The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.

INFORME GENERAL MANTENIMIENTO A POZO LAS AMARICAS

Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by UNPRO, 2019-08-06 14:02:20

INFORME GENERAL MANTENIMIENTO A POZO LAS AMARICAS

INFORME GENERAL MANTENIMIENTO A POZO LAS AMARICAS

COMEGSA UNPRO-B4-017
__________________________________________________________________________________________________________

MANTENIMIENTO PREVENTIVO SUBESTACIONES
DE EMPAGUA

POZO LAS AMERICAS
Octubre 2017

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B4-017
__________________________________________________________________________________________________________

Guatemala, 23 De Octubre 2017

Ingeniero
Jimmy Espinoza
Jefe de Area de Potencia - EMPAGUA

Estimados Ingeniero:

A continuación presentamos el informe sobre el mantenimiento preventivo realizado a un Banco de transformadores de
3x25 kva. De POZO LAS AMERICAS, realizados el día 17 de Octubre del 2017.

TRABAJOS REALIZADOS EN CADA TRANSFORMADOR:

1. LIMPIEZA GENERAL DE:
• Bushings de alta y baja tensión.
• Terminales de alta tensión y baja tensión.
• Cables principales de alta y baja tensión.
• Conexiones de tierra.
• Tanque del transformador.
• Limpieza general de la bóveda.
• Revisión y apriete de conectores y terminales de alta y baja tensión.
• Revisión y apriete de tornillería en general.

Revisión exterior para verificar fugas de aceite en:
• Bushings de alta y baja tensión.
• Tanque del transformador.
• Cambiadores de taps.
• Válvulas de toma de aceite.
• Tapadera principal del tanque.

2. PRUEBAS AL TRANSFORMADOR

Pruebas físicas y químicas al aceite dieléctrico

• Rigidez dieléctrica Método ASTM D-877

• Tensión Interfacial Método ASTM D-971-50

• Acidez Método ASTM D-1534

• Color Método ASTM D-1500

• Evaluación visual Método ASTM D-1524

• Gravedad específica Método ASTM D-1298

Pruebas a los devanados:

• Medición de la resistencia del aislamiento de cada bobina (primario a tierra, primario a secundario y secundario a
tierra).

• Medición del índice de polarización.
• Prueba de la relación de vueltas (TTR).
• Resistencia óhmica de devanados

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B4-017
__________________________________________________________________________________________________________

3. Estudio Termográfico.

Nos permite detectar fallas o condiciones inseguras en los equipos, mismas que no son evidentes a simple vista. Las
principales aplicaciones de esta técnica son:

Inspecciones eléctricas: identificación de falsos contactos, desbalanceo de cargas, sobrecargas en interruptores,
cortacircuitos, transformadores, bancos de capacitores, etc.

Se entrega reporte detallado con imágenes reales e infrarrojas con recomendaciones para mejorar cualquier desviación que
se detecte.

4. Medición de Red de Tierras.
Se utilizará el método del 62%

5. CONCLUCIONES:

Con el mantenimiento realizado se logró eliminar la contaminación acumulada en el aislamiento de los equipos de
la subestación. Todas las conexiones, herrajes y cableado de la subestación se encuentran en buenas
condiciones.

✓ Resistencia del aislamiento: Los transformadores tienen sus tres aislamientos en buenas condiciones toda vez
que las mediciones realizadas se encuentran entre los parámetros permisibles.

✓ Relación de transformación TTR: Los transformadores se encuentran en buenas condiciones, las lecturas
fueron menores al ±0.5% considerado como máximo aceptable, esto indica que los transformadores no tienen
espiras cortocircuitadas.

✓ Pruebas Físicas y Químicas al Aceite Dieléctrico: Muestras de aceite en buen estado, ya que se encuentra
entre los valores permisibles.

✓ Bushings y Conectores: Se encontraron los Bushings y conectores sucios los cuales fueron limpiados, los
Empaques se encuentran en buen estado.

✓ Termografia: Todo normal.

✓ Se cambiaron los 3 pararrayos de la subestación ubicados en el poste, (Enérgica)

✓ El resultado que dio la medición de la red de tierras está dentro del parámetro recomendado tomando en cuenta
que la capacidad del banco de transformadores es menor a 2 Mva.

✓ Se reapretaron todos los conectores de puesta a tierra de los transformadores ya que presentaban flojedad.

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B4-017
__________________________________________________________________________________________________________
6. RECOMENDACIONES

✓ Realizar mantenimientos preventivos una vez cada año para prolongar la vida útil de los equipos y evitar cualquier
imprevisto.

✓ Realizar un estudio termográfico cada año para anticiparse a cualquier falla por conexiones flojas y sucias.
✓ Archivar este informe y tomar como punto de partida para comparar resultados con los del próximo

mantenimiento.

