The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by Aiman Zalin, 2020-10-05 02:43:17

Company Profile

Company Profile

Jurutera Perunding Zaaba Sdn. Bhd.

Consulting Engineers

(306236-U)

COMPANY PROFILE

Jurutera Perunding 2
Zaaba Sdn. Bhd.

Consulting Engineers
(306236-U)

COMPANY
PROFILE

Jurutera Perunding Zaaba Sdn.
Bhd.

No. 17, Jalan Daud, Kampung Baru,
50300 Kuala Lumpur, Malaysia.

Tel: (6)03-2691-3007, 2691-3009
Fax: (6)03-2698-6239, 2692-5624

Website: http://www.jpz.com.my
E-mail Address: [email protected]

Mechanical and Electrical Unit
4, Jalan Puncak Setiawangsa 4,
Taman Setiawangsa, 54200 Kuala

Lumpur, Malaysia.
Tel. : 03-4252 0411
Fax : 03-4252 0223

Airport Unit
No. 16-2, Jalan 5/4C, Desa Melawati,

53100 Kuala Lumpur,
Malaysia.

Tel. : 03-4105 1509
Fax : 03-4105 1513

Copyright © 2020 Rev. 13
Jurutera Perunding Zaaba

Sdn. Bhd.

Content 4
6
Company Philosophy 8
Mission and Vision 10
A Message from the Board of Directors 11
Management Team 12
Organisational Chart 14
Company Strength 16
Corporate Integrity 18
General Services 28
34
Water Resources 46
Transportation Infrastructure 58
Land Development and Infrastructure 66
Mechanical and Electrical 69
Airport Division
Independent Project Management Checking Engineer
Certificates and Awards

3

4

5

Vision

To develop Jurutera Perunding Zaaba Sdn. Bhd. as a premier
international engineering company with advanced
technologies and all-round capabilities.

6

Mission

To undertake each engineering venture with the aim of
providing the highest standard in quality, efficiency, cost-
effectiveness, safety and environmental preservation through
the application of technology and the continuous development
and enhancement of human potential based on Islamic
Principles.

7

A Message

from the

Board of

Directors

Jurutera Perunding Zaaba Sdn. Bhd. started
in 1984 with a handful of engineers and big
aspirations. Today, with more than 30 years
of experience and a staff force of about 200
personnel, Jurutera Perunding Zaaba Sdn.
Bhd. is continuously striving to improve the
technical capabilities of its people and
upgrading its systems and procedures to
provide better service to its clients through the
acquisition of productivity tools and the
fostering of a corporate culture based on
excellence.

Over the years Jurutera Perunding Zaaba
Sdn. Bhd. has been entrusted with helping the
growth of the nation through diverse services,
including masterplans and policy-related
studies, in a wide spectrum of engineering
fields such as transportation, roads and
highways, water resources and water supply,
residential, commercial and industrial
development, mechanical and electrical
engineering.

We would like to thank our clients in both the
public and private sectors for giving us the
opportunity to provide them with our services,
enabling us to grow to our present stature. It
is hoped that such support will continue in the
future and that the new millennium will usher
in more existing and challenging opportunities
for the firm.

Together with our clients, Jurutera Perunding
Zaaba Sdn. Bhd. will continue its efforts in
building up the essential infrastructures for the
benefit of future generations as we head
towards a nation of self-reliance in fulfilling the
aspirations of Vision 2020 and beyond.

8

Board of Directors

Ir. Hj. Zalin Bin Amir
Managing Director

Dato Ir. Hj. Aziz Bin Dato’ Seri Ir. Dr. Haji Ponimin Bin Ir. Haji Shahul Hameed Bin
Mustafa Tayat (P.J.K.) Sel. Mydin
Executive Director
Executive Director Executive Director

Datuk Ir. Aminnudin Bin Ir. Hj. Kamarul Bahrin Bin Ir. Hj. Yusman Bin Daud
Yahya (PGDK) Mohamad Director
Director Director

9

Management Team

Hj. Abdullah Al-Mamun Hj. Md Ahmad Bin Hj. Dr. Hj. Mohamad Bin
Associate Director and Said @ Hj. Ait Abd. Ghani
Head of Hydraulics and
Hydrology Department Company Secretary Associate Director

Hjh. Safiah Binti Amir Azmi Bin Omar Hj. Amran Bin Alias Abdul Talib Bin
Head of Finance Head of Land Head of Road and Mohd. Yusof
Department Development and Highway Department Head of Water Supply
Geotechnical Department
Departments

Ir. Muhammad Ilyas Andee Raidza Bin Rudziah Binti Mohd Mohd Shukri Bin
Bin Ahmad Jamaluddin Diaudin Tap Abd. Kadir

Senior Engineer Senior Engineer Senior Engineer Senior Engineer

10

Jurutera Perunding Zaaba Sdn. Bhd.

Consulting Engineers

Organisational Chart

Board of Directors Company Secretary
Hj. Ahmad @ Md Ahmad Bin Hj. Said @ Hj. Ait
Managing Director
Ir. Hj. Zalin Bin Amir

11

Director Director Director Director Director Director Director
Datuk Ir. Ir. Hj. Ir. Hj. Ir. Hj. Zalin Bin Amir Dato’ Seri Ir. Dr. Hj. Ponimin Bin Tayat Dato Ir. Hj. Ir. Hj. Shahul Hameed Bin Mydin
Aminnudin
Bin Yahya Kamarul Yusman Aziz Bin
Bahrin Bin Bin Mustafa
Mohamad Daud

Associate Director
Dr. Hj. Mohammad

Bin Abd Ghani

Airport Mechanical and Electrical Finance Special Projects Hydraulics and Water Supply Dept. Admin/ Road Mgmt Structure Quality Land Geotechnical
Division Division Dept & Project Hydrology Dept. HR and Information Dept. Mgmt Development Dept.
Mgmt Highway System
Dept. Dept. System Unit Dept.
Unit

Head of Department Head of Department Head of Department Head of Head of Department
Hjh. Safiah Binti Ir. Muhammad Ilyas Abdul Talib Bin Mohd Department En. Azmi Bin Omar
Amir Hj. Amran Bin Alias
Bin Ahmad Yusof
Jamalluddin

Company Strength

As a knowledge-intensive business whose competitive edge hinges on the skills and
technical know-how of its staff, Jurutera Perunding Zaaba Sdn. Bhd. owes much of its
success to the hard work and dedication of its employees. Moulding itself as an
organisation of higher learning, Jurutera Perunding Zaaba Sdn. Bhd. is continuously
advancing the knowledge and skillsets of its employees through on-the-job as well as
formal training. At Jurutera Perunding Zaaba Sdn. Bhd., we perpetuate the habit of
teaching and learning by instilling a Continuous Learning Culture among our employees.
To provide the best services in a wide range of disciplines, Jurutera Perunding Zaaba
Sdn. Bhd. has long established technical affiliations with other engineering companies and
universities, overseas and local, to provide specialised technical expertise. This means
that clients can be assured of the best services from a company with strong commitment
to quality and reliability.

