INFORME GENERAL POZO H-5

INFORME GENERAL POZO H-5

Montaje y

COMEGSA UNPRO-RS-B1-014

MaMntoenntiamjeieynto_____________________________________________________________________________________
MaEntléecntimricieonto
Eléctrico

MANTENIMIENTO PREVENTIVO A SUBESTACIONES ELECTRICAS DE
EMPAGUA

SUBESTACION POZO H-5

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
_____________________________________________________________________________________

MaMntoenntiamjeieyntoGuatemala, 21 de Julio 2014

Ingeniero

EléctricoJimmy Espinoza
MantenimientoJefe de Area de Potencia - EMPAGUA

Estimado Ingeniero: Eléctrico

A continuación presentamos el informe sobre el Mantenimiento Preventivo realizado a la subestación del

pozo H-5 de 3x37.5 KVA efectuado el día 21 de Julio del presente año.

1. Mantenimiento a banco de transformadores:

ALCANCE

Limpieza general de:

 Bushings de alta y baja tensión.
 Terminales de alta y baja tensión.
 Cables principales de alta y baja tensión.
 Conexiones a tierra.
 Tanque de los transformadores.

Revisión y apriete de:

 Conectores y terminales de alta y baja tensión.
 Tornillería en general.

Revisión exterior para verificar fugas de aceite en:

 Bushings de alta y baja tensión.
 Tanque de los transformadores.
 Cambiador de taps.
 Tapadera principal del tanque.

Pruebas básicas a los devanados:

 Medición de la resistencia del aislamiento de cada bobina (primario a tierra, primario a secundario
y secundario a tierra).

 Prueba de la relación de vueltas (TTR).


2. Medición de la Red de Tierras:

 Se utilizara el método del 62%

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
_____________________________________________________________________________________

MaMntoenntiamjeieyntoCONCLUSIONES

 Resistencia del aislamiento: Los transformadores tienen sus tres aislamientos en buenas
condiciones toda vez que las mediciones realizadas se encuentran entre los parámetros

MaEntléecntimricieontopermisibles.

 Relación de transformación: Los transformadores se encuentran en buenas condiciones, las
lecturas fueron menores al ±0.5% considerado como máximo aceptable, esto indica que los
transformadores no tienen espiras cortocircuitadas.

Eléctrico Bushings y Conectores: Se encontraron Bushings y conectores sucios los cuales fueron

limpiados, los Empaques se encuentran en buen estado.
 Se cambiaron los 3 pararrayos de las líneas de distribución (Enérgica)
 El resultado que dio la medición de la red de tierras es de 1.76 Ohms el cual está dentro del

parámetro recomendado tomando en cuenta que la capacidad del banco de transformadores es
menor a 2 Mva.

RECOMENDACIONES

1. Realizar mantenimientos preventivos una vez cada año para prolongar la vida útil de los equipos y
evitar cualquier imprevisto.

2. Realizar un estudio termografico cada año para anticiparse a cualquier falla por conexiones flojas y
sucias.

Con el mejor deseo de poderles servir quedamos a sus órdenes para cualquier información
adicional que sea requerida.

Atentamente,

Juan Carlos Rodriguez
Jefe Unidad de Productos y Servicios

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
_____________________________________________________________________________________

MantenimientoHOJA DE RESULTADOS
Montaje yDATOS DEL EQUIPO
EléctricoNo. de serie:
Lugar de instalación: POZO H-5

Fecha: 21 de Julio de 2014 Capacidad:
Impedancia:
MantenimientoFabricante: 37.5 KVA
98A413052 2.50%

A.B.B.

