1'-2" 2'-9" 5'-11"2'-9" 1'-2" B.O.S 1'-2" 5'-7"
5'-7" 8'-7"1'-2" 9'-10" lvl.-24"
2'-5" 2'-5"
2'-9" 1'-8" B.O.FC 5'-7"
9'-4" 13'
3'-6" 2'-7"
B.O.FC AE
A 9'-0"
DB
HIGH GLOSS
C PU PAINT FINISH
STORAGE
ROYAL SHYNE
IVORY WALL PAINT
AS/SELCTION
5'-8" HT-4' PROFILE HANDLE
AS/SELECTION
3'-3"
4" SKIRTING
F.L
±00"
1'-2" 6"
FURNITURE LAYOUT
B.O.S 1'-10" 1'-10" 1'-10" 1" 1'-9" 1'-9" 1" 1' 1" 1'-3" B.O.S
9'-10" 9'-10"
B.O.FC
B.O.FC 9'-4"
9'-4"
B.O.FC
B.O.FC COVE 9'-0"
9'-0" 1"THICK BORDER
PAINTING
WHITE OAK VENEER +5" 1'-8" lvl.+14" lvl.+14" ±0 2"THICK BORDER
WITH PU POLISH FINISH 1'-8" ASIAN ROYAL SHYNE
lvl.+14" lvl.+14" WHITE HIGH IVORY COLOR
OFF WHITE HIGH ±0 GLOSS PU PAINT
GLOSS PU PAINT FINISH 2'-10" FINISH PAINT(AS PER APP)
OPEN SHELF
WALLPAPER ±0 ASIAN ROYAL SHYNE
4" SKIRTING PINK COLOR
lvl. ±0 4'-7"
PAINT(AS PER APP)
SUEDE FABRIC BED EQ. EQ. ±0 4" SKIRTING
BACK
2'-3" F.L
±00"
lvl.+3" lvl. +3" ±0
2'-321"
PULL DOWN BED 2'-321" lvl.+14"
WITH HETTICH/HAFELE lvl.+14"
HARDWARE 4'-7" 2'-11"
F.L 8" 5'-8" 3'-6" 1'-3"
±00"
*NOTES: D ELEVATION
* All PU paints and polish of SIRCA make.
* In windows,if safety glasses are there, then no need to put grille.
* Saint Gobain safety glass on the window's and outside glass doors.
* Internal arrangement of all wardrobes to be as/client's requirements coordinated with modular furnitur
* All the fabric and paint selections should be according to client's choices and preferences.
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the GUEST ROOM ELEVATIONS
designer's notice immediately. 1
4. All dimensions should be verified on site by the 2
contractor.
5. Designers must be informed for any additional 3
information required before commencement of the
work. 4
6. The drawing should be used for its issued purpose 5
only.
FOR REFERENCE FOR SUPPLIERS DRAWN BY : KANIKA PROJECT MANAGER :-
APPROVED BY: VISHAL ASST. PROJECT MANAGER :-
FOR TENDER FOR APPROVAL
FOR ESTIMATION FOR CONSTRUCTION
B.O.S 2'-221" eq. eq. 4'
9'-10"
DETAIL-B COVE 421" 1'-10" COVE
B.O.FC ASIAN
9" 5'-11" 3" VENEER 9'-4" CONCRETE
FRAME TEXTURE PAINT
5'-11" B.O.FC
'-11" 10MM 9'-0" TEAK WOOD
SAFETY DOOR FRAME
ELEVATION GLASS 15mm wide 4mm
deep GROOVE
14" deep DIVIDE IN 4 EQ. PARTS
8' 8'-3" CLOSE STORAGE WITH 4'-4" TV IN THE CENTRE
9'-10" WHITE HIGH GLOSS PU
FINISH PIANT(PUSH TO
WAY TOWARDS 8'
OPEN SHUTTERS) PASSAGE
5MM GLASS SHUTTERS 1'-4" 1'
PUSH TO OPEN
1' EQ. EQ.
DRAWER STORAGE 2'-3"
(WHITE HIGH GLOSS 6'
PU PAINT FINISH) B ELEVATION
4" SKIRTING
F.L
±00"
℄
2'-5"
SPILT AC
3'-2" Detail B'
4" 0.75" FALSECEILING
L.E .D STRIP
2" 2"
C ELEVATION
re vendor.
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
SION SCHEDULE : 08-09-2019 Mr.Vishal Sharma
ATE : DESCRIPTION : GUEST ROOM WALLREV : SCALE : CONSULTANT :
ELEVATIONS VISHAL/KANIKA
NORTH: DESIGNER :
artville
...the creative living...
B.O.S Damask Wallpaper
9'-10"
2" EDGE
B.O.FC 3'-3" 3'-3" 2" COVE
9''-6" 4" 1'-2" 4" 4'-9"
3'-6" 1' 6' 1' 4" 4" B.O.FC
ASIAN ROYAL SHYNE 1'-10" 8'-6" 9''-2"
BEIGE COLORED ENTRY FIX FIX ENTRY
PAINT(as per app.) GLASS GLASS 9' LIVI
3'-6" (11'-1
1.5" MDF MOULDING WITH Detail D
PU (MATT) WHITE PAINT 3'-6" 2'-3"
FINISH AT LVL-+0.75" 4"
entry
1"X2" COPPER 18'-5"
FINISH S.S strips
8' 4'-9" 4"
COPPER FINISH S.S strips 18'-5"
(1"wide)@1"GAP
D ELEVATION
SS window frame with
copper finish 0.75" wide DETAIL E
5mm thick bevelled 1' 6'
clear glass
Teak veneer frames
with pu polish finish
4" SKIRTING
F.L
±00
B.O.S Damask Wallpaper 8'
9'-10" 7'-6"
2 EDGE
2 COVE 2'-9"
B.O.FC 3'-3" B.O.FC
9''-6" 1' 4'-9" 4" 9''-2"
3'-3" 3'-6" 4"
ASIAN ROYAL SHYNE 4" 1'-2" 4" 6'-4" FIX FIX ENTRY 8'-6"
BEIGE COLORED ENTRY GLASS GLASS
PAINT(as per app.) 1'-10" 9'
3'-6" entry 4'-9"
1.5" MDF MOULDING WITH
PU (MATT) WHITE PAINT 2'-1" 1'-11" 2'-1" 2'-7"1'-10"
FINISH AT LVL-+0.75"
2'-2" 3'-11
1"X2" COPPER 3'-5"
FINISH S.S strips 8' 4'-9"
18'-5" 4"
COPPER FINISH S.S strips DETAIL X
(1"wide)@1"GAP D ELEVATION WINDOW GRILL DESIGN 3" VENEER
FRAME WITH
SS window frame with PU POLISH FINISH
copper finish 0.75" wide
10MM
5mm thick bevelled TOUGHENED
clear glass GLASS
Teak veneer frames
with pu polish finish
4" SKIRTING
F.L
±00
DETAIL C 3" 6'-3" 4"
7'-1"
7'-6"8 MM
BEVELLED
3" 7' 3"MIRROR
1" BEVELING
IN BETWEEN
4" 3' 4" 4" 3' 4"
7'-10" 3" 6'-7" 3"
7'-1"
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the DRAWING ROOM ELEVATIONS
designer's notice immediately. 1
4. All dimensions should be verified on site by the 2
contractor.
5. Designers must be informed for any additional
information required before commencement of the
work.
6. The drawing should be used for its issued purpose
only.