12

13

CORPORATE INTEGRITY

14

JURUTERA PERUNDING ZAABA SDN. BHD.
INTEGRITY PLEDGE

Recognizing that:
• The Anti-Corruption Principles for Corporations in Malaysia, as may be

amended or revised from time to time, are principles to which companies
in Malaysia should commit to promote integrity, transparency and good
governance in all aspects of its operations;

• To conduct business free from corruption and in accordance with the Anti-
Corruption Principles for Corporations in Malaysia and to ultimately act in
the best interests of the Company and its shareholders, as corruption
destroys shareholder value, undermines the confidence of investors, and is
the antithesis of sustainable growth,

Jurutera Perunding Zaaba Sdn. Bhd. hereby pledges that it shall:
• Not, through any of its employees, agents or subsidiaries commit any

corruption offence under any law, such as the MACC Act 2009 or Penal
Code;

• Not conduct any business practices or activities that would require or
encourage any of its employees, agents or subsidiaries to commit such
offences; and

• Work together with its business partners, regulators and law enforcement
agencies to create a business environment that is free from corruption,
and

• Uphold the Anti-Corruption Principles for Corporations in Malaysia in the
conduct of its business and in its interactions with its business partners
and the Government.

Ir. HJ. ZALIN BIN AMIR
Managing Director
01st June 2020

16

General Services

Jurutera Perunding Zaaba Sdn. Bhd. offers engineering design and management services
that cover a wide range of fields which include:

Services Fields of Engineering

❖ Project Planning and Management ❖ Transportation and Traffic
❖ Pre-Feasibility Studies ❖ Roads and Highways
❖ Technical and Economic Feasibility Studies ❖ Water Resources
❖ Environmental Studies ❖ Water Supply
❖ Asset Management Studies ❖ Hydrology and Hydraulics
❖ Rehabilitation Studies ❖ Coastal and Estuaries
❖ Field Investigation and Testing ❖ Geotechnical
❖ Detailed Design ❖ Mechanical and Electrical
❖ Design Review ❖ Bridges
❖ Design Audit ❖ Dams
❖ Safety Audit ❖ Structural
❖ Cost Estimation ❖ Public Health
❖ Tender Preparation and Documentation ❖ Land Development
❖ Tender Appraisal ❖ Power and Control
❖ Contract Preparation and Management ❖ SCADA System
❖ Construction Management
❖ Construction Supervision

17

18

Water Resources

Planning and development of water HYDRAULICS AND HYDROLOGY SERVICES
resources pose challenging tasks that require Drainage System Design
the latest technologies, expertise, ingenuity Stormwater Management
and balance in meeting the conflicting Dams and Barrages
demands of the social economy and the need Water Resources Studies
for a sustainable ecosystem. At Jurutera Irrigation System Design
Perunding Zaaba Sdn. Bhd., this sector Institutional Studies
forms one of the key areas in the strategic Flood Mitigation
long-term development of the organization. Floodplain Management
Waterway Hydraulics
So far, Jurutera Perunding Zaaba Sdn. Bhd. Hydrological Analysis & Design
has been fortunate to have carried out Hydraulic Analysis & Design
numerous varied projects in this sector, Groundwater
enabling it to gather the necessary Data Collection and Analysis
experience and expertise. The firm has also Environmental Review and Management
been forging ahead in acquiring and applying Water Quality
the latest technologies and has emerged Mathematical Modelling
among the leading consultants in this field. River Rehabilitation
Coastal & Estuaries Management
Over the years, Jurutera Perunding Zaaba
Sdn. Bhd. has affirmed its reputation for its WATER SUPPLY SERVICES
capability in feasibility studies and the design Technical & Economic
and implementation of multi-purpose water Feasibility Studies
resources project involving water supply, Water Resources Studies
irrigation, flood control, dams, drainage and Hydraulic Design
stormwater management, river improvement, Intakes Structures & Pumping Systems
watershed management and river basin Treatment Plants
studies. This is demonstrated by the Booster Pumping Stations
government's confidence in awarding Water Tank & Reservoirs
projects such as the preparation of guidelines Pipe Route Selection
and manuals in this field for the country. Pipe Line Design
Design Review

19

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Hydraulics and Hydrology

Flood Mitigation and Drainage Cost (mil) Client
Start End Project 1073 Department of Irrigation and
120.0 Drainage, Redmax Sdn. Bhd.
Detailed Design for Flood Mitigation and Drainage at Sg. Muda, Kedah Darul & Wira Kerjaya Sdn. Bhd.
2000 2017 Aman (Package 1, 2, 2A & 2B)
Department of Irrigation and
Detailed Design for Flood Mitigation and Drainage at Chukai, Kemaman, Drainage
2001 2010

Terengganu

Construction and Supervision of Flood Mitigation Structure for Sg. Ayer 10.8 Johor Bahru Municipal
2004 2010 Molek, Johor Bahru Council

Water Resources Development Cost (mil) Client
Start End Project 50.0
1997 2000 Detailed Design of Sungai Aur Dam, Pahang 15.0 Department of Water Supply
13.0 Pahang
2006 2008 Detailed Design of SABO Dam in the State of Perak 80.0 Department of Irrigation and
343.0 Drainage
2007 2010 Proposed Barrage Construction at Besut River, Terengganu Economic Planning Unit
Terengganu
2007 2009 Detailed Design for Paya Peda Dam for KETARA, Terengganu Department of Irrigation and
Construction and Supervision of Paya Peda Dam, Besut, Terengganu Darul Drainage
Department of Irrigation and
2010 2016 Iman Drainage

Other Works Cost (mil) Client
Start End Project 6.0 Department of Irrigation and
2004 2006 Proposed Upgrading of Lereh River/Udang River, Melaka Drainage Melaka
250.0
Engineering Consultancy Services for the Development of Langat River for 25.0 Megasteel Sdn Bhd.
2005 2005 62.0
175.0 Department of Irrigation and
Navigation Drainage
2006 2007 Flood Forecasting and Warning System in Klang Valley Sewerage Services
Department Selangor
2012 2015 Construction of Treatment Plant in Sub-Region of Upper Kerayong, Selangor Department of Irrigation and
2016 2017 Cleansing and Beautification of Melaka River – Parcel 2 Drainage Malaysia

Studies Client
Start End Project Department of Irrigation and
1992 1992 Drainage Master Plan Study for Daerah Besut, Terengganu Darul Iman Drainage
Department of Irrigation and
1996 1996 Feasibility Study for Paya Peda Dam for KETARA, Terengganu Drainage

1997 1998 Feasibility Study of the Proposed Barrage for Water Supply Intake at Sg. Paka, Dungun, Petronas
1997 1998 Terengganu
Dam Safety Review – Study of Bukit Merah Dam, Perak and Padang Saga Dam, Langkawi, Department of Irrigation and
Kedah Drainage
Department of Irrigation and
1997 1997 Drainage and Stormwater Master Plan Study, Ipoh, Perak Drainage
Department of Irrigation and
1997 1997 Drainage Study at Kuala Kubu Baru, Hulu Selangor, Selangor Drainage Selangor
Department of Irrigation and
1998 1998 Preparation of Urban Stormwater Management Manual for Malaysia Drainage

1998 2000 Feasibility Study of the Proposed Barrage for Water Supply Intake at Sg. Paka, Dungun, Petronas
Terengganu

