TR Bay Trafo#1-GI KIS

TR Bay Trafo#1-GI KIS

ID HitachiABB Frame A3 - Version 01 12 3 45 67 8

© Copyright 2020 Hitachi Power Grids. 20kV MV CB TRIP1 20kV MV CB TRIP1 SPARE SPARE QA2 Open CMD QA2 Close CMD 20kV MV CB TRIP2 20kV MV CB TRIP2 SPARE SPARE A

A C C

+C1 5 9
7SR22 7SR22
20KV MERGING UNIT MK
7 11
B
B

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s -XFN4 7 -XFN4 11

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 6 8

C -X100 6 -X100 8 -X100 10 -X100 13 -X110 16 15 -X110 19 18 +U.02 -KF2 -X100 6 -X100 8 -X100 10 -X100 13 C
D
+U.01 -KF1 P1#P01 P1#P02 P1#S01 P1#S02 MU P1#P02 P1#S01 P1#S02
/32.C3 /32.C3 /32.C3 /32.D3 REF615 /34.C3 /34.C3 /34.D3
MU 14 14
REF615 7 9 12 11 9 12 11

P2#SO.01 P2#SO.02 P1#P01
24-250VDC 24-250VDC /34.C3

/33.B4 /33.B4 7

14 17

D -XKF1 25 46 26 42 27 47 28 29 30 31 33 34 35 36 -XKF2 25 26 43 27 48 28 29 30 31

24 41 24

>=E05 +C1

TRAFO-1
MK
-XKF2 -XKF2
-XQ51
2 8
+DCF103 118 20kV MV CB TRIP2
MV_DC+
-XKF2
-XQ51
7
20kV MV CB TRIP1 119
MV_CB_open_CMD

-XQ51

117
MV_DC+

-XQ51

120
MV_CB_close_CMD
REF DWG:JBTB1.056-KIS-EM-E-004 SH Y51 REF DWG:JBTB1.056-KIS-EM-E-004 SH M31 REF DWG:JBTB1.056-KIS-EM-E-004 SH Y51

E >=J12 +S1 E

TRAFO 1 -X3 -X3
20KV SWITCHGEAR
27 31
+DC +DCF101

-X3 -X3

29 33
20kV MV CB TRIP2 BPU TRIP

F Based on REF DWG: (3)G77541-K1585-L012-C MR Title MARSHALING KIOSK TR-1 Doc. kind. Circuit diagram Ref.Des. =J00 F
A AS MANUFACTURED SH:M2 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 DCC EFS en
22-09-2021 Prepared 22-09-2021 BPU TRIPPING OUTPUT 29
Rev. Revision note KD Approved 23-09-2021 Resp. dept. PGGA Rev. ind. B Language 30
Date MR Project PT. PLN PERSERO HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-007 n. sheet
2 DSS 150KV KIS 56
Name ACP20051 7 8

34

ID HitachiABB Frame A3 - Version 01 12 3 4 56 7 8
A
© Copyright 2020 Hitachi Power Grids. A B

>=E05 +CP1 C

CONTROL AND PROTECTION PANEL D
TRAFO-1

TO TRAFO CRP ODF REF DWG JBTB1.056-KIS-EM-E-004 SH Y73 TO TRAFO CRP ODF

B -X -X

>=E05 +C1 TJ1-FO-20 TJ1-FO-21
FO FO
MARSHALING KIOSK
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s TRAFO-1

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. TO TRAFO MK ODF REF DWG JBTB1.056-KIS-EM-E-004 SH Y75 TO TRAFO MK ODF

C -X -X

+C1 TJ1-FO-18 TJ1-FO-19
FO FO
20KV MERGING UNIT MK
-FO1 -FO2
+U.03 -TJ1
ST 1 ST 2
D ODF

-FO1 -FO2

1 ST 2 ST

E +U.01 -KF1 +U.02 -KF2 E

MU Rx Tx -X1 Rx Tx -X3 MU Rx Tx -X1 Rx Tx -X3
REF615
REF615 LC LC /34.B6 LC LC /34.B6
#LAN1 #LAN3
LC LC /32.B6 LC LC /32.B6

#LAN1 #LAN3

F Based on Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Circuit diagram Ref.Des. =J00 F
A AS MANUFACTURED KD Approved 23-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN PERSERO DCC EFS en
22-09-2021 COMMUNICATION INTERFACE 30
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 31
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-007 n. sheet
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8
A
© Copyright 2020 Hitachi Power Grids. A B

+C1 -X110 22 21 -X110 23 C

20KV MERGING UNIT MK SPARE SPARE D
P2#SO.04 E
+U.01 -KF1 P2#SO.03 24-250VDC
24-250VDC
MU /33.C4
REF615 /33.C4
24
B 20

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s 37 38 39 40

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. C

+U.02 -KF2 -X110 16 15 -X110 19 18 -X110 22 21 -X110 23

MU SPARE SPARE SPARE SPARE
REF615 P2#SO.04
P2#SO.01 P2#SO.02 P2#SO.03 24-250VDC
D 24-250VDC 24-250VDC 24-250VDC
/35.C4
E /35.B4 /35.B4 /35.C4 24

14 17 20 39 40

-XKF2 34 35 36 37 38

33

F Based on Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Circuit diagram Ref.Des. =J00 F
A AS MANUFACTURED KD Approved 23-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN PERSERO DCC EFS en
22-09-2021 BPU/SMU BINARY OUTPUT SPARE 31
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 32
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-007 n. sheet
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 1 2 34 56 7 8
A
© Copyright 2020 Hitachi Power Grids. A POWER SUPPLY MODULE Communication interface module REx615
PSM02B COM0037 REF615 HBFEAEAGNHA1BNA11G
+C1.U.01 -KF1 48-250VDC, 100-240VAC, 50/60Hz RJ45, 2xLC
B
20KV MERGING UNIT MK 16 #LAN1 -X1
17 C
POWER SUPPLY MODULE 15 #LAN2 LC Tx
PSM02B 18 D
48-250VDC, 100-240VAC, 50/60Hz 19 #LAN3 /30.E2
LC Rx
-X100 21
22 -X2
1+ 20
23 RJ45 LAN2
2 - 24
/23.C2 -X3

100-240VAC, 50/60HZ LC Tx

B PE 48-250VDC /30.E3
LC Rx
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s #IRF -X100 SPARE
20kV MV CB TRIP1 P1#P03 TCS
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. P1#P01 3 P1#P03 TCS

C 20kV MV CB TRIP1 4 SPARE
/27.D2 P1#P04
P1#P02 P1#P04
5
SPARE
P1#S01 6
SPARE /29.D2
P1#S02
7
D
8
/29.D2

9

10

11
/29.C3

12

13
/29.D4

14

EE

F Based on Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Circuit diagram Ref.Des. =J00 F
A AS MANUFACTURED KD Approved 23-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN PERSERO DCC EFS en
22-09-2021 DEVICE OVERVIEW - KF1 32
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 33
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-007 n. sheet
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8

© Copyright 2020 Hitachi Power Grids. A BINARY INPUT/OUTPUT MODULE ANALOGUE INPUT MODULE ANALOGUE INPUT MODULE -X130 A
BIOB03A AIMB01A AIMB06A B
+C1.U.01 -KF1 24-250VDC 24-250VDC, 1/5A 24-250VDC, 60-210VAC +1 C
/26.E5 D
20KV MERGING UNIT MK
-2
BINARY INPUT/OUTPUT MODULE +3
BIOB03A
24-250VDC /26.E5
-4
MU -KF2 IED FAIL -X110 -X110 LOCAL -X120 SPARE +5

P2#BI.01 24-250VDC +1 QA2 Open CMD 14 P3#BI.01 24-250VDC +1 P3#BI.01 24-250VDC /26.E6
/25.E2 /26.E2 -6
B -KF1 IN TEST P2#SO.01 24-250VDC 16 REMOTE SPARE +7
-2 /29.D4 -2
P2#BI.02 24-250VDC P3#BI.02 24-250VDC P3#BI.01 24-250VDC /26.E7
+3 15 +3 -8
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s MU DC2 FAIL /25.E3 QA2 Close CMD TCS OK /26.E2 SPARE
17 9
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. P2#BI.03 24-250VDC -4 P2#SO.02 24-250VDC P3#BI.03 24-250VDC - P3#BI.01 24-250VDC 10
19 11
20kV CB OPEN +5 /29.D5 AC DC MCB OFF +4 SPARE
/25.E4 /26.E3 /24.E4
P2#BI.04 24-250VDC SPARE 18 P3#BI.04 24-250VDC P3#BI.01 24-250VDC 12
- P2#SO.03 - 13
C 20kV CB CLOSE SPARE 24-250VDC 20 CURRENT IL1
+7 P2#SO.04 24-250VDC +5 /24.E4
P2#BI.05 24-250VDC /25.E5 22 P3#CH.01 CT: 1/5A /26.E4 P3#CH.01 60-210VAC 14
/31.B4 15
20kV ES OPEN -6 CURRENT IL2 -6 VOLTAGE UL1
21 /24.E5
+8 7 16
/25.E5 23 /24.E1 17
/31.B5
- 8 /24.E5
24 18
+ 10 9
P2#BI.06 24-250VDC /25.E6 P3#CH.02 CT: 1/5A /24.E2 P3#CH.02 60-210VAC

20kV ES CLOSE -9 CURRENT IL3 10 VOLTAGE UL2

24-250VDC + 11 P3#CH.03 CT: 1/5A 11 P3#CH.03 60-210VAC
/25.E7 /24.E2
20kV CB RACK IN CURRENT IN MV VOLTAGE UL3
- 12
D P3#CH.04 CT: 1/5A P3#CH.04 60-210VAC
+ 13 13
24-250VDC /25.E7 /24.E2

- 12 14

VOLTAGE UN

P3#CH.05 60-210VAC

EE

F Based on Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Circuit diagram Ref.Des. =J00 F
A AS MANUFACTURED KD Approved 23-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN PERSERO DCC EFS en
22-09-2021 DEVICE OVERVIEW - KF1 33
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 34
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-007 n. sheet
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 1 2 34 56 7 8
A
© Copyright 2020 Hitachi Power Grids. A POWER SUPPLY MODULE Communication interface module REx615
PSM02B COM0037 REF615 HBFEAEAGNHA1BNA11G
+C1.U.02 -KF2 48-250VDC, 100-240VAC, 50/60Hz RJ45, 2xLC
B
20KV MERGING UNIT MK 16 #LAN1 -X1
17 C
POWER SUPPLY MODULE 15 #LAN2 LC Tx
PSM02B 18 D
48-250VDC, 100-240VAC, 50/60Hz 19 #LAN3 /30.E6
LC Rx
-X100 21
22 -X2
1+ 20
23 RJ45 LAN2
2 - 24
/23.C3 -X3

100-240VAC, 50/60HZ LC Tx

B PE 48-250VDC /30.E7
LC Rx
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s #IRF -X100 SPARE
20kV MV CB TRIP2 P1#P03 TCS
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. P1#P01 3 P1#P03 TCS

C 20kV MV CB TRIP2 4 SPARE
/25.D2 P1#P04
P1#P02 P1#P04
5
SPARE
P1#S01 6
SPARE /29.D6
P1#S02
7
D
8
/29.D7

9

10

11
/29.C7

12

13
/29.D8

14

EE

F Based on Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Circuit diagram Ref.Des. =J00 F
A AS MANUFACTURED KD Approved 23-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN PERSERO DCC EFS en
22-09-2021 DEVICE OVERVIEW - KF2 34
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 35
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-007 n. sheet
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8

© Copyright 2020 Hitachi Power Grids. A BINARY INPUT/OUTPUT MODULE ANALOGUE INPUT MODULE ANALOGUE INPUT MODULE -X130 A
BIOB03A AIMB01A AIMB06A B
+C1.U.02 -KF2 24-250VDC 24-250VDC, 1/5A 24-250VDC, 60-210VAC +1 C
/28.E5 D
20KV MERGING UNIT MK
-2
BINARY INPUT/OUTPUT MODULE +3
BIOB03A
24-250VDC /28.E5
-4
MU -KF1 IED FAIL -X110 -X110 SPARE -X120 SPARE +5

P2#BI.01 24-250VDC +1 SPARE 14 P3#BI.01 24-250VDC +1 P3#BI.01 24-250VDC /28.E6
/27.E2 P2#SO.01 /28.E2 -6
B -KF2 IN TEST 24-250VDC 16 SPARE SPARE +7
-2 /31.D2 -2
P2#BI.02 24-250VDC P3#BI.02 24-250VDC P3#BI.01 24-250VDC /28.E7
+3 15 +3 -8
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s MU DC1 FAIL /27.E3 SPARE SPARE /28.E2 SPARE
P2#SO.02 17 9
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. P2#BI.03 24-250VDC -4 24-250VDC P3#BI.03 24-250VDC - P3#BI.01 24-250VDC 10
19 11
AC MCB FAIL +5 /31.D3 SPARE +4 SPARE
/27.E4 /28.E3 /24.E7
P2#BI.04 24-250VDC SPARE 18 P3#BI.04 24-250VDC P3#BI.01 24-250VDC 12
- P2#SO.03 - 13
C SPARE SPARE 24-250VDC 20 CURRENT IL1
+7 P2#SO.04 24-250VDC +5 /24.E8
P2#BI.05 24-250VDC /27.E5 22 P3#CH.01 CT: 1/5A /28.E4 P3#CH.01 60-210VAC 14
/31.D4 15
SPARE -6 CURRENT IL2 -6 VOLTAGE UL1
21 /24.E8
+8 7 16
/27.E5 23 /24.E6 17
/31.D5
- 8 /24.E8
24 18
+ 10 9
P2#BI.06 24-250VDC /27.E6 P3#CH.02 CT: 1/5A /24.E6 P3#CH.02 60-210VAC