Voltaje primario: 7,620 / 13,200Y Conexión: ESTRELLA / DELTA

Voltaje secundario: Eléctrico240 / 480 N/A
Temperatura del aceite:

RESISTENCIA DEL AISLAMIENTO E INDICE DE POLARIZACIÓN

Lecturas en Giga ohms

Vdc aplicado 5000 5000 500

Ptos de prueba Primario-tierra Primario-secund. Secundario-tierra

1/4 min. 27.8 GΩ 28.5 GΩ 14.6 GΩ

1/2 min. 29.9 GΩ 34.1 GΩ 15.2 GΩ

3/4 min. 31.6 GΩ 37.5 GΩ 15.8 GΩ

1 31.9 GΩ 39.2 GΩ 16.7 GΩ

10 44.7 GΩ 56.3 GΩ 27.0 GΩ P-510640
Ip=10/1 min 1.40 1.44 1.62

Ip= Índice de polarización = (lectura de 10 min/lectura de 1 min.)

Observaciones: La prueba de aislamiento se encuentra dentro de los parametros permisibles

RELACION DE TRANSFORMACION TTR H1 H2
12345
Posición del tap
Voltaje primario 7,810

X4 X2 X3 X1

Puntos de medición Relación medida Relación teórica Lim Min Lim Max % error
16.266 16.271 16.263 16.279 0.031 OK
H1 - H2 X1 - X3

Observaciones: Prueba de relacion de transformacion se encuentran dentro de los parametros permisibles.

Observaciones:
Se cambiaron los 3 pararrayos de acometida

Pruebas realizadas por: f) Saul Antonio Cardona Pruebas Verificadas por: f) COMEGSA

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
_____________________________________________________________________________________

MantenimientoHOJA DE RESULTADOS
Montaje yDATOS DEL EQUIPO
EléctricoNo. de serie:
Lugar de instalación: POZO H-5

Fecha: 21 de Julio de 2014 Capacidad:
Impedancia:
MantenimientoFabricante: 37.5 KVA
98A413162 2.50%

A.B.B.

Voltaje primario: 7,620 / 13,200Y Conexión: ESTRELLA / DELTA

Voltaje secundario: Eléctrico240 / 480 N/A
Temperatura del aceite:

RESISTENCIA DEL AISLAMIENTO E INDICE DE POLARIZACIÓN

Lecturas en Giga ohms

Vdc aplicado 5000 5000 500

Ptos de prueba Primario-tierra Primario-secund. Secundario-tierra

1/4 min. 24.2 GΩ 32.0 GΩ 10.62 GΩ

1/2 min. 28.1 GΩ 35.7 GΩ 11.6 GΩ

3/4 min. 30.4 GΩ 38.2 GΩ 12.5 GΩ

1 33.5 GΩ 38.6 GΩ 13.0 GΩ

10 55.4 GΩ 55.3 GΩ 22.0 GΩ P-510642
Ip=10/1 min 1.65 1.43 1.69

Ip= Índice de polarización = (lectura de 10 min/lectura de 1 min.)

Observaciones: La prueba de aislamiento se encuentra dentro de los parametros permisibles

RELACION DE TRANSFORMACION TTR H1 H2
12345
Posición del tap
Voltaje primario 8,000 7,810

X4 X2 X3 X1

Puntos de medición Relación medida Relación teórica Lim Min Lim Max % error
16.265 16.271 16.263 16.279 0.037 OK
H1 - H2 X1 - X3

Observaciones: Prueba de relacion de transformacion se encuentran dentro de los parametros permisibles.
Observaciones:

Pruebas realizadas por: f) Saul Antonio Cardona Pruebas Verificadas por: f) COMEGSA

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
_____________________________________________________________________________________

MantenimientoHOJA DE RESULTADOS
Montaje yDATOS DEL EQUIPO
EléctricoNo. de serie:
Lugar de instalación: POZO H-5

Fecha: 21 de Julio de 2014 Capacidad:
Impedancia:
MantenimientoFabricante: 37.5 KVA
98A413167 2.50%

A.B.B.