*Cost in Malaysian Ringgit (Million) 20

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Hydraulics and Hydrology

Studies Client
Start End Project Economic Planning Unit,
1998 2000 National Water Resources Study Prime Minister’s Department
1999 1999 Dam Risk Assessment for Putrajaya Dams
1999 1999 Master Plan Study on Drainage and Flood Mitigation for Chukai, Kemaman, Terengganu Putrajaya Holdings
1999 1999 Preparation of Urban Stormwater Management Manual for Malaysia
2002 2002 Cleansing and Water Treatment of Pinang River Department of Irrigation and
2003 2003 Pollution Prevention and River Quality Improvement Program for Sungai Melaka Drainage
Department of Irrigation and
Drainage
Department of Irrigation and
Drainage

Department of Environment

2011 2012 Sg. Langat Water Abstraction Studies For Megasteel Sdn. Bhd. Lion Blast Furnace Sdn Bhd

2012 2013 Study of Ex-Mining Pond as Flood Storage at Selangor River Selangor Water Management
2012 2012 State of the River Report (SOR) for Klang River, Langat River and Selangor River Board

Selangor Water Management
Board

2013 2015 Hydraulic and Groundwater Modelling Study for Kuala Langat Tin Mining Project Lion Blast Furnace Sdn Bhd

2013 2014 Availability Study for Groundwater in Selangor Selangor Water Management
Board

2013 2013 Study for Hybrid Off River Augmentation Storage (HORAS) in Kg. Sg. Darah, Bestari Jaya as Economic Planning Unit
Water Resource for Water Supply

2013 2014 Coastal Hydraulic Study for Proposed Reclamation of Land for Mixed Development near Dewan Perniagaan Melayu
Johor Causeway Malaysia

2014 2014 Feasibility Study for Proposal of Developing Additional Water Resource from Rasau River Selangor Water Management
Flood Mitigation Project Board

2015 2016 Hydrological and Hydraulic Study for 512 km long Sabah Sarawak Gas Pipeline (SSGP) Pertronas Cari Gali Sdn Bhd

2015 2016 North South Expressway Central Link Flood Mitigation Study At Shah Alam Toll PLUS Berhad

2015 2015 Coastal Hydraulic Study for Proposed Upgrading of Dayang Bunting Jetty, Langkawi, Kedah Langkawi Development
Darul Aman Authority (LADA)

2015 2015 Feasibility Study for Proposed Water Treatement Plan in Cadangan Labohan Dagang, Kuala Selangor Economic Planning
Langat, Selangor Darul Ehsan Unit

2016 2018 Development Program for Water Balance for Water Resource Management (Phase 1) - Department of Irrigation and
National Water Balance Management System (NAWABS) for Muda River Drainage

2017 2018 Water Footprint Licensing and Water Source Abstraction Charge for Agriculture, Aquaculture Selangor Water Management
and Husbandry Study in Selangor Board

2017 2017 Hydraulic Study for Promissory Project, Phase II Fish Landing Complex Development, Malaysian Public Works
Malaysian Board of Fishery Development, Labuan Department

*Cost in Malaysian Ringgit (Million)

21

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Hydraulics and Hydrology

Projek Pembersihan dan Pengindahan Sungai Melaka – Parcel 2

Detailed Design for Flood Mitigation and Drainage at Sg. Muda, Kedah

22

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Hydraulics and Hydrology

Projek Pembangunan Empangan Paya Peda, Besut, Terengganu Darul Iman

23

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Water Supply

Start End Project Cost (mil) Client

1996 2002 Detailed Investigation, Detailed Design and Supervision of Construction for 110.0 Syarikat Air Terengganu Sdn.
Bekalan Air Kuala Terengganu Peringkat III in the State of Terengganu Bhd.

1996 2003 Rehabilitation and Upgrading of Water Supply Systems in Malaysia Package 2 102.0 Perak Water Management
- State of Perak. 15.0 Board
12.0
1997 Langkawi Water Supply Project Phase IV, Kedah – Pipe Installation at Bukit 10.0 Kedah Water Supply
2002 Changkuan, Simpang Malut and Pekan Kuah, Teluk Datai Road, Water Tank Department

Construction at Telok Nibong and Pekan Kuah Perak Water Management
Board
Engineering Investigation, Detailed Design, Tendering and Supervision of
1997 2004 Construction for the Rehabilitation and Upgrading of Kota Lama Kiri (Kuala Kedah Water Supply
Department
Kangsar) Water Treatment Plant, Balancing Reservoir and Pumping Mains

2001 Sungai Petani Stage III Water Supply Project – Detailed Design and
2004 Supervision for 10ML Water Tank at Taman Keladi (T10A), 15ML Water Tank

at Taman Kempas (T8A), Sg. Petani, in the District of Kuala Muda, Kedah

2001 2002 Integrated Concept Rural Water Supply Project for Negeri Selangor Year 6.4 Ministry of Rural and Regional
2001/2002 Development

2001 2015 Sik Water Supply Project – Detailed Design and Supervision of Construction 153.3 Kedah Water Supply
for Sik Water Supply Scheme, Kedah Department

2002 2008 Kuala Terengganu Stage IV Water Supply Project – Detailed Investigation, 150.0 Water Supply Department,
Detailed Design and Supervision of Construction Ministry of Energy, Water and
Communication

2002 2015 Pekan District Water Supply Project – Detailed Investigation, Detailed Design 160.0 Pahang Water Supply
and Supervision of Construction Department

2003 2004 Integrated Concept Rural Water Supply Project for Negeri Selangor Year 8.0 Ministry of Rural and Regional
2003/2004 Development

2005 2007 Reduction of Water Loss Program – Projek Old Water Pipe Replacement 31.0 Syarikat Bekalan Air Selangor
Project at Wilayah Hulu Langat Sdn. Bhd.

2009 2011 Water Supply Project Depoh Peluru (93 DPP), Mempaga, Bentong, Pahang 12.0 Ministry of Energy, Green
Technology and Water

2017 2022 Proposed Upgrading of Water Treatment Plant in Jenun Baru from 55 MLD, 113.5 Syarikat Air Darul Aman Sdn.
Pendang, Kedah Darul Aman Bhd.

2017 2018 Development Project of Water Treatment Plant in Labohan Dagang, Kuala 356.0 Economic Planning Unit
Langat

*Cost in Malaysian Ringgit (Million)

24

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Water Supply

Rancangan Bekalan Air Daerah Pekan, Pahang.
Top : Kg. Tanah Putih Suction Tank, Booster Pump Station and Elevated Water Tank.
Bottom right: Booster Pump Station.

Sik Water Supply Scheme Project in the State of Kedah
Top: 10 ML Jeniang Reservoir
Bottom: Jeniang Water Treatment Plant

25

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Water Supply

Kuala Terengganu Phase IV Water Supply Project, Top: Kepong Water Treatment Plant, Kuala Terengganu,
Bottom right: Overview at Kepong Treated Water Pump House, Kuala Terengganu,
Bottom left: 1,200 mm dia. Cladded Pipe Laying Work across Sg. Terengganu from Losong Feri to Bukit Datu.

