Php100
UP TO
Php1,000
1 – BOTTLE 2 – BOTTLES 3 – BOTTLES
OF LAVENDER OF LAVENDER OF LAVENDER
worth Php100
Only
1 – BOTTLE OF SWAT 2 – BOTTLES OF SWAT 3 – BOTTLES OF SWAT
TRACE MINERAL DROPS TRACE MINERAL DROPS TRACE MINERAL DROPS
(30ml) (30ml) (30ml)
worth Php1,000
Only
5.
1st YEAR
PROFIT SHARING
INCOME BONUS
PROMO
(2nd Stage of Accelerated Ladderized Program)
SYSTEMS &PROCEDURES
1st YEAR PROFIT SHARING INCOME BONUS
(Conceptualized for the Moderate – Speed Upline Leaders)
This INCOME OPPORTUNITY through our
PROFIT SHARING PROGRAM will be provided
to 8BDC Marketing BONAFIDE UPLINE
LEADER of GOOD STANDING to compensate
his effort in building – up his Own Network &
for his continuous purchase of Php1,250 &
Php2,750 MONTHLY PRODUCT PACKAGE
SHOWCASE MAINTENANCE during the 1st
Year of his Membership to 8BDC Marketing.
The UPLINE LEADER is enjoined to complete
the sponsoring of his 12 – Direct Downline
Leader Members on the 1st Month upon his
Membership. As a result, his 12 – Direct
Downline Leader Members will duplicate his
exemplary effort and immediately, therefore, the
144 – Indirect Downline Leader Members will be
formed at his 2nd Generation Level.
The UPLINE LEADER is responsible to monitor
the sponsoring activities of his 12 – Direct
Downline Leader Members to make sure that all
of them will be able to complete also the
sponsorship of their own 12 – Direct Downline
Leader Members & to emphasize to all of his
Downline Leader Members at the 1st & 2nd
Generation Level the great benefits that they can
achieve by continuously purchasing the Php1,250
& Php2,750 MONTHLY PRODUCT PACKAGE
SHOWCASE MAINTENANCE.
A TOTAL AMOUNT of Php200 will be allotted for
the PROFIT SHARING PROGRAM to be taken
from the COMPLETE START – UP KIT PRODUCT
PACKAGE SHOWCASE ENTRIES worth Php3,498
& the 1st PURCHASE of Php2,750 MONTHLY
PRODUCT PACKAGE SHOWCASE MAINTENANCE
of the 144 - Indirect Downline Leader Members at
his 2nd Generation Level.
The Php200 taken from every Php3,498
COMPLETE START – UP KIT PRODUCT
PACKAGE SHOWCASE ENTRY & the 1st
PURCHASE of the Php1,250 & Php2,750 PRODUCT
PACKAGE SHOWCASE MAINTENANCE of his
1st & 2nd Generation Level Indirect Downline Leader
Members will create a TOTAL of Php31,200 to be
designated as PROFIT SHARING INCOME
BONUS of the Leader Member being the
BONAFIDE UPLINE LEADER of his 12 – 1st
Generation Level Direct Downline Leader Members
& 144 – 2nd Generation Level Indirect Downline
Leader Members.
FORMULA
OF
COMPUTATION
FORMULA OF COMPUTATION
(Based on the Php3,498 Complete Start – Up Kit Product
Package Showcase Entry & the 1st Php1,250 & Php2,750
Monthly Product Package Showcase Maintenance)
8BDC MARKETING SETS A STANDARD ON THE
PROJECTED TOTAL AMOUNT OF PROFIT SHARING
INCOME BONUS OF THE BONAFIDE UPLINE
LEADER BASED ON HIS EFFORT OF BUILDING
HIS OWN NETWORK AT THE 1st & 2nd
GENERATION LEVELS DURING THE 1st YEAR OF
HIS MEMBERSHIP TO 8BDC MARKETING.
8BDC MARKETING SETS A MAXIMUM OF 156
TOTAL NUMBER OF DOWNLINE LEADER MEMBERS
WITHIN THE NETWORK OF THE BONAFIDE
UPLINE LEADER FROM 1st GENERATION LEVEL UP
TO 2nd GENERATION LEVEL AS THE STANDARD
TOTAL NUMBER OF DOWNLINE LEADER MEMBERS
TO BE THE BASIS OF COMPUTATION FOR THE 1st
YEAR PROFIT SHARING INCOME BONUS OF THE
BONAFIDE UPLINE LEADER.
