Company Profile Suite # F.I-09, 5th Floor Mateen Shopping Galaxy Rashid Minhas Road
Gulshan-e-Iqbal Block 10, Karachi.
Tel: +92 333 2124757, +92 346 2815870, +92 21 34967591
Email: [email protected], [email protected]
COMPANY PROFILE
Electrical, Mechanical,
Civil Contractor
& General Order Supplier
TABLE OF CONTENT
Introduction ...................................................................................................................................................................3
About Electrosol.............................................................................................................................................................4
1. Our Vision ................................................................................................................................................................ 4
2. Mission Statement .................................................................................................................................................. 4
3. Quality Policy ........................................................................................................... Error! Bookmark not defined.
Certificates .....................................................................................................................................................................6
1. Federal Board Of Revenue Division – Government of Pakistan NATIONAL TAX NUMBER (NTN)....................... 6
2. GOVERNMENT OF SINDH – SINDH REVENUE BOARD SINDH SALES TAX REGISTRATION CERTIFICATE.............. 7
3. KARACHI CHAMBER OF COMMERCE – MEMBERSHIP CERTIFICATE..................................................................... 8
4. PAKISTAN ENGINEERING CONCIL – LICENSE OF PAKISTANI CONSTRUCTOR / OPERATOR ................................. 9
5. UNDERTAKING REGARDING NOT BEING BLACKLISTING ..................................................................................... 10
6. SINDH PROFESSIONAL TAX ................................................................................................................................... 11
7. VERIFICATION OF CHARACTER & ANTECEDENTS ................................................................................................ 12
Registration & Enlistment ............................................................................................................................................13
Services ........................................................................................................................................................................14
1. Electrical Engineering............................................................................................................................................ 15
2. Civil Engineering .................................................................................................................................................... 16
Essential Experienced Resources .................................................................................................................................18
1. Syed Muhammad Azfer......................................................................................................................................... 18
2. Dr. Mazhar Hussain Malik ..................................................................................................................................... 19
3. Engineer Zubair Ahmed ........................................................................................................................................ 23
4. Shiraz Saeed........................................................................................................................................................... 29
5. Khalid Khan ............................................................................................................................................................ 31
6. List of Essential Experienced Resources............................................................................................................... 35
Key Projects .................................................................................................................................................................37
Equipment ...................................................................................................................................................................84
Heavy Equipment ........................................................................................................................................................... 84
Light Equipment ............................................................................................................................................................. 85
pg. 1
Survey Equipment .......................................................................................................................................................... 86
Lab Equipment................................................................................................................................................................ 87
Electrical Tools/Equipment ............................................................................................................................................ 88
Contact Us....................................................................................................................................................................89
pg. 2
Introduction
Established in 2011, ElectroSol is based in Karachi Pakistan. We specialize in the complete Civil,
electrical, Mechanical & Civil services in commercial, industrial and public sector projects. We
also carry out routine maintenance to existing electrical installations Mechanical fabrication
overhauling & civil renovation or new constructions. Our experience ranges from projects with a
value in excess of Rs. 20 million to small works contracts.
ElectroSol employs approximately 60 directly employed staff and operatives. Over the years we
have created a talented and committed staff and workforce to ensure the each contract is carried
out efficiently and profitably.
We believe that the way to promote our business is through the development of
good working relationships with our clients. To this end, we aim to provide high quality
installations in an efficient, friendly manner, on time and to budget. We endeavour to earn the
trust and confidence of those for whom we work with. Our objective is to provide, within the cost
plan, a service of such high quality that encourages the continuity of the business.
In all our undertakings, we offer a strong commitment to Quality, Health & Safety, and Training
and Environmental issues. This positive attitude has, we modestly claim, gained us a good
reputation and has resulted in repeated business from many satisfied clients.
pg. 3
About ElectroSol
ElectroSol is a team of experienced professionals with backgrounds in electrical, mechanical, and
civil engineering. From the head office in Karachi, the company aims to offer its services where
the key fundamentals are quality, efficiency and reliability.
