-X202 27
3s3 -X202 1 -X202 1 22
-X202 2
P2 P1 3s1 2 -X202 3 D26 D25
-X202 3
3s3 -X202 4 24 -F87BB.C
4 /Z06.B7
P2 -X202 5 IA(2)
P1 3s1
-X202 6
3s3 26 D26 D25
-X202 7
E P2
8
28

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. D01
PWT SCALE NTS
DSGN BY: PCS ENG BA CURRENT CIRCUIT BUSBAR PROTECTION F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


1 23 4 56 78
A
=HV SWITCGEAR =MK BUSPRO =BUSBAR PROTECTION
A BAY LINE B
BUS A -F87BB.A
PESANGGARAN BUS B
/Z06.C1
-Q21 -Q22
D28
-X87B.3 IA(3)
-F87BB.B
/Z01.E6 D27
/Z06.C4
B 1x3P -Q50.R -Q50.S -Q50.T 21
23 D28
P1 3s1 25
CORE 4 2000/1A CL PX -X203 -X203 27 -F87BB.C IA(3)
1 -X203 1 22
3s2 P1 3s1 -X203 -X203 2 24 /Z06.C7 D27
-X203 2 3 26
P2 3 -X203 28 D28
-X203 4
3s2 P1 3s1 -X203 4 22 IA(3)
5 24
P2 3s2 -X203 26
6 28
P2 -X203 D27
7
C -X203 C
8

BAY LINE
KAPAL 2

BUS A

BUS B

-Q21 -Q22 -F87BB.A

D -X87B.4 /Z06.C1 IA(4) D

1x3P -Q50.R -Q50.S -Q50.T /Z01.E4 D18 D17
P1 3s1
-X204 -X204 21 -F87BB.B IA(4)
CORE 3 2000/1A CL PX 3s2 P1 3s1 1 -X204 1 23
-X204 -X204 2 25 /Z06.C4 D17
P2 -X204 2 3 27
3 -X204 D18 IA(4)
3s2 P1 3s1 -X204 4
-X204 4 -F87BB.C D17
P2 5
-X204 /Z06.C7
3s2 6
-X204 D18
E P2 7
-X204 E
8

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. D02
PWT SCALE NTS
DSGN BY: PCS ENG BA CURRENT CIRCUIT BUSBAR PROTECTION F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


1 23 456 78
A
=HV SWITCGEAR =MK BUSPRO =BUSBAR PROTECTION
A B
BUS A -F87BB.A
BAY TRAFO 2 BUS B
UNINDO /Z06.C1
-Q22
-Q21

-X87B.5 IA(5)

B /Z01.E5 D20 D19

1x3P -Q50.R -Q50.S -Q50.T -X205 -X205 21 -F87BB.B
P1 3s1 -X205 23 /Z06.C4
-X205 -X205 25 IA(5)
CORE 6 2000/5A CL PX -X205 1 1 27 22
3s2 -X205 2
P1 3s1 -X205 2 3 D20 D19
P2 -X205 3
4
3s2 -X205 4 24 -F87BB.C
5 /Z06.C7
P2 -X205 IA(5)
P1 3s1 6

3s2 7 26 D20 D19

P2 C

C

28

-X205

8

BAY TRAFO 1 BUS A
HYUNDAI BUS B

-Q21 -Q22 -X87B.6 -F87BB.A IA(6) D
D
/Z01.E8 /Z06.C1

21 D22 D21
23
1x3P -Q50.R -Q50.S -Q50.T 25 -F87BB.B
27
P1 -X206 -X206 /Z06.C4 IA(6)
-X206 -X206
3s1 -X206 -X206
-X206
CORE 3 2000/1A CL X 3s2 -X206 1 -X206 1 22
-X206 2 2
P2 -X206 3 3 D22 D21
4
P1 -X206 5 4
6
3s1 7

3s2 8 24 -F87BB.C
/Z06.C7
P2 IA(6)
P1 3s1

E 3s2 26 D22 D21 E

P2

28

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. D03
PWT SCALE NTS
DSGN BY: PCS ENG BA CURRENT CIRCUIT BUSBAR PROTECTION F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


12 3 4 567 8
=BUSBAR PROTECTION A
=HV SWITCGEAR =MK BUSPRO B
A C
D
BUSCOUPLER E

BUS A

-Q21 -F87BB.A

-X87B.7A /Z06.C1 IA(7)