SPARE -9 CURRENT IL3 10 VOLTAGE UL2

24-250VDC + 11 P3#CH.03 CT: 1/5A 11 P3#CH.03 60-210VAC
/27.E7 /24.E6
SPARE CURRENT IN MV VOLTAGE UL3
- 12
D P3#CH.04 CT: 1/5A P3#CH.04 60-210VAC
+ 13 13
24-250VDC /27.E7 /24.E7

- 12 14

VOLTAGE UN

P3#CH.05 60-210VAC

EE

F Based on Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Circuit diagram Ref.Des. =J00 F
A AS MANUFACTURED KD Approved 23-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN PERSERO DCC EFS en
22-09-2021 DEVICE OVERVIEW - KF2 35
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 36
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-007 n. sheet
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 1 2 34 5 6 7 8
A
© Copyright 2020 Hitachi Power Grids. A B

+C1 C

20KV MERGING UNIT MK D

-XT1 -XT2 CONTACT 1-2 A FIRST OPEN (TRIP AND SIGNAL CIRCUITS, PROTECTION POWER SUPPLY CIRCUITS) 1
CONTACT 3-4 A 2
TEST TEST CONTACT 5-6 A SECOND OPEN (VOLTAGE CIRCUITS) A*
CONTACT 7-8 B B*
NORMAL NORMAL CONTACT 9-10 1 CURRENT CIRCUITS WITH AUTOMATIC SHORT CIRCUIT ON CT SIDE
1 CONTACT 11-12 1 CURRENT CIRCUITS WITH AUTOMATIC SHORT CIRCUIT ON CT SIDE.
12 /24.D1 2 /24.D6 CONTACT 13-14 1 INDICATING THE LAST SHORT CIRCUIT OF THE CT GROUP.
/24.D6 CONTACT 15-16 1
B 34 34 /24.D6 CONTACT 17-18 1
/24.D2 /24.D7 CONTACT 19-20 1
56 56 /24.D7 CONTACT 21-22 1
/24.D2 /24.D8 CONTACT 23-24 1
78 78 /24.D8 CONTACT 25-26 1
/24.D2 /24.D8 CONTACT 27-28 1
9 10 9 10 /27.D3
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s /24.D4
11 12 11 12
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. /24.D4
13 14 13 14
/24.D5
15 16 15 16
/24.D5
17 18 17 18
/25.D3
19 20 19 20

21 22 21 22

23 24 23 24 MOUNTING TYPE : HORIZONTAL H
MOUNTING TYPE : VERTICAL V
25 26 25 26 MOUNTING TYPE V

27 28 27 28

C -KF1 TEST SWITCH -KF2 TEST SWITCH
TSB-14-AAAB1111111111-V
TSB-14-AAAB1111111111-V

D

EE

F Based on Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Circuit diagram Ref.Des. =J00 F
A AS MANUFACTURED KD Approved 23-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN PERSERO DCC EFS
22-09-2021 DEVICE OVERVIEW
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 36
1 Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1001
2 34 56
7 8

ID HitachiABB Report frame A3 - Version 01 1 2 3 4 5 6 78
Technical data Remark Article number Manufacturer Manufacturer number Qty. Pages
© Copyright 2020 Hitachi Power Grids. Pos. Location Device Device Type designation
A designation description 125VAC, 25W Legrand 60419 with bulb 25W 1KHF404851R0125 Legrand 924018319 1 12,21 A
E27 125A 0.75-35mm², max 1 wire, metallic 1KHJ400000P0001 B
1 -E91 Lamp 1NO, 1NC Phoenix Contact 0702997 5 12,21 C
2 -PE AZK35 120-240VAC/DC, 4.5A 100W 1SNK506010R0000 D
3 -S91 Terminal (PE) 1000V, 41A 0.2-6mm², max 4 wires, grey GZN 590043P0007 Highly D5000 1 12,21 E
4 +A.10 -E93 D5000 1000V, 41A 1SNK505910R0000
5 +A.10 -XDC1 Door auxiliary contact 1000V, 32A 0.2-6mm², max 4 wires, grey STEGO 14007.0-00 1 12,21
HG 140 1000V, 32A 1SNK506010R0000
B +A.10 -XDC2 Heating 400V, 57A 0.2-4mm², max 4 wires, grey GZN 590043P0007 ABB Entrelec 1SNK506010R0000 4 12,22
ZS 6 1SNK505910R0000 Phoenix Contact 1201442 2 12,22
6 Feed-through terminal E/UK 400V, 57A 0.2-4mm², max 4 wires, grey ABB Entrelec 1SNK505910R0000 1 12,22
End bracket ES 4 1SNK505010R0000
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s 7 +A.10 -XDCF101 Cover 400V, 57A 0.5-6mm², max 2 wires, grey GZN 590043P0007 ABB Entrelec 1SNK506010R0000 4 12,22
ZS 6 1SNK505910R0000 Phoenix Contact 1201442 2 12,22
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 8 +A.10 -XDCF201 Feed-through terminal E/UK 400V, 57A BK ABB Entrelec 1SNK505910R0000 1 12,22
End bracket ES 4 BU 1SNK505010R0000
C9 +B.10 -BI21.X1 Cover RD GZN 590043P0007 ABB Entrelec 1SNK505010R0000 6 12,22
ZS 4 YE 1SNK505910R0000 Phoenix Contact 1201442 1 12,22
10 +B.10 -BI21.X2 Feed-through terminal E/UK 4 pole, right side mounting ABB Entrelec 1SNK505910R0000 1 12,22
End bracket ES 4 0.5-6mm², max 2 wires, grey 1MRB380012P0012
D Cover NBT 402963P0207 ABB Entrelec 1SNK505010R0000 6 12,22
ZS 4 BK GZN 590043P0007 Phoenix Contact 1201442 2 12,22
11 +B.10 -BI21.X11 Feed-through terminal E/UK BU 1KHF404745P0008 ABB Entrelec 1SNK505910R0000 1 12,22
End bracket ES 4 RD 1KHF404745P0003
E +B.10 -BI21.X12 Cover YE 1KHF404745P0002 Phoenix Contact 0311087 4 12,24
URTK/S 4 pole, right side mounting 1KHF404745P0004 Phoenix Contact 0310020 1 12,24
12 Transducer terminal D-URTK 0.5-6mm², max 2 wires, grey NBT 300270P0051 Phoenix Contact 1201442 1 12,24
Cover E/UK Phoenix Contact 0311388 1 24
End bracket PSBJ3.5/18/6 BK BK 1MRB380012P0012 Phoenix Contact 0311333 1 24
Test socket strip PSBJ3.5/18/6 BU BU NBT 402963P0207 Phoenix Contact 0311320 1 24
Test socket strip PSBJ3.5/18/6 RD RD GZN 590043P0007 Phoenix Contact 0311346 1 24
Test socket strip PSBJ3.5/18/6 YE YE 1KHF404745P0008 Phoenix Contact 0311265 1 24
Test socket strip SB 4-RTK/S 4 pole, right side mounting 1KHF404745P0003
Bracket switch bar 0.5-6mm², max 2 wires, grey 1KHF404745P0002 Phoenix Contact 0311087 4 12,24
URTK/S 1KHF404745P0004 Phoenix Contact 0310020 1 12,24
Transducer terminal D-URTK BK NBT 300270P0051 Phoenix Contact 1201442 1 12,24
Cover E/UK BU Phoenix Contact 0311388 1 24
End bracket PSBJ3.5/18/6 BK RD 1MRB380012P0012 Phoenix Contact 0311333 1 24
Test socket strip PSBJ3.5/18/6 BU YE NBT 402963P0207 Phoenix Contact 0311320 1 24
Test socket strip PSBJ3.5/18/6 RD 4 pole, right side mounting GZN 590043P0007 Phoenix Contact 0311346 1 24
Test socket strip PSBJ3.5/18/6 YE 1KHF404745P0008 Phoenix Contact 0311265 1 24
Test socket strip SB 4-RTK/S 1KHF404745P0003
Bracket switch bar 1KHF404745P0002 Phoenix Contact 0311087 4 12,24
URTK/S 1KHF404745P0004 Phoenix Contact 0310020 1 12,24
Transducer terminal D-URTK NBT 300270P0051 Phoenix Contact 1201442 1 12,24
Cover E/UK Phoenix Contact 0311388 1 24
End bracket PSBJ3.5/18/6 BK 1MRB380012P0012 Phoenix Contact 0311333 1 24
Test socket strip PSBJ3.5/18/6 BU NBT 402963P0207 Phoenix Contact 0311320 1 24
Test socket strip PSBJ3.5/18/6 RD GZN 590043P0007 Phoenix Contact 0311346 1 24
Test socket strip PSBJ3.5/18/6 YE 1KHF404745P0008 Phoenix Contact 0311265 1 24
Test socket strip SB 4-RTK/S 1KHF404745P0003
Bracket switch bar 1KHF404745P0002 Phoenix Contact 0311087 4 12,24
URTK/S 1KHF404745P0004 Phoenix Contact 0310020 1 12,24
Transducer terminal D-URTK NBT 300270P0051 Phoenix Contact 1201442 2 12,24
Cover E/UK Phoenix Contact 0311388 1 24
End bracket PSBJ3.5/18/6 BK Phoenix Contact 0311333 1 24
Test socket strip PSBJ3.5/18/6 BU Phoenix Contact 0311320 1 24
Test socket strip PSBJ3.5/18/6 RD Phoenix Contact 0311346 1 24
Test socket strip PSBJ3.5/18/6 YE Phoenix Contact 0311265 1 24
Test socket strip SB 4-RTK/S
Bracket switch bar

F Based on Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Parts list Ref.Des. =J00 F
A AS MANUFACTURED KD Approved 23-09-2021 MA Parts list +C1
B AS BUILT 25-03-2021 MR Project PT. PLN PERSERO DCC EPB
22-09-2021 =J00+C1
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI 1001
1 Doc. no. JBTB.056-KIS-EM-E-007 Sheet 1002
2 34 56 n. sheet

78

ID HitachiABB Report frame A3 - Version 01 1 2 34 5 67 8

© Copyright 2020 Hitachi Power Grids. Pos. Location Device Device Type designation Technical data Remark Article number Manufacturer Manufacturer number Qty. Pages
A designation description
0.5-6mm², max 2 wires, grey A
13 +B.10 -BI21.X13 Transducer terminal URTK/S 400V, 57A 1MRB380012P0012 Phoenix Contact 0311087 4 12,24 B
Cover D-URTK BK NBT 402963P0207 Phoenix Contact 0310020 1 12,24 C
B 14 +B.10 -BI21.X14 End bracket E/UK 400V, 57A BU GZN 590043P0007 Phoenix Contact 1201442 1 12,24 D
Test socket strip PSBJ3.5/18/6 BK RD 1KHF404745P0008 Phoenix Contact 0311388 1 24 E
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s 15 +B.10 -BU1.X1 Test socket strip PSBJ3.5/18/6 BU 400V, 57A YE 1KHF404745P0003 Phoenix Contact 0311333 1 24
-BU1.X2 Test socket strip PSBJ3.5/18/6 RD 4 pole, right side mounting 1KHF404745P0002 Phoenix Contact 0311320 1 24
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. C Test socket strip PSBJ3.5/18/6 YE 400V, 57A 0.5-6mm², max 2 wires, grey 1KHF404745P0004 Phoenix Contact 0311346 1 24
Bracket switch bar SB 4-RTK/S NBT 300270P0051 Phoenix Contact 0311265 1 24
16 +B.10 1000V, 41A BK
Transducer terminal URTK/S 250VAC, 16A BU 1MRB380012P0012 Phoenix Contact 0311087 4 12,24
D 17 +B.10 -XAC Cover D-URTK 20-250VAC RD NBT 402963P0207 Phoenix Contact 0310020 1 12,24
End bracket E/UK 6A YE GZN 590043P0007 Phoenix Contact 1201442 2 12,24
18 +B.10 -XG91 Test socket strip PSBJ3.5/18/6 BK 1CO 4 pole, right side mounting 1KHF404745P0008 Phoenix Contact 0311388 1 24
+C.10 -B91 Test socket strip PSBJ3.5/18/6 BU 6A 0.5-6mm², max 2 wires, grey 1KHF404745P0003 Phoenix Contact 0311333 1 24
19 +C.10 -F91 Test socket strip PSBJ3.5/18/6 RD 1CO 1KHF404745P0002 Phoenix Contact 0311320 1 24
20 +C.10 -F101 Test socket strip PSBJ3.5/18/6 YE 6A BK 1KHF404745P0004 Phoenix Contact 0311346 1 24
+C.10 -F201 Bracket switch bar SB 4-RTK/S 1CO BU NBT 300270P0051 Phoenix Contact 0311265 1 24
21 +C.20 -XKF1 400V, 20A RD
Transducer terminal URTK/S 400V, 20A YE 1MRB380012P0012 Phoenix Contact 0311087 4 12,24
E -XKF2 Cover D-URTK 0.5-6mm², max 2 wires, grey NBT 402963P0207 Phoenix Contact 0310020 1 12,24
End bracket E/UK GZN 590043P0007 Phoenix Contact 1201442 2 12,24
22 Test socket strip PSBJ3.5/18/6 BK BK 1KHF404745P0008 Phoenix Contact 0311388 1 24
Test socket strip PSBJ3.5/18/6 BU BU 1KHF404745P0003 Phoenix Contact 0311333 1 24
23 Test socket strip PSBJ3.5/18/6 RD RD 1KHF404745P0002 Phoenix Contact 0311320 1 24
Test socket strip PSBJ3.5/18/6 YE YE 1KHF404745P0004 Phoenix Contact 0311346 1 24
24 +C.30 0.2-6mm², max 4 wires, grey
Transducer terminal URTK/S 1MRB380012P0012 Phoenix Contact 0311087 4 12,24
Cover D-URTK 2 pole and earth NBT 402963P0207 Phoenix Contact 0310020 1 12,24
End bracket E/UK GZN 590043P0007 Phoenix Contact 1201442 1 12,24
Test socket strip PSBJ3.5/18/6 BK 35-95% 1KHF404745P0008 Phoenix Contact 0311388 1 24
Test socket strip PSBJ3.5/18/6 BU 2 pole, 400VAC/125VDC 1KHF404745P0003 Phoenix Contact 0311333 1 24
Test socket strip PSBJ3.5/18/6 RD 1st Auxilliary contact block 1KHF404745P0002 Phoenix Contact 0311320 1 24
Test socket strip PSBJ3.5/18/6 YE 2 pole, 400VAC/125VDC 1KHF404745P0004 Phoenix Contact 0311346 1 24
1st Auxilliary contact block
Feed-through terminal ZS 6 2 pole, 400VAC/125VDC 1SNK506010R0000 ABB Entrelec 1SNK506010R0000 10 12,21
End bracket E/UK 1st Auxilliary contact block GZN 590043P0007 Phoenix Contact 1201442 2 12,21
Cover ES 4 0.5-4mm², max 2 wires, grey 1SNK505910R0000 ABB Entrelec 1SNK505910R0000 1 12,21

