PBL Documentations Prepared by Dr. Hafizah Mohamad Hsbollah
BKAS2123 Coordinator

Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by Hafizah Mohamad Hsbollah, 2021-05-31 20:57:42

PBL Documentations

PBL Documentations Prepared by Dr. Hafizah Mohamad Hsbollah
BKAS2123 Coordinator

RizqIT Resources is a custom software development company that specialises in providing the
highest quality IT solution for businesses. The company consists of dedicated group of highly
skilled systems analysts and programmers, aiming at delivering the best custom software
application to its clients. The owner, Mr Rizz started this company with only two staff of
systems analyst and programmer in 2010. The business has expanding and now RizqIT has
employed more than 100 staff. At the moment, RizqIT is committed to train junior systems
analysts to be part of its mentoring project in system development.

The following is the conversation that takes place during a weekly meeting between Mr Rizz
and his five senior systems analysts:

Mr Rizz Hi everyone, welcome back to our meeting series. I am glad to
Mr A, B, C, D and E see you again here… How are you?
Mr Rizz
We are all good…
Mr A
Thanks again for attending this urgent meeting. There are two
things that I want to discuss today. Firstly, the conception that
our team always faces during the system development... and
secondly…. Will tell you later…. so, please Mr. A, presents your
findings as per our discussion last week
Well, thanks Mr Rizz.
As all of you know that we have issue with system development
life cycle problems… Please look into this illustration that I took
from
http://www.umsl.edu/~sauterv/analysis/6840papers_f12/Zhou/i
ndex.html
The diagram really represent our current issues with clients and
team members.
If we don’t overcome this issue, we could not deliver the best for
our client in the future.

1

Mr B I agree. I also faced the same issue, especially when I was dealing with our
Mr C junior analyst. They tend not to listen to the customers…. Always want to do
the system development in the way that they like…. I always have to interfere
Mr A during their session with the clients

Mr D Perhaps younger generation likes to short cut everything to make everything
Mr Rizz faster. After this, please advise all of your young members of systems
analysts to follow our traditional ways of doing the system development. But
Mr E let them know that we have the flexibility in terms of any modeling tools that
they want to use…

Yes, I agree with you Mr C. As senior system analysts, we have to teach and
share with our juniors that every approach in the system development has
pros and cons. But, we at RizqIT Resource maintains to use the traditional
approach as all of the documentation are clear. So, we have proper
documentation along the projects

eh, by the way, Mr Rizz, I heard that we are going to receive several big
projects coming in. Is it true?

Well, yes. This is the second thing that I want to update earlier. We are in the
process of finalising our discussion with several companies for system
development projects. Stay tune everyone…. The projects will landing
shortly… I will assign all of you with the projects details so that all of you
could work on it.. it’s kind of urgent projects…

Wow, that’s great. Happy to hear that… most of our project are all in the last
stage… so we are ready to start with a new one.

2

Mr B Urgent projects? What do you mean?
Mr Rizz
Mr A and D aha… that’s the main reason… we have to finish the task in less than 4
Mr B, C and E months…. Your team are going to prepare a preliminary investigation report
Mr Rizz Well, I think there would be no problem for us to do this… we are always in
this situations, and at the end of the day, we always successful.
Mr C Agree
Mr Rizz
That’s the spirit. I will inform you the details of the project. Don’t forget that
Mr E and B our mentoring project is still on. The aim is to assist our junior analysts to get
Mr A, C, and E new experience and become an expert in system development.
Mr Rizz
Yes, the HR manager has contacted us, informing that we will train new junior
system analysts, the earliest by next week.
I am glad that you all are aware of this mentoring project. All of our senior
analysts, well basically all of you will train them to become as good as you
all… they are going to work with you in the new urgent project that I
informed earlier.. Each of you will receive 2 new groups of junior system
analysts.
No problem. We’ll do our best

You can always depends on us

All good then. Don’t forget to communicate with your team member on what
Mr A informed us at the beginning of the meeting… and wait for my update
for the incoming system development project… Thank you and good day.