FOR REFERENCE FOR SUPPLIERS DRAWN BY : KANIKA PROJECT MANAGER :- 3
FOR TENDER FOR APPROVAL 4
5
APPROVED BY: VISHAL ASST. PROJECT MANAGER :-
FOR ESTIMATION FOR CONSTRUCTION
4" Detail B' B.O.S
2" 2" 9'-10"
0.75" FALSECEILING
L.E .D STRIP B.O.FC
9''-6"
B.O.FC 7'-9" 5" Detail B' 3"
9''-2" 8"
ING ROOM PLAN Detail X
11" x 18'-5") 3" WOODEN VENEER
frame with pu polish finish
6'-7" 2'-5" 7'-9"
12' side table 10MM TOUGHENED 7'-9"
Ø1'-6" GLASS IN WINDOW 9'-2"
4'-8" 9'-10"
S.S PIPE(1"X1") black
powder coated
1.5" MDF MOULDING WITH +4"
PU (MATT) WHITE PAINT
FINISH AT LVL-+0.75"
1'-6" ASIAN ROYAL
4'-1" COLOR PAINT
VENEER 1'-2" 1'-4"
7'-4" 4" SKIRTING A ELEVATION
sofa F.L 1'
±00
2' 2'-9" B.O.S
9'-6" 9'-10"
7'-6"
B.O.FC
1'-7" 2'-10" 1'-7" 18'-5" 9''-6"
B.O.FC
9''-2" 7'-9" 5" Detail B'
Detail X 7'-9" 3"
7'-9"
A Ø1'-6" +4" 9'-10"
DB side table
C 2'-7"
2'-6"
2'4" 1'-2" 2'2'
2'-1" 2' 2'-1"
6'-11"
1" 11'-11" 3'-11"
3'-5"
4' OTTOMAN 1'-4" 1'-4"
CONSOLE 4" SKIRTING 3'-2"
5'-1" F.L
±00
1'-8"
9"
FURNITURE LAYOUT 4'-9" 3'-4"
12'
9"
A ELEVATION
DETAIL D
SOFA DETAIL
7'-6"
2'-9"
6"
PLAN
2'-9" 6" 2'-2" 2'-2" 2'-2" 6"
4" 1'-1" 1'-4" 7'-6"
1'-5"
7'-6"
ELEVATION
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
SION SCHEDULE : 08-09-2019 Mr.Vishal Sharma
ATE : DESCRIPTION : DRAWING ROOMREV : SCALE : CONSULTANT :
WALL ELEVATIONS VISHAL/KANIKA
NORTH: DESIGNER :
artville
...the creative living...
B.O.S 4" 8'-6" 4" 2'-9" 4" 2'-9"
9'-10"
B.O.FC
9''-6"
B.O.FC
9''-2"
4"
4"
WALL BRACKET
LIGHT
3 SEATER SOFA
SIDE TABLE
as per design
OTTOMAN
1'-8"
2'
2'-9"
3'
F.L 7'-6" 4" 1'-3" 10" 2'-3" 1'-1" 1'-3"
±00 1'-6" 8" 1'-3" 4" 6"
18'-5" A'
9"
B ELEVATION BLACK
6'-8" MARBL
2'-8"
4'-11" C
S
1
C
B
5'
B.O.S 4" 8'-6" 4"2" 7'-1" 2"2'-9" 4" 2'-9" BAL. 5"
9'-10" 5'
℄ Detail C GLASS 4"
B.O.FC
9''-6" 4" GLASS
B.O.FC 2" ℄
9''-2"
1.5" MDF MOULDING WITH
PU (MATT) WHITE PAINT
FINISH AT LVL-+0.75"
COPPER FINISH
S.S PIPE(1"X1")
WALL BRACKET
LIGHT
ASIAN ROYAL 7'-10"
COLOR PAINT
8 MM BEVELED TINTED
MIRROR PASTED
OVER12MM PLY
2" GAP
4" SKIRTING 4" 8"
F.L 1'-6" 8" 1'-3" 4" 7'-6" 4" 1'-3" 10" 2'-3" 1'-1" 1'-3"
±00 9" 18'-5" 6"
B ELEVATION
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the DRAWING ROOM ELEVATIONS
designer's notice immediately. 1
4. All dimensions should be verified on site by the 2
contractor.
5. Designers must be informed for any additional
information required before commencement of the
work.
6. The drawing should be used for its issued purpose
only.
FOR REFERENCE FOR SUPPLIERS DRAWN BY : KANIKA PROJECT MANAGER :- 3
FOR TENDER FOR APPROVAL 4
5
APPROVED BY: VISHAL ASST. PROJECT MANAGER :-
FOR ESTIMATION FOR CONSTRUCTION
B.O.S lvl. ±0 SPLIT AC 9'-2"
9'-10" lvl. +4" BAL. 5"
lvl. ±0
B.O.FC Detail A 9'-10"
9''-6"
CONSOLE
B.O.FC
9''-2"
COPPER FINISH
S.S TRIM
BEIGE ITALIAN
MARBLE
MIRROR
(AS PER DESIGN)
lvl. +5"
HIGHLIGHTER
ITALIAN MARBLE
PLANTER
F.L 4" 5"
±00
4" 2'-9" 2'-9" 4"
3'-5" 4"
5'-1" 4" 3'-5"
11'-11"
ITALIAN
LE TOP C ELEVATION
DETAIL A BLACK ITALIAN
CONSOLE MARBLE TOP
COPPER FINISH DETAIL A'
S.S PIPE(1"X1") OF CONSOLE
1" GAP
COPPER FINISH
COPPER FINISH S.S S.S PIPE(1"X1")
BOTTOM 1" GAP
B.O.S
9'-10"
B.O.FC
9''-6"
B.O.FC SPLIT AC 9'-2"
9''-2" lvl. +4" BAL. 5"
COPPER FINISH lvl. ±0 9'-10"
S.S TRIM
lvl. ±0
BEIGE ITALIAN
MARBLE
MIRROR
(AS PER DESIGN)
lvl. +5"
HIGHLIGHTER
ITALIAN MARBLE
PLANTER
F.L 4" 5"
±00 2'-7" 2'-1" 2'-6" 2'-1" 2'-7"
11'-11"
C ELEVATION
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
SION SCHEDULE : 08-09-2019 Mr.Vishal Sharma
ATE : DESCRIPTION : DRAWING ROOMREV : SCALE : CONSULTANT :
WALL ELEVATIONS VISHAL/KANIKA
NORTH: DESIGNER :
artville
...the creative living...
2'-7" 5' 2'-7"
MANDIR 2'-821" A B.O.S
1'-4"DB 9'-10"
4'-8" B.O.FC
C 3'-6" 9''-0"
MANDIR AREA
(4'-8" x 13'-5") 6' DAMASK
WALLPAP
E POP MOU
F 1" WIDE
POP MOU
G 5" WIDE
WALL LIG
4" WIDE M
P
CREDENZ
4" SKIRTI
STORAGE 2'-821" DINING AREA B.O.S
(11'-4" x 13'-5") 9'-10"
10'-2" B.O.FC
9''-0"
LAYOUT 2'-1" 2'-1"
eq eq eq eq
CREDENZA DETAIL eq eq eq
1'-8" 1'-6" 1'-8" 2'-3"
eq eq eq eq
DRAWER 8" 8" 8" PU HIGH GLOSS 4'
FINISH
2'-6" DRAWER 2'-2" 3' 4' DETAIL B
METAL HANDLES
IN GOLDEN 2"
FINISH 2"
LVL. +16" LVL. +16" 1" 2" 2" 1'-1"
2"
DRAWER 2" 121"
2"
3" 2"1'-1"134"
5'-2" 2"
134" 2'-021"
(FRONT VIEW)
1'-8" 1'-6" 1'-8" 2'-1" 2'-1"
2'-6" STORAGE LVL. +16" 8" 8" 8" STORAGE2'-2" 10" 3' 10"
1'-021" 1'-021"STORAGE DRAWER 1'-021" 1'-021"STORAGE 2'-2"
(CROCKERY CABINET
LVL. +16" 3" INNER DETAIL)
DRAWER 1"
LVL. +16"
DRAWER
5'-2"
(INNER DETAIL)
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV D
3. Any discrepancies should be brought to the DINING/MANDIR WALL
designer's notice immediately. DRAWN BY : KANIKA ELEVATIONS 1
4. All dimensions should be verified on site by the APPROVED BY: VISHAL 2
contractor. PROJECT MANAGER :-
5. Designers must be informed for any additional 3
information required before commencement of the ASST. PROJECT MANAGER :-
work. 4
6. The drawing should be used for its issued purpose 5
only.
FOR REFERENCE FOR SUPPLIERS
FOR TENDER FOR APPROVAL
FOR ESTIMATION FOR CONSTRUCTION
B.O.S 5"
9'-10"
COVE 5"
B.O.FC 2" 2"
9''-0" 4" 5" 4" X FABRIC
WALLPAPER
DAMASK ℄
WALLPAPER ℄ 5"X5" CORNICE
POP MOULDING
1" WIDE DETAIL X
POP MOULDING
5" WIDE 4"
WALL LIGHTS
4" WIDE METAL
PIECES
4"
4'-8"
CREDENZA 4" 4" 5" 4" Y DETAIL Y
4" SKIRTING
5" 5" 4" BAL. 4" 5" 5"
B.O.S 2'-6" 5'-2" 2'-6"
9'-10"
B.O.FC A ELEVATION
9''-0"
5" WIDE
column
extension
AIL B 2" 121" WAY TO
2" PASSAGE
-1"
2"
-1" 134" 2"
021"
B ELEVATION
5" 12'-7" 5"
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
REVISION SCHEDULE : DINING/MANDIR08-09-2019 Mr.Vishal Sharma
: REV DATE : DESCRIPTION : REV : SCALE : CONSULTANT :
WALL
1 WALL ELEVATIONS VISHAL/KANIKA
GER :- 2
MANAGER :- DESIGNER :
NORTH:
artville
3
...the creative living...