26

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Water Supply

Projek Pembangunan Loji Rawatan Air Labohan Dagang, Daerah Kuala Langat

27

28

Transportation Infrastructure

Transportation infrastructure, an important TRANSPORTATION INFRASTRUCTURE
engine of growth that provides the vital SERVICES
connections that link people and their Technical and Economic Feasibility Studies
activities across a country as well as around Asset Management Studies
the globe. Recognizing its importance to the Traffic and Transportation Studies
development and growth of a nation, the Corridor and Route Selection
transportation sector at Jurutera Perunding Design and Safety Audit
Zaaba Sdn. Bhd. has evolved and Survey
systematically grown in complexity from the Geotechnical and Material Assessment
design of simple rural roads to the parallel Roads and Pavement
runways and taxiways of the prestigious Hydrology
Kuala Lumpur International Airport. Bridges
Street and Expressway Lighting
The firm provides value to its clients in Landscape Architecture
planning and engineering by clarifying their Public Utilities
needs, challenging assumptions and
developing solutions with the highest level of
quality and performance.

To date, Jurutera Perunding Zaaba Sdn.
Bhd. has been entrusted by the government
to handle some of the country’s notable
projects such as the Upgrading of Route B15
to Putrajaya and Cyberjaya, the Technical
and Economic Feasibility Study of the Trans-
Asia Railway and the Asset Management
Study for State Roads.

29

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Roads and Highways

Road Construction

Start End Project Cost (mil) Client

1986 1986 Construction and Completion of Roads for Perkampungan Felda Kecau, 5, 6 & 5.5 Malaysian Public Works
7 at Gugusan Felda Kecau, Daerah Lipis, Pahang Darul Makmur Department

1986 1986 Construction and Completion of Village Roads including Supply and Pipe 5.4 Malaysian Public Works
1986 1986 Reticulation Installation for Perkampungan Felda Kecau 8, 9 & 10 at Gugusan Department
1986 Kecau, Pahang Darul Makmur
Construction and Completion of Access Road and Bridge for Perkampungan 4.0 Malaysian Public Works
Felda Kecau 8, 9 & 10 at Gugusan Kecau, Daerah Lipis, Pahang Darul Department
Makmur

1986 Construction and Completion of Access Road for Perkampungan Felda Kecau 2.0 Malaysian Public Works
4, 11 & 12 at Gugusan Felda Kecau, Daerah Lipis, Pahang Darul Makmur Department

1988 1988 Proposed Construction of Safety Road, Sungai Jang Road to Sempadan 13.0 Ministry of Transportation
Mergastua Ampang Pechah, Hulu Selangor, Selangor Darul Ehsan

1988 1988 Study and Design for Road Construction from Sungai Tengi to Sungai Tinggi, 8.0 Malaysian Public Works
Hulu Selangor, Selangor Darul Ehsan Department

1995 1995 Proposed Rail Link to Pulau Indah, Kelang 385.0 Railway Asset Corporation
92.5
1997 Proposed Road from Kampung Berchang, Lipis to Ringlet, Cameron 70.0 Malaysian Public Works
1997 1999 Highlands, Pahang. Package 4, Kampung Susu/Sungai Bertam ke Ringlet, 20.0 Department
20.0
Pahang Darul Makmur 61.5 Dewan Bandaraya Kuala
Lumpur
2008 Proposed Trumpet Interchange from Federal Route 1 to Pasar Borong, Kuala
Lumpur Dewan Bandaraya Kuala
Lumpur
2002 2007 Connection Road from Taman Alam Damai to East-West Highway, at Cheras,
Kuala Lumpur Ministry of Rural and Regional
Development
2004 2016 New Road Project from Kg Tun Razak to Kg Tehel, Jasin, Melaka
Malaysian Public Works
2008 2014 Construction of Two Interchanges at Jalan Tampoi, Johor Bahru, Johor Darul Department
Takzim

Bridge Construction Cost (mil) Client
Start End Project

1987 1987 Proposed Bridge Construction atas Sungai Pontian Kecil, Jalan Sekolah Arab, 1.5 Malaysian Public Works
Pontian, Johor Darul Takzim Department

Proposed Bridge across the Railway Double Tracking at Laluan-laluan Kuala 30.0 Malaysian Public Works
1990 1990 Lumpur - Port Klang, Kuala Lumpur – Rawang dan Kuala Lumpur – Seremban Department

(Package 4)

1993 1996 Proposed Replacement of Six (6) Wooden Bridges At Daerah Kinta di Negeri 4.0 Malaysian Public Works
Perak Darul Ridzuan Department

2009 2012 Construction and Completion of Bridge from Kampung Binjai to Kampung Mak 12.0 Malaysian Public Works
Lagam, Kemaman, Terengganu Department

*Cost in Malaysian Ringgit (Million)

30

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Roads and Highways

Road Upgrades Cost (mil) Client
Start End Project 30.0
250.0 Malaysian Public Works
1993 2002 Upgrading Federal Route 8 (Bentong-Kuala Lipis), Package 2 75.0 Department
30.0
1998 2005 Realignment and Upgrading of Route B15 at Putrajaya and Cyberjaya 150.0 Malaysian Public Works
35.7 Department
1998 2005 Upgrading Federal Route FT001 From Johor Bahru to Simpang Pontian, 480.0
Johor Darul Takzim 320.0 Malaysian Public Works
Department
1999 2012 Upgrading of Jalan Kajang/Sepang (B48) Sepang, Selangor Darul Ehsan
Selangor Public Works
2005 2013 Upgrading of road from Seremban to Kuala Pilah, Negeri Sembilan (Phase 1 : Department
2005 Senawang junction– Bukit Putus)
Malaysian Public Works
2013 Upgrading of Jalan Seremban – Kuala Pilah, Negeri Sembilan (Phase 2 : Bukit Department
Putus – Sek. Keb. Ulu Bendul)
Malaysian Public Works
2010 2017 Proposed Road Upgrading from Ayer Keroh to Melaka City Department

2013 Construction of 3rd Bridge Klang, Klang District, Selangor Darul Ehsan (Phase Malaysian Public Works
2020 II) – Upgrading Road Link 3rd Bridge Klang from Persiaran Raja Muda Musa to Department

Selat Klang Highway. Selangor Public Works
Department

Studies Client
Start End Project Malaysian Public Works
Department
1996 1997 Rehabilitation of East West Highway Long Term Preventive Measures and Stability Study
Ministry of Transportation
1997 1997 Economic and Technical Feasibility Study for the Trans Asia Railway Network (Singapore-
Kunming)

1998 2000 Pre-Feasibility Study For The Construction of Bukit Bunga Bridge, Kelantan Darul Naim Ministry of Works

2000 2002 Feasibility Study for Jerantut - Sungai Lembing Road, Pahang Darul Makmur Ministry of Works

2002 2003 Putrajaya Transport Action Plan Putrajaya Corporation

2006 2009 Forest Road Construction Practices Peninsular Malaysia Forestry
Department

2009 2011 Traffic Impact Assessment for Proposed Development of Commercial/Residential Parcels in Putrajaya Holdings Sdn. Bhd.
Putrajaya

2010 2010 Proposed Melaka Tram System Economic Planning Unit,
Prime Minister’s Department

2011 2012 Traffic Impact Assessment of Transport Management Plan for the Construction of Klang Valley MMC Gamuda KVMRT (PDP)
2012
2014 Mass Rapid Transit from Sg Buloh to Kajang Sdn. Bhd.