1. HOW MUCH IS THE PROJECTED TOTAL AMOUNT
OF THE 1st YEAR PROFIT SHARING INCOME BONUS
OPPORTUNITY OF THE BONAFIDE UPLINE LEADER?
FORMULA:
THE PROJECTED TOTAL NUMBER OF DOWNLINE LEADER
MEMBERS THAT CAN AVAIL THE Php3,498 COMPLETE START
– UP KIT PRODUCT PACKAGE SHOWCASE ENTRY & 1st
PURCHASE OF 1st Php1,250 & Php2,750 MONTHLY PRODUCT
PACKAGE SHOWCASE MAINTENANCE AT THE 2nd
GENERATION LEVEL ONLY WILL BE THE BASIS OF
COMPUTATION FOR THE PROJECTED TOTAL AMOUNT OF
THE 1st YEAR PROFIT SHARING INCOME BONUS
OPPORTUNITY TO BE GIVEN TO THE BONAFIDE UPLINE
LEADER.
(2nd Generation Level – 144 Only)
Php31,200
PROFIT SHARING INCOME BONUS COMPUTATION
GENERATION TOTAL MULTIPLIED AMOUNT EQUALS TOTAL
LEVEL NUMBER BY OF AMOUNT
=
1st Level OF PROFIT = OF
2nd Level DOWNLINE SHARING = PROFIT
INCOME SHARING
TOTAL LEADER INCOME
MEMBERS BONUS BONUS
12 x 200 2,400
144 x
Php200 28,800
156 --- 0 ---
--- 0 --- Php31,20
0
1st YEAR
PROFIT SHARING INCOME BONUS SUMMARY
PRESENTATION CHART
GENERATION TOTAL NO. 1st 2nd 3rd 4th 5th 6th
LEVEL OF Month Month Month Month Month Month
1st Level DOWNLINE 12 0 0 0 0 0
LEADER
MEMBERS 12 12 12 12 12 12
New New New New New New
12 Downline Downline Downline Downline Downline Downline
Leader Leader Leader Leader Leader Leader
2nd Level 144 Members Members Members Members Members Members
MONTHLY PROFIT Php2,400 Php2,400 Php2,400 Php2,400 Php2,400 Php2,400
SHARING INCOME (12 x Php200) (12 x Php200) (12 x Php200) (12 x Php200) (12 x Php200) (12 x Php200)
BATCHES OF 12 MEMBERS 12 – 1st Batch 12 – 2nd Batch 12 – 3rd Batch 12 – 4th Batch 12 – 5th Batch 12 – 6th Batch
GENERATION TOTAL NO. 7th 8th 9th 10th 11th 12th
LEVEL OF Month Month Month Month Month Month
DOWNLINE 0
LEADER
MEMBERS 12
New
1st Level 12 0 Downline 0 0 0 0
Leader
2nd Level 144 12 Members 12 12 12 12
New New New New New
MONTHLY PROFIT Downline Php2,400 Downline Downline Downline Downline
SHARING INCOME Leader (12 x Php200) Leader Leader Leader Leader
Members Members Members Members Members
12 – 8th Batch
Php2,400 Php2,400 Php2,400 Php2,400 Php2,400
(12 x Php200) (12 x Php200) (12 x Php200) (12 x Php200) (12 x Php200)
BATCHES OF 12 MEMBERS 12 – 7th Batch 12 – 9th Batch 12 – 10th Batch 12 – 11th Batch 12 – 12th Batch
1st YEAR PROFIT SHARING INCOME BONUS
COMPLETION OF BATCHES SUMMARY PRESENTATION CHART
TOTAL SUB - TOTAL TOTAL TOTAL TOTAL SUB - TOTAL TOTAL TOTAL
NO. OF AMOUNT OF AMOUNT AMOUNT NO. OF AMOUNT OF AMOUNT AMOUNT
DOWNLINE DOWNLINE
LEADER PROFIT OF OF LEADER PROFIT OF OF
MEMBERS SHARING PROFIT PROGRESSIVE MEMBERS SHARING PROFIT PROGRESSIVE
INCOME SHARING INCOME SHARING
BONUS PER INCOME PROFIT BONUS PER INCOME PROFIT
DOWNLINE BONUS SHARING DOWNLINE BONUS SHARING
LEADER INCOME LEADER INCOME
MEMBER Php600 MEMBER Php600
600 BONUS 600 BONUS
3 Php200 600 39 Php200 600
600 Php2,400 600 Php12,000
6 Php200 42 Php200
Php2,400 Php7,200 Php2,400 Php14,400
9 Php200 45 Php200
Php600 Php9,600 Php600 Php16,800
