INFORME GENERAL MANTENIMIENTO A POZO L-2 EL LIMON

Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by UNPRO, 2019-08-06 16:21:15

INFORME GENERAL MANTENIMIENTO A POZO L-2 EL LIMON

INFORME GENERAL MANTENIMIENTO A POZO L-2 EL LIMON

COMEGSA UNPRO-B1-016
___________________________________________________________________________________________________________

MANTENIMIENTO PREVENTIVO SUBESTACIONES
DE EMPAGUA

POZO L-2 EL LIMON
Julio 2016

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B1-016
___________________________________________________________________________________________________________

Guatemala, 20 Julio 2016

Ingeniero
Jimmy Espinoza
Jefe de Área de Potencia - EMPAGUA

Estimado Ingeniero:

A continuación, presentamos el informe sobre el mantenimiento preventivo realizado a un Banco de transformadores de
3x167 kva. De Pozo L-2 EL LIMÓN, realizados el día 19 de Julio del 2016.

TRABAJOS REALIZADOS EN CADA TRANSFORMADOR:

1. LIMPIEZA GENERAL DE:
• Bushings de alta y baja tensión.
• Terminales de alta tensión y baja tensión.
• Cables principales de alta y baja tensión.
• Conexiones de tierra.
• Tanque del transformador.
• Limpieza general de la bóveda.
• Revisión y apriete de conectores y terminales de alta y baja tensión.
• Revisión y apriete de tornillería en general.

Revisión exterior para verificar fugas de aceite en:
• Bushings de alta y baja tensión.
• Tanque del transformador.
• Cambiadores de taps.
• Válvulas de toma de aceite.
• Tapadera principal del tanque.

2. PRUEBAS AL TRANSFORMADOR

Pruebas físicas y químicas al aceite dieléctrico

• Rigidez dieléctrica Método ASTM D-877

• Tensión Interfacial Método ASTM D-971-50

• Acidez Método ASTM D-1534

• Color Método ASTM D-1500

• Evaluación visual Método ASTM D-1524

• Gravedad específica Método ASTM D-1298

Pruebas a los devanados:
• Medición de la resistencia del aislamiento de cada bobina (primario a tierra, primario a secundario y secundario a

tierra).
• Medición del índice de polarización.
• Prueba de la relación de vueltas (TTR).

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B1-016
___________________________________________________________________________________________________________

3. Estudio Termográfico.

Nos permite detectar fallas o condiciones inseguras en los equipos, mismas que no son evidentes a simple vista. Las
principales aplicaciones de esta técnica son:

Inspecciones eléctricas: identificación de falsos contactos, desbalanceo de cargas, sobrecargas en interruptores,
cortacircuitos, transformadores, bancos de capacitores, etc.

Se entrega reporte detallado con imágenes reales e infrarrojas con recomendaciones para mejorar cualquier desviación que
se detecte.

4. Medición de Red de Tierras.
Se utilizará el método del 62%

5. CONCLUCIONES:

Con el mantenimiento realizado se logró eliminar la contaminación acumulada en el aislamiento de los equipos de
la subestación. Todas las conexiones, herrajes y cableado de la subestación se encuentran en buenas
condiciones.

✓ Resistencia del aislamiento: Los transformadores tienen sus tres aislamientos en buenas condiciones toda vez
que las mediciones realizadas se encuentran entre los parámetros permisibles.

✓ Relación de transformación TTR: Los transformadores se encuentran en buenas condiciones, las lecturas
fueron menores al ±0.5% considerado como máximo aceptable, esto indica que los transformadores no tienen
espiras cortocircuitadas.

✓ Pruebas Físicas y Químicas al Aceite Dieléctrico: Muestras de aceite en buen estado, ya que se encuentran
dentro de los valores permisibles.

✓ Bushings y Conectores: Se encontraron los Bushings y conectores sucios los cuales fueron limpiados, los
Empaques se encuentran en buen estado.

✓ Se cambiaron los 3 pararrayos de la subestación ubicados en bóveda (Servicios Técnicos), así como los de las
líneas de distribución (Enérgica)

✓ El resultado que dio la medición de la red de tierras está dentro del parámetro recomendado tomando en cuenta
que la capacidad del banco de transformadores es menor a 2 Mva.

✓ Se reapretaron todos los conectores de puesta a tierra de los transformadores ya que presentaban flojedad.

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B1-016
___________________________________________________________________________________________________________
6. RECOMENDACIONES

✓ Realizar mantenimientos preventivos una vez cada año para prolongar la vida útil de los equipos y evitar cualquier
imprevisto.

✓ Realizar un estudio termográfico cada año para anticiparse a cualquier falla por conexiones flojas y sucias.
✓ Archivar este informe y tomar como punto de partida para comparar resultados con los del próximo

mantenimiento.