3

A series of
MEMO

MEMO-1

TO SYSTEM ANALYSTS TEAM A1
FROM MR A, SENIOR ANALYSTS
DATE OCTOBER 22, 2020

Dear All

I like to inform that your team (A1) will be incharged of this
system development project. You are required to search a
real company as your client.

Assuming that at the moment, the company you have
selected is using manual system, you are required to
propose and develop a new system on cash management.

You have to prepare your preliminary investigation report
and present it to us during the meeting. I will plan to
schedule the meeting in between 6-10 December 2020.

Thank you. +603 234 897
[email protected]
Best regards, 15 Business Diamond Complex

Mr A Kuala Lumpur

~ RizqIT Do IT ALL~

MEMO-1

TO SYSTEM ANALYSTS TEAM A2
FROM MR A, SENIOR ANALYSTS
DATE OCTOBER 22, 2020

Dear All

I like to inform that your team (A2) will be incharged of
this system development project. You are required to search
a real company as your client.

Assuming that at the moment, the company you have
selected is using manual system, you are required to
propose and develop a new system on facilities
maintenance management.

You have to prepare your preliminary investigation report
and present it to us during the meeting. I will plan to
schedule the meeting in between 6-10 December 2020.

Thank you.
Best regards,

Mr A +603 234 897
[email protected]
15 Business Diamond Complex

Kuala Lumpur

~ RizqIT Do IT ALL~

MEMO-1

TO SYSTEM ANALYSTS TEAM B1
FROM MR B, SENIOR ANALYSTS
DATE OCTOBER 22, 2020

Dear All

I like to inform that your team (B1) will be incharged of this
system development project. You are required to search a
real company as your client.

Assuming that at the moment, the company you have
selected is using manual system, you are required to
propose and develop a new system on customer support.

You have to prepare your preliminary investigation report
and present it to us during the meeting. I will plan to
schedule the meeting in between 6-10 December 2020.

Thank you.
Best regards,

MrB +603 234 897
[email protected]
15 Business Diamond Complex

Kuala Lumpur

~ RizqIT Do IT ALL~

MEMO-1

TO SYSTEM ANALYSTS TEAM B2
FROM MR B, SENIOR ANALYSTS
DATE OCTOBER 22, 2020

Dear All

I like to inform that your team (B2) will be incharged of
this system development project. You are required to search
a real company as your client.

Assuming that at the moment, the company you have
selected is using manual system, you are required to
propose and develop a new system on food ordering.

You have to prepare your preliminary investigation report
and present it to us during the meeting. I will plan to
schedule the meeting in between 6-10 December 2020.

Thank you.
Best regards,

Mr B

+603 234 897
[email protected]
15 Business Diamond Complex

Kuala Lumpur

~ RizqIT Do IT ALL~

MEMO-1

TO SYSTEM ANALYSTS TEAM C1
FROM MR C, SENIOR ANALYSTS
DATE OCTOBER 22, 2020

Dear All

I like to inform that your team (C1) will be incharged of this
system development project. You are required to search a
real company as your client.

Assuming that at the moment, the company you have
selected is using manual system, you are required to
propose and develop a new system on customer and
supplier maintenance.

You have to prepare your preliminary investigation report
and present it to us during the meeting. I will plan to
schedule the meeting in between 6-10 December 2020.

Thank you. +603 234 897
Best regards, [email protected]
15 Business Diamond Complex
Mr C
Kuala Lumpur

~ RizqIT Do IT ALL~

MEMO-1

TO SYSTEM ANALYSTS TEAM C2
FROM MR C, SENIOR ANALYSTS
DATE OCTOBER 22, 2020

Dear All

I like to inform that your team (C2) will be incharged of
this system development project. You are required to search
a real company as your client.

Assuming that at the moment, the company you have
selected is using manual system, you are required to
propose and develop a new system on transportation
management.

You have to prepare your preliminary investigation report
and present it to us during the meeting. I will plan to
schedule the meeting in between 6-10 December 2020.

Thank you. +603 234 897
Best regards, [email protected]
15 Business Diamond Complex
Mr C
Kuala Lumpur

~ RizqIT Do IT ALL~

MEMO-1

TO SYSTEM ANALYSTS TEAM D1
FROM MR D, SENIOR ANALYSTS
DATE OCTOBER 22, 2020

Dear All

I like to inform that your team (D1) will be incharged of this
system development project. You are required to search a
real company as your client.

