Soiltec
Drilling Waste
Statoil showc
Oluf Berg
1
ch AS
e Management
case 20.11.14
gsvik, CEO
Soiltech provides full drilling w
Soiltec
Slop Treatment Cuttings Tr
Technology (STT) Technolog
2
waste management services
ch AS
reatment Associated
gy (CTT) equipment
Product development
Technology focus is key for Soiltech offering
• Soiltech has been granted patent for its
cuttings treatment technology (CTT)
• The slop treatment technology (STT) is
industry leading
• Product development based on client
cooperation and feedback
• Facility at Voll for R&D and testing
3
t is key succes factor
All sales and ops personnel involved in R&D
Offshore
operations
Sales Engineering R&D center
support Voll, Norway
Soiltech STT – v
• On-location treatment of waste with dischar
• No chemicals used
• No waste increase due to mechanical proce
• Limited transport of waste to shore
– Only 1-2 %
• Robust design enables treatment of high so
• Low personnel requirements, normally 1 pe
• Prepared for remote monitoring
4
value proposition
rge to sea
ess
olids content
erson
STT – capacities
• Treatment rate up to 10 m3/hr
• OIW levels constantly below 15 ppm
• Solids content above 50 % treated with su
*) Average last 12 months
5
and performance
uccess
Solids and water after
Treatment:
• Solids ~0.1%
• OIW < 4,0 ppm*)
STT – Treatm
Valhall – Tanker Anneleen Knudsen
Scope of work
- Operations Mar - Jul ‘12
- Remove solids from liquid waste
Ekofisk – Rowan Gorilla VI
Scope of work
- Operations Jul ‘14 – ongoing
- P&A operation – treatment of slop
Ekofisk – Eko M 6
Scope of work
- Operations Nov ‘14 – ongoing
- Treatment of slop from Eko complex
ment history
Ekofisk – Eko Charlie/Alpha
Scope of work
- Operation Oct ‘12 - Jun ‘14
- P&A operation – tratment of slop
Valhall – Maersk Reacher
Scope of work
- Operations Jul ‘14 – ongoing
- P&A operation – treatment of slop
STT ins
P&A
Drilling
7
stallation
• Containerized (20 ft container) or
skid based (integrated in rig)
• Easy interface with rig ("plug & play")
• Low power requirement (125 amps)
• Limited space requirements
• No weight issues
• Low pressure system
• Easy access for maintenance
• Installation normally takes 2 to 4 days
Cuttings Treatmen
Current solution
• Transport to shore with
supply boats
• Emissions
• Lifting operations
8
nt Technology (CTT)
Soiltech solution
• On location treatment
• Mechanical process
• Discharge to sea
• Cost savings
• Proven test results
Contrac
9
ct status
Thank
Questio
Soiltech AS, Hammaren 23,
www.soilt
10
you
ons?
, 4056 Tananger, Norway.
tech.no
0