Outlet SD-D/SC Grey 1KHF404808P0001 Phoenix Contact 2963310 1 12,21
End bracket E/UK 0.5-4mm², max 2 wires, grey GZN 590043P0007 Phoenix Contact 1201442 2 12

Hygrostat KTS 011 Grey 2CDS252001R0064 STEGO 2CDS252001R0064 1 12,21
2CDS200912R0001 2CDS200912R0001
Miniature circuit breaker S202-C6 ABB 1 12,21
Auxiliary contact block S2C-H6R 2CDS252001R0064 ABB 2CDS252001R0064 1 12,21,27
2CDS200912R0001 2CDS200912R0001
Miniature circuit breaker S202-C6 ABB 1 12,22
Auxiliary contact block S2C-H6R 2CDS252001R0064 ABB 2CDS252001R0064 1 12,22,27
2CDS200912R0001 2CDS200912R0001
Miniature circuit breaker S202-C6 ABB 1 12,22
Auxiliary contact block S2C-H6R 1SNA115986R0000 ABB 1SNA115986R0000 1 12,22,25
GZN 590043P0007 1201442
Disconnect terminal M 4/6.SNB 1SNA114994R0700 ABB Entrelec 1SNA114994R0700 50 12,25
End bracket E/UK Phoenix Contact 2 12,25
Cover FEM62 1SNA115986R0000 ABB Entrelec 1SNA115986R0000 1 12,25
GZN 590043P0007 1201442
Disconnect terminal M 4/6.SNB 1SNA114994R0700 ABB Entrelec 1SNA114994R0700 50 12,27
End bracket E/UK Phoenix Contact 2 12,27
Cover FEM62 ABB Entrelec 1 12,27

F Based on Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Parts list Ref.Des. =J00 F
A AS MANUFACTURED KD Approved 23-09-2021 MA Parts list +C1
B AS BUILT 25-03-2021 MR Project PT. PLN PERSERO DCC EPB
22-09-2021 =J00+C1
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI 1002
1 Doc. no. JBTB.056-KIS-EM-E-007 Sheet 1003
2 34 56 n. sheet

78

ID HitachiABB Report frame A3 - Version 01 1 23 4 5 6 78
Technical data Remark Article number Manufacturer Manufacturer number Qty. Pages
© Copyright 2020 Hitachi Power Grids. Pos. Location Device Device Type designation
A designation description
A
25 +U.01 -KF1 Numerical control and REF615 VER. 5.0 CONFIGURED REF615E_G REF615E_G ABB REF615 HBFEAEAGNHA1BNA11G 1 32 B
protection IED REF615E_G C
PSM02B 48-250VDC, 100-240VAC, 50/60Hz 8 inputs, 4 outputs ABB Supplied with main device 1 12,23,27,29,32
Power supply module BIOB03A 24-250VDC ABB Supplied with main device 1 12,25,31,33
Binary input/output module COM0037 RJ45, 2xLC 4xBinary inputs, CT: 1x3ph, 1x1ph ABB Supplied with main device 1 12,30,32
Communication interface module AIMB01A 24-250VDC, 1/5A 4xBinary inputs, VT: 5x1ph ABB Supplied with main device 1 12,24,26,33
Analogue input module AIMB06A 24-250VDC, 60-210VAC ABB AIMB06A 1 12,24,26,33
Analogue input module Instructions for test plug insertion
300VAC and extraction, kit (14 units) plug Arteche TSB-P 1
B 26 +U.01 -XT1 Test Plug TSB-P VER. 5.0 CONFIGURED 4 CT, 10 NC Contacts
-KF2 Arteche TSB-14-AAAB1111111111-V 1 12,24,25,36
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s Test block TSB-P REF615E_G
ABB REF615 HBFEAEAGNHA1BNA11G 1 34
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 27 +U.02 Numerical control and REF615
protection IED ABB Supplied with main device 1 12,23,25,29,34
PSM02B 48-250VDC, 100-240VAC, 50/60Hz 8 inputs, 4 outputs ABB Supplied with main device 1 12,27,31,35
Power supply module BIOB03A 24-250VDC ABB Supplied with main device 1 12,30,34
Binary input/output module COM0037 RJ45, 2xLC 4xBinary inputs, CT: 1x3ph, 1x1ph ABB Supplied with main device 1 12,24,28,35
Communication interface module AIMB01A 24-250VDC, 1/5A 4xBinary inputs, VT: 5x1ph ABB AIMB06A 1 12,24,28,35
Analogue input module AIMB06A 24-250VDC, 60-210VAC
Analogue input module Arteche TSB-P 1

C 28 +U.02 -XT2 Test Plug TSB-P Instructions for test plug insertion Arteche TSB-14-AAAB1111111111-V 1 12,24,27,36
-TJ1 and extraction, kit (14 units) plug TBA TBA 1 12,30
29 +U.03 Test block TSB-P 300VAC
Fibre Optic Patch Panels, ST TBA 8 Way (8x Simplex) ST Single Mode 4 CT, 10 NC Contacts

1U, Black

DD

EE

F Based on Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Parts list Ref.Des. =J00 F
A AS MANUFACTURED KD Approved 23-09-2021 MA Parts list +C1
B AS BUILT 25-03-2021 MR Project PT. PLN PERSERO DCC EPB
22-09-2021 =J00+C1
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language en
Date Name ACP20051 HITACHI 1003
1 Doc. no. JBTB.056-KIS-EM-E-007 Sheet 1101
2 34 56 n. sheet

78

ID HitachiABB Terminal A3 - Version 01 1 23 4 56 78
A A
© Copyright 2020 Hitachi Power Grids. B =J00
Cable type +C1 Cable type
C
Cable designations Target -PE Target Cable designations Signal
Internal External
Terminal strip /21.E2 #44465711
Device designation Device designation /21.E3 #44465710
=J00 +C1.B.10 -XG91 Pin Pin Placement in B
PE schematics
=J00 +C1.A.10 -E93
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s PE AZK35 1 1
AZK35 2 2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =J00 +C1.U.01 -KF1 PE (-X100) AZK35 3 3 /23.C2 EARTH C
=J00 +C1.U.02 -KF2 PE (-X100) AZK35 4 4 /23.C3 #44474473
AZK35 5 5

DD

EE

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -PE PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1101
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1102
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =J00
Cable type Internal +C1.A.10 Cable type
C
Cable designations Device designation -XDC1 Target Cable designations Signal
=J00 +C1.C.10 -F101 External
=J00 +C1.C.10 -F101 Terminal strip
Device designation
Pin Pin Placement in B
=J00 +EQ3413 -X05 schematics
E/UK =J00 +C1.A.10 -XDC2 1+
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s 101 =J00 +EQ3413 -X05 101 /22.B2 +DC1
1 ZS 6 101 102 =J00 +C1.A.10 -XDC2 /22.B2 +DC1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ZS 6 102 501 2- /22.B2 -DC1
502 501 /22.B2 -DC1
3 ZS 6 501
ZS 6 502

ES 4

E/UK

C

DD

EE

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.A.10
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -XDC1 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1102
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1103
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =J00
Cable type Internal +C1.A.10 Cable type
C
Cable designations Device designation -XDC2 Target Cable designations Signal
=J00 +C1.C.10 -F201 External
=J00 +C1.C.10 -F201 Terminal strip
Device designation
Pin Pin Placement in B
=J00 +C1.A.10 -XDC1 102 schematics
E/UK =J00 +C1.A.10 -XDC1 502
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s 101 /22.B6 +DC1
1 ZS 6 101 102 /22.B6 +DC1
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ZS 6 102 501 /22.B6 -DC1
502 /22.B6 -DC1
3 ZS 6 501
ZS 6 502

ES 4

E/UK

C

DD

EE

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.A.10
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -XDC2 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1103
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1104
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B =J00
Cable type +C1.A.10 Cable type
C
Cable designations Target -XDCF101 Target Cable designations Signal
Internal External
Terminal strip
Device designation Device designation
Pin Pin Placement in B
schematics C

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =J00 +C1.C.10 -F101 2 E/UK 101 =J00 +C1.U.02 -KF2 4 (-X100) /22.D2 #44474739
102 =J00 +C1.U.01 -KF1 1 (-X100) /22.D2 #44474739
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =J00 +C1.C.10 -F101 4 ZS 4 101 103 =J00 +C1.C.20 -XKF1 /22.D2 #44474739
=J00 +C1.U.01 -KF1 2 (-X100) ZS 4 102 501 =J00 +C1.U.01 -KF1 1 /22.D2 -DCF101
ZS 4 103 502 2 (-X110) /22.D2 -DCF101
ZS 4 501 503 /22.D3 -DCF101
ZS 4 502
ZS 4 503

ES 4

DD

EE

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.A.10
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -XDCF101 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1104
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1105
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B =J00
Cable type +C1.A.10 Cable type
C
Cable designations Target -XDCF201 Target Cable designations Signal
Internal External
Terminal strip
Device designation Device designation
Pin Pin Placement in B
schematics C

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =J00 +C1.C.10 -F201 2 E/UK 101 =J00 +C1.U.01 -KF1 4 (-X100) /22.D6 +DCF201
=J00 +C1.U.02 -KF2 1 (-X100) 102 /22.D6 +DCF201
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ZS 4 101 103 =J00 +C1.C.30 -XKF2 1 /22.D7 +DCF201
=J00 +C1.C.10 -F201 4 ZS 4 102 501 =J00 +C1.U.02 -KF2 2 (-X110) /22.D6 -DCF201
=J00 +C1.U.02 -KF2 2 (-X100) ZS 4 103 502 /22.D6 -DCF201
ZS 4 501 503 /22.D7 -DCF201
ZS 4 502
ZS 4 503

ES 4

E/UK

DD

EE

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.A.10
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -XDCF201 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1105
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1106
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =J00
Cable type Internal +C1.B.10 Cable type
C NYSY 4x6mm²
Device designation -BI21.X1
Cable designations Target Cable designations Signal
=J00 +C1.U.01 -XT1 Terminal strip External -WG4T116
=J00 +C1.U.01 -XT1 /24.C1 CT2_BPU_IL1
=J00 +C1.U.01 -XT1 Pin Device designation Pin Placement in/24.C2 CT2_BPU_IL2 B
=J00 +C1.U.01 -XT1 schematics/24.C2 CT2_BPU_IL3 C
=J12 +S1 -X1 :31 /24.C2 CT2_BPU_ILN
E/UK =J12 +S1 -X1 :#
=J12 +S1 -X1 :#
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s URTK/S 1 =J12 +S1 -X1 :# BU BK YE RD
2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. :1 PSBJ3.5/18/6 RD 1 3
4
URTK/S