Assuming that at the moment, the company you have
selected is using manual system, you are required to
propose and develop a new system on customer reward .

You have to prepare your preliminary investigation report
and present it to us during the meeting. I will plan to
schedule the meeting in between 6-10 December 2020.

Thank you.
Best regards,

Mr D

+603 234 897
[email protected]
15 Business Diamond Complex

Kuala Lumpur

~ RizqIT Do IT ALL~

MEMO-1

TO SYSTEM ANALYSTS TEAM D2
FROM MR D, SENIOR ANALYSTS
DATE OCTOBER 22, 2020

Dear All

I like to inform that your team (D2) will be incharged of
this system development project. You are required to search
a real company as your client.

Assuming that at the moment, the company you have
selected is using manual system, you are required to
propose and develop a new system on sales agent and
commission.

You have to prepare your preliminary investigation report
and present it to us during the meeting. I will plan to
schedule the meeting in between 6-10 December 2020.

Thank you. +603 234 897
Best regards, [email protected]
15 Business Diamond Complex
Mr D
Kuala Lumpur

~ RizqIT Do IT ALL~

MEMO-1

TO SYSTEM ANALYSTS TEAM E1
FROM MR E, SENIOR ANALYSTS
DATE OCTOBER 22, 2020

Dear All

I like to inform that your team (E1) will be incharged of this
system development project. You are required to search a
real company as your client.

Assuming that at the moment, the company you have
selected is using manual system, you are required to
propose and develop a new system on student course
registration.

You have to prepare your preliminary investigation report
and present it to us during the meeting. I will plan to
schedule the meeting in between 6-10 December 2020.

Thank you. +603 234 897
Best regards, [email protected]
15 Business Diamond Complex
Mr E
Kuala Lumpur

~ RizqIT Do IT ALL~

MEMO-2

TO SENIOR ANALYSTS & TEAMS
FROM MR RIZZ
DATE NOVEMBER 23, 2020

Dear all senior analysts

With reference to the discussion during our last meeting, on
behalf of the top management, I grant the permission to
continue the ANALYSIS and DESIGN phases for the
system project development. Please communicate this
information with your team.

You need to prepare the ANALYSIS and DESIGN phases
report of the project development and submit it on 6/7
January 2020. Management requires that the design of the
system contains the appropriate menus. You are given the
flexibility to construct the sub-menus under each menu. You
can also include more menus (if any) based on your
database design.

Thank you. +603 234 897
[email protected]
Best regards, 15 Business Diamond Complex

Rizz Kuala Lumpur

~ RizqIT Do IT ALL~

MEMO-3

TO SENIOR ANALYSTS & TEAMS
FROM MR RIZZ
DATE DECEMBER 30, 2020

Dear all senior analysts

With reference to Memo 2, all senior analysts must ensure
the teams that you are currently supervising to do the
followings
:

1.Prepare an entity relationship diagram to model the
data requirement relevant to the proposed system using
Ms Access. Make sure the business rule/policy in regard
to data design is clear.

2.Make sure their design follows the Handbook for User
Interface Design. Ask them to check the notes on 7
habits of seccessful interface design.

3.Design appropriate input and output screens for the
new system

4. Make sure that the design could help the user to key-in
the data efficiently and produce report effectively

Thank you.

Best regards, +603 234 897
[email protected]
Rizz 15 Business Diamond Complex

Kuala Lumpur

~ RizqIT Do IT ALL~

A series of
EMAILS

From Rizz ([email protected])
To Mr A ([email protected]); Mr B ([email protected]); Mr C
([email protected]); Mr D ([email protected]); Mr E ([email protected])
Subject Mentoring project and team information

Dear all senior system analyst,

As per discussion in our last meeting, each of senior systems analysts
is assigned with two groups for the mentoring project.

The group arrangements are as follows:
Mr A – Team A1 and A2
Mr B – Team B1 and B2
Mr C – Team C1 and C2
Mr D – Team D1 and D2
Mr E – Team E1 and E2

Herewith attached is the junior system analysts that will be joining
your team.