4
5
B.O.S DETAIL B COVE
9'-10"
FABRIC
B.O.FC WALLPAPER
9''-0"
8'-2" 4' ANTIQUE MIRROR
(AS PER APP)
3'-2"
0.75" S.S FRAME WITH
GOLDEN FINISH
5'-4" CLEAR MIRROR
WITH S.S GOLDEN
4" 4" FINISH FRAMING
4" SKIRTING
1'-2" 5" 2'-1" 5" 4'-5" 5" 2'-1" 5"
C ELEVATION
B.O.S B.O.S
9'-10" 9'-10"
B.O.FC B.O.FC
9''-0" 9''-0"
HANGING
1" 6" 6" 6" 6'-9" LIGHT ASIAN ROYAL SHYNE
IVORY WALL PAINT
CNC CUTTING
IN CORIAN
CORIAN SAFETY GLASS
(SAINT GOBAIN)
4" WINDOW
PUSH TO OPEN VENEER FRAMING
CABINET SHUTTERS
6" RISER OF STEPS 4" SKIRTING
IN CORIAN
LVL. +20"
10" 2'-8"
10" 3'
F ELEVA
E ELEVATION
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV D
3. Any discrepancies should be brought to the DINING/MANDIR WALL
designer's notice immediately. DRAWN BY : KANIKA ELEVATIONS 1
4. All dimensions should be verified on site by the APPROVED BY: VISHAL 2
contractor. PROJECT MANAGER :-
5. Designers must be informed for any additional 3
information required before commencement of the ASST. PROJECT MANAGER :-
work. 4
6. The drawing should be used for its issued purpose 5
only.
FOR REFERENCE FOR SUPPLIERS
FOR TENDER FOR APPROVAL
FOR ESTIMATION FOR CONSTRUCTION
OR B.O.S SPLIT A.C 7'-3"
9'-10" WAY TO THE POOJA AREA
E WITH
H B.O.FC
9''-0"
R
DEN FABRIC
G WALLPAPER
4" THICK VENEER
FRAMING WITH PU
POLISH FINISH
METAL ARTIFACT
(DULL GOLD FINISH)
4" SKIRTING
4"
2'-5" 4" 8' 4" 2'-5"
D ELEVATION B.O.S
9'-10"
B.O.FC
9''-0"
DIVIDE IN 4 EQ. PARTS 2"
2" 4'-2"
3' 4' HIGH GLOSS
PU PAINT
CROCKERY
CABINET
DIVIDE IN 4 EQ. PARTS
BAL. 2'-8" 10" 3' 10"
4'-8"
F ELEVATION
G ELEVATION
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
REVISION SCHEDULE : DINING/MANDIR08-09-2019 Mr.Vishal Sharma
: REV DATE : DESCRIPTION : REV : SCALE : CONSULTANT :
WALL
1 WALL ELEVATIONS VISHAL/KANIKA
GER :- 2
MANAGER :- DESIGNER :
NORTH:
artville
3
...the creative living...
4
5
B.O.S 9' COVE SID
9'-10" 8' 1" DEEP 4"WIDE GROOVE
B.O.FC 9'-6" 4"
9''-6" BLOCK PORTITION
9'-10"
COVE 9'-2" 1'-7"
S.S PROFILE FRAME 1'-1" 6"
±0" +4" ±0"
ARTIFACT AS/SELECTION
TEAK WOOD DOOR 2'-4" ENTRY TO
FRAMING WASHROOM
SUEDE FABRIC QUILTING 4"
ABOVE THE BED BACK
ONLY BAL. 2'-4" 3'-1" 2'-2"
CLEAR MIRROR
4" SKIRTING
F.L
±00"
15'-11"
C ELEVATION
B.O.S 3'-6"
9'-10" 9'
B.O.FC
9''-6" 8'
9'-6" 4"
COVE 9'-10"
±0" 9'-2" COVE
S.S PROFILE FRAME 1" DEEP 4"WIDE GROOVE
2' 4" BLOCK PORTITION
ARTIFACT AS/SELECTION
TEAK WOOD DOOR +4" ±0"
FRAMING ENTRY TO
SUEDE FABRIC QUILTING WASHROOM
OF THE BED BACK
(AS/SELECTION) 6' 2'
TABLE LAMP C ELEVATION
SIDE TABLE
F.L
±00"
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the PARENT'S ROOM ELEVATIONS
designer's notice immediately. 1
4. All dimensions should be verified on site by the 2
contractor.
5. Designers must be informed for any additional
information required before commencement of the
work.
6. The drawing should be used for its issued purpose
only.
FOR REFERENCE FOR SUPPLIERS DRAWN BY : KANIKA PROJECT MANAGER :- 3
FOR TENDER FOR APPROVAL 4
5
APPROVED BY: VISHAL ASST. PROJECT MANAGER :-
FOR ESTIMATION FOR CONSTRUCTION
2'1"
METAL FRAMED LEGS 2'-5" EQ. EQ. 3'-3"
1" METAL BASE 1'-6" 6' 2'-421" 6"
A
2" 11' DB
5' 3'
DE TABLE DETAIL C
5'-1021"
8'-3"
6'-6"
3' 2' 6' 2' 1'-4"
1'-6"
2'-4" 2'-9" 10'-10"
15'-11"
FURNITURE LAYOUT
B.O.S 3'-6" 9'-6" 4" COVE
9'-10" 1" DEEP
B.O.FC ℄ 2'-11"
9''-0"
X ±0" BAL. 4'-6"
COVE 3'
BLOCK PORTION 1'-10"
1'-6"
MARBLE SHEET PASTED
ON WALL 2'-5" 3" 2'-1" 4" 7" 2" 1'-4" 1'-4" 7" 4" 2'-4"
1" WHITE OAK WOODEN 2"
BATTONS WITH 1" GAP
12 X 12 MM GROOVE BETWEEN
THE SHEET
2"X1" WHITE OAK WOODEN
BATTON PASTED ABOVE 0.75"
PLYBOARD
DETAIL- X
1" S.S "T" STRIP (GOLDEN)
WHITE OAK VENEER PASTED
ON 0.75" THK. PLYBOARD
OTTOMAN
3" WOODEN PLATFORM
F.L
±00"
A ELEVATION
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
SION SCHEDULE : 08-09-2019 Mr.Vishal Sharma
ATE : DESCRIPTION : PARENTS ROOMREV : SCALE : CONSULTANT :
WALL ELEVATIONS VISHAL/KANIKA
NORTH: DESIGNER :
artville
...the creative living...
B.O.S EQ. EQ.
9'-10" 4'
B.O.S
9'-6" SPLIT A.C 1'-6"
COVE LVL+2'-0" LVL+2'-0"
BLOCK PORTION
1' 7' 7'-9"
Cappuccino COLOR 8'
PU HIGH GLOSS PAINT FINISH
3"
S.S PIPE(1"X1")
WITH 4" GAP 3' 5' 3'
10MM SAFETY D ELEVATION
GLASS IN WINDOW
4' HT. PROFILE HANDLE
AS/SELECTION
3" PLATFORM
BELOW WADROBE
4" SKIRTING
F.L
±00"
B.O.S EQ. EQ. 1'-6"
9'-10" 4'
COVE SPLIT A.C
BLOCK PORTIOTION LVL+2'-0" LVL+2'-0"
Cappuccino COLOR 7'-9"
PU HIGH GLOSS PAINT FINISH 8'
S.S PIPE(1"X1")
WITH 4" GAP
10MM SAFETY
GLASS IN WINDOW
4' HT. PROFILE HANDLE 1'-6"
AS/SELECTION
3"
3" PLATFORM
BELOW WADROBE 3' 4'-6" 3'
OTTOMAN
F.L
±00"
D ELEVATION
*NOTES:
* All PU paints and polish of SIRCA make.
* In windows,if safety glasses are there, then no need to put grille.
* Saint Gobain safety glass on the window's and outside glass doors.
* Internal arrangement of all wardrobes to be as/client's requirements coordinated with modular furnitu
* All the fabric and paint selections should be according to client's choices and preferences.
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the PARENT'S ROOM ELEVATIONS
designer's notice immediately. 1
4. All dimensions should be verified on site by the 2
contractor.
5. Designers must be informed for any additional
information required before commencement of the
work.
6. The drawing should be used for its issued purpose
only.