/Z02.E1 D12 D11

B -X207.A -X207.A 21 -F87BB.B
-X207.A -X207.A 23
P1 4s1 -X207.A -X207.A 25 /Z06.C4
-X207.A 27
-X207.A 1 -X207.A 1 22 D12 IA(7)
-X207.A 2 2 24
CORE 3 2000/1A CL PX 4s2 P1 4s1 -X207.A 3 3 26 -F87BB.C D11
P2 4s2 4 28
-X207.A 5 4 /Z06.C7
P2 P1 4s1 6 22 IA(7)
4s2 7 24 D12
26 D11
P2 8 28

C

1x3P -Q50.R -Q50.S -Q50.T -X87B.7B -F87BB.A IA(8)

P1 3s1 -X207.B -X207.B /Z02.E3 /Z06.D1 D13
-X207.B -X207.B
3s2 -X207.B 1 -X207.B 1 21 D14 IA(8)
-X207.B 2 2 23
D P1 3s1 -X207.B 3 -X207.B 3 25 -F87BB.B D13
-X207.B 4 27
P2 -X207.B 5 4 /Z06.D4 IA(8)
6
3s2 P1 3s1 -X207.B 7 D14 D13

P2 8 -F87BB.C

3s2 /Z06.D7

P2 D14

E
-Q22

BUS B

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. D04
PWT SCALE NTS
DSGN BY: PCS ENG BA CURRENT CIRCUIT BUSBAR PROTECTION F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


1 23 4567 8

A =HV SWITCHGEAR =MK BUSPRO =BUSBAR PROTECTION A
B
BAY TRAFO 3 BUS A C
B & D' BUS B D
E
-Q21 -Q22 -F87BB.A

-X87B.8 /Z06.D1 IA(9)

/Z02.E4 D16

-F87BB.B D15

B 1x3P -Q50.R -Q50.S -Q50.T -X208 -X208 /Z06.D4 IA(9)
-X208
P1 3s1 -X208 -X208 D16
-X208
CORE 3 2000/5A CL X 3s2 P1 3s1 1 -X208 1 21 22 -F87BB.C D15
-X208 2 23 24
P2 -X208 2 3 25 26 /Z06.D7
3
3s2 P1 3s1 -X208 4 27 28 D16 IA(9)
4
P2 -X208 5

3s2 -X208 6 D15

P2 7

C 8

BAY CAPASITOR

BUS A
BUS B

-Q21 -Q22 -X87B.9 -F87BB.A IA(10)
D
/Z02.E5 /Z06.D1

F24 F23

1x3P -Q50.R -Q50.S -Q50.T -F87BB.B
P1 3s1
-X209 -X209 /Z06.D4 IA(10)
CORE 4 2000/1A CL X 1 -X209 1 21 22
3s2 P1 3s1 -X209 -X209 2 23 24 F24 F23
P2 -X209 2 3 25 26
3 -X209 -F87BB.C
3s2 P1 3s1 -X209 4 27 28 IA(10)
P2 -X209 4 /Z06.D7
5
E 3s2 -X209 F24 F23
6
P2 -X209
7
-X209
8

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. D05
PWT SCALE NTS
DSGN BY: PCS ENG BA CURRENT CIRCUIT BUSBAR PROTECTION F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


1 23 4 56 78
A
=HV SWITCGEAR =MK BUSPRO =BUSBAR PROTECTION
A B
BUS A -F87BB.A
SPARE 1 BUS B
/Z06.B3
-Q21 -Q22
F26
-X87B.10 IA(11)
-F87BB.B
/Z02.E6 F25
/Z06.B5
B 1x3P -Q50.R -Q50.S -Q50.T -X210 -X210 21 IA(11)
-X210 23 F26
P1 4s1 -X210 -X210 25
-X210 27 -F87BB.C
4s2 P1 4s1 1 -X210 1 22 F25
P2 -X210 2 24 /Z06.B8
-X210 2 3 26
4s2 P1 4s1 3 28 F26 IA(11)
P2 -X210 4
4 22
4s2 -X210 5 24 F25
P2 26
-X210 6 28
C C
7

8

SPARE 2

BUS A
BUS B

-Q21 -Q22 -X87B.11 -F87BB.A IA(12) D
D
/Z02.E8 /Z06.B3
F27
21 F28
1x3P -Q50.R -Q50.S -Q50.T 23
P1 4s1 25 -F87BB.B
-X211 -X211 27 IA(12)
1 -X211 1 /Z06.B5
4s2 P1 4s1 -X211 -X211 2 F27
-X211 2 3 F28
P2 3
-X211 -F87BB.C
4s2 P1 4s1 -X211 4 IA(12)
5 /Z06.B8
P2 -X211
6 F28
4s2 -X211 F27
7
E P2 -X211 E
8
-X211