Voltaje primario: 7,620 / 13,200Y Conexión: ESTRELLA / DELTA

Voltaje secundario: Eléctrico240 / 480 N/A
Temperatura del aceite:

RESISTENCIA DEL AISLAMIENTO E INDICE DE POLARIZACIÓN

Lecturas en Giga ohms

Vdc aplicado 5000 5000 500

Ptos de prueba Primario-tierra Primario-secund. Secundario-tierra

1/4 min. 14.7 GΩ 12.5 Ω 9.3 GΩ

1/2 min. 17.1 GΩ 15.3 GΩ 11.2 GΩ

3/4 min. 18.4 GΩ 15.9 GΩ 12.3 GΩ

1 19.9 GΩ 18.2 GΩ 13.4 GΩ

10 32.5 GΩ 32.4 GΩ 28.3 GΩ P510641
Ip=10/1 min 1.63 1.78 2.11

Ip= Índice de polarización = (lectura de 10 min/lectura de 1 min.)

Observaciones: La prueba de aislamiento se encuentra dentro de los parametros permisibles

RELACION DE TRANSFORMACION TTR H1 H2
12345
Posición del tap
Voltaje primario 7,810

X4 X2 X3 X1

Puntos de medición Relación medida Relación teórica Lim Min Lim Max % error
16.266 16.271 16.263 16.279 0.031 OK
H1 - H2 X1 - X3

Observaciones: Prueba de relacion de transformacion se encuentran dentro de los parametros permisibles.
Observaciones:

Pruebas realizadas por: f) Saul Antonio Cardona Pruebas Verificadas por: f) COMEGSA

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
_____________________________________________________________________________________

MaMntoenntiamjeieyntoRESULTADOS OBTENIDOS DE LA MEDICION DE RED DE TIERRAS
POZO H-5

MaEntléecntimricieontoBanco de transformadores de 3X37.5 Kva.

No. UBICACIÓN DISTANCIA C2 DISTANCIA P2 LECTURA

1 Poste 50 Pies 31 Pies 1.76 Ohms
Eléctrico
DICTAMEN: El resultado que dio la medicion de tierras utilizando el metodo del 62% se encuentra

dentro del parametro recomendado como lo indica el cuadro siguiente, tomando en cuenta que la

capacidad del banco de transformadores es menor a 2 Mva.

VALORES PERMISIBLES PARA MEDICIONES DE TIERRAS

CAPACIDADES DE SUBESTACIONES OHMS

SUBESTACIONES MAYORES DE 10 MVA. 1-2Ω

SUBESTACIONES DE 2 A 10 MVA. 2.5 - 5 Ω

SUBESTACIONES MENORES DE 2 MVA. 5 - 10 Ω

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
_____________________________________________________________________________________

MaMntoenntiamjeieyntoFOTOS POZO H-5 EMPAGUA
MaEnAtNlTéeES DcnEL MtiAmrNTiENcIiMeIoENTnO to

EléctricoBanco de transformadores

Trafo REG. P-510640 TRANSFORMADORES Trafo REG. P-510641

Trafo REG. P-510642

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
MantenimientoPLACAS DE DATOS TECNICOS
_____________________________________________________________________________________

Montaje yTRAFO REG. 510640
TRAFO REG. 510642 TRAFO REG. 510641

MaEntléecntimricieonto

Eléctrico

TAP DE DERIVACIONES

CONECTORES DE TIERRA

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
_____________________________________________________________________________________

MaMntoenntiamjeieyntoFOTOS POZO H-5 EMPAGUA
DESPUES DEL MANTENIMIENTO

MaEntléecntimricieontoAcometida principal
Eléctrico

Banco de transformadores

MEDICION DE TIERRAS

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

COMEGSA UNPRO-B2-014
__________________________________________________________________________________________________________

RESULTADOS DEL RECORRIDO
TERMOGRAFICO ANTES DEL MANTENIMIENTO

_____________________________________________________________________________________________________________________________ ______________________
__ 6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

Breacker principal

POZO H­5 EMPAGUA

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO BAJA TENSION
POZO H­5

BLVAR VISTA HERMOSA FRENTE AL 15­20 ARRIATE CENTRALPLAZA CONFUCIO ZONA 15

21 DE JULIO DE 2014

PUNTO DE TERMOGRAFIA
1.­ BREACKER PRINCIPAL

TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
July 31, 2014

Breacker principal

Pozo H­5 / Bornes fuente y carga

24.7° C 30.7° C 07/20/14 ­ 07:17 AM

NOTES PROBLEM DESCRIPTION
Ninguno
s1 25.8° C
s2 27.7° C
s3 27.5° C
s4 27.3° C
s5 27.9° C
s6 27.1° C

a1 26.5° C Prom.