Sin otro particular, quedamos a sus órdenes para cualquier información adicional.
Atentamente,
Juan Carlos Rodríguez
Jefe Unidad de Productos y Servicios

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B1-016
___________________________________________________________________________________________________________

RESULTADOS DE PRUEBAS A TRANSFORMADORES

DATOS DEL EQUIPO EMPAGUA
DE:

Lugar de POZO L-2 EL LIMON
instalación:

Fecha: 19/07/2016 No. de P-527216 P-527215 P-527214
Transformador M99C16752

Conexión: ESTRELLA DELTA No. de serie : M99C16753 M99C16751 PROLEC
7,620 / 13,200V
Ubicación Fabricante: PROLEC PROLEC
7,620 / 13,200V 7,620 / 13,200V 240/480V
POSTE BOVEDA Voltaje primario: 167KVA
Voltaje 240/480V 240/480V 1.50%
√ secundario:
2
TIPO DE BANCO: Capacidad: 167KVA 167KVA 7,620V
1.51% 1.50%
CONVENCIONALES √ Impedancia:
Posición del TAP 2 2
PADMOUNTED 1-5

AUTOPROTEGIDO Voltaje Primario 7,620V 7,620V

RESISTENCIA DEL AISLAMIENTO E INDICE DE POLARIZACIÓN

Lecturas P-527216 P-527215 P-527214
en Giga
Ohms OBSERVACIONES

Vdc 5000 5000 500 5000 5000 500 5000 5000 500
aplicado
Primario Primari Secunda Primario Primario Secunda Primario Primario Secunda
Ptos. de Tierra o rio Tierra Secunda rio Tierra Secunda rio
prueba GΩ GΩ rio GΩ GΩ rio GΩ
Secund Tierra Tierra Tierra
ario GΩ GΩ GΩ GΩ

1/4 min. 13.3 11.9 5.87 9.11 7.70 4.78 12.9 10.45 6.58

1/2 min. 16.1 14.4 6.72 11.8 9.14 5.44 15.5 12.5 7.30 LAS PRUEBAS DE AISLAMIENTO Y

POLARIZACION SE ENCUENTRA DENTRO DE

3/4 min. 18.0 16.1 7.18 13.2 10.11 5.78 17.2 13.9 7.71 LOS PARAMETROS PERMISIBLES

1 19.4 17.3 7.58 14.2 10.85 6.03 18.4 15.0 8.02

10 29.3 25.4 11.14 22.0 18.55 10.25 30.9 24.9 13.8
Ip=10/1

min 1.51 1.47 1.47 1.55 1.71 1.70 1.68 1.66 1.72

Ip= Índice de polarización = (lectura de 10 min/lectura de 1 min.)

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B1-016
___________________________________________________________________________________________________________

RELACION DE TRANSFORMACION TTR

No. Puntos de Relación Relación Lim. Lim. % error OBSERVACIONES
Transform medición Medida teórica Min Max 0.006 OK
0.018 OK LAS PRUEBAS DE
ador 0.006 OK TRANSFORMACION SE
ENCUENTRA DENTRO DE LOS
P-527216 H-1 - H-2 / X1 – X3 16.271 16.270 16.1887 16.3514 PARAMETROS PERMISIBLES
P-527215 H-1 - H-2 / X1 - X3 16.273 16.270 16.1887 16.3514
P-527214 H-1 - H-2 / X1 - X3 16.271 16.270 16.1887 16.3514

H1 H2

X4 X X X1
2 3

ACEITE DIELÉCTRICO

P-527216 P-527215 P-527214

Prueba-Metodo ASTM Resultados Resultados Resultados Metodo ASTM Límites

Gravedad específica NA NA NA D-1298 0.84 a 0.91
Evaluación visual LIMPIO LIMPIO LIMPIO D-1524 Limpio, transparente
Color D-1500
Tensión interfacial 1.5 1.5 1.5 D971-50 Máximo 3.5
Acidez 35.7 35.2 36.4 D-1534 Mínimo 24 Dinas/cm
Rigidez dieléctrica < 0.3 mg < 0.3 mg < 0.3 mg D-877 2.5mm Máximo 0.3 mg KOH/g.
32.3 31.6 32.8
Mínimo 24 kV

Pasan la prueba ✓ ✓ ✓

Observaciones: Muestras de aceite en buen estado, ya que se encuentran dentro de los valores permisibles

Pruebas realizadas por: f) SAUL CARDONA Pruebas Verificadas por: f) SERVICIOS TECNICOS

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B1-016
___________________________________________________________________________________________________________

VERIFICACION DE BUSHING, EMPAQUES, CONECTORES Y PARARRAYOS

BUSHING EMPAQUES CONECTORES PARARRAYOS

REVISADO ESTADO REVISADO ESTADO REVISADO ESTADO P1 REVISADO ESTADO
CAMBIO
H1 √ √ H1 √ √ H1 √ √ CAMBIO √
CAMBIO √
H2 √ √ H2 √ √ H2 √ √ P2 √

X1 √ √ X1 √ √ X1 √ √ P3

X2 √ √ X2 √ √ X2 √ √ S1

X3 √ √ X3 √ √ X3 √ √ S2
X4 X4 X4 S3

Observaciones: SE REALIZO EL CAMBIO DE LOS TRES PARARRAYOS DE 10 KV. EN LOS TRANSFORMADORES .