The objectives are simple. We will operate with the high standards of workmanship, quality,
commercial awareness, and safety. It is the intention of the company to employ a locally-based
skilled and experienced workforce and to implement a training and development program. The
main objective is to provide dependable, efficient and affordable services to our clients and
support reciprocal investment in the local economy.
1. Our Vision
Encompassing the fields of electrical installation, Mechanical maintenance, and civil repairs, and
fabrication; our group will be indispensable. This is and will remain the driving principle of
progress and the touchstone of success.
2. Mission Statement
ElectroSol is committed to providing the highest quality services, competitively priced, with
services exceeding our customers’ expectations. We will continue to invest in facilities, systems
and highly trained technical personnel providing added-value to our business relationships.
3. Quality and Safety Policy
The policy of ElectroSol is to empower all employees to create, implement, and improve our services to
meet and exceed external and internal customer expectations. ElectroSol pledges to create a work
environment which develops motivated, knowledgeable employees committed to the corporate mission.
Continuous Process Improvement will be driven toward improved customer satisfaction and enhanced
customer loyalty.
We will lead the industry by promoting best practice and exceeding the guidance of the Health and Safety
Executive and other regulatory bodies. This policy reflects our commitment to ensuring that health and
pg. 4
safety at work are paramount to the business and that effective health and safety actively contributes to
our success. Through the way we work and behave, all our people and stakeholders will be protected from
risks of occupational injury or ill health.
All our people are adequately instructed and trained on the health and safety issues that affect them, and
the safe working practices that should be followed. We will ensure the health and safety competence of
our sub-contractors and stakeholders.
We will assess the risks associated with health and safety hazards in the workplace. All our people will be
informed of the health and safety hazards and risks that affect their work. We already take actions to
prevent, reduce or control risks to an acceptable level and reduce the potential for incidents and
accidents. We will require our sub-contractors and stakeholders to identify health and safety risks that
may impact on our work activities.
We will actively and openly, review and report on our health and safety performance against published
objectives and targets. Improvement plans will be developed to support the delivery of these objectives
and targets.
We will only work with joint venture partners and clients who are willing to meet and achieve our health
and safety expectations. We will engage and influence stakeholders to drive improvements in health and
safety.
pg. 5
Certificates
1. Federal Board Of Revenue Division – Government of Pakistan
NATIONAL TAX NUMBER (NTN) - REGISTRATION
pg. 6
2. GOVERNMENT OF SINDH – SINDH REVENUE BOARDSINDH SALES
TAX REGISTRATION CERTIFICATE
pg. 7
3. KARACHI CHAMBER OF COMMERCE – MEMBERSHIP CERTIFICATE
pg. 8
4. PAKISTAN ENGINEERING CONCIL – LICENSE OF PAKISTANI
CONSTRUCTOR / OPERATOR
pg. 9
5. UNDERTAKING REGARDING NOT BEING BLACKLISTING
pg. 10
6. SINDH PROFESSIONAL TAX
pg. 11
7. VERIFICATION OF CHARACTER & ANTECEDENTS
pg. 12
Registration & Enlistment
ElectroSol has been registered in following Government and private sectors.
1- Pakistan Military Academy.
2- Engro Thar Coal Sindh
3- PEL Pakistan
4- Intervid
5- Hoora Pharma
6- Reon Energy
7- Tufail Chemical industries Ltd.
8- Bahria Town Karachi
9- ISI
10- 74 Signals
11- Gwadar Development Authority.
12- Gwadar Port Authority.
13- Baluchistan Development Authority
14- SSGC
15- Scientist Society
16- MAL Pakistan
17- NED University
18- Pakistan Navy
19- Pak Works
20- PICT Karachi.
21-National Logistic Cell.
22- MediPlast Pharma.
23- Universal Packages.
