Close-up View of some of the 15,000 Halfen Channels Setting Out Brickwork Cladding Support Brackets
Tate Modern Extension
The New Tate Modern Tate Modern Extension – Finished!
Situated on the site of the former Bankside power station, the Using a 1” Leica TS15 total station the cladding support system
new Tate Modern forms an iconic addition to London’s skyline. brackets that connect to the halfen channels were accurately set
Designed by Swiss architects Herzog and Meuron, the new -out. Each bracket was set out to a tolerance of +/- 2mm.
building comprises a 64.5 metre 10-storey tower in the form of
an imposing ziggurat which sits on top of three underground First Time Fit
concrete oil tanks, now converted to museum space. With the cladding support brackets accurately placed, the brick-
work cladding could be installed to the required tolerances, re-
Setting out the Brick Cladding System sulting in a stunning building which has been widely acclaimed
for its architecture.
Known as the Switch House, the twisting pyramid-like shape of
the tower’s exterior features latticed ‘chainmail’ brickwork, We are pleased to have been involved in this project, and wish
stacked in a double-bond and threaded together on steel rods, all at Tate Modern well with their new building.
over a concrete cage. Warner Surveys were appointed by Swift
Brickwork Contractors to check the position of the previously
installed halfen channels and to then set out the brickwork clad-
ding system on the building. The angular design of the building
posed a challenge, with precision a prime requisite.
High Accuracy Survey Control and Instrumentation
Warner Surveys were responsible for checking the existing sur-
vey control network and adding additional control points where
required.
All four corners of every halfen channel had to be surveyed and
each point compared to design – in total 15,000 channels cover-
ing 60,000 surveyed points.
Construction Projects
CIS Tower, Manchester. ground & roof levels,
CLIENT: ISG • Detailed survey of the exist-
ing tower facades using
Re-Cladding of a 30 Storey roped access methods,
Tower. Activities included;
• Setting-out of the new pho-
• Install Primary & Secondary tovoltaic cladding system
survey control networks at
One New Change
The Shard, London
CLIENT: Bovis Lend Lease
The Shard, designed by Renzo Piano, is 310 meters tall and
houses a combination of commercial and residential space in- Movement monitoring works
corporating a 195 room luxury Hotel. during demolition, excavation
& construction to ground level
Topographic & Measured Building Surveys slab completion
WS were involved with the shard from initial feasibility surveys Monitoring of LUL Central line
through detailed topographic and measured building surveys. tunnels by precise level, total
Further works to enable demolition were carried out and finally station & electro level beams
extensive construction surveying and setting out was carried out.
Monitoring of St Pauls Cathe-
Movement & Deformation Monitoring dral & other structures
Extensive 3D monitoring and dimensional surveys were under- Setting out of piles & other
taken to London Bridge Platform and tunnels. groundworks
www.warnersurveys.com
Head Office Unit 22 Theale Lakes Business Park Moulden Way READING RG7 4GB T +44 (0)118 930 3314
London Office G.3 Bedford House 69-79 Fulham High St LONDON SW6 3JW T +44 (0)203 651 7549
Bristol Office 5th Floor 1 Temple Way BRISTOL BS2 0BY T +44 (0)117 301 8137
Birmingham Office Unit G9, The Arch, 48- 52 Floodgate Street BIRMINGHAM B5 5SL T +44 (0)121 752 1220
Topographic, GPR, Measured Construction, Site Engineering Movement, Deformation & Oil, Gas & Industrial Surveying
Building & UAV Surveys Surveys & 3D Laser Scanning Environmental Monitoring & Dimensional Control
[email protected] [email protected] [email protected] [email protected]
Construction Projects
Albion Riverside, Battersea British Museum, Great Activities included;
Court Project
CLIENT: ISG • Installation of Primary and
CLIENT: Wagner Biro Secondary control networks
DESIGNED: Foster and Partners
DESIGNED: Foster and • Positioning of complex
Construction and Site Engineering Surveys along with high ac- Partners steelwork roof sections
curacy Dimensional Control to high specification residential
apartments. Dimensional Control to Com- • As-built surveys of complex
plex Roof Structure. WS Pro- steelwork roof sections post
vided full time Dimensional welding to determine glass
Control services to the steel- tolerance issues (all 3500
work & glass fabricators, unique glass panels fitted first
Waagner Biro. time)
Activities included; Saw Swee Hock Student
Centre, LSE.