Sin otro particular, quedamos a sus órdenes para cualquier información adicional.
Atentamente,
Juan Carlos Rodriguez
Jefe Unidad de Productos y Servicios

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B4-017
__________________________________________________________________________________________________________

RESULTADOS DE PRUEBAS A TRANSFORMADORES

DATOS DEL EQUIPO POZO LAS AMERICAS
DE:

Lugar de
instalación:

Fecha: 17-10-2017 No. de CÍA 62275 CÍA 69307 CÍA S/N
Transformador S/P

Conexión: ESTRELLA / DELTA No. de serie : 023730AA 0502129198 S/P
7,620 / 13,200 V
Ubicación Fabricante: A.B.B. COOPER
7,620 / 13,200 V 7,620 / 13,200 V 240/480 V
POSTE BOVEDA Voltaje primario: 25 KVA
Voltaje 240/480 V 240/480 V S/P
√ secundario: 3
7,620V
TIPO DE BANCO: Capacidad: 25 KVA 25 KVA
ILEGIBLE 1.2 %
CONVENCIONALES √ Impedancia:
Posición del TAP 3 3
PADMOUNTED 1-5

AUTOPROTEGIDO Voltaje Primario 7,620V 7,620V

RESISTENCIA DEL AISLAMIENTO E INDICE DE POLARIZACIÓN

Lecturas CÍA 62275 CÍA 69307 CÍA S/N
en Giga
Ohms OBSERVACIONES

Vdc 5000 5000 500 5000 5000 500 5000 5000 500
aplicado
Primario Primari Secunda Primario Primario Secunda Primario Primario Secunda
Ptos. de Tierra o rio Tierra Secunda rio Tierra Secunda rio
prueba GΩ GΩ rio GΩ GΩ rio GΩ
Secund Tierra Tierra Tierra
ario GΩ GΩ GΩ GΩ

1/4 min. 8.55 19.5 9.83 19.2 13.2 12.2 3.45 3.98 2.74

1/2 min. 13.6 23.6 13.7 21.3 16.4 18.0 4.33 5.28 2.93 LAS PRUEBAS DE AISLAMIENTO Y

POLARIZACION SE ENCUENTRA DENTRO DE

3/4 min. 19.6 27.1 16.4 23.5 18.6 21.2 4.71 5.99 3.88 LOS PARAMETROS PERMISIBLES

1 22.7 30.2 22.7 30.4 19.9 24.4 5.03 6.53 4.15

10 32.70 44.39 32.92 45.30 29.25 36.84 7.19 9.47 5.93
Ip=10/1

min 1.44 1.47 1.45 1.49 1.47 1.51 1.43 1.45 1.43

Ip= Índice de polarización = (lectura de 10 min/lectura de 1 min.)

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B4-017
__________________________________________________________________________________________________________

RELACION DE TRANSFORMACION TTR

No. Puntos de Relación Relación Lim. Lim. OBSERVACIONES
Transform medición Medida teórica Min Max
% error
ador

CÍA 62275 H-1 - H-2 / X1 - X3 15.872 15.875 15.7956 15.9544 0.019 OK

CÍA 69307 H-1 - H-2 / X1 - X3 15.880 15.875 15.7956 15.9544 0.031 OK LAS PRUEBAS DE TRANSFORMACION SE
CÍA S/P H-1 - H-2 / X1 - X3 15.874 15.875 15.7956 15.9544 0.006 ENCUENTRA DENTRO DE LOS

OK PARAMETROS PERMISIBLES

H1 H2

X4 X2 X3 X1

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B4-017
__________________________________________________________________________________________________________

POZO LAS AMERICAS - EMPAGUA

VERIFICACION DE BUSHING, EMPAQUES, CONECTORES Y PARARRAYOS

BUSHING EMPAQUES CONECTORES PARARRAYOS

REVISADO ESTADO REVISADO ESTADO REVISADO ESTADO REVISADO ESTADO

H1 √ √ H1 √ √ H1 √ √ P1 CAMBIO √
H2 √ √ H2 √ √ H2 √ √ P2 CAMBIO √
X1 √ √ X1 √ √ X1 √ √ P3 CAMBIO √
X2 √ √ X2 √ √ X2 √ √ S1

X3 √ √ X3 √ √ X3 √ √ S2

X4 X4 X4 S3

Observaciones: SE REALIZO EL CAMBIO DE LOS TRES PARARRAYOS DE 10 KV. EN EL POSTE .

ACEITE DIELÉCTRICO

CIA-62275 CIA-69307 CIA-S/N

Prueba-Metodo ASTM Resultados Resultados Resultados Metodo ASTM Límites

Gravedad específica NA NA NA D-1298 0.84 a 0.91
Evaluación visual OK OK OK Limpio, transparente
Color 2.0 2.0 2.0 D-1524
Tensión interfacial 36.4 35.8 31.7 D-1500 Máximo 3.5
Acidez ˂ que 0.3A ˂ que 0.3A ˂ que 0.3A D971-50 Mínimo 24 Dinas/cm
Rigidez dieléctrica 33.1 32.6 29.2 D-1534 Máximo 0.3 mg KOH/g.
D-877 2.5mm
Mínimo 24 kV

Pasan la prueba
Observaciones: Muestras de Aceite en buen estado.