Feasibility Study for Upgrading of Melaka Coastal Road from Kuala Linggi – Masjid Tanah – Ministry of Works
2013 Sungai Udang – Klebang – Limbongan – Jalan Pantai – Jambatan Syed Abdul Aziz – Alai

(Telok Mas)

2016 Axle Load Study (Bridges) on Federal and Major State Routes in Peninsular Malaysia Malaysian Public Works
Department

2016 2017 West Coast Expressway Lidar Survey Kajian Lidar Highway Planning Division,
Ministry of Works

2017 2017 Feasibility Study on the Proposed Privatisation of Peninsular Malaysia Northern Corridor Highway Planning Division,
Highway Ministry of Works

*Cost in Malaysian Ringgit (Million)

31

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Roads and Highways

Membina Dua Persimpangan Bertingkat di Jalan Tampoi, Johor Bahru, Johor Darul Takzim

Upgrading of road from Seremban to Kuala Pilah, Negeri Sembilan (Phase 1 : Senawang Junction to Bukit Putus)

Upgrading of road from Seremban to Kuala Pilah, Negeri Sembilan (Phase 2 : Bukit Putus to Sekolah Kebangsaan Ulu Bendul)

32

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Roads and Highways

Proposed Trumpet Interchange from Federal Route 1 to Pasar Borong, Kuala Lumpur

Connection Road from Taman Alam Damai to East-West Highway, at Cheras, Kuala Lumpur

Proposed Road Upgrading from Ayer Keroh to Melaka City

33

34

Building and Infrastructure

Elegance, efficiency and economy—the BUILDING AND INFRASTRUCTURE SERVICES
essential elements of engineering that forms Universities
the basis of works carried out at Jurutera Shopping Complexes
Perunding Zaaba Sdn. Bhd. Through the Multi-storey Offices
application of technology and experience, we Hotels
provide creative, and frequently non- Schools
traditional, solutions in the integration of Mosques
client needs, architecture and engineering Courthouse Buildings
requirements. Multi-storey Apartments
Bridges
In providing its services, the firm’s focus is on Substations
value engineering, often presenting, Warehouses
reviewing and comparing—together with Multi-purpose Halls
architects and other consultants—various Institutional Developments
alternatives before arriving at the best Deep Basements and Foundations
solution for the client. An example is the Pre-cast Construction
redesign of two international class hotel and Telecommunication Towers
office towers in Kuala Lumpur involving at Industrial Plants
least three different structural concepts, Design Review and Audit
giving a substantial saving of the structural Sewerage Line
cost while shortening the construction period. Sewerage Treatment Plant
Pumping Station
The firm’s experience embraces all aspects Water Reticulation
of engineering from site development and
infrastructure, commercial, residential,
institutional, industrial, dams, bridges and
pre-cast technology for the public and private
sectors.

35

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Structure, Land Development and Geotechnical

Housing Developments

Start End Project Cost (mil) Client
15.0 Pasukan Polis Hutan
1995 1998 Proposed PPH Kompeni Bebas Camp, BN 16, Kudat and Police 15.0 Malaysian Public Works
Office/Housing, Kudat, Sabah 56.0 Department
275.0 Putrajaya Holdings Sdn Bhd
1997 2002 Construction and Completion of 128 Units Quarters to Replace Existing Transit 80.0 Sime Darby Property Berhad
Quarters, Kuantan, Pahang 53.5 Kementerian Pertahanan
48.0 Malaysia
2001 2009 Proposed 344 Units Residential Development within lot boundary in Sub- Euro Saga Sdn Bhd
Presint 14-1 & 14-2 of Precinct 14 at Putrajaya 14.2
UEM Land
2002 2020 Proposed Construction of Housing dan Commercial at Bukit Subang 2 Mukim 22.2
Bukit Raja, Daerah Petaling, Section U16, Shah Alam, Selangor Darul Ehsan Planning TPPT Sdn Bhd

Proposed Multiple Grade Family Housing (365 Units) for Officers and other 233.0 Seriemas Development Sdn
2004 2005 members of Royal Malaysian Navy (TLDM) Mawilla 1, Bandar Baru Gebeng, 2.4 bil Bhd
Sime Darby Property Berhad
Kuantan, Pahang Sime Darby Property Berhad

2005 2006 Proposed Housing Development for TUDM at Pengkalan Udara Gong Kedak, Sime Darby Property Berhad
Jertih, Terengganu

2008 Proposed Development of 125 units Triple Story Stratified Terraces, Type A
2008 2014 41 units, Type B 84 units, Guard House 1 unit on Housing Block 1, Flagship

Zone Cyberjaya, Mukim Dengkil, Daerah Sepang, Selangor Darul Ehsan
Proposed Construction and Completion of Phase 2 Development – Package 1
2012 which includes 85 Units of Double Story Terraces (20’x70’) and a Substation
on Lot 8664, Kajang, Selangor Darul Ehsan

Proposed Construction and Completion of 51 Units Double Storey Terrace at
2010 2012 PT5.3 and 74 Units Double Storey Terrace at PT5.4, Kota Seriemas, Nilai,

Negeri Sembilan

2014 2015 Proposed Construction of Housing dan Commercial at Semenyih Estate,
Selangor Darul Ehsan (Planning Stage)

2015 2017 Proposed Development of Serenia City for Phase 2, Mukim Dengkil, Daerah
Sepang, Selangor Darul Ehsan

2015 Proposed Phase 1 Development (229.12 Acres), on Lots 5647 & 5648
2024 G.46057, Lot 25 G.24132 & Lot 24 G.24130, at Bandar Bukit Raja Stage 2,

Mukim Kapar, Daerah Klang, Selangor Darul Ehsan (Phase 1)

Offices Cost (mil) Client

Start End Project

2004 2013 Proposed Development of Government Office Building on Lot 4G7 at Precinct 150.0 Putrajaya Holdings Sdn Bhd
4, Putrajaya

2009 2018 Proposed Development of Government Office Buildings in Parcel F, Precinct 1.8 bil Putrajaya Holdings Sdn Bhd
1, Putrajaya

Towers Cost (mil) Client

Start End Project

1993 1993 Proposed Menara Majlis Perbandaran Labuan, Sabah 17.0 Majlis Perbandaran Labuan

1994 1999 10 Storey Office Tower for Petronas Carigali Headquarters Kota Kinabalu, 35.0 Petronas Carigali Sdn Bhd
Sabah

1998 1998 Proposed 25-Storey Office Tower on Lot 2-8, Shah Alam for Lankhorst Group 85.0 Lankhorst Hartanah Sdn Bhd
of Companies

2007 2007 Proposed Design, Build and Completion of Proposed Amwaj Tower at Umm- UAE Dirham Wang Com Sdn. Bhd.
Al-Quwain on Lot 2468, Uum-Al-Quwain, United Arab Emirates 933.0

*Cost in Malaysian Ringgit (Million)

36

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Structure, Land Development and Geotechnical

Hotels Cost (mil) Client

Start End Project

1993 1996 Alternative Design for 34 Storey Sheraton Towers Hotel, Kuala Lumpur 180.0 Inter Heritage Sdn Bhd