RESULTADOS OBTENIDOS DE LA MEDICION DE RED DE TIERRAS
POZO L-2 EL LIMON

Banco de transformadores de 3x167Kva.

No. UBICACIÓN DISTANCIA C2 DISTANCIA P2 LECTURA

1 SUBESTACION 50 Pies 31 Pies 1.03 Ohms

DICTAMEN: El resultado que dio la medicion de tierras utilizando el metodo del 62% se encuentra
dentro del parametro recomendado como lo indica el cuadro siguiente, tomando en cuenta que la
capacidad del banco de transformadores es menor a 2 Mva.

VALORES PERMISIBLES PARA MEDICIONES DE TIERRAS

CAPACIDADES DE SUBESTACIONES OHMS

SUBESTACIONES MAYORES DE 10 MVA. 1-2Ω

SUBESTACIONES DE 2 A 10 MVA. 2.5 - 5 Ω

SUBESTACIONES MENORES DE 2 MVA. 5 - 10 Ω

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B1-016
___________________________________________________________________________________________________________

FOTOS ANTES DEL MANTENIMIENTO

Corta circuitos abiertos

Trafo serie: M99C16753 Trafo serie: M99C16751 Trafo serie: M99C16752

Banco de transformadores

Estado del sistema de tierras

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B1-016
___________________________________________________________________________________________________________

Conectores de tierra

Estado de la subestación
Tap de derivaciones

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B1-016
___________________________________________________________________________________________________________

FOTOS DESPUES DEL MANTENIMIENTO

Corta circuitos cerrados

Banco de transformadores

Estado de la subestación

Trafo serie: M99C16753 Placas de Características Trafo serie: M99C16752
Trafo serie: M99C16751

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B1-016
___________________________________________________________________________________________________________

Tierras Físicas

Medicion de tierras

Conectores de tierras

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

Acometida primaria

Pozo El Limon L­2

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA TENSION
CLIENTE: POZO EL LIMON L­2
FECHA: 19 DE JULIO 2016
PUNTO DE TERMOGRAFIA:
CORTA CIRCUITOS Y HOT­LINE
TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

P:
F:

September 28, 2016

Acometida primaria

Corta circuitos y Hot­Line / Pozo El Limon L­2

­49.9° C 32.3° C 09/27/16 ­ 11:37 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 13.7° C
s2 12.7° C
s3 14.9° C
s4 12.0° C
s5 12.7° C
s6 10.8° C

P: 1
F:

September 28, 2016

Breacker principal

Pozo El Limon L­2

ESTUDIO TERMOGRAFICO REALIZADO AEQUIPO DE BAJA TENSION
CLIENTE: POZO EL LIMON L­2
FECHA: 19 DE JULIO 2016
PUNTO DE TERMOGRAFIA:
BORNES LADO FUENTE Y CARGA
TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

P:
F:

September 28, 2016

Breacker principal

Bornes lado fuente y carga / Pozo El Limon L­2

16.2° C 31.1° C 09/27/16 ­ 11:33 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 29.6° C
s2 30.7° C
s3 28.4° C
s4 28.2° C
s5 30.4° C
s6 28.3° C

P: 1
F:

September 28, 2016

Trafo P­527214

Pozo El Limon L­2

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA Y BAJA TENSION
CLIENTE: POZO EL LIMON L­2
FECHA: 19 DE JULIO 2016
PUNTO DE TERMOGRAFIA:
BUSHING DE ALTA Y BAJA TENSION
TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

P:
F:

September 28, 2016

Trafo P­527214

Bushing de alta y baja tension / Pozo El Limon L­2

17.7° C 38.1° C 09/27/16 ­ 11:36 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 20.3° C
s2 20.0° C
s3 24.6° C
s4 24.2° C
s5 25.0° C
s6 25.8° C

P: 1
F:

September 28, 2016

Trafo P­527215

Pozo El Limon L­2

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA Y BAJA TENSION
CLIENTE: POZO EL LIMON L­2
FECHA: 19 DE JULIO 2016
PUNTO DE TERMOGRAFIA:
BUSHING DE ALTA Y BAJA TENSION
TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

P:
F:

September 28, 2016

Trafo P­527215

Bushing de alta y baja tension / Pozo El Limon L­2

18.2° C 38.1° C 09/27/16 ­ 11:36 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 19.1° C
s2 19.2° C
s3 25.3° C
s4 24.9° C
s5 25.2° C
s6 26.6° C

P: 1
F:

September 28, 2016

Trafo P­527216

Pozo El Limon L­2

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA Y BAJA TENSION
CLIENTE: POZO EL LIMON L­2
FECHA: 19 DE JULIO 2016
PUNTO DE TERMOGRAFIA:
BUSHIONG DE ALTA Y BAJA TENSION
TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

P:
F:

September 28, 2016

Trafo P­527216

Bushing de alta y baja tension / Pozo El Limon L­2

17.5° C 37.1° C 09/27/16 ­ 11:36 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 25.8° C
s2 26.9° C
s3 26.0° C
s4 25.6° C
s5 19.7° C
s6 19.9° C

P: 1
F:

September 28, 2016


Click to View FlipBook Version
Previous Book