• Installation of Primary and Secondary survey control point net-
works at ground level and at all floor levels CLIENT: Osborne
• Checking of groundworks and concrete structures Dimensional Control to Com-
plex Facade. WS provided
• Setting-out of complex cladding systems Dimensional Control services
to the brickwork cladding con-
• Positioning of complex steelwork roof sections tractor
• River Wall movement monitoring
www.warnersurveys.com
Head Office Unit 22 Theale Lakes Business Park Moulden Way READING RG7 4GB T +44 (0)118 930 3314
London Office G.3 Bedford House 69-79 Fulham High St LONDON SW6 3JW T +44 (0)203 651 7549
Bristol Office 5th Floor 1 Temple Way BRISTOL BS2 0BY T +44 (0)117 301 8137
Birmingham Office Unit G9, The Arch, 48- 52 Floodgate Street BIRMINGHAM B5 5SL T +44 (0)121 752 1220
Topographic, GPR, Measured Construction, Site Engineering Movement, Deformation & Oil, Gas & Industrial Surveying
Building & UAV Surveys Surveys & 3D Laser Scanning Environmental Monitoring & Dimensional Control
[email protected] [email protected] [email protected] [email protected]
Construction Projects
Crossrail, London
CLIENT: Crossrail ( Contract C821 )
WS have been appointed as Geomatics Consultant to Crossrail. Manhattan Loft Gardens, for cladding setting out pur-
We have undertaken QA/QC works site wide from installation Stratford, London poses.
and surveying of the primary controls network at the beginning
of the project to now undertaking as-built surveys of the first CLIENT: Kyotec • Control point network check-
section of tracks to be laid. ing
Designed: SOM
• Installation and surveying of primary control network by GNSS, • Installation of control points
total stations and precise levelling methods WS have been appointed to and level datums to facilitate
carry out checking of the Main cladding installation
• Topographic surveys prior to site works commencing Contractors control point net-
work as the 40 storey tower • Providing dimensional re-
• Checking of sub-contractors monitoring networks progresses and to provide ports and drawings
high order control to our client
• Laser scanning of the whole of Whitechapel LUL and Over-
ground station and streetscape around the station
• Production of a 3D CAD model of the whole of Whitechapel
LUL and Overground station and streetscape around the station
• Laser scanning of a number of the newly constructed station
boxes and provision of various deliverables such as deformation
mapping, 3D models, cross sections etc
• Laser scanning of tunnels and provision of alignments and
cross sections
• Installation of monitoring regimes and monitoring readings at
various locations in the new tunnels
• Surveying newly installed track geometry and tunnel clearance
using the Amberg GRP1000 and GRP5000
www.warnersurveys.com
Head Office Unit 22 Theale Lakes Business Park Moulden Way READING RG7 4GB T +44 (0)118 930 3314
London Office G.3 Bedford House 69-79 Fulham High St LONDON SW6 3JW T +44 (0)203 651 7549
Bristol Office 5th Floor 1 Temple Way BRISTOL BS2 0BY T +44 (0)117 301 8137
Birmingham Office Unit G9, The Arch, 48- 52 Floodgate Street BIRMINGHAM B5 5SL T +44 (0)121 752 1220
Topographic, GPR, Measured Construction, Site Engineering Movement, Deformation & Oil, Gas & Industrial Surveying
Building & UAV Surveys Surveys & 3D Laser Scanning Environmental Monitoring & Dimensional Control
[email protected] [email protected] [email protected] [email protected]
Warner Survey Resources
Extensive Resources Available
• GPS receivers enabling survey of large networks linked to
OS active base stations and RTK or through the Leica
Smartnet system for large open topographic and volume
surveys. Corrected handheld for asset data collection
• Full range of total stations & 3D laser scanners for any
structure, building elevations and stations
• AutoCad, Microstation, Terramodel, N4ce, TGO, Columbus
and in house software to provide data processing, Cad and
output in any client required format
• Digital levels, cant bars, other in house tools to aid surveying
in unusual locations and all necessary safety equipment
• Total staff resource of 50+
• CAD Technology Department of permanent specialised CAD
technicians, including 3D CAD Modelling and Lidar pro-
cessing
• Supply multiple fully equipped survey teams at any one time
for work anywhere in London, UK, Europe or the Rest of
the World
• PTS, safety passports, CSCS, LUL and confined space,
working at height and CAT scan tickets.