24- Universal Brush.
pg. 13
pg. 14
Services
1. Electrical Engineering
Electrical engineering is our area of emphasize. Having a vast, comprehensive, and diversified
knowledge in the field of electrical engineering, we provide full range of services. Our services
includes but not limited to supply, installation, commissioning, and testing of Medium Voltage,
Low Voltage, and Extra Low Voltage systems in industrial, commercial, and residential projects.
The areas of work undertaken by the company are as under.
1) Power Supply (Utility, Backup, and Renewable Energy)
• Distribution Transformer
• Diesel Generator
• Solar System
• UPS
2) Switchgear (LV/MV)
• Main/Submain Panels
• MCC/PCC Panels
• HVAC Panels
• VFD Panels
• Star-Delta Starter Panels
• ATS Panels
• Lighting Distribution Boards
• UPS Distribution Boards
3) Low Voltage System
• Power Distribution
• Cable Laying & Termination
• Busway system
pg. 15
• Illumination
• Earthing/Grounding
• Lightening Protection
4) Low Current / ELV System
• Integrated Building Management System
• Fire Alarm System
• Data & Voice Communication System
• CCTV
• Paging / Background Music System
• Nurse Call System
2. Civil Engineering
ElectroSol also provides Civil, Mechanical & Plumbing Solutions including structural architectural
designs, interior designing, 2D/3D diagrams/maps etc.
Civil Construction
1. Building Construction
2. High rise Building
3. Industrial Constructions
4. Banglows
5. Road & Bridges Works
6. Infra-structure
7. Drainage & Sewerage Construction
• HVAC System
• Plumbing System
pg. 16
3. Sinage, MS & SS Railing Works.
ElectroSol also provides services of Sinage, MS & SS railing works on various government and
private projects.
pg. 17
Essential Experienced Resources
At ElectroSol, we believe that our workforce is the most valuable intangible asset. Our workforce
includes highly talented and professional individuals. The people working at ElectroSol are
graduated from the best universities in Pakistan, and have a diverse expertise in the different
fields. We have no doubt that it is because of the skill-set, expertise, and professional loyalty of
our team that has made it possible for ElectroSol to come this far. Following are the key people
at ElectroSol.
1. Syed Muhammad Azfer
Mr. S. M. Azfer is the Director in ElectroSol. He studied Electrical Engineering from Balochistan
University of Engineering & Technology. After that he did MBA in Project Management. He has
more than Fifteen years of experience in the field of engineering. Before starting his own
contractor firm, he served renowned organizations at senior positions and provided managerial
role at various projects. He also worked in KSA at the senior position for four years.
Mr. Azfer has extensive experience of execution, commissioning, testing, and maintaining of
medium voltage, low voltage, and extra low voltage electrical system. He has worked on all types
of engineering projects, including: Infrastructure, Industrial, Commercial, and Residential
projects. Few of his key projects are:
• 220 KW Solar System installations at Jacobabad Institute of Medical Sciences of USAID
under supervision of CDM SMITH, at Jacobabad Sindh.
• Korangi Creek Industrial Park, (Power Project-07) of National Industrial Parks &
Development Authority under Supervision of NESPAK at Korangi Creek in Pakistan.
• Saudi Aramco sulfur upgrade project (BI-10-00059) at Utmaniya Gas Plant in Saudi Arabia.
• Replace Obsolete Electrical Distribution Equipment, (BI-10-03082) under Saudi Aramco
Abqaiq plants at Abqaiq in Saudi Arabia
pg. 18
2. Dr. Mazhar Hussain Malik
pg. 19
pg. 20
pg. 21
pg. 22
3. Engineer Zubair Ahmed
Cell # 0345-3256554
Address: House No. K-220 street #05 Sector #16 blk B-2,
Gulshan-e-Bahar, Orangi Town Karachi, Pakistan
Email Address:[email protected]
CAREER OBJECTIVE:
Intended in seeking a Challenging Career that will help to make the best use of my skills and abilities
in attainment of organizational goals and which helps in career growth along with the growth of the
company.