1994 1995 Basement and Superstructure Framing Concept Design for Guoman Hotel and 330.0 Hong Leong Properties
Office Tower, Kuala Lumpur Management Co. Sdn Bhd

1994 1996 K.L. International Hotel Extension Kuala Lumpur 60.0 Koperasi Polis

Educational Institutions

Start End Project Cost (mil) Client
Kementerian Pendidikan
1994 1998 Design and Proposed Retaining Wall System at Cadangan Pembangunan 27.0 Malaysia
Politeknik, Dungun, Terengganu 15.0 Yayasan Islam Perlis
20.5
1994 1996 Proposed Institut Pengajian Tinggi Al-Quran dan Sunnah, Yayasan Islam 250.0 Institut Teknologi MARA
Perlis 270.0
32.5 Kementerian Pelajaran
1995 1998 Construction and Completion of Kampus ITM Cawangan Dungun, Phase 1B, 450.0 Malaysia
Terengganu Darul Iman Telekom Malaysia Berhad
Proposed Construction of ‘Industrialised Building System (IBS)’ for Sekolah
U-Wood Holding Berhad
1997 2015 Kebangsaan Kementah which includes 30 classrooms in Wilayah Persekutuan
Techart Sdn Bhd
Kuala Lumpur
U-Wood Holding Berhad
1998 1999 Infrastructural Works for the Development of Multimedia University in
Cyberjaya, Selangor

Proposed Turnkey, Design & Built Construction of the Extension to the

2002 2004 University Technology MARA (UiTM) Shah Alam Main Campus at Bandar
Puncak Alam, Selangor Darul Ehsan – Infrastructure

2005 2012 Proposed Construction and Completion of Maktab Rendah Sains MARA
(MRSM) Jitra at Daerah Kubang Pasu, Jitra, Kedah Darul Aman

Proposed Turnkey Method, Design & Built Construction of the Extension to the

2010 2015 University Technology MARA (UiTM) Shah Alam Main Campus at Bandar
Puncak Alam, Selangor Darul Ehsan – Building

Mosques

Start End Project Cost (mil) Client
2004 2017 Proposed Construction and Completion of a Mosque, “Kiblat Walk” and related 208.0 Perbadanan Putrajaya
works on Plot 12080 and 12085 including part of 2 Roads between Plot 12080
with Plot 12085 and Plot 12080 with Plot 12072 and part of Plot 12072, 20.0 Majlis Agama Islam Wilayah
Precinct 3, Wilayah Persekutuan, Putrajaya Persekutuan

Proposed Construction of Masjid Ibnu Sina in Taman Tasik Titiwangsa,
2009 2018 Wilayah Persekutuan Kuala Lumpur for Majlis Agama Islam Wilayah

Persekutuan

Bridges Cost (mil) Client
30.0 Setia Haruman Sdn Bhd
Start End Project
1999 2000 The Design, Construction, Completion & Maintenance of Bridge D, Cyberjaya

Development (Flagship Zone Phase 1)

2009 2016 Privatised Construction of Pulau Pinang’s Second Bridge 800.0 UEM Construction Sdn. Bhd.

*Cost in Malaysian Ringgit (Million)

37

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Structure, Land Development and Geotechnical

Condominiums and Apartments Cost (mil) Client
100.0
Start End Project 16.0 GKM Development Bhd
1990 1992 Proposed Development of 106 Units Condominium on Lot 334, Jalan Sayers, 30.0 Pulau Indah Marina Resorts
Sdn Bhd
Bukit Tunku (Kenny Hill), Kuala Lumpur
1997 1997 Proposed Condominium Development for Pulau Indah Marina Resort, Pulau DBKL and Fleet Group

Indah, Klang, Selangor Darul Ehsan
2001 2010 450 Units 16 Storey Apartments on Lot 1700,Taman Danau Desa, Kuala

Lumpur

Others Cost (mil) Client

Start End Project

1992 1995 Proposed Kompleks Latihan Islam Kuala Kubu Baru, Selangor Darul Ehsan 30.0 Pusat Islam JPM

1993 1996 Construction and Completion of Cultural and Craft Complex, Pulau Langkawi, 30.0 Perbadanan Kemajuan
Kedah Darul Aman Kraftangan Malaysia

1995 2001 Proposed Mahkamah Syariah Building, Terengganu 16.0 Jabatan Kerja Raya

1996 1999 Proposed Main Sub Station (PMU) 132/22/11 KV, Silibin, Ipoh 10.4 Tenaga Nasional Berhad

2000 2002 Four Storey Telekom Exchange Building With One Level Basement ( PUJ1 ) at 16.0 Telekom Malaysia Berhad
Putsrajaya, Sepang, Selangor Darul Ehsan

2002 2004 Four Storey Telekom Exchange Building With One Level Basement ( CBJ 2 ) 15.0 Telekom Malaysia Berhad
2003 at Putrajaya, Sepang, Selangor Darul Ehsan 70 TH Universal Builders Sdn
2006 250 Bhd
2006 Proposed Training Center for Malaysian Armed Forces Gabungan Pasukan 10 Pembinaan BLT Sdn Bhd
2010 2012 Tempur Tentera Darat Phase II in Gemas Negeri Sembilan for THUB Sdn Bhd 25.0
Kementerian Pertahanan
and Ministry of Defence Malaysia Sector A2
Jabatan Kerja Raya
2015 Proposed Development of Police Retention Center and its Components on Lot
40365, Batu Muda, Jalan Ipoh, Kuala Lumpur

2009 Proposed Construction and Completion of Abandoned Works of Markas
Wilayah Laut 3 (Mawilla 3), Royal Malaysian Navy, in Tanjung Gerak,
Langkawi, Kedah Darul Aman for the Ministry of Defence Malaysia Phase 1,
Package 2, Related Building and Infrastructure Works

2010 Proposed Construction and Completion of Pusat Latihan Belia Wakaf
Tapai,Terengganu Darul Iman

2011 2017 Proposed Construction and Completion of 21 Units Double Storey Shop 10.0 I&P Kota Bayuemas Sdn Bhd
Office, Phase A16, Kota Bayuemas at Pandamaran

Studies Cost (mil) Client
Study
Start End Project Jabatan Kerja Raya
2008 2010 Research Study to Determine Factors Controlling and Causing Land Slides Study
JKR – Cawangan
Along Tapah Road, Cameron Highland (FT 059) Kejuruteraan Jalan dan
Geoteknikal
2014 2015 Investigation on Soil Settlement at Southern Region Sea Department
Complex, Gelang Patah, Johor.