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B4-017
__________________________________________________________________________________________________________

RESULTADOS OBTENIDOS DE LA MEDICION DE RED DE TIERRAS
POZO LAS AMERICAS

Banco de transformadores de 3x25 KVA

No. UBICACIÓN DISTANCIA C2 DISTANCIA P2 LECTURA

1 SUBESTACION MÉTODO INDUCCIÓN 0.043 Ohms

DICTAMEN: El resultado que dio la medición de tierras utilizando el metodo del 62% se encuentra
dentro del parametro recomendado como lo indica el cuadro siguiente, tomando en cuenta que la
capacidad del banco de transformadores es menor a 2 Mva.

VALORES PERMISIBLES PARA MEDICIONES DE TIERRAS

CAPACIDADES DE SUBESTACIONES OHMS

SUBESTACIONES MAYORES DE 10 MVA. 1-2Ω

SUBESTACIONES DE 2 A 10 MVA. 2.5 - 5 Ω

SUBESTACIONES MENORES DE 2 MVA. 5 - 10 Ω

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B4-017
__________________________________________________________________________________________________________

FOTOS ANTES DEL MANTENIMIENTO

Corta circuitos abiertos

Trafo serie: 023730AA Trafo serie: 0502129198 Trafo serie: Sin Placa

Sistema de tierras

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B4-017
__________________________________________________________________________________________________________

FOTOS DESPUES DEL MANTENIMIENTO

Corta circuitos cerrados Banco de transformadores

Trafo serie: 023730AA Placas de Características Trafo serie: Sin Placa
Trafo serie: 0502129198

Tierras Físicas

Medición de tierras

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

COMEGSA UNPRO-B4-017
__________________________________________________________________________________________________________

RESULTADOS DEL RECORRIDO
TERMOGRAFICO

_____________________________________________________________________________________________________________________________________________________
6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

Acometida Primaria

POZO LAS AMERICAS

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA TENSION
CLIENTE: POZO LAS AMERICAS EMPAGUA
FECHA: 03 DE OCTUBRE 2017
PUNTO DE TERMOGRAFIA:
CORTA CIRCUITOS Y HOT­LINE
TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

P:
F:

October 12, 2017

Acometida Primaria

Corta Circuitos y Hot­Line / Pozo Las Americas

­31.7° C 18.5° C 10/10/17 ­ 10:00 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 9.1° C
s2 9.1° C
s3 9.1° C
s4 9.5° C
s5 9.3° C
s6 9.5° C

P: 1
F:

October 12, 2017

Breacker Principal

POZO LAS AMERICAS

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE BAJA TENSION
CLIENTE: POZO LAS AMERICAS EMPAGUA
FECHA: 03 DE OCTUBRE 2017
PUNTO DE TERMOGRAFIA:
BREACKER PRINCIPAL
TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

P:
F:

October 12, 2017

Breacker Principal

Breacker Principal / Pozo Las Americas

17.9° C 26.6° C 10/10/17 ­ 09:58 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 19.3° C
s2 19.0° C
s3 19.7° C
s4 19.0° C
s5 19.7° C
s6 18.9° C

P: 1
F:

October 12, 2017

Trafo Fase Centro

POZO LAS AMERICAS

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA Y BAJA TENSION
CLIENTE: POZO LAS AMERICAS EMPAGUA
FECHA: 03 DE OCTUBRE 2017
PUNTO DE TERMOGRAFIA:
BUSHING DE ALTA Y BAJA TENSION
TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

P:
F:

October 12, 2017

Trafo Fase Centro

Bushing de Alta y Baja Tension / Pozo Las Americas

­36.2° C 27.4° C 10/10/17 ­ 10:01 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 17.9° C
s2 17.8° C

P: 1
F:

October 12, 2017

Trafo Fase Norte

POZO LAS AMERICAS

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA Y BAJA TENSION
CLIENTE: POZO LAS AMERICAS EMPAGUA
FECHA: 03 DE OCTUBRE 2017
PUNTO DE TERMOGRAFIA:
BUSHING DE ALTA Y BAJA TENSION
TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

P:
F:

October 12, 2017

Trafo Fase Norte

Bushing de Alta y Baja Tension / Pozo Las Americas

­30.6° C 22.7° C 10/10/17 ­ 10:00 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 17.3° C
s2 16.1° C

P: 1
F:

October 12, 2017

Trafo Fase Sur

POZO LAS AMERICAS

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA Y BAJA TENSION
CLIENTE: POZO LAS AMERICAS EMPAGUA
FECHA: 03 DE OCTUBRE 2017
PUNTO DE TERMOGRAFIA:
BUSHING DE ALTA Y BAJA TENSION
TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

P:
F:

October 12, 2017

Trafo Fase Sur

Bushing de Alta y Baja Tension / Pozo Las Americas

­33.6° C 27.4° C 10/10/17 ­ 10:01 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 19.3° C
s2 19.8° C

P: 1
F:

October 12, 2017


Click to View FlipBook Version
Previous Book
INFORME GENERAL MANTENIMIENTO A POZO PRIMERA Y TERCERA
Next Book
INFORME GENERAL MANTENIMIENTO A POZO SANTO DOMINGO