PERSONAL INFORMATION:
Father’s Name : Nazeer Ahmed
42401-9592889-5
CNIC No. : Islam
Pakistani
Religion : Married
[email protected]
Nationality :
Marital Status :
Email Address :
QUALIFICATION:
Degree / Certification Year Institution
B.S Civil Engineering
B-TECH Civil Engineering In-Process PIMSAT
DAE Civil Engineering
HSC (Commerce) 2011 Newport’s Institute Karachi,
SSC (Science) 2003
2010Govt. College of Technology (GCT) Site Karachi.
2005 Private
Rakhshinda Public Secondary School Karachi.
PROFESSIONAL EXPERIENCE (More than 18 Years)
M/S ElectroSol (Your Solution Partner.
(Sept 2014 – to date)
Currently working as a "Project Manager” on ENGRO THAT COAL. (Contractor Representative). Here
my duties are to manage the ongoing site activities along with the QA/QC, Project Management work.
My current projects include both residential and commercial works.
pg. 23
M/S DEECON ENGINEERS & CONTRACTORS.
(Aug 2014 – to date)
Currently working as a "Project Manager” in BahriaTown Karachi projects. (Contractor
Representative). Here my duties are to manage the ongoing site activities along with the QA/QC, Project
Management work. My current projects include both residential and commercial works.
PROJECT DETAILS:
• Construction of 54 houses of 8Marla at Precinct #2 (Grey Structure) (2400sft each).
• Construction of Cine Gold Cinema at MID Way Commercial (Grey Structure)
(63500sft).
• Construction of School Building at Phase 2. (Grey Structure) (127000 sft)
• Construction of JAMIA Masjid at Phase 2. (Grey Structure) (17500 sft)
• Construction of 157 houses of 8Marla at Precinct #27 ( Grey Structure)
• Construction of Fuel Pump at Precinct #12 and 18 of PSO standards.(Complete with all
respect)
M/S Principal Builder(Pvt) Ltd.
(Jan-2013 toJul-2014)
Previously worked as a “Site Manager”. My job duties included reviewing &monitoring the
ongoing projects with respect to taking off the bill of quantities, engineering estimates then
having the top Supervision/ Monitoring of the project so that the project runs smoothly.
PROJECT DETAILS:
• Construction of 200 Beds Hospital USAID Founded Project at Jacobabad.
Project Duration: 1.5 years
Project Total Area: 696960 sft
Overall Project Cost: PKR 1700 million
pg. 24
M/S Tobishima Corporation
(Jan-2011 to Dec-2012)
Previously worked as a “Site Engineer” (Client Representative) in export processing zone Karachi
(YKK International). My job duties included reviewing & monitoring the ongoing projects as per
construction standard and make sure project completed with appropriate time.
PROJECT DETAILS:
• Construction Zipper Factory Phase-2 at export processing zone Karachi (YKK
international). (P.E.B. Building).
Project Duration: 1 years
Project Total Area: 108900sft
Overall Project Cost: PKR 220 million
M/S My Land Builders and Developers.
(Dec-2007 to Jan-2011)
Previously worked as a “Site In-charge”. My job duties included reviewing & monitoring the ongoing
project with respect to taking off the bill of quantities, engineering estimates, surveying QA/QC, Site
Management and supervision to make sure construction work completed with respect to committed
time.
PROJECT DETAILS:
• Construction of 16 stories commercial plus residential building with name of Diamond
Residency near KPT interchange Karachi.
• Construction of 8 stories commercial plus residential building with name of Diamond
Tower at Gulshan-e-Maymar Karachi.
• Land Escaping /Plotting of Diamond City at Gulshan-e-Maymar Karachi
M/S City Developer.
(July-2005 to Dec-2007)
Previously worked as a “Chief Surveying”. My job duties included reviewing & monitoring the ongoing
projects with respect to site surveying and leveling.