*Cost in Malaysian Ringgit (Million)

38

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Structure, Land Development and Geotechnical

Commercial Complexes

Start End Project Cost (mil) Client
100.0
1993 Redevelopment Of Existing UDA Commercial Complex on Lot PT 10 Sec 4 50.0 ZEUS Development Sdn Bhd,
1995 1995 Bandar Bukit Mertajam, Seberang Perai Tengah with New Commercial and Kumpulan Pinang JV

Retail Complex , Hotel, Bus and Taxi Terminal on Lot PT 15 Sec. 4 , Bandar Bayan Galleria Development
Bukit Mertajam, Seberang Perai Tengah Sdn Bhd
Proposed 6 Storey Commercial Complex With 2 Level Basement Comprising
1998 Retail and Office Space, Bus and Taxi Terminal on Lots 1096,1599 and 1600,
Mukim 12,Daerah Barat Daya, Jalan Mayang Pasir Satu, Pulau Pinang

Sewerage Treatment Plant Cost (mil) Client PE

Start End Project

1991 1991 Proposed Construction of Polytechnic Dungun, Terengganu 102.0 Kementerian 2,200
1997 2001 Proposed Construction of Terengganu Polytechnic Campus, Dungun, 107.0 Pendidikan Malaysia 2,200

(Phase 2), Terengganu Darul Iman. Kementerian
Pendidikan Malaysia

1997 1999 Infrastructural Works for the Development of Multimedia University in 250.0 Telekom Malaysia 5,490
Cyberjaya, Selangor Berhad

Proposed Design, Construct and Completion Turnkey (Design and

2002 2002 Build) UiTM Kuala Pilah Permanent Campus in Kg. Beting, Mukim Parit 50.0 Tenunan Budi Sdn. 2,045
Tinggi, Daerah Kuala Pilah, Negeri Sembilan Darul Khusus by Tenunan Bhd.

Budi (M) Sdn. Bhd. for Universiti Teknologi Mara (UiTM)

2002 Design, Construct and Completion of Royal Artillery Regiment 51 Camp, 232.0 Target Resources Sdn. 2,075
2002 2007 Ammunition Storage Facility, and Family Houses, Gemas, Negeri 275.0 Bhd.

Sembilan Darul Khusus Sime Darby Property 50,000
Berhad
Proposed Construction of Housing dan Commercial at Bukit Subang 2
2020 Mukim Bukit Raja, Daerah Petaling, Section U16, Shah Alam, Selangor

Darul Ehsan

2004 2012 Proposed Construction and Completion of Maktab Rendah Sains MARA 32.5 Techart Sdn Bhd 1,148
(MRSM) Jitra at Daerah Kubang Pasu, Jitra, Kedah Darul Aman

2005 Proposed Malaysian Royal Air Force Housing Construction Project at 31.0 Euro Saga Sdn. Bhd. 1,245
2007 Gong Kedak Airbase, Terengganu Skn 84-30 Mkm (Sukhoi), Gong

Kedak, Besut, Terengganu Darul Iman.

2006 2015 Proposed Development of Police Retention Center and its Components 250 Pembinaan BLT Sdn 1,802
on Lot 40365, Batu Muda, Jalan Ipoh, Kuala Lumpur Bhd

Proposed Construction and Completion of Abandoned Works of Markas

2006 2009 Wilayah Laut 3 (Mawilla 3), Royal Malaysian Navy, in Tanjung Gerak, 10 Kementerian 1,283
Langkawi, Kedah Darul Aman for the Ministry of Defence Malaysia Pertahanan

Phase 1, Package 2, Related Building and Infrastructure Works

2015 2024 Proposed Development on Lot 24 G.24130, Lot 25 G.24132, Lot 36 1.5 bil Sime Darby Property 241,400
G.3704, Lot 37 G.47244, Lot 38 G.33603, Lot 39 G.40045, Lot 5645 Berhad
and 5648 G. 46057 and Lot 86 G.51058 at Bandar Bukit Raja (Stage II
dan III), Mukim Kapar, Klang, Selangor

*Cost in Malaysian Ringgit (Million)

39

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Structure, Land Development and Geotechnical

Proposed Construction and Completion of a Mosque, “Kiblat Walk” and related works on Plot 12080 and 12085 including
part of 2 Roads between Plot 12080 with Plot 12085 and Plot 12080 with Plot 12072 and part of Plot 12072, Precinct 3,
Wilayah Persekutuan, Putrajaya

40

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Structure, Land Development and Geotechnical

Proposed 344 Units Residential Development within lot boundary in Sub-Presint 14-1 & 14-2 of Precinct 14 at Putrajaya

Cadangan Pembinaan Secara ‘Industrialised Building System (IBS)’ bagi Sekolah Kebangsaan Kementah yang
mengandungi 30 Bilik Darjah di Wilayah Persekutuan Kuala Lumpur

41

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Structure, Land Development and Geotechnical

Cadangan Membina 125 unit Rumah Teres Strata yang Mengandungi Rumah Teres 3 Tingkat, Jenis A - 41 unit, Rumah
Teres 3 Tingkat Jenis B – 84 Unit, Pondok Pengawal – 1 Unit di atas Blok Perumahan 1, Zon Flagship Cyberjaya, Mukim
Dengkil, Daerah Sepang, Selangor Darul Ehsan

Proposed Construction and Completion of 51 Units Double Storey Terrace at PT5.3 and 74 Units Double Storey Terrace at
PT5.4, Kota Seriemas, Nilai, Negeri Sembilan

42

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Structure, Land Development and Geotechnical

Proposed Design & Built Construction of the Extension to the University Technology MARA (UiTM) Shah Alam Main Campus
at Bandar Puncak Alam, Selangor Darul Ehsan – Building & Infrastructure

Proposed Development of Government Office Building on Lot 4G7 at Precinct 4, Putrajaya

43

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Structure, Land Development and Geotechnical

Proposed Design, Build and Completion of Proposed Amwaj Tower at Uum-Al-Quwain on Lot 2468, Uum-Al-
Quwain, United Arab Emirates

Alternative Design for 34 Storey Kuala Lumpur International Hotel Extension Kuala
Sheraton Towers Hotel, Kuala Lumpur
Lumpur
44

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Structure, Land Development and Geotechnical

Concept Structural and Foundation Engineering Design for the 60 Storey Tower
4, Lot C, KLCC

45

46

Mechanical and Electrical

Jurutera Perunding Zaaba Sdn. Bhd. has MECHANICAL AND ELECTRICAL SERVICES
undertaken a number of projects in Air Conditioning Systems
mechanical and electrical engineering, Mechanical Ventilation
amassing experience in a wide ranging Lift Installations
scope of work that covers conventional as Building Automation Systems (BAS)
well as state-of-the-art building complexes for Power Transmission
the commercial, industrial, institutional and Airport Ground Lighting
residential sectors right up to airports, mini- Street and Expressway Lighting
hydros and power generation stations. Uninterrupted Power Supply
General Lighting
Whether working as part of a team or as a Telecommunication, PABX and Telephone
consultancy, Jurutera Perunding Zaaba Sdn. Public Address Systems
Bhd. takes pride in its work commitment and Audio Visual Systems
quality. Security and Access Control

Recent projects incorporating the latest in
control systems such as the airfield ground
lighting system for the Kuala Lumpur
International Airport proves the company's
ability to rise to new challenges.