Typical Clients
• Consulting & Civil Engineers
• Network Rail & LUL
• Environment Agency
• Architectural Practices
• Utility companies
• Local Authorities and planners
www.warnersurveys.com
Head Office Unit 22 Theale Lakes Business Park Moulden Way READING RG7 4GB T +44 (0)118 930 3314
London Office G.3 Bedford House 69-79 Fulham High St LONDON SW6 3JW T +44 (0)203 651 7549
Bristol Office 5th Floor 1 Temple Way BRISTOL BS2 0BY T +44 (0)117 301 8137
Birmingham Office Unit G9, The Arch, 48- 52 Floodgate Street BIRMINGHAM B5 5SL T +44 (0)121 752 1220
Topographic, GPR, Measured Construction, Site Engineering Movement, Deformation & Oil, Gas & Industrial Surveying
Building & UAV Surveys Surveys & 3D Laser Scanning Environmental Monitoring & Dimensional Control
[email protected] [email protected] [email protected] [email protected]
Paddington Station—Roof Span 4
Detailed 3D Laser Scan Survey
WS carried out a detailed survey of Span 4 of the roof at Padding-
ton Station. Span 4 was built in 1916 and has been in need of
repair for some years.
Structural Assessment
We were awarded the contract by WSP and Wentworth House
Consultants, to carry out a full 3D laser scan of the entire roof.
The laser scan aided greatly in the structural assessment and
engineering of the £25m restoration project.
Matt Young was responsible for carrying out the laser scan and
supervising a team of surveyors that dimensionally controlled
the location of each scan.
Leica ScanStation & TCRP1201+
Two Leica ScanStation’s were used to scan the 200m long roof
and a Leica TCRP1201+ total station was used to provide dimen-
sional control to the individual scans.
Scans were registered using CloudWorx Software and drawing
produced on AutoCAD
www.warnersurveys.com
Head Office Unit 22 Theale Lakes Business Park Moulden Way READING RG7 4GB T +44 (0)118 930 3314
London Office G.3 Bedford House 69-79 Fulham High St LONDON SW6 3JW T +44 (0)203 651 7549
Bristol Office 5th Floor 1 Temple Way BRISTOL BS2 0BY T +44 (0)117 301 8137
Birmingham Office Unit G9, The Arch, 48- 52 Floodgate Street BIRMINGHAM B5 5SL T +44 (0)121 752 1220
Topographic, GPR, Measured Construction, Site Engineering Movement, Deformation & Oil, Gas & Industrial Surveying
Building & UAV Surveys Surveys & 3D Laser Scanning Environmental Monitoring & Dimensional Control
[email protected] [email protected] [email protected] [email protected]
London Underground, DLR and Rail Surveys
Industry Leading Solutions
WS is accredited to ISO 9001 and are Link-Up approved. WS is
committed to competence, quality and safety. Our Rail knowledge
covers Network rail AC/DC sites, London Underground and DLR
sites.
No job or client is alike:
For your next project, we will be happy to assess your require-
ments and provide a full and detailed methodology fit for pur-
pose for your needs.
What sets WS apart is its willingness to go the extra mile, working
in adverse conditions on tight schedules and at any time to meet
the needs of its customers. Whether it’s data taken from the
ground level or in difficult to access locations, WS can provide a
survey solution that uses the very latest in terms of time and
cost-saving technology combined with professional surveying
principals to deliver reliable accurate data quickly and cost-
effectively.