:3 PSBJ3.5/18/6 YE 2

URTK/S

:5 PSBJ3.5/18/6 BK 3

URTK/S 4
PSBJ3.5/18/6 BU
:7
SB 4-RTK/S,

D-URTK

DD

EE

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.B.10
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -BI21.X1 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1106
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1107
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =J00
Cable type Internal +C1.B.10 Cable type
C NYSY 4x6mm²
Device designation -BI21.X2
Cable designations Target Cable designations Signal
=J00 +C1.U.02 -XT2 Terminal strip External -WG4T117
=J00 +C1.U.02 -XT2 /24.C6 CT2_BPU_IL1
=J00 +C1.U.02 -XT2 Pin Device designation Pin Placement in/24.C6 CT2_BPU_IL2 B
=J00 +C1.U.02 -XT2 schematics/24.C6 CT2_BPU_IL3 C
=J12 +S1 -X :# /24.C7 CT2_BPU_ILN
E/UK =J12 +S1 -X :#
=J12 +S1 -X :#
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s URTK/S 1 =J12 +S1 -X :# BU BK YE RD
2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. :1 PSBJ3.5/18/6 RD 1 3
4
URTK/S

:3 PSBJ3.5/18/6 YE 2

URTK/S

:5 PSBJ3.5/18/6 BK 3

URTK/S 4
PSBJ3.5/18/6 BU
:7
SB 4-RTK/S,

D-URTK

DD

EE

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.B.10
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -BI21.X2 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1107
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1108
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =J00
Cable type Internal +C1.B.10 Cable type
C
Cable designations Device designation -BI21.X11 Target Cable designations Signal
External
Terminal strip /24.E1 CT1_BPU_IL1
Device designation /24.E2 CT1_BPU_IL2
Pin Pin /24.E2 CT1_BPU_IL3Placement in B
/24.E2 CT1_BPU_INschematics C

E/UK

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s URTK/S 1 1 =J00 +C1.U.01 -KF1 -X120:8
PSBJ3.5/18/6 RD 2 2 =J00 +C1.U.01 -KF1 -X120:10
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 3 3 =J00 +C1.U.01 -KF1 -X120:12
URTK/S 4 4 =J00 +C1.U.01 -KF1 -X120:14
PSBJ3.5/18/6 YE

URTK/S
PSBJ3.5/18/6 BK

URTK/S
PSBJ3.5/18/6 BU

SB 4-RTK/S,

D-URTK

DD

EE

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.B.10
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -BI21.X11 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1108
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1109
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =J00
Cable type Internal +C1.B.10 Cable type
C
Cable designations Device designation -BI21.X12 Target Cable designations Signal
External
=E05 +C1 -BI1.X21 Terminal strip /24.E3 CT2_MPU_IL1
=E05 +C1 -BI1.X21 Device designation /24.E3 CT2_MPU_IL2
=E05 +C1 -BI1.X21 Pin Pin Placement in/24.E3 CT2_MPU_IL3 B
=E05 +C1 -BI1.X21 schematics/24.E4 CT2_MPU_ILN C

E/UK

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s URTK/S 1
2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. :1 PSBJ3.5/18/6 RD 1 3
4
URTK/S

:2 PSBJ3.5/18/6 YE 2

URTK/S

:3 PSBJ3.5/18/6 BK 3

URTK/S 4
PSBJ3.5/18/6 BU
:4
SB 4-RTK/S,

D-URTK

E/UK

DD

EE

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.B.10
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -BI21.X12 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1109
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1110
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =J00
Cable type Internal +C1.B.10 Cable type
C
Cable designations Device designation -BI21.X13 Target Cable designations Signal
External
=E05 +CP1 -BI1.X21 Terminal strip /24.E6 CT1_BPU_IL1
=E05 +CP1 -BI1.X21 Device designation /24.E6 CT1_BPU_IL2
=E05 +CP1 -BI1.X21 Pin Pin /24.E6 CT1_BPU_IL3Placement in B
=E05 +CP1 -BI1.X21 /24.E7 CT1_BPU_INschematics C

E/UK

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s URTK/S 1 =J00 +C1.U.02 -KF2 -X120:8
2 =J00 +C1.U.02 -KF2 -X120:10
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. :1 PSBJ3.5/18/6 RD 1 3 =J00 +C1.U.02 -KF2 -X120:12
4 =J00 +C1.U.02 -KF2 -X120:14
URTK/S

:2 PSBJ3.5/18/6 YE 2

URTK/S

:3 PSBJ3.5/18/6 BK 3

URTK/S 4
PSBJ3.5/18/6 BU
:4
SB 4-RTK/S,

D-URTK

DD

EE

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.B.10
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -BI21.X13 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1110
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1111
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =J00
Cable type Internal +C1.B.10 Cable type
C
Cable designations Device designation -BI21.X14 Target Cable designations Signal
External
=E05 +C1 -BI1.X22 Terminal strip /24.E7 CT2_BPU_IL1
=E05 +C1 -BI1.X22 Device designation /24.E8 CT2_BPU_IL2
=E05 +C1 -BI1.X22 Pin Pin Placement in/24.E8 CT2_BPU_IL3 B
=E05 +C1 -BI1.X22 schematics/24.E8 CT2_BPU_ILN C

E/UK

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s URTK/S 1
2
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. :1 PSBJ3.5/18/6 RD 1 3
4
URTK/S

:2 PSBJ3.5/18/6 YE 2

URTK/S

:3 PSBJ3.5/18/6 BK 3

URTK/S 4
PSBJ3.5/18/6 BU
:4
SB 4-RTK/S,

D-URTK

E/UK

DD

EE

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.B.10
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -BI21.X14 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1111
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1112
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =J00
Cable type Internal +C1.B.10 Cable type
C NYSY 4x4mm²
Device designation -BU1.X1
Cable designations Target Pin Cable designations SignalPlacement in B
=J00 +C1.U.01 -XT1 Terminal strip External -WG5T111 schematics C
=J00 +C1.U.01 -XT1 :1 /24.C4 BU1_BPU_UL1
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =J00 +C1.U.01 -XT1 Pin 1 Device designation :2 BU BK YE RD /24.C4 BU1_BPU_UL2
=J00 +C1.U.01 -XT1 2 :3 /24.C5 BU1_BPU_UL3
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. E/UK 3 =J12 +S1 -X2 :4 /24.C5 BU1_BPU_UN
URTK/S 4 =J12 +S1 -X2
=J12 +S1 -X2
:9 PSBJ3.5/18/6 RD 1 =J12 +S1 -X2

URTK/S

:11 PSBJ3.5/18/6 YE 2

URTK/S

:13 PSBJ3.5/18/6 BK 3

URTK/S

:15 PSBJ3.5/18/6 BU 4

D-URTK
E/UK

DD

EE

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.B.10
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -BU1.X1 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1112
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1113
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =J00
Cable type Internal +C1.B.10 Cable type
C NYSY 4x4mm²
Device designation -BU1.X2
Cable designations Target Pin Cable designations SignalPlacement in B
=J00 +C1.U.02 -XT2 Terminal strip External -WG5T112 schematics C
=J00 +C1.U.02 -XT2 :5 /24.C7 BU1_BPU_UL1
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =J00 +C1.U.02 -XT2 Pin 1 Device designation :6 BU BK YE RD /24.C8 BU1_BPU_UL2
=J00 +C1.U.02 -XT2 2 :7 /24.C8 BU1_BPU_UL3
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. E/UK 3 =J12 +S1 -X2 :8 /24.C8 BU1_BPU_UN
URTK/S 4 =J12 +S1 -X2
=J12 +S1 -X2
:9 PSBJ3.5/18/6 RD 1 =J12 +S1 -X2

URTK/S

:11 PSBJ3.5/18/6 YE 2

URTK/S

:13 PSBJ3.5/18/6 BK 3

URTK/S

:15 PSBJ3.5/18/6 BU 4

D-URTK

DD

EE

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.B.10
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -BU1.X2 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1113
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1114
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B Target =J00
Cable type Internal +C1.B.10 Cable type
C
Cable designations Device designation -XAC Target Cable designations Signal
D =J00 +C1.C.10 -F91 External
Terminal strip
=J00 +C1.C.10 -F91 Device designation
=J00 +C1 -E91 Pin Pin Placement in B
=J00 +CX1 -XAC 2 schematics C
E/UK
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s 1 =J00 +CX1 -XAC 8 /21.C2 ACM_R
1 ZS 6 1 2 =J00 +C1.C.10 -F91 4 /21.C2 ACM_R
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ZS 6 2 3 =J00 +C1.A.10 -E93 N /21.C2 ACM_S
ZS 6 3 4 /21.C2 ACM_S
ZS 6 4 5 /21.C3 ACM_T
ZS 6 5 6 /21.C3 ACM_T
ZS 6 6 7 /21.C4 AC_N
8 /21.C4 AC_N
3 ZS 6 7 9
ZS 6 8 10 /21.E3 AC_N
ZS 6 9

N ZS 6 10

ES 4

E/UK

D

EE

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.B.10
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -XAC PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1114
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1115
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. =J00
Cable type +C1.C.20 Cable type
NYSY 19x2.5mm²
-XKF1
Cable designations Target Target Cable designations Signal
Internal Terminal strip External -WG1T117

B Device designation Pin Device designation Pin Placement in B
schematics

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =J00 +C1.A.10 -XDCF101 103 E/UK 1 /25.C3 #44474739
2 /25.C4 #44474494
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =J00 +C1.C.20 -XKF1 1 M 4/6.SNB 1 3 /25.C4 #44474739
M 4/6.SNB 2 4 /25.C5 20kV CB OPEN
=J00 +C1.U.01 -KF1 7 (-X110) M 4/6.SNB 3 5 /25.C5 #44474739
M 4/6.SNB 4 6 /25.C5 20kV CB CLOSE
=J00 +C1.C.20 -XKF1 3 M 4/6.SNB 5 7 /25.C6 #44474739
M 4/6.SNB 6 8 /25.C6 20kV ES OPEN
=J00 +C1.U.01 -KF1 8 (-X110) M 4/6.SNB 7 9 /25.C6 #44474739
M 4/6.SNB 8 10 /25.C7 20kV ES CLOSE
C =J00 +C1.C.20 -XKF1 5 M 4/6.SNB 9 11 /25.C7 #44474739 C
M 4/6.SNB 10 12 /25.C7 20kV CB RACK IN D
=J00 +C1.U.01 -KF1 10 (-X110) M 4/6.SNB 11 13 /26.C1 #44474739 E
M 4/6.SNB 12 14 /26.C2 Spare
=J00 +C1.C.20 -XKF1 7 M 4/6.SNB 13 15 /26.C2 #44474739
M 4/6.SNB 14 16 /26.C2 Spare
=J00 +C1.U.01 -KF1 11 (-X110) M 4/6.SNB 15 17 /26.C3 Spare
M 4/6.SNB 16 18 /26.C4 #44474739
=J00 +C1.C.20 -XKF1 13 M 4/6.SNB 17 19 /26.C4 Spare
M 4/6.SNB 18 20 /26.C5 Spare
=J00 +C1.U.01 -KF1 13 (-X110) M 4/6.SNB 19 21 /26.C5 Spare
M 4/6.SNB 20 22 /26.C6 Spare
=J00 +C1.C.20 -XKF1 11 M 4/6.SNB 21 23 /26.C7 Spare
M 4/6.SNB 22 24 /29.D1 +DCF103
=J00 +C1.U.01 -KF1 1 (-X120) M 4/6.SNB 23 25 /29.D2 20kV MV CB TRIP1
M 4/6.SNB 24 26 /29.D2 +DC
D =J00 +C1.C.20 -XKF1 13 M 4/6.SNB 25 27 /29.D2 20kV MV CB TRIP2
M 4/6.SNB 26 28 /29.D3 #44474708
=J00 +C1.U.01 -KF1 3 (-X120) M 4/6.SNB 27 29 /29.D3 #44474709
M 4/6.SNB 28 30 /29.D3 #44474710
=J00 +C1.U.01 -KF1 4 (-X120) M 4/6.SNB 29
M 4/6.SNB 30
=J00 +C1.C.20 -XKF1 15
Prepared 22-09-2021
=J00 +C1.U.01 -KF1 5 (-X120) Approved 23-09-2021
Project PT. PLN PERSERO
=J00 +C1.U.01 -KF1 1 (-X130)
DSS 150KV KIS
=J00 +C1.U.01 -KF1 3 (-X130) ACP20051
34
=J00 +C1.U.01 -KF1 5 (-X130)

=J00 +C1.U.01 -KF1 7 (-X130)

E =J00 +C1.U.01 -KF1 6 (-X100)

=J00 +C1.U.01 -KF1 7 (-X100)

=J00 +C1.U.01 -KF1 8 (-X100)

=J00 +C1.U.01 -KF1 9 (-X100)

=J00 +C1.U.01 -KF1 10 (-X100)

=J00 +C1.U.01 -KF1 12 (-X100)

=J00 +C1.U.01 -KF1 13 (-X100)

