INFORME GENERAL POZO N-5

INFORME GENERAL POZO N-5

Montaje y

COMEGSA UNPRO-RS-B1-014

MaMntoenntiamjeieynto_____________________________________________________________________________________
MaEntléecntimricieonto

Eléctrico

MANTENIMIENTO PREVENTIVO A SUBESTACIONES ELECTRICAS DE
EMPAGUA

SUBESTACION POZO N-5

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
_____________________________________________________________________________________

MaMntoenntiamjeieyntoGuatemala, 09 de Julio 2014

Ingeniero

EléctricoJimmy Espinoza
MantenimientoJefe de Area de Potencia - EMPAGUA

Estimado Ingeniero: Eléctrico

A continuación presentamos el informe sobre el Mantenimiento Preventivo realizado a la subestación del

pozo N-5 de 3x100 KVA efectuado el día 9 de Julio del presente año.

1. Mantenimiento a banco de transformadores:

ALCANCE

Limpieza general de:

 Bushings de alta y baja tensión.
 Terminales de alta y baja tensión.
 Cables principales de alta y baja tensión.
 Conexiones a tierra.
 Tanque de los transformadores.

Revisión y apriete de:

 Conectores y terminales de alta y baja tensión.
 Tornillería en general.

Revisión exterior para verificar fugas de aceite en:

 Bushings de alta y baja tensión.
 Tanque de los transformadores.
 Cambiador de taps.
 Tapadera principal del tanque.

Pruebas básicas a los devanados:

 Medición de la resistencia del aislamiento de cada bobina (primario a tierra, primario a secundario
y secundario a tierra).

 Prueba de la relación de vueltas (TTR).

2. Medición de la Red de Tierras:

 Se utilizara el método del 62%

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
_____________________________________________________________________________________

MaMntoenntiamjeieyntoCONCLUSIONES

 Resistencia del aislamiento: Los transformadores tienen sus tres aislamientos en buenas
condiciones toda vez que las mediciones realizadas se encuentran entre los parámetros

MaEntléecntimricieontopermisibles.

 Relación de transformación: Los transformadores se encuentran en buenas condiciones, las
lecturas fueron menores al ±0.5% considerado como máximo aceptable, esto indica que los
transformadores no tienen espiras cortocircuitadas.

Eléctrico Bushings y Conectores: Se encontraron Bushings y conectores sucios los cuales fueron

limpiados, los Empaques se encuentran en buen estado.

 Se cambiaron los 3 pararrayos de la subestación ubicados en bóveda (Servicios Técnicos), así
como los de las líneas de distribución (Enérgica)

 El resultado que dio la medición de la red de tierras es de 1.42 Ohms el cual está dentro del
parámetro recomendado tomando en cuenta que la capacidad del banco de transformadores es
menor a 2 Mva.

 Se reapreto el conector de puesta a tierra del transformador ya que se encontraba con flojedad.

RECOMENDACIONES

1. Realizar mantenimientos preventivos una vez cada año para prolongar la vida útil de los equipos y
evitar cualquier imprevisto.

2. Realizar un estudio termografico cada año para anticiparse a cualquier falla por conexiones flojas y
sucias.

Con el mejor deseo de poderles servir quedamos a sus órdenes para cualquier información
adicional que sea requerida.

Atentamente,

Juan Carlos Rodriguez
Jefe Unidad de Productos y Servicios

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
_____________________________________________________________________________________

MaMntoenntiamjeieyntoPOZO N-5 EMPAGUA
MaAEnNTtElSéeDEcnL MtiAmrNTiEcNiIeMoIEnNTtOo

Banco de transformadores 3 x 100 kva

EléctricoAcometida primaria Trafo reg. P521779
Banco de trafos

Trafo reg. P521776 Trafo reg. P521790 Estado de bóveda

ESTADO DEL SISTEMA DE TIERRAS

SE RE-APRETARON TODOS LAS CONEXIONES DE TIERRA

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
_____________________________________________________________________________________

MaMntoenntiamjeieyntoPARRARRAYOS DE 10 KV.
MaEntléecntimricieonto

Eléctrico

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
_____________________________________________________________________________________

MaMntoenntiamjeieyntoFOTOS DESPUES DEL MANTENIMIENTO
MaEntléecntimricieontoBanco de transformadores lado frontal

Eléctrico

Banco de transformadores lado atrás

MEDICION DE TIERRAS

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

Montaje y

COMEGSA UNPRO-RS-B1-014
_____________________________________________________________________________________

MaMntoenntiamjeieyntoESTADO DEL SISTEMA DE TIERRAS
MaEntléecntimricieonto

Eléctrico

TRANSFORMADORES CON EL CINCHO DE TAPADERA CAMBIADO

_____________

6ª. Avenida 8-14 zona 1 PBX 2420 4200 / 2420 4277 Fax 2230 5618 www.comegsa.com.gt