PROJECT DETAILS:
• Construction ofDefence Regency (High Rise Project - 18 Floor).
pg. 25
M/S The Technologist Company
(Feb-2004 to July-2005)
Previously worked as a “Site supervisor and Surveyor”. My job duties included reviewing &
monitoring the ongoing projects with respect to taking off the bill of quantities, engineering estimates
then having the top Supervision/ Monitoring of the project so that the project runs smoothly.
PROJECT DETAILS:
• Construction of Consul General Residence of Japan at gizri Karachi.
• Construction Zipper Factory Phase-1 at export processing zone Karachi (YKK
international). (P.E.B. Building)
M/S Faryad Construction & Co
(Mar-2002 to Feb-2004)
Previously worked as a “Site surveyor”. My job duties included reviewing & monitoring the ongoing
projects surveying and leveling.
PROJECT DETAILS:
• Several Govt Projects of Water and Sewage work at different sites in Karachi. (KW&SB
Projects).
M/S Kings Enterprises
(Sep-2001 to Mar-2002)
Previously worked as a “Site surveyor”. My job duties included reviewing & monitoring the ongoing
projects surveying and leveling.
PROJECT DETAILS:
• Roadwork at Karachi Medical and Dental College Karachi.(CDGK Project).
TECHNICAL & COMPUTER SKILLS:
• Familiar with AUTO CAD, GIS Software, Total Station & level Machine
• Able to operate Microsoft Office tools such as word, power point and excel.
ACTIVITIES AND INTERESTS:
• Cricket
pg. 26
CURRICULUM VITAE
Muhammad Azhar Lodhi
MEP Director of ElectroSol
Tele No.
Mob No.03218751452
Email: [email protected]
PERSONAL INFORMATION
Date of Birth : 25th June, 1975
Father Name : Muhammad Naqi Khan Lodhi
Marital Status : Married
NIC # : 42101-2751543-7
Religion : Islam
Language : English & Urdu
Nationality : Pakistani
PROFESSIONAL & ACADEMIC QUALIFICATION:
➢ Diploma Associate Engineering. (Mechanical) ( S.B.T.E ) in 1998
➢ Intermediate Pre – Engineering in Year 1995
➢ S.S.C. (Board of Secondary Education Karachi) in Year 1993
COMPUTER SKILS:
➢ MS Office
➢ Auto Cad
➢ MS Project
➢ Internet & Emails
PROFESSIONAL EXPERIENCE:
I am working with National and Multination companies in Industrial, offices, Buildings, Restaurant,
Residences, Banks, Hospital & external development works & others works.
➢ 20 Year Projects Experience
pg. 27
I. Indus Motor Company ( Plumbing & Fire Fighting Works)
II. Siemens Pakistan ( Plumbing & External Piping Works)
III. Engro Chemical Limited ( Plant MS Piping & Plumbing
Works)
IV. NTDC Interconnection Hub (External Piping & Pumping works)
V. Gull Ahmed Textile ( Plumbing & Fire Fighting Works)
VI. KICT Marine Building ( Plumbing & Fire Fighting Works)
VII. Pakistan Textile City Admin Building ( Plumbing & Fire Fighting Works)
VIII. Pakistan Textile City Water Works Plumbing & Pumping Station Works)
IX. MR. Haseeb Khan Banglows (Plumbing , Filtration Plant, Fountain
Works)
X. Brooks Pharmecital (Plumbing , HVAC & Fire Works)
XI. Hyperstar (Plumbing, RO Plant, Watersoftner,
Filtration Plant & Fire Fighting
Works)
XII. Bank Al Habib IT & Data Center Building ( Plumbing & Fire Fighting
Works)
XIII. Coca Cola Beverage Limited ( Bulk Water Supply Line 16KM)
XIV. JPMC ( USAID Project) ( Plumbing , Fire & Medical Gases
Works)
I am working with following Consultant:
I. S.Mehboob & Co
II. Y.S Associates
III. Matrix Consultant
IV. Sem Engineers
V. Halcrow Pakistan (Pvt.) Ltd.
VI. Fahim Nanji Desouza (FND)
VII. Y.H.Associates
VIII. Engineering Associates
pg. 28
4. Shiraz Saeed
pg. 29
pg. 30
5. Khalid Khan
Instrumentation Engineer
CB-1053/1, Mehria colony, Pirwadhaimor, Rawalpindi Cantt,Punjab, Pakistan.