Typical rail related projects
• Topographical surveys of all sizes
• GPS / RTK control surveys linking to national grid
• Monitoring of slopes, buildings, rails & other structures
• All types of specific railway surveys including through align-
ment, S&C, OLE, level crossings, clearance (.SC0), bridge
surveys, embankment, rail & structure monitoring, tunnel &
platform surveys
• Measured building surveys - plans, sections & elevations
• Setting out on construction sites
• Terrestrial 3D Laser Scanning & Scan to BIM
• Aerial Lidar surveys for railways
• Asset data collection
www.warnersurveys.com
Head Office Unit 22 Theale Lakes Business Park Moulden Way READING RG7 4GB T +44 (0)118 930 3314
London Office G.3 Bedford House 69-79 Fulham High St LONDON SW6 3JW T +44 (0)203 651 7549
Bristol Office 5th Floor 1 Temple Way BRISTOL BS2 0BY T +44 (0)117 301 8137
Birmingham Office Unit G9, The Arch, 48- 52 Floodgate Street BIRMINGHAM B5 5SL T +44 (0)121 752 1220
Topographic, GPR, Measured Construction, Site Engineering Movement, Deformation & Oil, Gas & Industrial Surveying
Building & UAV Surveys Surveys & 3D Laser Scanning Environmental Monitoring & Dimensional Control
[email protected] [email protected] [email protected] [email protected]
Tottenham Court Road LUL Station Upgrade
Bauer Tech / Keller Foundations JV
Bauer / Keller JV was awarded the contract for the foundation
and ground engineering works of the £250 million Tottenham
Court Road Station Upgrade.
WS were appointed for the setting out & collection of as built in-
formation on one of the most technically challenging Europe-
an piling project in recent years.
Construction Works Included:
• 440 m’s of hard / soft piled secant walls
• 150 m’s of Diaphragm Wall. 1m wide X 42 m’s deep
• 11 no 2.5 m dia Rotary piles inc Plunge columns.
• 7 no 2.5 m dia Complex Rotary Over Site Development
(OSD) piles.
This project drew on the skills & procedures developed over the
years while working on complex projects such as: One New
Change; 2012 Athletes Village; British Museum Great Court
Roof, etc.
Fabrication Shop Visits for QA/QC
Visits to the steel fabrication works were needed to carry out as
built surveys of critical elements, prior to these elements being
transported to site. As well as being a crucial QA/QC check these
works proved invaluable to planning and logistics.
Primary & Secondary Control Networks
WS were involved from the early stages with the checking of the
client issued Primary Control network and establishment of a
project wide Secondary Control network.
Specialist Constructed Heavy Duty Piles
WS continued to assist with the installation of the Plunge Col-
umns for the Crossrail ticket hall. The plunge columns were up
to 0.7m square and 33.5 m’s long. Too large for traditional manu-
facturing techniques, these columns had to be welded together
from 3 separate pieces of steel, with the heaviest column weigh-
ing approximately 55 tonnes. Each of the 2.5 meter diameter piles
supporting the plunge columns containing the heaviest steel
reinforcing cage to be installed in the U.K. to date.
Tottenham Court Road LUL Station Upgrade
Most Technically Complex Piles in UK
The most challenging aspect of the project was the construction
of the 7 Over Site Development (OSD) piles. These have been
recognised as the most technically complex piles construct-
ed in the UK. Each one took a week to construct, three of which
were positioned less than 2 metres from the LUL Northern
Line running tunnels.
Continuous Phased Surveying
As well as being involved with the pre construction phase carry-
ing out as built checks at the steel works of the steel liners, on
site we; positioned the liners for welding; provided real time as
built information during the pile oscillation phase, ending with
the final pile as built information. The deepest pile was installed
to a depth of 64 metres.