F Based on 25-03-2021 KD MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 MR MA Terminal table Resp. dept. +C1.C.20
B AS BUILT DCC EMA
Date Name -XKF1 PGGA Rev. ind. B Language en
Rev. Revision note Sheet 1115
2 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1116
1
56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B =J00
Cable type +C1.C.20 Cable type
C
Cable designations Target -XKF1 Target Cable designations Signal
D Internal External
E Terminal strip
Device designation Device designation
=J00 +C1.U.01 -KF1 Pin Pin Placement in B
14 (-X100) schematics C
=J00 +C1.U.01 -KF1
=J00 +C1.U.01 -KF1 15 (-X110) M 4/6.SNB 31 31 /29.D4 #44474711
=J00 +C1.U.01 -KF1 14 (-X110) M 4/6.SNB 32 32
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =J00 +C1.U.01 -KF1 18 (-X110) M 4/6.SNB 33 33 /29.D4 MV_DC+
=J00 +C1.U.01 -KF1 17 (-X110) M 4/6.SNB 34 34 /29.D4 MV_CB_open_CMD
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =J00 +C1.U.01 -KF1 21 (-X110) M 4/6.SNB 35 35 /29.D5 MV_DC+
=J00 +C1.U.01 -KF1 20 (-X110) M 4/6.SNB 36 36 /29.D5 MV_CB_close_CMD
=J00 +C1.U.01 -KF1 23 (-X110) M 4/6.SNB 37 37 /31.C3 +DCF201
24 (-X110) M 4/6.SNB 38 38 /31.C4 +DCF201
M 4/6.SNB 39 39 /31.C4 Spare
M 4/6.SNB 40 40 /31.C5 Spare
M 4/6.SNB 41 41
M 4/6.SNB 42 42 D
M 4/6.SNB 43 43
M 4/6.SNB 44 44
M 4/6.SNB 45 45
M 4/6.SNB 46 46
M 4/6.SNB 47 47
M 4/6.SNB 48 48
M 4/6.SNB 49 49
M 4/6.SNB 50 50

FEM62

E/UK

E

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.C.20
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -XKF1 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS Sheet 1116
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1117
1
34 56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. =J00
Cable type +C1.C.30 Cable type
NYSY 19x2.5mm²
-XKF2
Cable designations Target Target Cable designations Signal
Internal Terminal strip External -WG1T117

B Device designation Pin Device designation Pin Placement in B
schematics

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =J00 +C1.C.30 -XKF2 3 E/UK 1 /27.C3 +DCF201
2 /27.C4 #44474501
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =J00 +C1.C.30 -XKF2 1 M 4/6.SNB 1 3 /27.C4 +DCF201
M 4/6.SNB 2 4 /27.C5 #44474502
=J00 +C1.C.30 -XKF2 3 M 4/6.SNB 3 5 /27.C5 +DCF201
M 4/6.SNB 4 6 /27.C5 #44474503
=J00 +C1.U.02 -KF2 8 (-X110) M 4/6.SNB 5 7 /27.C6 +DCF201
M 4/6.SNB 6 8 /27.C6 #44474504
C =J00 +C1.C.30 -XKF2 5 M 4/6.SNB 7 9 /27.C6 +DCF201 C
M 4/6.SNB 8 10 /27.C7 #44474505 D
=J00 +C1.U.02 -KF2 10 (-X110) M 4/6.SNB 9 11 /27.C7 +DCF201 E
M 4/6.SNB 10 12 /27.C7 #44474506
=J00 +C1.C.30 -XKF2 7 M 4/6.SNB 11 13 /28.C1 +DCF201
M 4/6.SNB 12 14 /28.C2 Spare
=J00 +C1.U.02 -KF2 11 (-X110) M 4/6.SNB 13 15 /28.C2 +DCF201
M 4/6.SNB 14 16 /28.C2 Spare
=J00 +C1.C.30 -XKF2 9 M 4/6.SNB 15 17 /28.C3 Spare
M 4/6.SNB 16 18 /28.C4 +DCF201
=J00 +C1.U.02 -KF2 13 (-X110) M 4/6.SNB 17 19 /28.C4 Spare
M 4/6.SNB 18 20 /28.C5 Spare
=J00 +C1.C.30 -XKF2 11 M 4/6.SNB 19 21 /28.C5 Spare
M 4/6.SNB 20 22 /28.C6 Spare
=J00 +C1.U.02 -KF2 1 (-X120) M 4/6.SNB 21 23 /28.C7 Spare
M 4/6.SNB 22 24 /29.D6 +DCF103
D =J00 +C1.C.30 -XKF2 13 M 4/6.SNB 23 25 /29.D6 20kV MV CB TRIP2
M 4/6.SNB 24 26 /29.D6 +DCF101
=J00 +C1.U.02 -KF2 3 (-X120) M 4/6.SNB 25 27 /29.D7 BPU TRIP
M 4/6.SNB 26 28 /29.D7 #44474712
=J00 +C1.U.02 -KF2 4 (-X120) M 4/6.SNB 27 29 /29.D7 #44474713
M 4/6.SNB 28 30 /29.D8 #44474714
=J00 +C1.C.30 -XKF2 15 M 4/6.SNB 29
M 4/6.SNB 30
=J00 +C1.U.02 -KF2 5 (-X120)
Prepared 22-09-2021
=J00 +C1.U.02 -KF2 1 (-X130) Approved 23-09-2021
Project PT. PLN PERSERO
=J00 +C1.U.02 -KF2 3 (-X130)
DSS 150KV KIS
=J00 +C1.U.02 -KF2 5 (-X130) ACP20051
34
=J00 +C1.U.02 -KF2 7 (-X130)

E =J00 +C1.U.02 -KF2 6 (-X100)

=J00 +C1.U.02 -KF2 7 (-X100)

=J00 +C1.U.02 -KF2 8 (-X100)

=J00 +C1.U.02 -KF2 9 (-X100)

=J00 +C1.U.02 -KF2 10 (-X100)

=J00 +C1.U.02 -KF2 12 (-X100)

=J00 +C1.U.02 -KF2 13 (-X100)

F Based on 25-03-2021 KD MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 MR MA Terminal table Resp. dept. +C1.C.30
B AS BUILT DCC EMA
Date Name -XKF2 PGGA Rev. ind. B Language en
Rev. Revision note Sheet 1117
2 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 n. sheet 1118
1
56 7 8

ID HitachiABB Terminal A3 - Version 01 1 2 34 56 78
A A
© Copyright 2020 Hitachi Power Grids. B =J00
Cable type +C1.C.30 Cable type
C
Cable designations Target -XKF2 Target Cable designations Signal
D Internal External
E Terminal strip
Device designation Device designation
=J00 +C1.U.02 -KF2 Pin Pin Placement in B
14 (-X100) schematics C
=J00 +C1.U.02 -KF2
=J00 +C1.U.02 -KF2 15 (-X110) M 4/6.SNB 31 31 /29.D8 #44474472
=J00 +C1.U.02 -KF2 14 (-X110) M 4/6.SNB 32 32
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\20kV=J00+C1- 20kV MK -JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =J00 +C1.U.02 -KF2 18 (-X110) M 4/6.SNB 33 33 /31.E2 #44474459
=J00 +C1.U.02 -KF2 17 (-X110) M 4/6.SNB 34 34 /31.E2 #44474705
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. =J00 +C1.U.02 -KF2 21 (-X110) M 4/6.SNB 35 35 /31.E3 #44474460
=J00 +C1.U.02 -KF2 20 (-X110) M 4/6.SNB 36 36 /31.E3 #44474706
=J00 +C1.U.02 -KF2 23 (-X110) M 4/6.SNB 37 37 /31.E3 #44474461
24 (-X110) M 4/6.SNB 38 38 /31.E4 #44474707
M 4/6.SNB 39 39 /31.E4 #44474462
M 4/6.SNB 40 40 /31.E5 #44474455
M 4/6.SNB 41 41
M 4/6.SNB 42 42 D
M 4/6.SNB 43 43
M 4/6.SNB 44 44
M 4/6.SNB 45 45
M 4/6.SNB 46 46
M 4/6.SNB 47 47
M 4/6.SNB 48 48
M 4/6.SNB 49 49
M 4/6.SNB 50 50

FEM62

E/UK

E

F Based on 25-03-2021 Prepared 22-09-2021 MR Title MARSHALING KIOSK TR-1 Doc. kind. Ref.Des. =J00 F
A AS MANUFACTURED 22-09-2021 KD Approved 23-09-2021 MA Terminal table Resp. dept. +C1.C.30
B AS BUILT MR Project PT. PLN PERSERO DCC EMA
Date -XKF2 PGGA Rev. ind. B Language en
Rev. Revision note DSS 150KV KIS
2 Name ACP20051 HITACHI Doc. no. JBTB.056-KIS-EM-E-007 Sheet 1118
1
34 56 7 n. sheet

8

ID HitachiABB Title page A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 ABB B

B Customer : PT. PLN (PERSERO) C

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s Order : ACP20051 D

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. C Plant : DSS 150KV KIS

Equipment : 150KV COMMMON DRAWING

D Title : SCHEMATIC DIAGRAM

EE

F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 Title page 1
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 10
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 No.sheets
2 34 56
7 8

ID HitachiABB Report frame A3 - Version 01 1 23 4 5 67 8
Sheet n.sh. Description 1 Description 2 Rev. Revision note Sheet n.sh. Description 1 Description 2 Rev. Revision note
© Copyright 2020 ABB A 12
TITLE PAGE B AS BUILT A
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s 2 21 LIST OF CONTENT 1 - 28 B AS BUILT B
21 22 SCHEMATIC DIAGRAM 110V DC SUPPLY FOR CRP/MK B AS BUILT C
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 22 23 SCHEMATIC DIAGRAM 110V DC SUPPLY FOR CRP/MK B AS BUILT
23 24 SCHEMATIC DIAGRAM SAS AC & DC SUPPLY B AS BUILT
20KV SAS AC SUPPLY B AS BUILT
B 24 25 SCHEMATIC DIAGRAM 400/230V AC SUPPLY FOR CRP B AS BUILT
400/230V AC SUPPLY FOR MK B AS BUILT
25 26 SCHEMATIC DIAGRAM 400/230V AC SUPPLY FOR MOTOR B AS BUILT
26 27 SCHEMATIC DIAGRAM MK TEMP SENSOR COMMUNICATION B AS BUILT
27 28 SCHEMATIC DIAGRAM
28 SCHEMATIC DIAGRAM

C

DD

EE

F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. LIST OF CONTENT Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA LIST OF CONTENT
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EAB en
22-09-2021 HITACHI 2
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 21
Date Name ACP20051 56
1 Doc. no. JBTB.056-KIS-EM-E-011 Sheet
2 34 n. sheet

78

ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8

© Copyright 2020 ABB 110V DC SUPPLY CRP/MK REF DWG NO: GI-110/KIS-883/2020 SH: 19-18/54 MCB - Q03, 2P , 20A, 15kA A
B
A MCB - Q02, 2P , 20A, 15kA MCB - Q01, 2P , 20A, 15kA C
D
=E00 +EQ3411 E

110V DC DISTRIBUTION PANEL 1
MCB - Q04, 2P , 20A, 15kA

-X04 -X02 -X01 -X03

1+ 1+ 1+ 1+
+DC1 +DC1 +DC1 +DC1
2- 2- 2- 2-
-DC1 -DC1 -DC1 -DC1

=E00 +EQ3412 MCB - Q04, 2P , 20A, 15kA REF DWG NO: GI-110/KIS-883/2020 SH: 21-22/54 MCB - Q01, 2P , 20A, 15kA MCB - Q03, 2P , 20A, 15kA
MCB - Q02, 2P , 20A, 15kA
110V DC DISTRIBUTION PANEL 2

B

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s -X04 -X02 -X01 -X03

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 1+ 1+ 1+ 1+
+DC2 +DC2 +DC2 +DC2
2- 2- 2- 2-
-DC2 -DC2 -DC2 -DC2

=E01 +CP1 =E02 +CP1 =E03 +CP1 =E04 +CP1

CRP BUS COUPLER CRP PORONG OHL CRP BANGIL OHL CRP KTT UGC

102 502 102 502 102 502 102 502 102 502 102 502 102 502 102 502
501 501
101 501 101 501 101 501 101 501 101 501 101 101 501 101

-XDC1 -XDC2 -XDC1 -XDC2 -XDC1 -XDC2 -XDC1 -XDC2

C

=E01 +C1 =E02 +C1 =E03 +C1 =E04 +C1

MK BUS COUPLER MK PORONG OHL MK BANGIL OHL MK KTT UGC

D 101 501 101 501 101 501 101 501 101 501 101 501 101 501

101 501 -XDC2 -XDC1 -XDC2 -XDC1 -XDC2 -XDC1 -XDC2

-XDC1

REF DWG: JBTB1.056-KIS-EM-E-005/L11/L12/L13/L14 REF DWG: JBTB1.056-KIS-EM-E-002/L11/L12/L13/L14 REF DWG: JBTB1.056-KIS-EM-E-001/L11/L12/L13/L14 REF DWG: JBTB1.056-KIS-EM-E-003/L11/L12/L13/L14

E

F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 110V DC SUPPLY FOR CRP/MK 21
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 22
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 12 34 5 6 7 8
A
© Copyright 2020 ABB A 110V DC SUPPLY CRP/MK B

=E00 +EQ3411 REF DWG NO: GI-110/KIS-883/2020 SH: 19-18/54 MCB - Q13, 2P , 20A, 15kA C
MCB - Q11, 2P , 20A, 15kA
110V DC DISTRIBUTION PANEL 1 D
MCB - Q05, 2P , 20A, 15kA E

-X05 -X11 -X13

1+ 1+ 1+
+DC1 +DC1 +DC1
2- 2- 1-
-DC1 -DC1 -DC1

=E00 +EQ3412 MCB - Q05, 2P , 20A, 15kA REF DWG NO: GI-110/KIS-883/2020 SH: 21/54 REF DWG NO: GI-110/KIS-883/2020 SH: 22/54
MCB - Q10, 2P , 20A, 15kA MCB - Q13, 2P , 20A, 15kA
110V DC DISTRIBUTION PANEL 2