FOR REFERENCE FOR SUPPLIERS DRAWN BY : KANIKA PROJECT MANAGER :- 3
FOR TENDER FOR APPROVAL 4
5
APPROVED BY: VISHAL ASST. PROJECT MANAGER :-
FOR ESTIMATION FOR CONSTRUCTION
B.O.S COVE
9'-10"
B.O.FC
9''-6"
COVE
TEAK WOOD DOOR
FRAMING
2' 2' 6" 2' 621"
PAINTING
PAINTING PAINTING
8'
PAINTING way towards 2'
dining
DOOR AS/APP. DESIGN 7'
FABRIC WALLPAPER
SIDE VEIW OF BED WITH 1'-4"
SIDE TABLE
11'-6"
4" SKIRTING
B ELEVATION
F.L
±00"
3'-5"
1"X 1" WOODEN BATTON 1" SS "T" STRIP PVD COATED INSERTED
SCREWED IN WALL IN PLY BY MAKING A GROOVE
1" 1" 1" 1" 1" 1" 1" 4" 1" 7" 0.75" PLY BOARD SCREWED
ON WALL
2" WALL
MARBLE SHEET
PASTED ON WALL
2"X1" WOODEN BATTON
SCREWED
DETAIL- X
ure vendor.
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
SION SCHEDULE : 08-09-2019 Mr.Vishal Sharma
ATE : DESCRIPTION : PARENTS ROOMREV : SCALE : CONSULTANT :
WALL ELEVATIONS VISHAL/KANIKA
NORTH: DESIGNER :
artville
...the creative living...
POWDER LOO B.O.S DETAIL
( 4'-5" x 5'-10") 9'-10"
B.O.FC TALL BOY
MARBLE TURNING FAUCET
1'-10" 9'-2"
COUNTER TOP
A 3'-9" WHITE TILES WASH BASIN
DB 3' AS/SELECTION STATUARIO
MARBLE TOP
C 3'-11" STATUARIO
MARBLE BOTTLE TRAP
1'-10"
1" THICKER BWP DRAWER
THAN TILE FINISHED WITH
3" 1'-8" WHITE OAK
LAMINATE
4'-5" 1'
LAYOUT A ELEVATION
(FLOORING) B.O.S
9'-10"
B.O.FC
9'-2"
POWDER LOO
( 4'-5" x 5'-10") STATUARIO MARBLE
WHITE TILES
AS/SELECTION
5'-10" WOODEN LADDER 0" 5'
TO HANG VERTICAL
PLANTS
BWP DRAWER6" 6"
FINISHED WITH
WHITE OAK
LAMINATE
4'-5"
4" 1'-2
1'-7"
C
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the POWDER TOILET WALL
designer's notice immediately. DRAWN BY : KANIKA ELEVATIONS 1
4. All dimensions should be verified on site by the APPROVED BY: VISHAL 2
contractor. PROJECT MANAGER :-
5. Designers must be informed for any additional 3
information required before commencement of the ASST. PROJECT MANAGER :-
work. 4
6. The drawing should be used for its issued purpose 5
only.
FOR REFERENCE FOR SUPPLIERS
FOR TENDER FOR APPROVAL
FOR ESTIMATION FOR CONSTRUCTION
X B.O.S LVL. ±0 COVE LIGHT
9'-10" TILL THE WOODEN
1'-10" B.O.FC LVL. +3" DRAWER
9'-2" HANGING
'-7" 8" 4" R1'-6" 5' LIGHT
MARBLE TURNING 6'-10"
℄ VENEER
MIRROR IN 1" THICK S.S FRAMING
FRAME WITH ROSE
GOLD FINISH TOUGHENED GLASS
WITH FROSTED
2'-4" FILM
STATUARIO X WHITE TILES
MARBLE TOP AS/SELECTION
6" 6" 1' 8"
6" STATUARIO
MARBLE
3'
BWP DRAWER 1'-2"
FINISHED WITH
3'-11" 1'-8" 3"
WHITE OAK
LAMINATE B ELEVATION
B.O.S
9'-10"
B.O.FC
9'-2"
TEAK WOOD
DOOR FRAME
WHITE TILES
AS/SELECTION
DOOR
2" D ELEVATION
"
ELEVATION
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
SION SCHEDULE : 08-09-2019 Mr.Vishal Sharma
ATE : DESCRIPTION : POWDER TOILETREV : SCALE : CONSULTANT :
WALL ELEVATIONS VISHAL/KANIKA
NORTH: DESIGNER :
artville
...the creative living...
B.O.S
9'-10"
B.O.FC
9''-2"
WHITE MARBLE
(AS/SELECTION)
2'-621" 6" PYRAMID SHELVES 7" 6" 1'
(NATURAL 5" 1'
WOODEN FINISH)
1'
TEAK DOOR
℄ FRAME DOOR
TOWARDS
2' PARENT'S
ROOM
A
921" DB
4' C
2'-4" F.L 421" 2'-8" 9'-1141" 3'-1121"
±00"
H A ELEVATION
EG B.O.S
6'-583" 9'-10" 2'-621" 2'-121"
F B.O.FC
9''-2"
(OPENABLE) (FIX)
S.S FRAMING
1'-1" 2'-6" 1'-1" 4" (1"X1.5")DULL
GOLD
GLASS PARTITION
WITH ONE SIDE
VISIBILITY FILM ON
CLEAR GLASS
WHITE MARBLE
(AS/SELECTION)
LAYOUT
C ELEVATION F.L 4'-8"
±00"
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the
designer's notice immediately. KID'S TOILET WALL ELEVATIONS 1
4. All dimensions should be verified on site by the
contractor. 2
5. Designers must be informed for any additional
information required before commencement of the
work.
6. The drawing should be used for its issued purpose
only.
FOR REFERENCE FOR SUPPLIERS DRAWN BY : KANIKA PROJECT MANAGER :- 3
FOR TENDER FOR APPROVAL 4
5
APPROVED BY: VISHAL ASST. PROJECT MANAGER :-
FOR ESTIMATION FOR CONSTRUCTION
B.O.S ℄
9'-10"
B.O.FC TEAK DOOR FRAME
9''-2"
7'-2" DOOR
DEPTH 8" TOWARDS
KID'S
DEPTH 8" ROOM
1" THICK DULL GOLD
DEPTH 10" FINISH S.S TRIM
WHITE MARBLE
(AS/SELECTION)
W.C
4'-3" ITALIAN BOOK
5'-5" MATCH MARBLE
6'-5" AS/SELECTION
F.L 8"
±00" 4" 5'-4" 4" 2'-8"
B ELEVATION COVE
12MM THICK
B.O.S MIRROR SAFETY GLASS
8' 9'-10" WITH FROSTED FILM
5'B.O.FCR1'-9" 1" S.S PROFILE
10" 5"9''-2" FRAME (GOLD FINISH)
DETAIL-A 4'-8"
6'-7"HANGING D ELEVATION
1'LIGHT
3'-2" 1'-6" 1'-8"
1" THICK 4'-8" 8'-8"
S.S COPPER
FRAME(FOR MIRROR)
GLASS PARTITION
WITH ONE SIDE
VISIBILITY FILM ON
CLEAR GLASS
WHITE MARBLE
TOP
DRAWER
METAL FRAME
WHITE MARBLE
(AS/SELECTION)
F.L
±00"
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
SION SCHEDULE : 08-09-2019 KID'S TOILET WALL Mr.Vishal Sharma
ATE : DESCRIPTION : REV : SCALE : CONSULTANT :
ELEVATIONS VISHAL/KANIKA
NORTH: DESIGNER :
artville
...the creative living...
WHITE MARBLE B.O.S
(AS/SELECTION) 9'-10"
B.O.FC LVL+4.5 C
9''-2" L
1'-2" 4" 1'-2" O
HIGHLIGHTER
TILES W
WHITE MARBLE
(AS/SELECTION)
4" DEEP NICHE
FINISHED WITH
WOODEN TILE
2'-6"
SHOWER 2' LVL LVL
PANEL +4.5" +4.5"
LEDGE
4" 1'-1" 2'-2" 1'-1"
F.L 2"
±00"
2"
F ELEVATION
DETAIL A TALL BOY
TAP
FLOORING SPACE FOR 3'
LAYOUT FINGER GROOVE 10" 5" COUNTER
SUNK WB
STONE TOP
BOTTLE TRAP
CUTOUT IN DRAW
FOR BOTTLE TRAP
BWP DRAWER
1" SS FRAME WITH
GOLDEN FINISH
2'
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the
designer's notice immediately. KID'S TOILET WALL ELEVATIONS 1
4. All dimensions should be verified on site by the
contractor. 2
5. Designers must be informed for any additional
information required before commencement of the
work.
6. The drawing should be used for its issued purpose
only.