UK Firsts
Many U.K. firsts can be claimed on the OSD piling works includ-
ing the first piles with 3 steel tubular linings and the very first D
shaped pile in the UK.
www.warnersurveys.com
Head Office Unit 22 Theale Lakes Business Park Moulden Way READING RG7 4GB T +44 (0)118 930 3314
London Office G.3 Bedford House 69-79 Fulham High St LONDON SW6 3JW T +44 (0)203 651 7549
Bristol Office 5th Floor 1 Temple Way BRISTOL BS2 0BY T +44 (0)117 301 8137
Birmingham Office Unit G9, The Arch, 48- 52 Floodgate Street BIRMINGHAM B5 5SL T +44 (0)121 752 1220
Topographic, GPR, Measured Construction, Site Engineering Movement, Deformation & Oil, Gas & Industrial Surveying
Building & UAV Surveys Surveys & 3D Laser Scanning Environmental Monitoring & Dimensional Control
[email protected] [email protected] [email protected] [email protected]
DLR East India Station
Crossrail 3D Laser Scan Project
WS were commissioned by Crossrail to undertake a 3D measure-
ment survey of East India DLR station.
We first checked the integrity of the Survey Control Points provid-
ed using a Leica 1201+ Total Station and found no problems.
Remote Survey Without Track Access
Using a Leica 3D Laser Scanner we carried out a ‘non-track’
measurement survey of the station. Even though we were not
required to access the track to take measurements the scanner
was still able to capture much of the rail data.
Observations to the underside of the rail viaduct were carried out
from the public highway in liaison with the local council and prop-
erty owners.
Leica Cloudworx / AutoCAD / Microstation
The individual laser scans were dimensionally controlled by a
Leica 1201+ Total Station and registered in the office using
CloudWorx software. The modelling was carried out in AutoCAD
and the end deliverable was a rendered 3D model in DGN
(MicroStation) format.
DLR Track Awareness
Rail protection staff were utilised whist on DLR property and all
staff were DLR Track Awareness trained.
www.warnersurveys.com
Head Office Unit 22 Theale Lakes Business Park Moulden Way READING RG7 4GB T +44 (0)118 930 3314
London Office G.3 Bedford House 69-79 Fulham High St LONDON SW6 3JW T +44 (0)203 651 7549
Bristol Office 5th Floor 1 Temple Way BRISTOL BS2 0BY T +44 (0)117 301 8137
Birmingham Office Unit G9, The Arch, 48- 52 Floodgate Street BIRMINGHAM B5 5SL T +44 (0)121 752 1220
Topographic, GPR, Measured Construction, Site Engineering Movement, Deformation & Oil, Gas & Industrial Surveying
Building & UAV Surveys Surveys & 3D Laser Scanning Environmental Monitoring & Dimensional Control
[email protected] [email protected] [email protected] [email protected]
WS were commissioned by Crossrail to undertake a 3D meas-
urement survey of East India DLR station.
We first checked the integrity of the Survey Control Points pro-
vided using a Leica 1201+ Total Station and found no problems.
Using a Leica 3D Laser Scanner we carried out a ‘non-track’
measurement survey of the station. Even though we were not
required to access the track to take measurements the scanner
was still able to capture much of the rail data.
Observations to the underside of the rail viaduct were carried out
from the public highway in liaison with the local council and
property owners.
The individual laser scans were dimensionally controlled by a
Leica 1201+ Total Station and registered in the office using
CloudWorx software. The modelling was carried out in AutoCAD
and the end deliverable was a rendered 3D model in DGN
(MicroStation) format.
Rail protection staff were utilised whist on DLR property and all
staff were DLR Track Awareness trained.
www.warnersurveys.com [email protected]
Head Office Unit 22 Theale Lakes Business Park Moulden Way READING RG7 4GB T +44 (0)118 930 3314
London Office G.3 Bedford House 69-79 Fulham High St LONDON SW6 3JW T +44 (0)203 651 7549
Bristol Office 5th Floor 1 Temple Way BRISTOL BS2 0BY T +44 (0)117 301 8137
Birmingham Office Unit G9, The Arch, 48- 52 Floodgate Street BIRMINGHAM B5 5SL T +44 (0)121 752 1220