12 Php200 600 48 Php200 600
600 600
COMPLETION OF 600 COMPLETION OF 600
1st BATCH 4th BATCH
Php2,400 Php2,400
15 Php200 51 Php200
Php600 Php600
18 Php200 600 54 Php200 600
600 600
21 Php200 600 57 Php200 600
24 Php200 Php2,400 60 Php200 Php2,400
COMPLETION OF COMPLETION OF
2nd BATCH 5th BATCH
27 Php200 63 Php200
30 Php200 66 Php200
33 Php200 69 Php200
36 Php200 72 Php200
COMPLETION OF 3rd BATCH COMPLETION OF 6th BATCH
1st YEAR PROFIT SHARING INCOME BONUS
COMPLETION OF BATCHES SUMMARY PRESENTATION CHART
TOTAL SUB - TOTAL TOTAL TOTAL TOTAL SUB - TOTAL TOTAL TOTAL
NO. OF AMOUNT OF AMOUNT AMOUNT NO. OF AMOUNT OF AMOUNT AMOUNT
DOWNLINE DOWNLINE
LEADER PROFIT OF OF LEADER PROFIT OF OF
MEMBERS SHARING PROFIT PROGRESSIVE MEMBERS SHARING PROFIT PROGRESSIVE
INCOME SHARING INCOME SHARING
75 BONUS PER INCOME PROFIT 111 BONUS PER INCOME PROFIT
DOWNLINE BONUS SHARING DOWNLINE BONUS SHARING
LEADER INCOME LEADER INCOME
MEMBER Php600 MEMBER Php600
600 BONUS 600 BONUS
Php200 600 Php200 600
600 Php19,200 600 Php26,400
78 Php200 114 Php200
Php2,400 Php21,600 Php2,400 Php28,800
81 Php200 117 Php200
Php600 Php24,000 Php600 Php31,200
84 Php200 600 120 Php200 600
600 600
COMPLETION 600 COMPLETION OF 600
OF 7th BATCH 10th BATCH
Php2,400 Php2,400
87 Php200 123 Php200
Php600 Php600
90 Php200 600 126 Php200 600
600 600
93 Php200 600 129 Php200 600
96 Php200 Php2,400 132 Php200 Php2,400
COMPLETION OF COMPLETION OF
8th BATCH 11th BATCH
99 Php200 135 Php200
102 Php200 138 Php200
105 Php200 141 Php200
108 Php200 144 Php200
COMPLETION OF COMPLETION OF
9th BATCH 12th BATCH
NOTE:
The
PROFIT SHARING INCOME BONUS
will be released upon
EVERY COMPLETION OF 12 – DOWNLINE
LEADER MEMBERS
at the 2nd GENERATION LEVEL only
to be counted as one
COMPLETED BATCH.
Schedule of Pay – Out is on every 1st Monday
of the Month.
C.
EXCITING
EXECUTIVE INCENTIVES
HOW
TO
QUALIFY TO GET
THE FOLLOWING
EXCITING
EXECUTIVE INCENTIVES?
(2nd Stage of Accelerated Ladderized Program)
GUIDELINE
CHART PRESENTATION
(Cumulative Executive & VIP Points System)
CUMULATIVE
EXECUTIVE & VIP POINTS
SYSTEMS
CUMULATIVE
EXECUTIVE & VIP POINTS
SYSTEMS
Aside from your entitlement for the LEADERS
MEMBER ASSISTANCE & BENEFITS,
BONUS INCOME & PRIVILEGES, you
are also given the chance to avail the
EXCITING EXECUTIVE INCENTIVES &
AMAZING VIP REWARDS.
The basis to get these INCENTIVES & REWARDS will be
through the CUMULATIVE EXECUTIVE & VIP POINTS
SYSTEMS.
Every INCENTIVE & REWARD has a corresponding
equivalent NUMBER OF POINTS.
Once that you had generated &
completed the CUMULATIVE EXECUTIVE
& VIP POINTS based on the
designated TOTAL NUMBER OF
POINTS corresponding to the available
INCENTIVES & REWARDS that you
wishes to get, you will just make a
written request to our Company for the
release of your chosen INCENTIVE &
REWARD & it could be awarded to you
within the minimum grace period of TWO (2)
WEEKS upon your request.