DOB: March 4th, 1979.
[email protected]
+92-334-5428279, +92-322-5097790
Summary:
Dynamic & result oriented with excellent skills, and maintain high-level of team building spirit, with
Engineering Education of B.Tech(Pass) Electronics and 17+ years’ experiencerelated to shutdowns,
Maintenance of Instrumentation, Power related jobs in plants.
Education:
• Preston University Islamabad (2006)
• B-Tech (Pass)
• Electronics Engineering
• R.I.T Rawalpindi (1999)
• D.A.E
• Electronics Engineering
Certifications:
• Certified Associate of SCADA & PLC (CAPS), NUST, Islamabad.
• Six Sigma “Green Belt” ( DAS Pakistan & IQMS UK)
• Saudi Aramco Industrial safety (Saudi Arabia)
• Saudi Aramco power plant operations (Saudi Arabia)
• Industrial controls and automation. T.T.I, P.O.F Wah
• VeriLog HDL
Engineering Software’s:
• AutoCAD 2005
• LabVIEW 6 & 6.5
• MatLab 6.5
• Protel 99
• VeriLog HDL
pg. 31
Carrier Highlights:
1. Joined ElectroSol as a Project manager from March 2016 till Date.
2. Project Engineer (E & I)
M/S IMAD Company for Trading & Contracting (K.S.A)
5 January 2008 to 5 February 2016
MAJOR PROJECTS:
• Interconnecting facilities HRSG (Heat recovery steam generator) @ Abqaiq gas plant (BI-10-
01252) Year 2014-16
• Interconnecting facilities HRSG (Heat recovery steam generator) @ Hawiyah gas plant (BI-
10-012526)
Year 2014-16
• Sulfur Plant Up Grade Phase II, Uthmaniyah Gas Plant
(BI-1000-59). Year 2009-13
• Sulfur Plant Up Grade Phase II, Shedgum Gas Plant
(BI-1000-57). Year 2009-13
• Replace Obsolete Electrical Distribution Equipment at Abqaiq Plant.
(BI-10-03082). Year 2008-9
Tasks
As a team leader of E & I discipline in Saudi Aramco projects with a team of experienced field
engineers, field supervisors and complete crew of approximately 80 ≈ 200 persons. I have to
perform following tasks
• Preparation of shutdown schedule
• Design review meeting with designer
• Technical bid evaluation
• Work execution plan
• Prepare tender & bid documents
• On site design changes, change orders & technical query
• Prepare daily, weekly& monthly schedule
• Meeting with Client, vendors etc
• Material order & inquiries
• Commissioning & startup
Shutdown Coordinator
• Preparation of shutdown schedule for within the defined timeline for the complete sulfur lines
(including static & rotating equipment, major & minor power etc), electrical sub-stations and
related equipment.
• Maintenance of power plants during shutdowns
pg. 32
• Responsible for the all E&I activities during bypass line, by pass mode& Final construction
shutdown in Saudi Aramco Shedgum gas plan t& Saudi Aramco Uthmaniyah Gas Plant.
• Responsible for major power shutdowns for replacement of obsolete power distribution
equipment in Saudi Aramco abqaiq gas plant.
• Worked as member of the exceptional items team before signature of final MCC to Saudi
Aramco.
• In-charge of the Instrument loop check & pre-commissioning team.
• Final hook-up before the final startup of Sulfur Recovery Unit in Shedgum&uthmaniyah project.
• 4.18KV, 2.4KV, 480V substations shutdown and demolition of old obsolete equipment and
installation of new switch gears and MCC’s.
• Linkage of all protection & relays during major shutdown of 69KV line.