B

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s -X05 -X10 -X09

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 1+ 1+ 1+
+DC2 +DC2 +DC2
2- 1- 1-
-DC2 -DC2 -DC2

=E05 +CP1 =E00 +CM1 =E00 +DFR1 =E00 +DFR2

CRP TRAFO-1 ENERGY METER PANEL DFR PANEL1 DFR PANEL2

102 502 102 502 101 501 101 501 + - + -
501
101 501 101 -XDC1 -XDC2 -TP31 -TP31

-XDC1 -XDC2

C

REF DWG: JBTB1.056-KIS-EM-E-011/L11 REF DWG: JBTB1.056-KIS-EM-F-001/ SH 03 OF 15 REF DWG: JBTB1.056-KIS-EM-F-001/ SH 08 OF 15

=E05 +C1

MK TRAFO-1

D 101 501 101 501

-XDC1 -XDC2

REF DWG: JBTB1.056-KIS-EM-E-004/L11/L12/L13/L14

E

F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 110V DC SUPPLY FOR CRP/MK 22
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 23
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 1 2 34 5 67 8

© Copyright 2020 ABB A REF DWG NO: GI-110/KIS-845/2020 SH: 17 OFF 54 -X07 A
MCB - Q07, 2P , 20A, 15kA B
+EQ3411 C
1+ 2- D
110V DC DISTRIBUTION PANEL 1
MCB - Q07, 2P , 20A, 15kA
+EQ3412 REF DWG NO: GI-110/KIS-883/2020 SH: 22 OF 54

110V DC DISTRIBUTION PANEL 2 1+ 2-

B RN
-X02
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E00 +Inverter -X01 -X07

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. INVERTER SUPPLY =E00 +EQ3421 MCB - Q04,2P , 20A, 15kA
REF DWG NO: GI-48/TTY-XXX/2020 SH:XX
RN 48V DC DISTRIBUTION PANEL

=E00 +EQ3401-X06 N -X04
ACM_N
C 400/230V AC DISTRIBUTION PANELS 1+
ACM_S +48V DC
REF DWG NO: GI-400/KIS-882/2020 SH: 12 OF27 1-
MCB - Q11 ,3P , 20A, 15kA -48V DC

=E00 +CX1 =E00 +CX2

SAS PANEL - 1 SAS PANEL - 2

D

E E

12 3 4 5 6 7 8 1 2 101 102 501 502 101 501 101 501 12 3 4 5 6 7 8 1 2 101 501 101 102 501 502

-XAC. -XAC3 -XDC1 -XDC2 -XDC3 -XAC -XAC3 -XDC1 -XDC2 -XDC2

REF DWG: JBTB1.056-KIS-EM-E-012/21/22 REF DWG: JBTB1.056-KIS-EM-E-013/21/22

F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 SAS AC & DC SUPPLY 23
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 24
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 1 2 34 56 78

© Copyright 2020 ABB A REF DWG NO: GI-110/KIS-845/2020 SH: 17 MCB - Q01,2P , 20A, 15kA MCB - Q05, 2P , 20A, 15kA A
MCB - Q04, 2P , 20A, 15kA REF DWG NO: GI-48/KIS-XXX/2020 SH:XX B
+EQ3413 -X04 -X05 C
1+ 2- =J00 +C1 D
110V DC DISTRIBUTION PANEL 3 1+ E
20kV MERGING UNIT MK +DC1
=E00 +EQ3401 2-
-DC1
400/230V AC DISTRIBUTION PANEL REF DWG NO: GI-400/KIS-882/2020 SH: 12 OF27
-X21 -X21
B
R N
MCB - Q11 ,3P , 20A, 15kAACM_R ACM_N

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E00 +Inverter -X03RN

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. INVERTER SUPPLY -X011+ 2-

+EQ3422

C 48V DC DISTRIBUTION PANEL 2

=J00 +CX1

20KV SAS PANEL

D

12 3 4 5 6 7 8 1 2 101 501 101 501 12 3 4 5 6 7 8 101 501

-XAC. -XAC3 -XDC1 -XDC3 -XAC. -XDC1

REF DWG: JBTB1.056-KIS-EM-E-014/21/22 REF DWG: JBTB1.056-KIS-EM-E-011/22

E

F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 20KV SAS AC SUPPLY 24
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 25
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 12 34 5 67 8
A
© Copyright 2020 ABB 230V AC SUPPLY FOR CRP
-X02
-X02 A

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E00 +EQ3401 =E02 +CP1 =E03 +CP1 B
C
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 400/230V AC DISTRIBUTION PANEL PORONG OHL BANGIL OHL D
E
REF DWG NO: GI-400/KIS-882/2020 SH: 12 OF27 REF DWG: JBTB1.056-KIS-EM-E-002/G11 REF DWG: JBTB1.056-KIS-EM-E-0011/G11
MCB - Q02 ,2P , 20A, 15kA

RN

B

=E01 +CP1

BUS COUPLER

REF DWG: JBTB1.056-KIS-EM-E-005/G11

C 12 34 56 78 1 2 34 56 78 1 2 34 56 78

-XAC. -XAC. -XAC.

=E04 +CP1 =E00 +CM1 =E05 +CP1

KTT BAY ENERGU METERING PANEL TRAFO-1

REF DWG: JBTB1.056-KIS-EM-E-003/G11 REF DWG: JBTB1.056-KIS-EM-E-009/G11 REF DWG: JBTB1.056-KIS-EM-E-004/G11

D

1 2 34 56 78 1 2 34 56 78 1 2 34 56 78

-XAC. -XAC. -XAC.

E

F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 400/230V AC SUPPLY FOR CRP 25
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 26
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 12 3 45 67 8

© Copyright 2020 ABB A AC SUPPLY MARSHALLING KIOSK REF DWG: GI-400/KIS-882/2020 SH 12 OF 27 A
HEATING/LIGHTING MCB - Q01,3P , 40A, 15kA B
=E00 +EQ3401 C
REF DWG: GI-400/KIS-882/2020 SH 12 OF 27 D
400/230V AC DISTRIBUTION PANEL MCB - Q05,3P , 20A, 15kA
REF DWG: GI-400/KIS-882/2020 SH 13 OF 27
MCB - Q13,3P , 20A, 15kA

-X13 -X05 -X01

R R R
ACM_R ACM_R ACM_R
S S S
ACM_S ACM_S ACM_S
T T T
ACM_T ACM_T ACM_T
N N N
AC_N AC_N AC_N

B

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E01 +C1 =E02 +C1 =E03 +C1

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. MK BUS COUPLER PORONG OHL BANGIL OHL

12 34 56 78 1 2 34 56 78 1 2 34 56 78

C -XAC -XAC -XAC

REF DWG: JBTB1.056-KIS-EM-E-005/G12 REF DWG: JBTB1.056-KIS-EM-E-002/G14/G12 REF DWG: JBTB1.056-KIS-EM-E-001/G14/G12

=E00 +EQ3401 REF DWG: GI-400/KIS-882/2020 SH 13 OF 27 REF DWG: GI-400/KIS-882/2020 SH 14 OF 27 REF DWG: GI-400/KIS-882/2020 SH 16 OF 27
MCB - Q10,3P , 20A, 15kA MCB - Q18,3P , 20A, 15kA MCB - Q34,3P , 32A, 15kA
400/230V AC DISTRIBUTION PANEL

D

-X10 -X18 -X34

R R R
ACM_R ACM_R ACM_R
S S S
ACM_S ACM_S ACM_S
T T N
ACM_T ACM_T ACM_T
N N T
AC_N AC_N AC_N

=E04 +C1 =E05 +C1 =E05 +T1.C1

KTT BAY TRAFO-1 TRAFO-1 MK

E E

1 2 34 56 78 1 2 34 56 78 -X1

-XAC -XAC L1
ACM_R

-X1

L2
ACM_S

-X1

L3
ACM_T

-X1

N
AC_N

REF DWG: JBTB1.056-KIS-EM-E-003/G12 REF DWG: JBTB1.056-KIS-EM-E-004/G12 DRAWING NO. PS-PX-070-FOMB SH: 14 OF 19

F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 400/230V AC SUPPLY FOR MK 26
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 27
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 123 45 67 8

© Copyright 2020 ABB A AC SUPPLY MARSHALLING KIOSK TRAFO MK MOTOR/HEATING/LITGHTING/TAP CHANGER DRIVE A
CB/DS MOTOR SUPPLY B
=E00 +EQ3401 REF DWG: GI-400/KIS-882/2020 SH 12 OF 27 C
REF DWG: GI-400/KIS-882/2020 SH 12 OF 27 MCB - Q03,3P , 40A, 15kA
400/230V AC DISTRIBUTION PANEL MCB - Q08,3P , 20A, 15kA
REF DWG: GI-400/KIS-882/2020 SH 13 OF 27-X15 -X08 -X03RSTN
MCB - Q15,3P , 20A, 15kA RSTN

RSTN

B

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E01 +C1 =E02 +C1 =E03 +C1

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. MK BUS COUPLER PORONG OHL BANGIL OHL

11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18

C -XAC -XAC -XAC

REF DWG: JBTB1.056-KIS-EM-E-005/G14 REF DWG: JBTB1.056-KIS-EM-E-002/G14/G14 REF DWG: JBTB1.056-KIS-EM-E-001/G14/G14

=E00 +EQ3401 REF DWG: GI-400/KIS-882/2020 SH 13 OF 27 REF DWG: GI-400/KIS-882/2020 SH 14 OF 27
MCB - Q11,3P , 20A, 15kA MCB - Q19,3P , 20A, 15kA
400/230V AC DISTRIBUTION PANEL
RSTN D
D

-X11RSTN -X19

=E04 +C1 =E05 +C1

KTT BAY TRAFO-1

E E

11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18

-XAC -XAC

REF DWG: JBTB1.056-KIS-EM-E-003/G14 REF DWG: JBTB1.056-KIS-EM-E-004/G14

F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 400/230V AC SUPPLY FOR MOTOR 27
Rev. Revision note DSS 150KV KIS Resp. dept. PGGA Rev. ind. B Language 28
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 1 23 4 56 7 8
A
© Copyright 2020 ABB A MK TEMPERATURE SENSOR MONITORING SIGNAL TO RTU B

=E00 +CX1 -KF21.81 C

SAS PANEL - 1 RTU560 D
E
RTU(DAISY CHAIN)

CP2
D+
#
D-
#
GND
#
Shld

-XCOM

B 12 3 4

REF DWG: JBTB1.056-KIS-EM-E-012 SH 39

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=Common Drawing-JBTB1.056-KIS-EM-E-011-Rev-B_AS BUILT.e3s =E01 +C1 =E04 +C1

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. MK BUS COUPLER KTT BAY

-XCOM -XCOM

12 3 4 12 3 4

C REF DWG: JBTB1.056-KIS-EM-E-005 SH L24

=E02 +C1 =E05 +C1

PORONG OHL TRAFO-1

D -XCOM -XCOM

12 3 4 12 3 4

=E03 +C1 -XCOM

BANGIL OHL 12 3 4

E

F Based on Prepared 22-09-2021 MR Title 150KV COMMMON DRAWING Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) MA SCHEMATIC DIAGRAM DCC EFS en
22-09-2021 28
Rev. Revision note DSS 150KV KIS MK TEMP SENSOR COMMUNICATION Resp. dept. PGGA Rev. ind. B Language
Date Name ACP20051 Sheet
1 HITACHI Doc. no. JBTB.056-KIS-EM-E-011 n. sheet
2 34
56 7 8

ID HitachiABB Title page A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. B

B Customer : PT. PLN (PERSERO) C

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s Order : ACP20051 D

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. C Plant : DSS 150KV KIS

Equipment : 150KV ENERGY METER PANEL

D Title : SCHEMATIC DIAGRAM

EE

F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 Title page 1
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language 48
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 No.sheets
2 34 56
7 8