Afterward, you can again generate another
CUMULATIVE EXECUTIVE & VIP POINTS
every Month until you reach the designated
NUMBER OF POINTS corresponding to the next
available INCENTIVES & REWARDS that you
prefer to get.
ADVISORY:
PLEASE REFER TO THE
“EXECUTIVE &VIP POINTS
PRESENTATION MANUAL”
FOR COMPLETE DETAILS.
(2nd Stage of Accelerated Ladderized Program)
ROYBARLANCDARNIEBBWEAN
CLRIUCIESNESIENDTFEIRRNEAATRIMONAL
(GLOCK 43, 9mm)
TRAVEL
Php48,000
BRAND NEW, GLOCK 43, 9mm
Based on 5,333 Cumulative Executive Points
(2nd Stage of Accelerated Ladderized Program)
(1st up to 5th Generation Level)
ROYALLOCCAARLIBBEAN
CRTURIASVEEILNITNECRENNATTIIVOENAL
(Trip to Boracay)
TRAVEL
Php50,000
LOCAL TRAVEL INCENTIVES
worth Php50,000
Based on 5,555 Cumulative Executive Points
(2nd Stage of Accelerated Ladderized Program)
(1st up to 5th Generation Level)
ROYAL CARIBBEAN
MOTORBIKE INCENTIVE
CR(UKIaSwEasaINkiTBEaRraNkAoT1I7O5N) AL
TRAVEL
Php80,000
Php80,000
Based on 9,555 Cumulative Executive Points
(2nd Stage of Accelerated Ladderized Program)
(1st up to 5th Generation Level)
ROYAL CARIBBEAN
ASIAN COUNTRIES TRAVEL
CRUI(SSEingIaNpoTreE/RMNaAlaTyIsOiaN/ AL
Thailand & Hongkong)
TRAVEL
Php300,000
Asian Countries Travel worth Php300,000
Singapore / Hongkong / Thailand / Malaysia
Based on 33,333 Cumulative Executive Points
(2nd Stage of Accelerated Ladderized Program)
(1st up to 5th Generation Level)
ADVISORY:
PLEASE REFER TO THE
“POSSIBLE SCENARIOS ON HOW TO
ACHIEVE THE EXCITING EXECUTIVE
INCENTIVES PRESENTATION
MANUAL“
FOR COMPLETE DETAILS.
(2nd Stage of Accelerated Ladderized Program)
ADVISORY:
PLEASE REFER TO THE
“MARKETING PLAN PRESENTATION
MANUAL”
FOR COMPLETE DETAILS.
(2nd Stage of Accelerated Ladderized Program)
WELCOME
to the
3rd STAGE
OF
ACCELERATED
LADDERIZED PROGRAM
(ONE (1) YEAR
PRODUCT PACKAGE SUBSCRIPTION
SHOWCASE ENTRY - Php6,000)
(1st up to 4th Generation Level)
(PRODUCT PACKAGE SUBSCRIPTION
COMMISSION - Php329,200)
A.
PROJECTED
PRIMARY POTENTIAL
INCOME
ONE (1) YEAR
PRODUCT PACKAGE
SUBSCRIPTION
COMMISSION SUMMARY
Php329,200
ONE (1) YEAR
PRODUCT PACKAGE
SUBSCRIPTION COMMISSION
SUMMARY
GENERATION NO. OF NO. OF EQUIVALENT MULTIPLICATION COMMISSION EQUAL TOTAL
LEVEL DOWNLINE DOWNLINE NO. OF SYMBOL PER GROUP SYMBOL COMMISSION
MEMBERS MEMBERS GROUPS
1st Level PER LEVEL
2nd Level PER 4
3rd Level GROUP
(12 ÷ 3)
4th Level 12 3 x Php700 = Php2,800
16 x Php800
TOTAL x Php900 (4 x Php700)
(144 ÷ 9)
144 9 = 12,800
64
(16 x Php800)
(1,728 ÷
1,728 27 27) = 57,600
256 (64 x Php900)
20,736 81 (20,736 ÷ x Php1,000 = 256,000
81) (256 x
22,620 Php1,000)
340
= Php329,200
STEP BY STEP
SYSTEMS
& PROCEDURES