4

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. D06
PWT SCALE NTS
DSGN BY: PCS ENG BA CURRENT CIRCUIT BUSBAR PROTECTION F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


12 34 567 8
=BUSBAR PROTECTION A
=HV SWITCGEAR =MK BUSPRO B
A -F87BB.A C
BUS A D
SPARE 3 BUS B /Z06.C3 E

-Q21 -Q22 F18

-X87B.12 IA(13)

B /Z03.E1 F17

1x3P -Q50.R -Q50.S -Q50.T -X212 -X212 21 -F87BB.B
-X212 23 /Z06.C5
P1 4s1 -X212 -X212 25 IA(13)
-X212 27
4s2 1 -X212 1 22
P2 -X212 2
P1 4s1 -X212 2 3 F18 F17
3
4s2 -X212 4 24 -F87BB.C
P2 4 /Z06.C8
-X212 5 IA(13)
P1 4s1
-X212 6
4s2 26 F18 F17
P2 7

C 8

28

SPARE 4 BUS A -F87BB.A
BUS B
-Q21 /Z06.C3
D -Q22
F20
-X87B.13 IA(14)

/Z03.E3 F19

1x3P -Q50.R -Q50.S -Q50.T 21 -F87BB.B
23
P1 4s1 -X213 -X213 25 /Z06.C5 IA(14)
-X213 27
4s2 -X213 1 -X213 1 22
P2 -X213 2
P1 4s1 2 -X213 3 F20 F19
-X213 3
4s2 -X213 4 24 -F87BB.C
P2 4 /Z06.C8
-X213 5 IA(14)
P1 4s1
-X213 6
E 4s2 26 F20 F19
-X213 7
P2
8
28

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. D07
PWT SCALE NTS
DSGN BY: PCS ENG BA CURRENT CIRCUIT BUSBAR PROTECTION F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


1 23 456 78

A =MK BUSPRO =BUSBAR PROTEKSI

VOLTAGE CIRCUIT -Q951 -X102 -X102 -F87BB.A A
BUS A OF /S12.C4 B
OF /Z06.E1 C
1a D
1 1 D2 E
-T51R
-X101 -Q951 VT
1n
1a 1 3P, 6A D1

B 12 -F87BB.A

-T51S -X101 -X102 -X102 /Z06.B1

1n 2 34 2 2 D4
1a
VT
-T51T
-X101 D3
1n -X101
3 56 -F87BB.A
C 4 /B06.A8
/Z06.B1
VOLTAGE CIRCUIT -X102 3 -X102 3
BUS B -X102 4 -X102 4 F2

1a VT

D -T51R F1
1n
1a -Q952 -X104 -X104 -F87BB.B
-T51S OF /S12.C4
1n OF 1 1 /Z06.B3
1a
-T51T -Q952 D2
1n
-X103 3P, 6A VT
E
1 12 D1

-X103 34 -X104 -X104 -F87BB.B

2 56 2 2 /Z06.B3
/B06.A8
D4

VT

-X103 D3
-X103
3 -F87BB.B
4 -X104 -X104
-X104 -X104 /Z06.B3
3 3
4 4 F2

VT

F1

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. M01
PWT SCALE NTS
DSGN BY: PCS ENG BA VOLTAGE CIRCUIT FOR BUSPRO BUS.A AND BUS.B F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