FOR REFERENCE FOR SUPPLIERS DRAWN BY : KANIKA PROJECT MANAGER :- 3
FOR TENDER FOR APPROVAL 4
5
APPROVED BY: VISHAL ASST. PROJECT MANAGER :-
FOR ESTIMATION FOR CONSTRUCTION
COVE LIGHT TILL B.O.S LVL. ±0 1'-2" 4" 1'-2"
LEDGE TOP ONLY 9'-10" LVL. ±0
ON BOTH THE SIDES B.O.FC
9''-2" LVL. +4"
WHITE MARBLE BORDER
WHITE MARBLE
(AS/SELECTION)
(WOODEN TILE)
4" DEEP NICHE
FINISHED WITH
WOODEN TILE
1" THICK(WOODEN
TILE BORDER)
4'-6"
F.L 1'-1121" 2'-8" 1'-1021"
±00"
G ELEVATION
B.O.S (FIX) (OPENABLE)
9'-10"
B.O.FC
9''-2"
S.S FRAMING
(1"X1.5")DULL
GOLD
GLASS PARTITION
WITH ONE SIDE
VISIBILITY FILM ON
CLEAR GLASS
WER
P
H
F.L H ELEVATION
±00" 2'-121" 2'-621"
4"
4'-8"
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
SION SCHEDULE : 08-09-2019 KID'S TOILET WALL Mr.Vishal Sharma
ATE : DESCRIPTION : REV : SCALE : CONSULTANT :
ELEVATIONS VISHAL/KANIKA
NORTH: DESIGNER :
artville
...the creative living...
4'-10" 15'-2" 8'-4" B.O.S
2' 9'-10"
3'-2" 1'-6" 5" 1'-10" B.O.F
9'-2"
ENTRY 2'6'-6" COVE
TO BEDROOM 6' 2'-3"
5' WALLPA
2'
NISCHE
ASIAN R
SHYNE B
COLOUR
8'
9'-8" ASIA
SHY
8'-5" 2' 1'-8" COL
5'
3'-4" 4" SKIRT
A
DB F
C2' ±
B.O3'-10"
9'-1
6'-2" 2'-6" 2'
B.O.
KID'S BEDROOM ENTRY 9'-2"
(11'-7" X 15'-2") TO TOILET COVE
FURNITURE LAYOUT 6'
WALLP
WHITE PU HIGH GLOSS
HANGI
1'-9" DRAWER 2" GROOVE BETWEEN
2" 9" 9" DRAWER DRAWERS BLUE
FABRI
1" EDGE BANDING ON 6" MAT
3 SIDES BED S
FINGE
2" 1'-8" 2" (NO H
2'
A ELEVATION
DETAIL-A
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the KID'S BEDROOM WALL
designer's notice immediately. DRAWN BY : KANIKA ELEVATIONS 1
4. All dimensions should be verified on site by the APPROVED BY: VISHAL 2
contractor. PROJECT MANAGER :-
5. Designers must be informed for any additional 3
information required before commencement of the ASST. PROJECT MANAGER :-
work. 4
6. The drawing should be used for its issued purpose 5
only.
FOR REFERENCE FOR SUPPLIERS
FOR TENDER FOR APPROVAL
FOR ESTIMATION FOR CONSTRUCTION
S B.O.FC SPOTLIGHT
" 9'-6"
FC ±0" 1' POSTER ±0"
4'
APER ±0" ±0" ±0"
1' 6" 1' 6" 1' 9"
E WITH 1'-6" 9'-6" 4"3' 1'-6"
ROYAL 9'-10"
BLUE ±0" ±0" LVL+5" ±0"
R
10'-4"
AN ROYAL
YNE IVORY 4'-10" 6" 1'-6" 1'-9" 3' 1'-9" 1'-6" 5"
LOR PAINT
TING A ELEVATION
F.L B.O.FC SPOTLIGHT
±00
O.S 9'-6"
10"
.FC
"
PAPER
ING LIGHT
±0"
±0"
SUEDE 2'-2" DETAIL-A
IC TUFTING
DRAWER 1'-10" DRAWER 1'-9"
TRESS DRAWER 1'-4" 6" DRAWER
SIDE TABLES 2' 4' 2'
ER GROOVES
HANDLES) 4'-10" 6' CLIENT :
F.L Mr.Vishal Sharma
±00
CONSULTANT :
DATE : DECISION/ DISCUSSION AT SITE:
VISHAL/KANIKA
SION SCHEDULE : 08-09-2019
DESIGNER :
ATE : DESCRIPTION : KID'S BEDROOMREV : SCALE :
artville
WALL ELEVATIONS
...the creative living...
NORTH:
B.O.S B.O.FC
9'-10" 9'-2"
B.O.F
9'-4" SPLIT AC
BLOCK PORTION 2'-6" 1'-9"
COVE
PAINTING 1'-3" 1'-3"
BLUE HIGH GLOSS
LAMINATE LVL+2' LVL+2'
10MM THK.TOUGHENED 8'-5" ENTRY 2'-9"
GLASS FIXED IN FRAME TOTOILET
±0"
VENEER FRAMING LVL+2'
4' HT. HANDLES
(PROFILE)
STUDY CHAIR
4'-10"
4" SKIRTING 3"
3" PLATFORM
1'-5" 1'-5" 1'-5" 1'-5" 6" 2'-6" 1'-2" 3' 2'
F.L 4" 2'-10" 6'
±00
6'
C ELEVATION
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the KID'S BEDROOM WALL
designer's notice immediately. DRAWN BY : KANIKA ELEVATIONS 1
4. All dimensions should be verified on site by the APPROVED BY: VISHAL 2
contractor. PROJECT MANAGER :-
5. Designers must be informed for any additional 3
information required before commencement of the ASST. PROJECT MANAGER :-
work. 4
6. The drawing should be used for its issued purpose 5
only.
FOR REFERENCE FOR SUPPLIERS
FOR TENDER FOR APPROVAL
FOR ESTIMATION FOR CONSTRUCTION
B.O.S
9'-10"
B.O.FC
9'-2"
OFF WHITE 1" EDGE 2'-6" 2'-6" 2"
BANDING AT LVL 1'
EQ. EQ. EQ. EQ. 1'-3" 1'-3"
OFF WHITE HIGH ±0" ±0" ±0" ±0"
GLOSS LAMINATE
OPEN BOX OPEN BOX OPEN BOX OPEN BOX
ASIAN ROYAL SHYNE SHELF SHELF SHELF SHELF
IVORY COLOR PAINT
+1' CABINET +1' CABINET
2' DEPTH OF TABLE
EQ. EQ. EQ. EQ.
BLUE EDGE BANDING
1'-2" 8" 2" WIDE 4 EQ. PARTS 2'-7" WAY 7'-11"
8'-5"
WALLPAPER WALL TURNING TOWARDS
6'-7"
DRAWERS WITH FINGER 1'-8" 2" DINING
GROOVES
8" 8" 8" DRAWER
4" SKIRTING
F.L DRAWER 2'-8"
±00
DRAWER
B.O.S
5'-4" 9'-10" 6'-7" 1'-10" 3'-2"
D ELEVATION
2'-8" B.O.FC
9'-2"
2'-6" 2'-6" 2"
OFF WHITE 1" EDGE
BANDING AT LVL 1' EQ. EQ. EQ. EQ. 1'-3" 1'-3"
±0" ±0" ±0" ±0"
OFF WHITE HIGH
GLOSS LAMINATE OPEN BOX OPEN BOX
SHELF SHELF
ASIAN ROYAL SHYNE
IVORY COLOR PAINT +1' CABINET +1' CABINET
2' DEPTH EQ. EQ. EQ. EQ. 7'-11"
OF TABLE 9'-10"
BLUE TAPING 2" 4 EQ. PARTS 2'-7" WAY
5MM THICK 8'-5"
TOWARDS
WALL TURNING 6'-7"
1'-8" 2" DINNING
4" SKIRTING
2'-8" DRAWER
F.L 8" 8"
±00 DRAWER 2'-8"
DRAWER
4"
6'-7" 1'-10" 3'-2"
11'-7"
D ELEVATION
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
SION SCHEDULE : 08-09-2019 Mr.Vishal Sharma
ATE : DESCRIPTION : KID'S BEDROOMREV : SCALE : CONSULTANT :
WALL ELEVATIONS VISHAL/KANIKA
NORTH: DESIGNER :
artville
...the creative living...