Máx: 28.6° C Min: 25.0° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
July 31, 2014

Corta circuitos

POZO H­5 EMPAGUA

ESTUDIO REALIZADO A EQUIPO DE ALTA TENSION
POZO H­5
BLVAR. VISTA HERMOSA FRENTE AL 15­20 ARRIATE CENTRAL PLAZA CONFUCIO ZONA 15

21 DE JULIO DE 2014

PUNTO DE TERMOGRAFIA
1.­ CORTA CIRCUITOS

TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
July 31, 2014

Corta circuitos

Pozo H­5 / Corta circuitos

­19.7° C 20.2° C 07/20/14 ­ 07:13 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 16.8° C
s2 16.6° C
s3 16.5° C

a1 9.8° C Prom.

Máx: 23.4° C Min: ­21.7° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
July 31, 2014

Estribos y Hot­Line

POZO H­5 EMPAGUA

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA TENSION
POZO H­5
BLVAR. VISTA HERMOSA FRENTE AL 15­20 ARRIATE CENTRAL PLAZA CONFUCIO ZONA 15

21 DE JULIO DE 2014

PUNTO DE TERMOGRAFIA:
1.­ ESTRIBOS Y HOT­LINE

TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
July 31, 2014

Estribos y Hot­Line

Pozo H­5 / Linea 7,620­13,200

­16.2° C 27.1° C 07/20/14 ­ 07:17 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 17.0° C
s2 17.2° C
s3 17.3° C

a1 8.3° C Prom.

Máx: 26.8° C Min: ­21.6° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
July 31, 2014

Trafo P510640A

POZO H­5 EMPAGUA

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA Y BAJA TENSION
POZO H­5
BLVAR. VISTA HERMOSA FRENTE AL 15­20 ARRIATE CENTRAL PLAZA CONFUCIO ZONA 15

21 DE JULIO DE 2014

PUNTO DE TERMOGRAFIA:
TRANSFORMADOR P510640

TERMOGRAFO: SaulAntonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
August 03, 2014

Trafo P510640A

Pozo H­5 / Bushing de baja

­20.5° C 26.9° C 07/20/14 ­ 07:16 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 24.7° C
s2 24.4° C

a1 14.7° C Prom.

Máx: 26.9° C Min: ­21.7° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
August 03, 2014

Trafo P510641

POZO H­5 EMPAGUA

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA Y BAJA TENSION
POZO H­5
BLVAR. VISTA HERMOSA FRENTE AL 15­20 ARRIATE CENTRAL PLAZA CONFUCIO ZONA 15

21 DE JULIO DE 2014

PUNTO DE TERMOGRAFIA:
1.­ TRANSFORMADOR P510641

TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
July 31, 2014

Trafo P510641

POZO H­5 / Banco de transformadores

­20.6° C 25.7° C 07/20/14 ­ 07:13 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 25.0° C
s2 23.9° C

a1 10.6° C Prom.

Máx: 25.7° C Min: ­18.6° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
July 31, 2014

Trafo P510642A

POZO H­5 EMPAGUA

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA Y BAJA TENSION
POZO H­5
BLVAR. VISTA HERMOSA FRENTE AL 15­20 ARRIATE CENTRAL PLAZA CONFUCIO ZONA 15

21 DE JULIO DE 2014

PUNTO DE TERMOGRAFIA:
TRANSFORMADORP510642

TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
August 03, 2014

Trafo P510642A

Pozo H­5 / Bushing de baja

1.1° C 27.1° C 07/20/14 ­ 07:14 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 24.7° C
s2 25.5° C

a1 20.5° C Prom.