47

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Mechanical and Electrical

Housing Developments Cost (mil) Client

Start End Project

2006 2010 Proposed Development a 444-unit Apartment and Condominium on Lots 490, 40.0 Elhamda Consultant Architect
491 and 492, Section 17, Daerah Timur Laut, Pulau Pinang

2006 2010 Proposed Industrial Development on Kawasan Perusahaan Bandar Baru 200.0 Selaman Sdn Bhd
Bangi, Selangor

2009 2011 Proposed Hill Resort and Apartment, Fraser's Hill, Pahang 35.0 Sriba Sdn Bhd

2009 2011 Proposed Development of Sepang Lakes for Shah Alam Properties 200.0 Arkitek Alam Sekitar Sdn Bhd

2010 On Project Mixed Development of Denai Alam, Shah Alam 300.0 Sime Darby Property Berhad
going

2010 2016 Proposed Housing Development of Kota Seriemas, Negeri Sembilan 79.4 Seriemas Development Sdn
Bhd

2010 2013 Proposed Housing on Extended Land in Persisiran Pantai, Jalan Hang Kasturi, 50.0 Pembinaan Bandar Melaka
Melaka Sdn Bhd

2010 2013 Proposed Joint-Venture Development between S.A.P. and Consurtium Ulu 50.0 S.A.P. Project Consultant
Selangor on 195-acre Serendah District, Selangor

2011 2016 Proposed Housing Development of Jalan Medang Tanduk, Kuala Lumpur 15.0 Landview Tower Sdn Bhd

2011 2014 Proposed 10-storey Hotel, Jalan San Peng / Jalan Sg Besi, Kuala Lumpur 12.0 Malaysian Inns Sdn Bhd

2013 On Proposed Construction of 46 Units of Double Storey Bangalows, Bayu 148.5 Lakehomes Development Sdn
going Lakehomes, Mukim Setul, Daerah Seremban, Negeri Sembilan Darul Khusus Berhad

2017 On Design, Construction and Completion of 100 units Single Story Terraces, Kementerian Kesejahteraan
going (20’x65’) People’s Housing Project (PPR) Dan and other Amenities, Mukim
64.5 Bandar, Perumahan dan
Rantau, Daerah Seremban, Negeri Sembilan Darul Khusus
Kerajaan Tempatan.

*Cost in Malaysian Ringgit (Million)

48

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Mechanical and Electrical

Educational Institutions Cost (mil) Client

Start End Project 20.0 Jabatan Agama Islam
Selangor Darul Ehsan
1993 2011 Institute Professional Baitulmal, Kampung Pandan, Kuala Lumpur

1996 2011 Infrastructure Development Project at Institut Teknologi MARA, Shah Alam 30.0 Institut Teknologi MARA

2002 2004 MASTERPLAN for Universiti Tun Hussein Onn Malaysia (UTHM) 0.3 Universiti Tun Hussein Onn
240.0 Malaysia
2004 2006 Development of Committed Phase for Universiti Tun Hussein Onn Malaysia
(UTHM) Universiti Tun Hussein Onn
Malaysia

2007 2015 Proposed Construction of Chemistry Lab, Universiti Malaya, Kuala Lumpur / 120.0 Universiti Malaya
Restoration of Burnt Lab

2007 2012 Interior Renovation of Existing B08, C08 and D07 Buildings for Universiti 3.0 Universiti Teknologi Malaysia
Teknologi Malaysia (UTM)

2008 2011 Phase 1 Development for Universiti Tun Hussein Onn Malaysia (UTHM) 280.0 Universiti Tun Hussein Onn
Malaysia

2010 2014 New Library and Dewan Kuliah Building for Universiti Teknologi Malaysia 30.0 Universiti Teknologi Malaysia
(UTM), Skudai

2010 2012 Additional Development of Fakulti Alam Bina Universiti Teknologi Malaysia 8.0 Universiti Teknologi Malaysia
(UTM)

2010 2012 Additional Building of Fakulti Kejuruteraan Kimia dan Sumber Asli for Universiti 4.0 Universiti Teknologi Malaysia
Teknologi Malaysia (UTM)

2010 2012 Additional Building of Fakulti Kejuruteraan Mekanikal for Universiti Teknologi 12.0 Universiti Teknologi Malaysia
Malaysia (UTM)

2010 2013 Terengganu Darul Iman Polytechnic, Dungun, Terengganu 100.0 Kementerian Pendidikan

2010 2013 Proposed Extension of Institut Latihan Petronas, Batu Rakit, Terengganu 11.0 Petronas Hartabina Sdn Bhd

2011 2015 Proposed Construction and Completion of Malaysian Teachers Education 137.0 Kementerian Pelajaran
Institute Complex, Bandar Enstrek, Nilai, Negeri Sembilan 25.0 Malaysia

2012 2015 Malaysian Sports School Terengganu, Kuala Terengganu Kementerian Pelajaran
Malaysia

2012 2015 Development of Permanent Campus for Malaysian Islamic University College, 110.0 Universiti Sains Islam Malaysia
Bandar Baru Nilai, Negeri Sembilan

2012 2015 Construction and Completion of Selangor International Islamic College, Bangi, 100.0 Majlis Agama Islam Selangor
Daerah Hulu Langat Selangor (MAIS)

*Cost in Malaysian Ringgit (Million)

49

Featured Projects

Jurutera Perunding Zaaba Sdn. Bhd.

Mechanical and Electrical

Health and Medical Developments Cost (mil) Client

Start End Project

2008 2010 Contract under the Malaysian Ministry of Health Cooling Tower, Ipoh Perak 3.5 Kementerian Kesihatan
Hospital Malaysia

2008 2010 Contract under the Malaysian Ministry of Health, Kuala Alor Setar Junction, 4.0 Kementerian Kesihatan
Kedah Malaysia

2008 2010 Contract under the Malaysian Ministry of Health, Pokok Sena Medical Centre, 3.5 Kementerian Kesihatan
Kedah. Malaysia

2008 2011 Kampung Bharu Medical Centre, Kuala Lumpur 10.0 Kampung Bharu Medical
Centre

2009 2010 Contract under the Malaysian Ministry of Health, Serendah Medical Clinic, 3.5 Kementerian Kesihatan
Selangor. Malaysia

2009 2011 Contract under the Malaysian Ministry of Health, Mortuary, Ipoh Hospital, 4.0 Kementerian Kesihatan
Perak Malaysia

2009 2011 Implementation of Tenth Malaysia Plan (RMK-10) for Middle Zone, Selangor 5.0 Kementerian Kesihatan
dan Perak Malaysia

2010 2012 Contract under the Malaysian Ministry of Health, Health Clinic, Sungai Buloh, 4.0 Kementerian Kesihatan
Selangor Malaysia

2010 2013 Contract under the Malaysian Ministry of Health, Pulau Pinang Hospital (Block 4.5 Kementerian Kesihatan
C), Pulau Pinang Malaysia

2010 2013 Contract under the Malaysian Ministry of Health, Medical Center, Changloon, 5.0 Kementerian Kesihatan
Kedah Malaysia

2010 2012 Contract under the Malaysian Ministry of Health, Haemodialysis, Tanjung 3.0 Kementerian Kesihatan
Malim Hospital, Perak Malaysia

2011 2013 Contract under the Malaysian Ministry of Health, PABX, Teluk Intan Hospital, 5.0 Kementerian Kesihatan
Perak Malaysia

2011 2014 Construction for Instructors’ Hospital, Universiti Putra Malaysia, Serdang 548.0 Johowaki Sdn Bhd
Selangor

*Cost in Malaysian Ringgit (Million)

50


Click to View FlipBook Version