6" 8'-8"
8'-8"
ENTRY
TO BEDROOM
3'-4" 6" 2'
17'-8"
2'-11"
4'-8"
5'-6"
1'-7"
1'-6" 2'-9" 1'-8" 2" 6'-6" 3" 2'
15'-8" 6' B.O.S
6'-6" 9'-10"
B.O.S
5' 9'-4"
A 2' 3" B.O.FC
DB 9'-0"
1'-7"
C SIDE ELEVATI
4'-5" OF CUPBOAR
5'-3" 2'-5" WALLPAPER
2'-5" 8' 2'-1" SUEDE FABRI
12'-6" QUILTING
FURNITURE LAYOUT LAMP
SIDE TABLE
F.L
±00
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the MASTER BEDROOM WALL
designer's notice immediately. DRAWN BY : KANIKA ELEVATIONS 1
4. All dimensions should be verified on site by the APPROVED BY: VISHAL 2
contractor. PROJECT MANAGER :-
5. Designers must be informed for any additional 3
information required before commencement of the ASST. PROJECT MANAGER :-
work. 4
6. The drawing should be used for its issued purpose 5
only.
FOR REFERENCE FOR SUPPLIERS
FOR TENDER FOR APPROVAL
FOR ESTIMATION FOR CONSTRUCTION
B.O.S LVL-+2' LVL-+2' 3" 8'-8"
9'-10"
B.O.FC WAY TOWARDS
9''-4" PASSAGE
B.O.FC
9''-0" 3'-4" 6" 2'-2" 2'-2" 2'-2" 2'-2"
0.75" PLY WITH 8MM
MDF FINISHED WITH A ELEVATION
PU PAINT Z
1" S.S "T" STRIP Y
(GOLDEN)
1" MDF MOULDING LVL:+3"
FINISHED WITH PU
8'-8"
PAINT
TEAK WOOD
DOOR FRAME
ALMIRAH
SHUTTERS
GOLDEN NOBS
PLATFORM
F.L
±00
ION
RD
IC
X
DETAIL -C
4"
2' 2'-4" 2' 3" B ELEVATION 2' 2'-4"
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
SION SCHEDULE : 08-09-2019 Mr.Vishal Sharma
ATE : DESCRIPTION : MASTER BEDROOMREV : SCALE : CONSULTANT :
WALL ELEVATIONS VISHAL/KANIKA
NORTH: DESIGNER :
artville
...the creative living...
B.O.S 8'-8"
9'-10"
B.O.FC
9''-4"
B.O.FC
9''-0"
ASIAN ROYAL SHYNE
IVORY PAINT
ARCHITECTURAL
GLAZING
18MM THK MDF BOARD
PU PAINT FINISH(MATTE)
S.S PVD COATED "T"
GOLDEN STRIP(1" WIDE)
4" SKIRTING 4"
F.L 2'-1" 8' 2'-5"
±00 12'-6"
B.O.S CONS
DETAIL -X C ELEVATION 9'-10"
2'-4"
MS STRUCTURE
2" 3" B.O.FC
9''-4"
B.O.FC
9''-0"
WHITE PU PAINT
2" S.S "T" STRIP(1" WIDE)
DULL GOLD
SS PVD COATED
GOLD FINISH TRIM MARBLE FINISHED WALL LIGHT
8" 8" 2" OVER PLY 1'-8"2" BORDER 18MM THK MDF
2" WHITE HIGH GLOSS BOARD PU PAINT
2' PU PAINT FINISH FINISH
3" S.S PVD COATED
DRAWER BED SUEDE GOLD FINISH TRIM
+19" FABRIC 2" GAP WITH
WHITE PU POLISH
DRAWER CONSOLE
+19"
4" SKIRTING
F.L
±00
BED SIDE TABLE DETAIL
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the MASTER BEDROOM WALL
designer's notice immediately. DRAWN BY : KANIKA ELEVATIONS 1
4. All dimensions should be verified on site by the APPROVED BY: VISHAL 2
contractor. PROJECT MANAGER :-
5. Designers must be informed for any additional 3
information required before commencement of the ASST. PROJECT MANAGER :-
work. 4
6. The drawing should be used for its issued purpose 5
only.
FOR REFERENCE FOR SUPPLIERS
FOR TENDER FOR APPROVAL
FOR ESTIMATION FOR CONSTRUCTION
1"X 1" MDF 1" SS "T" STRIP PVD DETAIL -Y
18MM MDF BOARD
COATED INSERTED
IN MDF BY MAKING A 2" 1"
GROOVE MDF MOULDING 1" 2" 1"
WHITE PU FINISH(1" WIDE)
S.S PVD COATED "T"
GOLDEN STRIP(1" WIDE)
DETAIL -Z
1" THK. BORDER
WITH HIGH PU PAINT
2" S.S "T" PVD DRAWER LVL+ 1'-6" DRAWER LVL+ 1'-6" 4" 7" 7" 4"
COATED TRIM 2'
WHITE PU FINISH LVL+ 1'-6" DRAWER DRAWER DRAWER
DRAWER LVL+ 1'-6" LVL+ 1'-6" LVL+ 1'-6"
5MM GROOVE DRAWER LVL+ 1'-6" DRAWER
4" S.S "T" PVD
LVL+ 1'-6"
COATED TRIM 1'-2" 10" 1'-2" 1'-2" 10" 1'-2"
6'-6"
SOLE DETAIL
2' BLOCK PORTION
4'-6" 7'
GOLDEN SPYDER
/GOLDEN STATUARIO
MARBLE
(AS/SELECTION)
SIDE ELEVATION
OF WADROBE
T.V
X
LVL+ 1'-6"
4"
2'-4" 3" 6' 3" 2'-4" 2'-4" 2'
D ELEVATION
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
SION SCHEDULE : 08-09-2019 Mr.Vishal Sharma
ATE : DESCRIPTION : MASTER BEDROOMREV : SCALE : CONSULTANT :
WALL ELEVATIONS VISHAL/KANIKA
NORTH: DESIGNER :
artville
...the creative living...
℄6" 9" B.O.
8'-7" 4" 3'-7" 9'-10
3'-10" 4'-9" 3'-11" B.O
9''-2
9" 9"
1" THICK S
4'-6" 1' 2'-2" WITH COP
5'-5" A CLEAR M
DB
3'-1" EF 7'-5" GLASS
C
LIGHT EM
6" 1'-4" 10" ITALIAN M
10" 2'-8" 4" DARK EM
2' ITALIAN M
2' SHOWER
(AS PER A
6" WHITE OAK LA
FINISH WITH
4'-10" 4" 3'-7"
GR
6" 8'-8" 9" WC(AS PE
4" SKIRTING
B.O.S LAYOUT
9'-10" F
±
B.O.FC 1' 4" 1' 1' 4'-11"
9''-2" B.O.S
HANGING LIGHT NICHE 3'-6" 9'-10"
LIGHT EMPERADOR 8'
ITALIAN MARBLE NICHE B.O.FC
9''-2"
S.S FRAMING(1"X1.5") 3'-6" 1'-4" 1' 4" 5"
DULL GOLD 3' LIGHT IN NICH
DARK EMPERADO
12MM THICK 3" 1'-11" 3'-1" 2'-2"
TOUGHENED GLASS MARBL
NICHE HOLLOW FROM LIGHT EMPERAD
BOTH SIDES ITALIAN MARB
1" THICK(DARK
EMPERADOR MARBLE) WRAPPED AROUND
WRAPPED AROUND IN THE NIC
THE NICHE
DARK EMPERADOR 1" THICK BORD
ITALIAN MARBLE (LIGHT MARB
ON COUNTER TOP LEDGE MADE
F.L CONCRETE, FINIS
±00 WITH WOODEN
DARK EMPERA
ITALIAN MA
F.L
±00
B ELEVATION
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the MASTER TOILET WALL
designer's notice immediately. DRAWN BY : KANIKA ELEVATIONS 1
4. All dimensions should be verified on site by the APPROVED BY: VISHAL 2
contractor. PROJECT MANAGER :-
5. Designers must be informed for any additional 3
information required before commencement of the ASST. PROJECT MANAGER :-
work. 4
6. The drawing should be used for its issued purpose 5
only.
FOR REFERENCE FOR SUPPLIERS
FOR TENDER FOR APPROVAL
FOR ESTIMATION FOR CONSTRUCTION
.S 1'-2"
0"
LVL+3"
O.FC
2" 8'
S.S FRAME 4" 1'-8" 6" DRAWER DRAWER
PPER FINISH LVL+12" LVL+12"
MIRROR A ELEVATION
S DOOR
MPERADOR
MARBLE
MPERADOR
MARBLE
R PANEL
APP)
AMINATE
FINGER
ROOVES
ER APP)
G UNDER
MIRROR
F.L
±00
3'-10" 1' 2'-9" 1' 4" 3'-5"
X
HE HANGING LIGHT
OR WALL TURNING INSIDE
LE
LIGHT EMPERADOR
DOR 1'-2" 2'-7" ENTRY ITALIAN MARBLE
BLE TO DRESS/
D IN NICHE WASHROOM 1" THICK S.S FRAME
CHE LVL . -4" WITH COPPER FINISH
2'-2"
DER LVL . +1'-4" MIRROR
BLE) LVL . +2'
VENEER FRAMIMG
E OF 1'-6" 4" LVL . +2'
SHED DARK EMPERADOR
DETAIL-A MARBLE ON COUNTER
TILE
LIGHT EMPERADOR
ADOR ITALIAN MARBLE ON
ARBLE
DRAWER
GOLDEN FINISH
METAL HANDLE
3'-7" 4" 4'-10" 8" 3'
LIGHT BELOW LEDGE C ELEVATION
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
SION SCHEDULE : 08-09-2019 Mr.Vishal Sharma
ATE : DESCRIPTION : MASTER TOILETREV : SCALE : CONSULTANT :
WALL ELEVATIONS VISHAL/KANIKA
NORTH: DESIGNER :
artville
...the creative living...