Máx: 27.1° C Min: ­6.8° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
August 03, 2014

COMEGSA UNPRO-B2-014
__________________________________________________________________________________________________________

RESULTADOS DEL RECORRIDO
TERMOGRAFICO DESPUES DEL MANTENIMIENTO

_____________________________________________________________________________________________________________________________ ______________________
__ 6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

Breacker principal

POZO H­5

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE BAJA TENSION
POZO H­5

21 DE AGOSTO DE 2014

PUNTO DE TERMOGRAFIA:
BREACKER PRINCIPAL DE 175 AMP.

TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
August 27, 2014

Breacker principal

POZO H­5 / Bornes lado fuente y carga

21.4° C 28.4° C 08/21/14 ­ 06:20 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguno
s1 28.5° C
s2 28.7° C
s3 28.3° C
s4 28.6° C
s5 27.6° C
s6 29.0° C

a1 25.2° C Prom.

Máx: 29.6° C Min: 22.7° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
August 27, 2014

Corta circuitos

POZO H­5

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA TENSION
POZO H­5

21 DE AGOSTO DE 2014

PUNTO DE TERMOGRAFIA:
CORTA CIRCUITOS

TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
August 27, 2014

Corta circuitos

POZO H­5 / Acometida primaria

3.5° C 26.4° C 08/21/14 ­ 03:13 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 14.9° C
s2 15.0° C
s3 15.5° C

a1 12.7° C Prom.

Máx: 17.0° C Min: 2.7° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
August 27, 2014

Hot­line

POZO H­5

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA TENSION
POZO H­5

21 DE AGOSTO DE 2014

PUNTO DE TERMOGRAFIA:
HOT­LINE

TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
August 27, 2014

Hot­line

POZO H­5 / Hot­line

13.6° C 23.1° C 08/21/14 ­ 03:14 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 14.8° C
s2 14.7° C
s3 15.0° C

a1 15.1° C Prom.

Máx: 21.1° C Min: 12.8° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
August 27, 2014

Transformador 510640

POZO H­5

ESTUDIO TERMOGAFICO REALIZADO A EQUIPO DE ALTA Y BAJA TENSION
POZO H­5

21 DE AGOSTO DE 2014

PUNTO DE TERMOGRAFIA:
TRANSFORMADOR P­510640

TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
August 27, 2014

Transformador 510640

POZO H­5 / Bushing de baja tension

­25.1° C 29.4° C 08/21/14 ­ 06:17 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 26.9° C
s2 26.5° C

a1 14.1° C Prom.

Máx: 28.6° C Min: ­26.3° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
August 27, 2014

Transformador 510641

POZO H­5

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA Y BAJA TENSION
POZO H­5

21 DE AGOSTO DE 2014

PUNTO DE TERMOGRAFIA:
TRANSFORMADOR P­510641

TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICAC|ION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
August 27, 2014

Transformador 510641

POZO H­5 / Bushing de baja tension

­15.6° C 28.8° C 08/21/14 ­ 03:17 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 26.2° C
s2 27.7° C

a1 15.1° C Prom.

Máx: 28.3° C Min: ­22.0° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
August 27, 2014

Transformador 510642

POZO H­5

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE DE ALTA Y BAJA TENSION
POZO H­5

21 DE AGOSTO DE 2014

PUNTO DE TERMOGRAFIA:
TRANSFORMADOR P­510642

TERMOGRAFO: Saul Antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
August 27, 2014

Transformador 510642

POZO H­5 / Bushing de baja tension

­6.8° C 29.0° C 08/21/14 ­ 03:17 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 27.1° C
s2 25.7° C

a1 18.5° C Prom.

Máx: 29.2° C Min: 2.4° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
August 27, 2014


Click to View FlipBook Version
Previous Book
INFORME GENERAL POZO H-7
Next Book
INFORME GENERAL POZO N-3