Commissioning specialist
Commissioning of stationary and rotary field equipment including
• DCS system
• ESD system
• SCADA
• Field Instruments &Control valves
• 69KV switch yard
• 13.8, 4.18, 2.4KV & 480V substations
• 4.18KV, 2.4KV & 480 V MCC
• Oil cooled and air cooled systems
• 4.18 KV air blower
• Relay and protection panels
• Rotating stages of sulfur units such as converters, condensers, air pre heater, oil pre-heaters
etc
• Fiber optic networks
Installation of Heavy Equipment
• Installation for the sulfur recovery units (SRU 1 to 5) and related Equipment such as Thermal
oxidizer igniter unit, Air gas preheated, Reaction Furnace, Converters, Coalescer, 15PSIG steam
Condenser, Sulfur Condenser, Static Mixer, Combustion Air Blower, Auxiliary Burner, Tail Gas &
Stack Gas Analyzer.
• Demolishing of the existing obsolete equipment.
• Pre-commissioning and commissioning of rotating and stationary equipment, field instruments,
control panels etc.
• Installation of SCADA RTU (GE HARRIS 200)
• Installation & commissioning of sales gas metering skid
• 69KV & 213 KVSF6 circuit breakers
pg. 33
• High and medium voltage transformers
1. SUPERVISOR (INSTRUMENTATION):
M/S LTE Pakistan (Pvt) Ltd, PAKISTAN.
Aug 2000 to Jan 2008 (7 Years & 5 Months)
PROJECT PROFILE:
Installation, Commissioning & Maintenance
• Gyroscopic sensors (IFOG)
• Class 100 clean room
• Data acquisition system (DAQ)
• Wireless sensors, transmitters etc
• Fiber optics drawing tower
• Fiber optic cabling lines
• Optical preforming
• Fiber optic test benches & instruments
• Extension of 11KV substation
• Established stand-alone electronics work bench
• Annunciator, DFR & PMS systems
• Installation & commissioning of 3D rotational system
• Installation of floating instruments
• Installation & commissioning of SCADA & DCS system cabinets
• Substation and substation equipment
Manufacturing:
• Manufacturing of fiber gyroscopes
• Manufacturing of various type of optical fibers & optical fiber cables (SMF, MMF, PMF etc)
Manufacturing of fiber optic products (patch cord, couplers, attenuators, polarizer’s, sensing coils etc)
2. TRAINEE MAINTENANCE ENGINEER (Electro-medical)
M/s S. Ejazuddin& Co. Islamabad, PAKISTAN.
July 2000 to Aug 2000 (2 Months)
• Maintenance & troubleshooting of hematology analyzers (Sysmex)
• Maintenance of cobas analyzers (Roche)
pg. 34
6. List of Essential Experienced Resources
Sr. Name Designation Experience Remarks
1. Dr. Mazhar Director 14 Years P.E, ME IN Electronic Design,
Technical MPILL Embedded System Design,
Hussain Malik PHD In Progress; Machine VISION,
Remotely Available.
2. Syed Director Admin 20 Years MBA
Muhammad
Athar Director HSE 19 Years MBA, Certified Lead Auditor ISO.
3. Syed Administrative 14 Years MBA.
Muhammad Consultant 12 Years Masters.
Ahmer Executive 10 Years Graduation.
Director 20 Years Diploma Mechanical
4. Maj. (R) Syed Executive 16 Years B. Tech
Kausar Ali Zaidi Director 18 Years Civil Engineer
Director MEP 15 Years Creative Director
5. Nida Azfer 14 Years Masters
Instrument 15 Years Masters
6. Nadia Azfer Engineer
Project (P.E), MSC
7. Azhar Lodhi Manager
Director (P.E), MBA
8. Engr. Khalid
Khan Procurement
Manager
9. Engr. Zubair Manager
Ahmed Contracts
10. Shiraz Saeed
11. Syed Irshad
Alam
12. Mian. Rizwan
Sarwar
13. Engr. Naseer Manager 14 Years
Ahmed Dehwar Projects
14. Wehdi Khan Manager MEP 14 Years
Domki
pg. 35
15. Engr. Musharaf Senior Engineer 7 Years (R.E)
Electrical Engineer
Arain Electrical Engineer
Diploma
16. Engr. Asad Ali SITE Engineer 5 Years
Graduation.