8'-7"
DRESSER
3'-7"
MASTER TOILET 7'-5"
(12'-6" x 7'-5")
DARK EMPERADOR
ITALIAN MARBLE
SERPEGGIANTE
MARBLE
FLOORING PLAN 0
B.O.S B.O.S F
9'-10" 9'-10"
B.O.FC
9''-2" B.O.FC
9''-2"
LIGHT BELOW
LEDGE 4'
F.L S.S FRAMING(1"X1.5")
0-0"
DULL GOLD LIGHT
EMPERADOR
1' 12MM THICK ITALIAN
NICHE TOUGHENED GLASS MARBLE
1' 4" 1'
NICHE HOLLOW
FROM BOTH SIDES
8' NICHE 1" THICK(DARK
EMPERADOR MARBLE)
WRAPPED AROUND IN
THE NICHE
3'-6" LIGHT EMPERADOR
ITALIAN MARBLE
1'-4" 10" 3'-1" 2'-2" F.L
±00
E ELEVATION
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the MASTER TOILET WALL
designer's notice immediately. DRAWN BY : KANIKA ELEVATIONS 1
4. All dimensions should be verified on site by the APPROVED BY: VISHAL 2
contractor. PROJECT MANAGER :-
5. Designers must be informed for any additional 3
information required before commencement of the ASST. PROJECT MANAGER :-
work. 4
6. The drawing should be used for its issued purpose 5
only.
FOR REFERENCE FOR SUPPLIERS
FOR TENDER FOR APPROVAL
FOR ESTIMATION FOR CONSTRUCTION
B.O.S DETAIL B
9'-10"
B.O.FC CHANNEL
9''-2"
2' 6" SCREW
SERPEGGIANTE 6"
MARBLE BWP DRAWER
SIDE ELEVATION 1'
OF DRESS DRAWER
DETAIL-B
F.F
0-0" D ELEVATION
4'-5" 1'
9'-2" 8"DETAIL X TALL BOY
9'-10" TAP
3' COUNTER
1' 4" TOP WB
DARK EMPERADOR
2' MARBLE TOP
BOTTLE TRAP
ELEVATION CUTOUT IN DRAWER
FOR BOTTLE TRAP
DATE : DECISION/ DISCUSSION AT SITE:
LIGHT EMPERADOR
SION SCHEDULE : 08-09-2019 MARBLE ON DRAWER
SHUTTER
ATE : DESCRIPTION : MASTER TOILETREV : SCALE : BWP DRAWER
LONG HANGLE WITH
WALL ELEVATIONS GOLDEN METAL FINISH
NORTH: CLIENT :
Mr.Vishal Sharma
CONSULTANT :
VISHAL/KANIKA
DESIGNER :
artville
...the creative living...
B.O.S
9'-10"
B.O.FC 4" 5" 11" 4'-8" 11"
9''-0"
ASIAN ROYAL SHYNE IVORY
COLOR PAINT
WALLPAPER
1" WIDE MDF MOULDING 12'
WITH PU PAINT FINISH DINING AREA
PAINTING PAINTING PAINTING ENTRY TO 12'
PARENT'S BEDROOM
A ELEVA
PAINTING 2' 2' 2'
6" POP FRAME FINISHED 5" 5" 2" 3'-3" 2"4" 6"
WITH WALL PAINT
4" SKIRTING
F.F
0-0"
B.O.S ENTRY 6'-4" 2' FIX ENTRY
9'-10" DRAWING GLASS DRAWING
ROOM FIX ROOM
B.O.FC GLASS
9''-0" 4'-10"
9'
CNC CUTTING 3'-6"
2'-2" 1'-7" 6' 1'
1"X2" COPPER 1'-4" 3'-5" 4'-9"
FINISH S.S FRAME
2'8'
5MM THICK
GLASS 3'-4" 10"
BEVELLED GLASS
ASIAN ROYAL SHYNE
IVORY COLOR PAINT
CONSOLE TABLE
PUFFE
F.F
0-0"
BE
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV DA
3. Any discrepancies should be brought to the PASSAGE WALL
designer's notice immediately. DRAWN BY : KANIKA ELEVATIONS 1
4. All dimensions should be verified on site by the APPROVED BY: VISHAL 2
contractor. PROJECT MANAGER :-
5. Designers must be informed for any additional 3
information required before commencement of the ASST. PROJECT MANAGER :-
work. 4
6. The drawing should be used for its issued purpose 5
only.
FOR REFERENCE FOR SUPPLIERS
FOR TENDER FOR APPROVAL
FOR ESTIMATION FOR CONSTRUCTION
8'-6" ENTRY TO ENTRY TO ℄ 3'-1" CNC CUTTING
9' STAIRWAY GUEST 4" 10" 5'-7" 10" HDF JAALI
BEDROOM 5'-11" ASIAN ROYAL
8' SHYNE IVORY
8'-6" COLOR PAINT
WALLPAPER
9"
WALL LIGHT
1" WIDE MDF
BORDER WITH PU
PAINT FINISH
6" 1' 3'-4" 2" 3'-2" 2"4" 9" 2" 3'-3" 2"
46'
ATION
3" 2' 1'-6" 2" 1'-6" ASIAN ROYAL SHYNE
9'-10" IVORY COLOR PAINT
WALL FOCUS LIGHT
1'-6" X 2'-0" FRAMES
SCULPTURE
KITCHEN ENTRY TO 3" 2' WALL TURNING
POWDER
7'-10" TOILET 2' LVL- -3'-10" ASIAN STUCCO
GREY TEXTURE PAINT
ELEVATION 2'-10" 1'-5" 3'-6" 4" SKIRTING
2'-9"
4"
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
SION SCHEDULE : PASSAGE08-09-2019 Mr.Vishal Sharma
ATE : DESCRIPTION : REV : SCALE : CONSULTANT :
WALL ELEVATIONS VISHAL/KANIKA
NORTH: DESIGNER :
artville
...the creative living...
AB 3'-6" 4" B.O.S LVL- -1'-9"
ENTRY 9'-10"
WALL-C 8'-8"
PASSAGE B.O.FC
9''-0" 8'
C
AB 6" GROOVE
2" DEEP
D WOODEN MAIN
DOOR
IVORY PAINT
8'
3'-3" ENTRANCE F.F
0-0" 1' 3'-4" 1'-1"
5'-5"
C ELEVATION
4'-9"
3'-4"
1'-11"
3'-5"
8'-10"
13'
2'-6" 9"
3'-3" 6" ENTRANCE WALL-B
WALL-A 10' DRESSER
PASSAGE
8'-3" 3'-10"
3'-6"
3'-6"
3'-4"
1'-5" 3'-2"
A' B'
PASSAGE
LAYOUT
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
intellectual property of artville.
2. All dimensions are to be read and not measured. REVISION SCHEDULE : PASSAGE08-09-2019 Mr.Vishal Sharma
3. Any discrepancies should be brought to the
designer's notice immediately. DRAWING TITLE : REV DATE : DESCRIPTION : REV : SCALE : CONSULTANT :
4. All dimensions should be verified on site by the PASSAGE WALL
contractor. POINTS OF CONCERN : ELEVATIONS 1 WALL ELEVATIONS VISHAL/KANIKA
5. Designers must be informed for any additional 2
information required before commencement of the DRAWN BY : KANIKA PROJECT MANAGER :- DESIGNER :
work. APPROVED BY: VISHAL NORTH:
6. The drawing should be used for its issued purpose ASST. PROJECT MANAGER :- artville
only.
...the creative living...