1 23 4 567 8

=MK BUSPRO BAY LINE PEMECUTAN KELOD BAY LINE KAPAL 1

A S1 + DS.A -Q21 STATUS DS.B -Q22 STATUS DS.A -Q21 STATUS DS.B -Q22 STATUS

/L04.F5 CLOSE/OPEN CLOSE/OPEN CLOSE/OPEN CLOSE/OPEN

B S1 + A
/M03.A1

-X501 1 -X501 4 -X502 1 -X502 4

1 4 1 4

DS,A -Q21 DS,B -Q22 DS,A -Q21 DS,B -Q22

B

C -X501 2-X501 3 -X501 5-X501 6 -X502 -2X502 3 -X502 -5X502 6 C
=BUSBAR PROTECTION
23 56 23 56

-X501 1-X501 2 -X501 3-X501 4 -X502 1-X502 2 -X502 -3X502 4

12 34 12 34

D D

-K2101 1 5 -K2201 1 5 -K2102 1 5 -K2202 1 5

/B04.A1 /B05.A1 /B04.A1 RES /B05.A1 RES

SET RES SET RES SET SET

10 6 10 6 10 6 10 6

S1 - S1 -
/L04.D5 /M03.E1

E E

-K2101 -K2201 -K2102 -K2202
1st /S01.B1 1st /S01.B3 1st /S01.B5 1st /S01.B6
2nd /S01.B2 2nd /S01.B3 2nd /S01.B5 2nd /S01.B7
3rd /S01.B2 3rd /S01.B3 3rd /S01.B6 3rd /S01.B7
4th 4th 4th 4th

OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. M02
PWT SCALE NTS
DSGN BY: PCS ENG BA DIGITAL INPUT STATUS OF DS,A AND DS,B F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


1 23 4 5 6 7 8
BAY LINE KAPAL 2
A =MK BUSPRO BAY LINE PESANGGARAN DS.B -Q22 STATUS S1 +
DS.A -Q21 STATUS CLOSE/OPEN /M04.A1
S1 + DS.A -Q21 STATUS DS.B -Q22 STATUS CLOSE/OPEN
/M02.A8
CLOSE/OPEN CLOSE/OPEN
B
A

-X503 1 -X503 4 -X504 1 -X504 4

1 4 1 4

DS,A -Q21 DS,B -Q22 DS,A -Q21 DS,B -Q22

B

C -X503 -2X503 3 -X503 -5X503 6 -X504 -2X504 3 -X504 -5X504 6 C

=BUSBAR PROTECTION 23 56 23 56

-X503 1-X503 2 -X503 -3X503 4 -X504 1-X504 2 -X504 3-X504 4

12 34 12 34

D D

-K2103 1 5 -K2203 1 5 -K2104 1 5 -K2204 1 5

/B04.A1 /B05.A1 /B04.B1 RES /B05.B1 RES

SET RES SET RES SET SET

10 6 10 6 10 6 10 6

S1 - S1 -
/M02.E8 /M04.E1

E -K2103 -K2203 -K2104 -K2204 E
1st /S02.B2 1st /S02.B3 1st /S02.B5 1st /S02.B6
2nd /S02.B2 2nd /S02.B3 2nd /S02.B5 2nd /S02.B6
3rd /S02.B2 3rd /S02.B3 3rd /S02.B5 3rd /S02.B7
4th 4th 4th 4th

OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. M03
PWT SCALE NTS
DSGN BY: PCS ENG BA DIGITAL INPUT STATUS OF CB, DS,A AND DS,B F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


1 2 3 4 567 8

A =MK BUSPRO DS.A -Q21 STATUS BAY TRAFO 2 UNINDO DS.B -Q22 STATUS BAY TRAFO 1 HYUNDAI S1 +
CLOSE/OPEN CLOSE/OPEN /M05.A1
S1 + DS.A -Q21 STATUS DS.B -Q22 STATUS
/M03.A8
CLOSE/OPEN CLOSE/OPEN
B
A

-X505 1 -X505 4 -X506 1 -X506 4

1 4 1 4

DS,A -Q21 DS,B -Q22 DS,A -Q21 DS,B -Q22

B

C -X505 -2X505 3 -X505 5-X505 6 -X506 -2X506 3 -X506 5-X506 6 C

=BUSBAR PROTECTION 23 56 23 56

-X505 1-X505 2 -X505 -3X505 4 -X506 1-X506 2 -X506 3-X506 4

12 34 12 34

D D

-K2105 1 5 -K2205 1 5 -K2106 1 5 -K2206 1 5

/B04.B1 /B05.B1 /B04.B1 RES /B05.B1 RES

SET RES SET RES SET SET

10 6 10 6 10 6 10 6

S1 - S1 -
/M03.E8 /M05.E1

E E

-K2105 -K2205 -K2106 -K2206
1st /S03.B1 1st /S03.B3 1st /S03.B5 1st /S03.B6
2nd /S03.B2 2nd /S03.B3 2nd /S03.B5 2nd /S03.B6
3rd /S03.B2 3rd /S03.B3 3rd /S03.B5 3rd /S03.B7
4th 4th 4th 4th

OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. M04
PWT SCALE NTS
DSGN BY: PCS ENG BA DIGITAL INPUT STATUS OF DS,A AND DS,B F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