17. Engr. Obaid-ur- SITE Engineer 5 Years Diploma
Diploma
Rahman Diploma
Diploma
18. Tajammul Signage & 25 Years Diploma
Hussain SS/MS Railing
Expert.
19. Ghulam Projects 16 Years
Hussain Coordinator
20. Waseem Senior Electrical 16 Years
Ahmed Supervisor
21. Syed Danish Auto Cad 12 Years
Bukhari Operator
22. Umair Naqvi Electrical 15 Years
Supervisor
23. Sarfaraz Ahmed Civil Supervisor 08 Years
Ronjha
24. Waseem Project 18 Years
Ahmed Manager
40 well skilled & experience staff of including Masons, Fabricators, Electricians, Labors and
Helpers.
pg. 36
Current Projects:
Multi Story Building (G+18) on 533 Sq yds of IKS Builders at BTK Khi.
pg. 37
pg. 38
pg. 39
pg. 40
ElectroSol-Projects:
60 Sq Yds Houses in Karachi.
pg. 41
pg. 42
Key Projects:
1. Pakistan Military Academy- Kakool
Client: Pakistan Military Academy-Kakool
Project: Up Gradation of Horse and Saddle Club PMA Abbottabad.
Location: PMA Abbottabad
Project Brief: Supply and installation of tuff tiles, Marbles, levelling of areas, wiring,
lights, 5000 Gallons RO Plant complete in all respect.
2. Tufail Chemical Industries Limited.
Client: Tufail Chemical Industries.
Project: Supply and installation of cable trays, Motors overhauling stands,
complete earthing system of Formic Acid Plant.
Location: Formic Acid Plant Bin Qasim Karachi Sindh.
Project Brief: Supply and installation of cable trays, Motors overhauling stands,
complete earthing system of Formic Acid Plant complete in all respect.
pg. 43
pg. 44
3. 50MWP PV PROJECT IN GHARO SINDH.
Client: TBEA XINTE ENERGY (PVT) LIMITED/ JNECO (PVT) LIMITED.
Project: Fire alarm & separation system rectification.
Location: 50MWP PV PROJECT IN GHARO SINDH.
Project Brief: Inspection, troubleshoot, rectification of fire alarm system and
replacement of fire alarm cable 1.5mmsq, twisted pair also linear heat
detector, sounder complete in all respect.
4. Pakistan Military Academy- Kakool
Client: Pakistan Military Academy-Kakool
Project: Renovation of equipment’s display training center PMA Abbottabad
Location: PMA Abbottabad
Project Brief: Supply and installation of Tiles, skirting, wooden racks, false ceiling,
wiring, lights, Pena flexes, reception desk, 40” LED, A/c and
construction of Fata style house, route design complete in all respect.
pg. 45
pg. 46
pg. 47
5. National Industrial Parks-PIDC
Client: National Industrial Parks.
Project: External Renovation of site Office, Pump room Paint works, Paint works
at Generator Room including Partition wall.
Location: National Industrial Park Korangi Creek Karachi.
Project Brief: Supply complete material, plaster repair, shades installation, paint
works on pipes, wall, lovers and gates also installation of partition wall
complete in all respect.
pg. 48
6. National Logistic Cell
Client: Pakistan Cricket Board-National Logistic Cell
Project: Refurbishment/Uplift of National Stadium Karachi
Location: National Stadium Karachi Sindh.
Project Brief: Supply and installation of 630KVA Transformer, Power cables, DB’s of
all empire rooms, dressing rooms, VIP lounge, LV room, halls wiring and
lights complete in all respect.
pg. 49