IDABB Report frame A3 - Version 03 1 2 34 5 67 8
Description 2 Rev. Revision note
© Copyright 2020 Hitachi P Sheet n.sh. Description 1 Description 2 Rev. Revision note Sheet n.sh. Description 1
A 12 =E00+CM1 B AS BUILT
TITLE PAGE B AS BUILT 1005 1101 PARTS LIST =E00+CM1-PE B AS BUILT A
2 8 LIST OF CONTENT =E00+CM1.A.30-XDC1 B AS BUILT B
8 21 SYMBOL LEGENDS 1 - 1117 B AS BUILT 1101 1102 TERMINAL TABLE =E00+CM1.A.30-XDC2 B AS BUILT C
21 22 CUBICLE LAYOUT =E00+CM1.A.30-XDCF101 B AS BUILT D
22 23 CUBICLE LAYOUT B AS BUILT 1102 1103 TERMINAL TABLE =E00+CM1.A.30-XDCF102 B AS BUILT
=E00+CM1.A.30-XDCF103 B AS BUILT
B 23 24 CUBICLE LAYOUT FRONT VIEW WITH DOOR B AS BUILT 1103 1104 TERMINAL TABLE =E00+CM1.A.30-XDCF104 B AS BUILT
=E00+CM1.A.30-XDCF105 B AS BUILT
24 25 CUBICLE LAYOUT SECTION VIEW INCL. LOCATION DESIGNATION B AS BUILT 1104 1105 TERMINAL TABLE =E00+CM1.A.30-XDCF201 B AS BUILT
25 26 CUBICLE LAYOUT =E00+CM1.A.40-BI1.X1 B AS BUILT
26 D11 CUBICLE LAYOUT FIXED FRAME VIEW B AS BUILT 1105 1106 TERMINAL TABLE =E00+CM1.A.40-BI1.X2 B AS BUILT
D11 D12 SCHEMATIC DIAGRAM =E00+CM1.A.40-BI1.X3 B AS BUILT
D12 D13 SCHEMATIC DIAGRAM INSIDE VIEW B AS BUILT 1106 1107 TERMINAL TABLE =E00+CM1.A.40-BI1.X4 B AS BUILT
D13 D14 SCHEMATIC DIAGRAM =E00+CM1.A.40-BU1.X1 B AS BUILT
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s INSIDE REAR VIEW B AS BUILT 1107 1108 TERMINAL TABLE =E00+CM1.A.40-BU1.X2 B AS BUILT
C =E00+CM1.A.40-X811 B AS BUILT
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. LIST OF LABELS B AS BUILT 1108 1109 TERMINAL TABLE =E00+CM1.A.40-XAC B AS BUILT
D14 G11 SCHEMATIC DIAGRAM
G11 L11 SCHEMATIC DIAGRAM ENERGY METER MAIN P51.1=E04 B AS BUILT 1109 1110 TERMINAL TABLE
L11 L12 SCHEMATIC DIAGRAM
L12 L16 SCHEMATIC DIAGRAM ENERGY METER CHECK P51.2=E04 B AS BUILT 1110 1111 TERMINAL TABLE
L16 Y21 SCHEMATIC DIAGRAM
Y21 Y23 SCHEMATIC DIAGRAM ENERGY METER MAIN P51.3=E05 B AS BUILT 1111 1112 TERMINAL TABLE

D ENERGY METER CHECK P51.4=E05 B AS BUILT 1112 1113 TERMINAL TABLE

Y23 Y24 SCHEMATIC DIAGRAM CRP AC POWER SUPPLY B AS BUILT 1113 1114 TERMINAL TABLE
Y24 Z11 SCHEMATIC DIAGRAM
Z11 Z12 SCHEMATIC DIAGRAM 110V DC1 SUPPLY B AS BUILT 1114 1115 TERMINAL TABLE
Z12 Z13 SCHEMATIC DIAGRAM
Z13 Z14 SCHEMATIC DIAGRAM 110V DC2 SUPPLY B AS BUILT 1115 1116 TERMINAL TABLE
Z14 Z21 SCHEMATIC DIAGRAM
IED PSM B AS BUILT 1116 1117 TERMINAL TABLE
E Z21 Z22 SCHEMATIC DIAGRAM
COMMON ALARM B AS BUILT 1117 TERMINAL TABLE
Z22 1001 SCHEMATIC DIAGRAM
1001 1002 PARTS LIST COMMUNICATION INTERFACE B AS BUILT
1002 1003 PARTS LIST
1003 1004 PARTS LIST COMMUNICATION INTERFACE B AS BUILT
1004 1005 PARTS LIST
DEVICE OVERVIEW - P51.1 B AS BUILT
F Based on
A AS MANUFACTURED DEVICE OVERVIEW - P51.2 B AS BUILT
B AS BUILT
DEVICE OVERVIEW - P51.3 B AS BUILT
Rev. Revision note
DEVICE OVERVIEW - P51.4 B AS BUILT
1
DEVICE OVERVIEW - ESW1 B AS BUILT E

DEVICE OVERVIEW - ESW2 B AS BUILT

=E00+CM1 B AS BUILT

=E00+CM1 B AS BUILT

=E00+CM1 B AS BUILT

=E00+CM1 B AS BUILT

Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. LIST OF CONTENT Ref.Des. =E00 F
Approved 22-09-2021 MA LIST OF CONTENT
25-03-2021 KD Project PT. PLN (PERSERO) DCC EAB en
22-09-2021 MR HITACHI 2
DSS 150KV KIS 56 Resp. dept. - Rev. ind. B Language 8
Date Name ACP20051
Doc. no. JBTB.056-KIS-EM-E-006 Sheet
2 34 n. sheet

78

© Copyright 2020 Hitachi Power Grids. 12 3 4 5 6 7 8

SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION

A TERMINAL IN GENERAL OPTOCOUPLER OPERATED BY CIRCUIT BREAKER THREE PHASE A
BINARY INPUT TURNING STAR WINDING B
N/O CONTACT
(NORMALLY OPEN)

N/C CONTACT TERMINAL WITH PLUG BINARY OUTPUT OPERATED BY CRANK DISCONNECTOR THREE PHASE WINDING
(NORMALLY CLOSED) WITH NEUTRAL

B PROTECTIVE EARTHING FO CONNECTOR OPERATED BY LEVER EARTH SWITCH THREE PHASE
ZIG-ZAG WINDING
CHANGE-OVER CONTACT

Print: 9/27/2021 150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT TEST CONTACT BLOCK, AUXILIARY RELAY PLUG CONNECTOR M OPERATED BY MOTOR WAVE TRAP THREE PHASE DELTA
SHORT CIRCUIT BEFORE (1 COIL) & OPEN DELTA WINDING
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. OPENING

N/C CONTACT BISTABLE RELAY ANALOG INPUT TRANSFORMER WITH LIGHTNING ARRESTOR CONNECTOR
(SET AND RESET COIL) TWO WINDING EARTH
(LATE OPENING)
TRANSFORMER WITH C
C THREE WINDING

N/O CONTACT MINIATURE CIRCUIT POWER SUPPLY
(PASSING WHEN ACTUATED) BREAKER

N/O CONTACT LAMP FAN AUTO TRANSFORMER DIODE
(EARLY CLOSING) RESISTANCE CAPACITOR
HEATING RESISTOR D
D CHANGE-OVER CONTACT
HOR REACTOR
(MAKE BEFORE BREAK) N

SIGNAL SOURCE / DESTINATION SEMAPHORE DIRECT CURRENT M MOTOR
FOR CONNECTION BETWEEN
DIFFERENT PAGES

1 SWITCH, 2 POSITIONS ALTERNATING G GENERATOR DOOR SWITCH
0 CURRENT LINK
E CT TERMINAL E

DISCONNECTABLE

WITH BRIDGE SEPARABLE, 0
4 POLES 1
2 KEY SWITCH, CURRENT
OPERATED BY KEY TRANSFORMER
3 POSITIONS

VT TERMINALS CONDUCTOR OPERATED BY VOLTAGE FUSE
DISCONNECTABLE PUSHING TRANSFORMER

F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. F
A AS MANUFACTURED KD Approved 22-09-2021 MA SYMBOL LEGENDS
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 HITACHI 8
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language 21
Date Name ACP20051 56 Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34
7 8

ID HitachiABB Layout A3 - Version 01 1 2 3 4 5 67 8
A
© Copyright 2020 Hitachi Power Grids. 150KV ENERGY METER PANEL =E00+CM1 A
BI B
I REFERENCE DOCUMENTS: - C
FRAME TYPE FIXED D
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s FIXED FRAME HIGH 43U E
OPENING ANGLE 90°
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ACCESS DOOR FRONT AND REAR
TECHNICAL DATA:
HEIGHT X WIDTH X DEPTH 2200MM H X 800MM W X 800MM D
WEIGHT APPROX. - 350KG
PROTECTION CLASS IP42
DOOR LOCK 5MM HANDLING PIN, DOUBLE WEB
CUBICLE COVER SHEETS COLOUR (OUTSIDE/INSIDE) RAL7032, TEXTURED
COVER PLATE COLOUR (MOUNTED ON FIXED FRAME) RAL7032, SMOOTH

C RATED SUPPLY VOLTAGE AC 400/230V, 50HZ
RATED SUPPLY VOLTAGE DC 220V
CUBICLE ILLUMINATION 60W
HEATING WITH INTEGRATED THERMOSTAT 55W
HEATING CONTROL THERMOSTAT & HYGROSTAT
VENTILATION EXHAUST FILTERS AND FANS
AC POWER OUTLET 1PHASE, 10A, TYPE SCHUKO

CABLE DUCT PVC
WIRE INSULATION
2100 WIRE END SLEEVE PVC 70°C
2200 WIRE MARKING
WITH PLASTIC SLEEVE
CONDUCTOR MATERIAL
2100 KTH/Q, WHITE WITH BLACK INSCRIPTION, 12MM

-K1:A2 -K1:A2 / -X1:51 -K1:A2 / -X1:51 -X1:51

COPPER PLAIN MULTISTRANDED FLEXIBLE

D WIRE COLOUR, CONDUCTOR CROSS SECTION AC MULTICORE CABLE, 1.5MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION CONTROL/SIGNAL DC GREY, 1.5MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION DC MAIN GREY, 4MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION VT CIRCUITS RED, YELLOW, BLACK, BLUE - 2.5MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION CT CIRCUITS RED, YELLOW, BLACK, BLUE - 4MM²
WIRE COLOUR, CONDUCTOR CROSS SECTION EARTHING GREEN / YELLOW, 4MM²
CONDUCTOR CROSS SECTION EMC EARTHING 16MM²

E TERMINAL ABB ENTRELEC/PHOENIX CONTACT
TERMINAL VT URTK/S
II TERMINAL CT URTK/S WITH SHORTING FACILITY
TERMINAL AC/DC MAIN INPUT ZS 6
F Based on TERMINAL AC/DC DISTRIBUTION ZS 4
A AS MANUFACTURED TERMINAL PROTECTION/REMOTE INTERFACE M 4/6.SNB
B AS BUILT TERMINAL GROUND (ON EARTHING BAR) AZK35
TERMINAL PRIMARY PROCESS M 4/6.SNB
Rev. Revision note
II
1
100.00 100.00

800.00 Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
KD Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
25-03-2021 MR Project PT. PLN (PERSERO) DCC ELU
22-09-2021 FRONT VIEW WITH DOOR
DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 21
Doc. no. JBTB.056-KIS-EM-E-006 n. sheet 22
2 34 56
7 8

ID HitachiABB Layout A3 - Version 01 1 2 34 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. B Drawing Pocket 800 B
800
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s C 540mm BOTTOM VIEW 800 C
90° +A +C FIXED FRAME
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. D 90° +V D
E 800 +U E

CROSS SECTIONAL VIEW II - II
FIXED FRAME

F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC ELU
22-09-2021 SECTION VIEW INCL. LOCATION DESIGNATION
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 22
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet 23
2 34 56
7 8

ID HitachiABB Layout A3 - Version 01 1 23 4 56 7 8
A A
© Copyright 2020 Hitachi Power Grids. B +U FRONT VIEW FIXED FRAME +W SIDE VIEW
B
C -CM1 -CM1

D U -KC1
E 01 -KC1 -KC2

02
03 -KC2

04

05

06 -P51.1 -P51.2
07
Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s 08 EDMI Mk6N
09
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. BILLING
RESET

SELECT

PULSE 1 PULSE
Wh varh

10

11

12

13

14

15 -X1.1 -X1.2 -X2.1 -X2.2

16 C

17

18

19

20 -P51.3 -P51.4
21
22 EDMI Mk6N

BILLING
RESET

SELECT

PULSE 1 PULSE
Wh varh

23

24

25

26

27 D

28 -X3.1 -X3.2 -X4.1 -X4.2

29

30

31

32

33

34

35

36

37

38 E

39

40

41

42

43

F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC ELU
22-09-2021 FIXED FRAME VIEW
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 23
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet 24
2 34 56
7 8

ID HitachiABB Layout A3 - Version 01 1 2 34 5 67 8

© Copyright 2020 Hitachi Power Grids. A +V BACK VIEW FIXED FRAME -F91 6A AC SUPPLY A
B
+C RIGHT SIDE -F101 10A P51.1 EM POWER SUPPLY +A LEFT SIDE C
(VIEWED FROM FRONT DOOR / +U) -F102 10A P51.2 EM POWER SUPPLY (VIEWED FROM FRONT DOOR / +U) D
-CM1 -F103 10A P51.3 EM POWER SUPPLY E
75x75x460Internal U -F104 10A P51.4 EM POWER SUPPLY -F91 Internal
+C.10 75x75x1925 01 -F105 10A ESW KC1 SUPPLY -F101 75x75x1925
75x50x460 Internal 02 -F201 10A ESW KC2 SUPPLY -F102
03 -F103
B 04 -P1 SLOT 1 -P2 -P5 SLOT 3 -P6 SLOT 5 SLOT 7 SLOT 9 GND N L 12 -F104
05 -P1 -R1 -F105
+C.20 06
07 Tx PORT 1 Rx Tx PORT 2 Rx PORT 5 RJ45 RJ45 PORT 6 PORT 9 PORT 10 PORT 13 PORT 14 PORT 17 PORT 18
C 08
09 RJ45
10
11 -KC1 -P3 SLOT 2 -P4 -P7 SLOT 4 -P8 SLOT 6 SLOT 8 SLOT 10 PE PE 75x75x460
12 -KC2
13 Tx PORT 3 Rx Tx PORT 4 Rx PORT 7 RJ45 RJ45 PORT 8 PORT 11 PORT 12 PORT 15 PORT 16 PORT 19 PORT 20
14
15 75x50x450mm External AFS670-EREEAATTEEEEEEEENZEX08.0
16
17 11 11 11 11 11 11
18 13
19 13 13 13 13 13
20
21 Internal -F201 6A 10A
22 10A
23 -P1 SLOT 1 -P2 -P5 SLOT 3 -P6 SLOT 5 SLOT 7 SLOT 9 GND N L 12 +A.10 10A
24 -P1 -R1 10A
25 10A
26 Tx PORT 1 Rx Tx PORT 2 Rx PORT 5 RJ45 RJ45 PORT 6 PORT 9 PORT 10 PORT 13 PORT 14 PORT 17 PORT 18 -K101
27 -K201
28 RJ45
29
30 -P3 SLOT 2 -P4 -P7 SLOT 4 -P8 SLOT 6 SLOT 8 SLOT 10
31
32 Tx PORT 3 Rx Tx PORT 4 Rx PORT 7 RJ45 RJ45 PORT 8 PORT 11 PORT 12 PORT 15 PORT 16 PORT 19 PORT 20
33
34 AFS670-EREEAATTEEEEEEEENZEX08.0 2 4 12 2 4 12 2 4 12 2 4 12 2 4 12 2 4 12
35 14 14 14 14 14 14
36 75x50x450mm
37
38 Internal
39
40 75x50x460 31 21 11 31 21 11 -B91 -B93
41 34 24 14 34 24 14
42 1110A 32 22 12 32 22 12
43 13
+A.20
2 4 12
14 12