1 2 3 4 567 8
CB -Q52 STATUS
=MK BUSPRO BUSCOUPLER BAY TRAFO B & D S1 +
CLOSE/OPEN /M06.A1
S1 + DS.A -Q21 STATUS DS.B -Q22 STATUS DS.A -Q21 STATUS DS.B -Q22 STATUS
-X507 1
A /M04.A8 CLOSE/OPEN CLOSE/OPEN CLOSE/OPEN CLOSE/OPEN
1
-X507 4 -X508 1 -X508 4 A
CB Q52
4 -X507 7 1 4

DS,B -Q22 7 DS,B -Q22 DS,A -Q21 DS,B -Q22

B B

C -X507 -2X507 3 -X507 5-X507 6 -X507 -8X507 9 -X508 -2X508 3 -X508 5-X508 6 C
=BUSBAR PROTECTION
23 56 89 23 56

-X507 1-X507 2 -X507 -3X507 4 -X507 -5X507 6 -X508 1-X508 2 -X508 3-X508 4

12 34 56 12 34

D -K5207 -K2107 -K2207 -K2108 -K2208 D

/B04.C1 1 5 /B04.B1 1 5 /B05.B1 1 5 /B04.B1 1 5 /B05.B1 1 5

SET RES SET RES SET RES SET RES SET RES

10 6

10 6 10 6 10 6 10 6

S1 - S1 -
/M04.E8 /M06.E1

E E

-K5207 -K2107 -K2207 -K2108 -K2208
1st /S04.B1 1st /S04.B3 1st /S04.B4 1st /S04.B6 1st /S04.B7
2nd /S04.B2 2nd /S04.B3 2nd /S04.B4 2nd /S04.B6 2nd /S04.B7
3rd /S04.B2 3rd /S04.B3 3rd /S04.B5 3rd /S04.B6 3rd /S04.B8
4th 4th 4th 4th 4th

OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. M05
PWT SCALE NTS
DSGN BY: PCS ENG BA DIGITAL INPUT STATUS OF DS,A AND DS,B F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78
56


1 2 3 4 567 8
BAY CAPASITOR
=MK BUSPRO DS.B -Q22 STATUS SPARE 1 S1 +
DS.A -Q21 STATUS CLOSE/OPEN /M07.A1
A S1 + CLOSE/OPEN DS.A -Q21 STATUS DS.B -Q22 STATUS

/M05.A8 CLOSE/OPEN CLOSE/OPEN

B A

-X509 1 -X509 4 -X510 1 -X510 4

1 4 1 4

DS,A -Q21 DS,B -Q22 DS,A -Q21 DS,B -Q22

B

C -X509 -2X509 3 -X509 -5X509 6 -X510 -2X510 3 -X510 5-X510 6 C
D
=BUSBAR PROTECTION 23 56 23 56

D -X509 1-X509 2 -X509 3-X509 4 -X510 1-X510 2 -X510 -3X510 4

12 34 12 34

-K2109 1 5 -K2209 1 5 -K2110 1 5 -K2210 1 5

/B04.B1 RES /B05.B1 RES /B04.B1 RES /B05.B1 RES

SET SET SET SET

10 6 10 6 10 6 10 6

S1 - S1 -
/M05.E8 /M07.E1

E E

-K2109 -K2209 -K2110 -K2210
1st /S05.B2 1st /S05.B3 1st /S05.B5 1st /S05.B6
2nd /S05.B2 2nd /S05.B3 2nd /S05.B5 2nd /S05.B7
3rd /S05.B2 3rd /S05.B4 3rd /S05.B6 3rd /S05.B7
4th 4th 4th 4th

OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP OMRON MM4XKP

REV DESCRIPTION DATE DRAWN CHECKED APPROVED DWG. TITLE JOB. NO. XX SHEET NO. M06
PWT SCALE NTS
DSGN BY: PCS ENG BA DIGITAL INPUT STATUS OF DS,A AND DS,B F
3
0 ISSUED FOR APPROVAL 23.02.2022 GTT PT. BISETTA CUSTOMER PT. PLN ( Persero ) UIT JBM UPT BALI

4 PROJECT DRAWING NO.

PEMASANGAN BUSPRO PADA GI 150kV PESANGGARAN (AIS),GI 150kV NUSA DUA, 004/BSE/040122/BP/PDNGSMBN
GI. 150kV PADANG SAMBIAN, DAN GI 150kV ANTOSARI
12 78