Certificado SC 6748-1

COMEGSA UNPRO-B2-014
__________________________________________________________________________________________________________

RESULTADOS DEL RECORRIDO
TERMOGRAFICO DESPUES DEL MANTENIMIENTO

_____________________________________________________________________________________________________________________________ ______________________
__ 6a. Avenida 8-14 Zona 1 • PBX (502) 2420-4200 * (502) 2420-4277 * FAX (502) 2230-5628 • Visítenos www.comegsa.com.gt

Breacker principal

POZO N­5

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE BAJA TENSION
POZO N­5

20 DE AGOSTO DE 2014

PUNTO DE TERMOGRAFIA:
BREACKER PRINCIPAL DE 500 AMP.

TERMOGRAFO: Saul antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
August 25, 2014

Breacker principal

POZO N­5 / Bornes lado fuente y carga

26.5° C 37.0° C 08/20/14 ­ 10:18 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 35.0° C
s2 37.1° C
s3 36.0° C
s4 38.1° C
s5 35.6° C
s6 37.9° C

a1 32.7° C Prom.

Máx: 40.1° C Min: 28.1° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
August 25, 2014

Corta circuitos

POZO N­5

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA TENSION
POZO N­5

20 DE AGOSTO DE 2014

PUNTO DE TERMOGRAFIA:
CORTA CIRCUITOS

TERMOGRAFO: Saul antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
August 25, 2014

Corta circuitos

POZO N­5 / Acometida principal

8.9° C 22.1° C 08/20/14 ­ 10:16 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 16.8° C
s2 16.6° C
s3 17.9° C

a1 11.6° C Prom.

Máx: 22.6° C Min: 8.4° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
August 25, 2014

Hot­line

POZO N­5

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA TENSION
POZO N­5

20 DE AGOSTO DE 2014

PUNTO DE TERMOGRAFIA:
HOT­LINE

TERMOGRAFO: Saul Antonio cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
August 25, 2014

Hot­line

POZO N­5 / Hot­line

8.8° C 21.9° C 08/20/14 ­ 10:16 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 16.1° C
s2 17.6° C
s3 17.4° C

a1 10.7° C Prom.

Máx: 20.3° C Min: 8.5° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
August 25, 2014

Transformador 521776

POZO N­5

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA Y BAJA TENSION
POZO N­5

20 DE AGOSTO DE 2014

PUNTO DE TERMOGRAFIA:
TRANSFORMADOR P­521776

TERMOGRAFO: Saul antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
August 25, 2014

Transformador 521776

POZO N­5 / Bushing de alta y baja tension

23.5° C 41.6° C 08/20/14 ­ 10:20 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 26.0° C
s2 26.2° C
s3 28.9° C
s4 29.4° C
s5 28.5° C

a1 29.4° C Prom.

Máx: 42.7° C Min: 22.8° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
August 25, 2014

Transformador 521779

POZO N­5

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA Y BAJA TENSION
POZO N­5

20 DE AGOSTO DE 2014

PUNTO DE TERMOGRAFIA:
TRANSFORMADOR P­521779

TERMOGRAFO: Saul antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
August 25, 2014

Transformador 521779

POZO N­5 / Bushing de alta y baja tension

23.1° C 40.0° C 08/20/14 ­ 10:19 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 25.7° C
s2 25.9° C
s3 28.1° C
s4 29.0° C

a1 29.2° C Prom.

Máx: 41.2° C Min: 22.9° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
August 25, 2014

Transformador 521790

POZO N­5

ESTUDIO TERMOGRAFICO REALIZADO A EQUIPO DE ALTA Y BAJA TENSION
POZO N­5

20 DE AGOSTO DE 2014

PUNTO DE TERMOGRAFIA:
TRANSFORMADOR P­521790

TERMOGRAFO: Saul antonio Cardona Hernandez
CERTIFICACION No. 17897

Servicios Tecnicos P: 5206­8840 Saul Cardona
5a. Av. 9­75 Amatitlan F: [email protected]
August 25, 2014

Transformador 521790

POZO N­5 / Bushing de alta y baja tension

23.4° C 41.9° C 08/20/14 ­ 10:20 AM

NOTES PROBLEM DESCRIPTION RECOMMENDATION
Ninguno Ninguna
s1 26.0° C
s2 26.2° C
s3 29.5° C
s4 28.8° C

a1 30.1° C Prom.

Máx: 43.3° C Min: 22.7° C

Servicios Tecnicos P: 5206­8840 Saul Cardona 1
5a. Av. 9­75 Amatitlan F: [email protected]
August 25, 2014