213

A2 A1 A2 A1 -MO.A40

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s -P51.2 -P51.1

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. C4ZC4KC4YC3ZC3KC3YC2ZC2KC2YC1ZC1KC1Y S1 S2 S3SCOM -IRIG-B
+-

-XDCF105 -XDCF103 -XDCF101-XDC1 E -BU1.X1 -BI1.X3 -BI1.X1-XAC - -XXAACC

502 501 102 101 502 501 102 101 E EE E E E -XDCF201 -XDCF104 -XDCF102 -XDC2 E E E E E E E E E EE E 110 109 108 107 106 105 104 103 102 101 110 109 108 107 106 105 104 103 102 101

SH + - 502 501 102 101 502 501 102 101 E EE E E E
-COM1
504 503 502 501 104 103 102 101 504 503 502 501 104 103 102 101 E
SH + -
-COM4 E EE E E E E E E E

ETH PE -TB2 -TB3 -TB4 -TB5 -TB6 -TB7 -TB8

L
N
G

-TB12 E
-TB1
I31 I21 I11 V1 V3 -TB10 -TB11 11 13 504 503 502 501 104 103 102 101 504 503 502 501 104 103 102 101 E EE E E E E E E E E E E EE 4321 4321
2 579

I32 I22 I12 -Vref V2 1 3 4 6 8 10 12 14 -BI1.X4 -BI1.X2

E

504 503 502 501 104 103 102 101 504 503 502 501 104 103 102 101 E EE E E E E E E E External E E E EE 4321 4321

Internal E
External
External -X1.2 75-Xx510.1x450mm 504 503 502 501 104 103 102 101 504 503 502 501 104 103 102 101 E EE E E E E E E E E E E EE 4321 4321

-X2.2 -X2.1 1234 EEEE 4321E 4321

1234

1 3 01 03 1 3 01 03 502 501 102 101 502 501 102 101 E EE E E E E
2 4 02 04 2 4 02 04
E E E E E E E EE
01 02 03 04 01 02 03 04 87654321 87654321

502 501 102 101 502 501 102 101 EE E E E

Internal External/Internal -BU1.X2 E
External 75x50x450mm
E E E E E E E EE 87654321 87654321
-P51.4 -P51.3

E

C4ZC4KC4YC3ZC3KC3YC2ZC2KC2YC1ZC1KC1Y S1 S2 S3SCOM -IRIG-B
+-

SH + - E 87654321 87654321 -X811
-COM1 EEEEEEEE

SH + - E
-COM4
E

-TB2 -TB3 -TB4 -TB5 -TB6 -TB7 -TB8 ETH PE

-TB12 L
-TB1 N
G

-TB10 -TB11 11 13 I31 I21 I11 V1 V3
2 579

1 3 4 6 8 10 12 14

I32 I22 I12 -Vref V2

D

75x50x450mm External
Internal
-X4.2 -X4.1 -X3.2 -X3.1

1234 1234 1 3 01 03
2 4 02 04
1 3 01 03 01 02 03 04
2 4 02 04

01 02 03 04

Internal -CM1
75x50x450mm

E

75x75x1925 75x100x1925 Internal 75x100x1800 External P PE N
Internal -XG1
+C.30 L PE -E93
75x100x1250
External N Internal
+C.40
+A.30

1 2 3 4 5 6 7 8 9 10

NOTE: FOR SECTION LEGEND REFER SHEET 32.

F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
A AS MANUFACTURED Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
B AS BUILT 25-03-2021 KD Project PT. PLN (PERSERO) DCC ELU
22-09-2021 MR INSIDE VIEW
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 24
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet 25
2 34 56
7 8

ID HitachiABB Layout A3 - Version 01 1 2 3 4 5 67 8
A A
© Copyright 2020 Hitachi Power Grids. +B REAR PLANE B

-CM1 C

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s B Internal D
75x100x1925
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 75x75x460 75x75x1925

+B.10 Internal
75x50x460

+B.20

C 75x50x460

+B.30
75x50x460

+B.40
75x50x460

D

E E

NOTE: FOR SECTION LEGEND REFER SHEET 32.

F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
A AS MANUFACTURED Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
B AS BUILT 25-03-2021 KD Project PT. PLN (PERSERO) DCC ELU
22-09-2021 MR INSIDE REAR VIEW
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 25
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet 26
2 34 56
7 8

ID HitachiABB Layout A3 - Version 01 1 2 34 5 67 8
A
© Copyright 2020 Hitachi Power Grids. ABB TYPE NUMBER: 1KHF601226R0016 ABB TYPE NUMBER: 1KHF601226R0015 A
B MATERIAL, COLOUR GROUND / INSCRIPTION: PVC BLACK/WHITE MATERIAL, COLOUR GROUND / INSCRIPTION: PVC BLACK/WHITE
37.00
C 150KV ENERGY METER PANEL =E00+CM1

D 105.00 B

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s E 210.00 42

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. F Based on 86
A AS MANUFACTURED
B AS BUILT 28 14

Rev. Revision note MATERIAL, COLOUR GROUND / INSCRIPTION: PVC WHITE/BLACK

1 MATERIAL, COLOUR GROUND / INSCRIPTION: PVC WHITE/BLACK

+U.02 -KC1 +U.15 -X1.1 -X1.2 -X2.1 -X2.2 C
+U.04 ETHERNET SWITCH +U.28 D
+U.08 CT TEST BLOCK VT TEST BLOCK CT TEST BLOCK VT TEST BLOCK
+U.08 -KC2
+U.20 ETHERNET SWITCH -X3.1 -X3.2 -X4.1 -X4.2
+U.20
-P51.1 CT TEST BLOCK VT TEST BLOCK CT TEST BLOCK VT TEST BLOCK
ENERGY METER MAIN
E
(OHL KTT)

-P51.2
ENERGY METER CHECK

(OHL KTT)

-P51.3
ENERGY METER MAIN

(TRAFO-1)

-P51.4
ENERGY METER CHECK

(TRAFO 1)

Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Assembly drawing Ref.Des. =E00 F
KD Approved 22-09-2021 MA CUBICLE LAYOUT +CM1
25-03-2021 MR Project PT. PLN (PERSERO) DCC ELU
22-09-2021 LIST OF LABELS
DSS 150KV KIS Resp. dept. - Rev. ind. B Language en
Date Name ACP20051 HITACHI Sheet 26
Doc. no. JBTB.056-KIS-EM-E-006 n. sheet D11
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 1 2 3 4 5 67 8

© Copyright 2020 Hitachi Power Grids. A HV Current IL1 HV Current IL3 HV Voltage UL1 HV Voltage UL3

>=E04 +C1 HV Current IL2 HV Voltage UL2 A

MARSHALLING KIOSK B
KTT

B

REF DWG:JBTB1.056-KIS-EM-E-003 REF DWG:JBTB1.056-KIS-EM-E-003
SH D14 SH D14

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s -BI1.X5 -BU1.X2

We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. 1 2
IL1 UL1
2 4
IL2 UL2
3 6
IL3 UL3
4 8
ILN ULN

C C
D
+CM1 E

ENERGY METER PANEL 1

12 3 4 12 3 4 5 6 7 8

-BI1.X1 -BU1.X1

-X1.1 -X1.2

Test Test

D Normal 01 Normal 01 UL1 UL2 UL3 ULN
1 /D11.D2 1 /D11.D6 +U.15-X2.2:1 +U.15-X2.2:2 +U.15-X2.2:3 +U.15-X2.2:4

+U.15 -X1.1 2 02 2 02 +U.15 -X1.2
/D11.D2 /D11.D7

TEST BLOCK CT 3 03 3 03 TEST BLOCK VT /D12.D6 /D12.D7 /D12.D7 /D12.D7
/D11.D3 /D11.D7
CC-E-VA-6.6 1 2 3 4 TC-DS-VL 1 2 3 4

4 04 4 04
/D11.D3 /D11.D7

/D11.D4 01 /D11.D4 02 /D11.D4 03 /D11.D4 04 CURRENT TEST BLOCK VOLTAGE TEST BLOCK /D11.D5 01 /D11.D5 02 /D11.D5 03 /D11.D5 04

+U.08 -P51.1

EDMI, Mk6N -TB1 1 -TB1 4 -TB1 8 -TB1 2 -TB1 5 -TB1 9

MULTIFUNCTION METER Ib Ic Va Vb Vc
#UL1 #UL2 #UL3
Ia
VT: VT: VT:
E #IL1 #IL2 #IL3 57-240V 57-240V 57-240V
/Z11.C3 /Z11.D3 /Z11.D3 Vn
CT: CT: CT:
13
1A 1A 1A
/Z11.B3 Ia /Z11.C3 Ib /Z11.C3 Ic

3 6 10

IL1 IL2 IL3 ILN
+A.40-BI1.X2:1 +A.40-BI1.X2:2 +A.40-BI1.X2:3 +A.40-BI1.X2:4

/D12.C2 /D12.C2 /D12.C3 /D12.C3

F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 ENERGY METER MAIN P51.1=E04 D11
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language D12
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8

ID HitachiABB Frame A3 - Version 01 1 2 3 4 5 67 8
A
© Copyright 2020 Hitachi Power Grids. HV Current IL1 HV Current IL3 HV Voltage UL1 HV Voltage UL3

HV Current IL2 HV Voltage UL2 A

B B

Print: 9/27/2021 D:\OneDrive - PG\PROJECT\KIS\46 DATA FOR AS BUILT\Skematik\as built finish from pak asep\ganti no dwg\150kV=E00+CM1-EM-JBTB1.056-KIS-EM-E-006-Rev-B_AS BUILT.e3s C /D11.F2 /D11.F2 /D11.F3 /D11.F3 C
D
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. +CM1 E

ENERGY METER PANEL 1

IL1 IL2 IL3 ILN /D11.D8 /D11.D8 /D11.D8 /D11.D8
+U.08-P51.1:3 (-TB1) +U.08-P51.1:6 (-TB1) +U.08-P51.1:10 (-TB1) +U.15-X1.1:04
UL1 UL2 UL3 ULN
+A.40-BU1.X1:2 +A.40-BU1.X1:4 +A.40-BU1.X1:6 +A.40-BU1.X1:8

12 3 4 -X2.1 -X2.2

D -BI1.X2 Test Test

Normal 01 Normal 01
1 /D12.D2 1 /D12.D6

+U.15 -X2.1 2 02 2 02 +U.15 -X2.2
/D12.D2 /D12.D7

TEST BLOCK CT 3 03 3 03 TEST BLOCK VT
/D12.D3 /D12.D7
CC-E-VA-6.6 1 2 3 4 TC-DS-VL 1 2 3 4

4 04 4 04
/D12.D3 /D12.D7

/D12.D4 01 /D12.D4 02 /D12.D4 03 /D12.D4 04 CURRENT TEST BLOCK VOLTAGE TEST BLOCK /D12.D5 01 /D12.D5 02 /D12.D5 03 /D12.D5 04

+U.08 -P51.2

ION8650 I11 I21 I31 V1 V2 V3

MULTIFUNCTION METER

E #I1 #I2 #I3 #V1 #V2 #V3
VT: VT: VT:
CT: CT: CT: 57-277V 57-277V 57-277V
/Z12.B5 - /Z12.B5 /Z12.B5
1-5A 1-5A 1-5A
-Vref
/Z12.C5 /Z12.C5 /Z12.C5

I12 I22 I32

F Based on Prepared 22-09-2021 MR Title 150KV ENERGY METER PANEL Doc. kind. Circuit diagram Ref.Des. =E00 F
A AS MANUFACTURED KD Approved 22-09-2021 MA SCHEMATIC DIAGRAM
B AS BUILT 25-03-2021 MR Project PT. PLN (PERSERO) DCC EFS en
22-09-2021 ENERGY METER CHECK P51.2=E04 D12
Rev. Revision note DSS 150KV KIS Resp. dept. - Rev. ind. B Language D13
Date Name ACP20051 HITACHI Sheet
1 Doc. no. JBTB.056-KIS-EM-E-006 n. sheet
2 34 56
7 8