FOR REFERENCE FOR SUPPLIERS 3
FOR TENDER FOR APPROVAL 4
5
FOR ESTIMATION FOR CONSTRUCTION
ENTRY
3" 1'-1"
4" 4' 4"
PASSAGE
LIVING ROOM
(11'-11" x 18'-5")
WOODEN VITRIFIED 13'-3"
TILES 15'-7"
15'-7"
GUEST ROOM DARK EMPERADOR
(13'-11" x 12'-4") ITALIAN
MARBLE
ENTRANCE 2'-4" 9" 3"4"
BEIGE
10" 1'-2" 4' ITALIAN
MARBLE
BEIGE 5'-2"
ITALIAN MARBLE 4" 3" BEIGE
ITALIAN
2" THICK STRIP BEIGE 3" MARBLE
DARK EMPERADOR ITALIAN MARBLE 2'-8"
ITALIAN MARBLE BEIGE
ITALIAN
WOODEN VITRIFIED BEIGE 5'-2" MARBLE
TILES ITALIAN MARBLE 3"
4" 3" 3"4" 2' 3" THICK STRIP
DARK
DINING AREA 3'-9" 5'-2" 3" THICK EMPERADOR
(11'-4" x 13'-5") 4" ITALIAN MARBLE
MANDIR AREA 2" 2"4" 4'-10" 9' STRIP
(4'-8" x 13'-5") 11'-4" PASSAGE 3" THICK STRIP
7'-7" KITCHEN DARK
2" 2" THICK 2" 2" (12'-2" x 10'-0") EMPERADOR
6" 4" 2" STRIP@4"GAP 4" 6" ITALIAN MARBLE
4'-8" 2'-4" 3"
HIGLIGHTER BEIGE
TILES 3"8" 3" ITALIAN
MARBLE
9'
WHITE
2" 3'-5" 5'-10" WASHING AREA 5'-10" MARBLE
3'-9" 4"2" PASSAGE (7'-7" x 5'-10") STATUARIO
MARBLE
POWDER LOO 7'-7"
(4'-5" x 5'-10") BEIGE
ITALIAN MARBLE
4'-5"
3" THICK STRIP
16'-1" 8'-7" DARK
16'-1" EMPERADOR
PARENT'S BEDROOM DRESSER ITALIAN MARBLE
(15'-11" x 11'-5")
3'-7"
7'-5" MASTER TOILET 7'-5"
(12'-6" x 7'-5")
8" 2" 2"2'-6" 4"4"
2'-10"
10" 3" 4"
2"
WOODEN 7' KID'S BEDROOM 4" THICK STRIP
VITRIFIED KID'S TOILET (11'-7" x 15'-2") 3" 4"1' DARK
TILES EMPERADOR
(7'-0" x 15'-2") 11'-7" 4" MASTER BEDROOM 2" 3" 4" ITALIAN MARBLE
1' 3" (12'-6" x 15'-8") 1'
2'-6" WOODEN 9' 2" THICK STRIP
VITRIFIED DARK
TILES EMPERADOR
ITALIAN MARBLE
15'-2" 15'-2" BEIGE
12'-3" ITALIAN MARBLE
6'-6"
4"
1' 3"2"
VITRIFIED WOODEN
DECK TILES
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
intellectual property of artville.
2. All dimensions are to be read and not measured. REVISION SCHEDULE : 08-09-2019 FLOORING DRAWING Mr.Vishal Sharma
3. Any discrepancies should be brought to the
designer's notice immediately. DRAWING TITLE : REV DATE : DESCRIPTION : REV : SCALE : CONSULTANT :
4. All dimensions should be verified on site by the FLOORING DRAWING
contractor. POINTS OF CONCERN : 1 VISHAL/KANIKA
5. Designers must be informed for any additional 2
information required before commencement of the DESIGNER :
work. NORTH:
6. The drawing should be used for its issued purpose artville
only.
...the creative living...
FOR REFERENCE FOR SUPPLIERS DRAWN BY : KANIKA PROJECT MANAGER :- 3
APPROVED BY: VISHAL ASST. PROJECT MANAGER :-
FOR TENDER FOR APPROVAL 4
5
FOR ESTIMATION FOR CONSTRUCTION
2' B.O.S
9'-10"
A B.O.F
DB 9''-0"
C KITCHEN FURNITURE
LAYOUT
(12'-2" x 10'-0")
2'-6" 2'-6"
2'
2'-6"
B.O.S
9'-10"
B.O.FC
9''-0"
CHIMNEY
SIDE SIDE GLASS O
STORAGE STORAGE SHUTTER C
COVE COVE OVERHEAD HIG
CABINETS S
HIGHLIGHTER
TILES
STATUARIO TILES
QUARTZ MARBLE TOP
UNDER COUNTER
STORAGE
SKIRTING
B ELEVATION
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV D
3. Any discrepancies should be brought to the KITCHEN WALL
designer's notice immediately. DRAWN BY : KANIKA ELEVATIONS 1
4. All dimensions should be verified on site by the APPROVED BY: VISHAL 2
contractor. PROJECT MANAGER :-
5. Designers must be informed for any additional 3
information required before commencement of the ASST. PROJECT MANAGER :-
work. 4
6. The drawing should be used for its issued purpose 5
only.
FOR REFERENCE FOR SUPPLIERS
FOR TENDER FOR APPROVAL
FOR ESTIMATION FOR CONSTRUCTION
B.O.S
9'-10"
B.O.FC
9''-0"
NITURE COVE 1' COVE CHIMNEY
YOUT 1'
OVER HEAD
PANTRY MICROWAVE CABINETS
UNIT UNIT HIGHLIGHTER TILES
STATUARIO TILES
A ELEVATION
SKIRTING
B.O.S
9'-10"
B.O.FC
9''-0"
OVERHEAD SIDE 2'-6" TEAK WOOD
CABINETS STORAGE DOOR
STATUARIO
D COVE TILES
S
HIGHLIGHTER ENTRY TO 8' REFRIGIRATOR
TER TILES WASHING SINK
AREA
O TILES STATUARIO AREA
ARBLE TOP TILES
OUNTER
E
SIDE
STORAGE
C ELEVATION
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
REVISION SCHEDULE : KITCHEN08-09-2019 Mr.Vishal Sharma
: REV DATE : DESCRIPTION : REV : SCALE : CONSULTANT :
GER :- 1 WALL ELEVATIONS VISHAL/KANIKA
MANAGER :- 2
DESIGNER :
NORTH:
artville
3
...the creative living...
4
5
3' 5' 5MM GROOVE
DIVIDE IN 16 EQ. PARTS
8' FROSTED
GLASS
1'-11" 5" 6"
3" 3"
3'-4"
3'-4"
INTERNAL DOOR DESIGN
NOTES:
* All the internal doors are 8' high but the width of each door can va
drawing needs to be modified by the contractor according to the dim
* External door dimensions specified above are according to the me
measurements of this door also needs to be modified by the contra
1. This drawing with all its contents is the sole PROJECT : 23,Ramprastha Greens, Gzb. DRAWING NO : REVIS
intellectual property of artville.
2. All dimensions are to be read and not measured. POINTS OF CONCERN : DRAWING TITLE : REV D
3. Any discrepancies should be brought to the
designer's notice immediately. INTERNAL & EXTERNAL DOOR 1
4. All dimensions should be verified on site by the DESIGNS 2
contractor.
5. Designers must be informed for any additional
information required before commencement of the
work.
6. The drawing should be used for its issued purpose
only.
FOR REFERENCE FOR SUPPLIERS DRAWN BY : KANIKA PROJECT MANAGER :- 3
FOR TENDER FOR APPROVAL ASST. PROJECT MANAGER :- 4
5
APPROVED BY: VISHAL
FOR ESTIMATION FOR CONSTRUCTION
3"
7'-7" DIVIDE IN 6 EQ. PARTS
3'
3"
1'-6" 1'-5"
3'-4"
2" 3" 1'
1'
3'-4"
EXTERNAL DOOR DESIGN
door can vary as per actual site measurements...so the above shared
ng to the dimensions.
ng to the measurements achieved before demolition..the
by the contractor according to the actual size achieved after demolition.
DATE : DECISION/ DISCUSSION AT SITE: CLIENT :
REVISION SCHEDULE : INTERNAL &08-09-2019 Mr.Vishal Sharma
: REV DATE : DESCRIPTION : REV : SCALE : CONSULTANT :
ERNAL DOOR
1 EXTERNAL DOOR VISHAL/KANIKA
2
DESIGNS DESIGNER :
NORTH:
artville
GER :- 3
...the creative living...
MANAGER :- 4
5
*NOTES:
* All PU paints and polish of SIRCA make.
* In windows,if safety glasses are there, then no need to
* Saint Gobain safety glass on the window's and outside
* Internal arrangement of all wardrobes to be as/client's r
* All the fabric and paint selections should be according
* Kitchen detail drawings to be as/client's requirements a
o put grille.
e glass doors.
requirements coordinated with modular furniture vendor.
to client's choices and preferences.
and budget coordinated with modular furniture vendor.