All the best!

Sincerely yours
Rizz

Team A1 Attachment

No Matric No Name
1 269663 Leo Zhen Yuan
2 273387 Nur Aynissa Nabila Binti Nazrulaimi
3 273392 Tharshini A/P Ravi
4 273448 Amni Ruqayyah Binti Mohd Rosli
5 272430 Noor Siti Fazilah Binti Abu Bakar

Team A2 Name
Saw Weng Guan
No Matric No Liu Guoqing
1 269724 Siti Nurhafizah Binti Shukri
2 256864 Nurul Fatin Nadia Binti Rosle
3 264363 Siti Nur Syazana Binti Mat Dahari
4 264893
5 272623 Name
Ching Kah Sheng
Team B1 Tan Li Na
Vinothini A/P A Thanigasalam
No Matric No Nor Shasleen Asyhrani Binti Ismail
1 270291 Natasha Binti Mohd Saupe
2 269673
3 263938 Name
4 248124 Lau Foo Qui
5 273080 Christina Won Yuet Yee
Nur Nabilah Binti Shaik Abdul Jalil
Team B2 Nur Izzati Binti Tarmizi
Nurwati Amirah Binti Abdul Halim
No Matric No
1 270698 Name
2 270848 Ooi Wei Kean
3 272115 Tan Sze Tao
4 272193 Tuan Nur Athiya Binti Tuan Rosli
5 272586 Nur Sharafana Binti Zulkarnain
Nurul Safiah Binti Salehudin
Team C1

No Matric No
1 272384
2 271923
3 272373
4 273726
5 272716

Team C2 Name
Law Yue Teng
No Matric No Darunee A/P Si Cha Ren
1 272331 Yvone Yong
2 272959 Adwa Nasuha Binti Azahar
3 272357 Nursazwina Sahira Binti Mohd Sabri
4 273411
5 272464 Name
Tan Pei Ming
Team D1 Nursyafiqah Binti Hapiz
Nur Syafiqah Binti Soobri
No Matric No Maryam Insyirah Binti Che Sobry
1 273812 Nur Atasha Izlin Binti Rohaizi
2 273688
3 273682 Name
4 273747 Ng Lai Yee
5 273476 Izzah Anisah Binti Norazhar
Nur Qamarina Binti Mohamad Kamal
Team D2 Nur Fatin Najwa Binti Mohd Ridzuwan
Alwa Malek Mohammed Hamood
No Matric No
1 272160 Name
2 272376 Nur Rasyidatul Husna Binti Rohijan
3 264774 Ooi Kok Liang
4 273441 Nur Khamsiah Binti Mohd Yusof
5 252115 Suraya Binti Ismail

Team E1

No Matric No
1 273978
2 271482
3 273386
4 273423
5

From Mr A ([email protected])
To Team A1 & A2
Subject Performing Preliminary Investigation

Dear all system analyst,

Thank you for your hard work. I believe that you have a better
understanding on the new systems development project. Remember
that the project is important as it will help the company to improve its
business process and operations. Now the challenge begins. As a
system analysts team for this project, I would like you all to

1. Describe the project scope and constraints.
2. Perform fact findings

If you encounter any issue, please do not hesitate to contact me

Sincerely yours
Mr. A

From Mr B ([email protected])
To Team B1 & B2
Subject Performing Preliminary Investigation

Dear all system analyst,

Thank you for your hard work. I believe that you have a better
understanding on the new systems development project. Remember
that the project is important as it will help the company to improve its
business process and operations. Now the challenge begins. As a
system analysts team for this project, I would like you all to

1. Describe the project scope and constraints.
2. Perform fact findings

If you encounter any issue, please do not hesitate to contact me

Sincerely yours
Mr. B

From Mr C ([email protected])
To Team C1 & C2
Subject Performing Preliminary Investigation

Dear all system analyst,

Thank you for your hard work. I believe that you have a better
understanding on the new systems development project. Remember
that the project is important as it will help the company to improve its
business process and operations. Now the challenge begins. As a
system analysts team for this project, I would like you all to

1. Describe the project scope and constraints.
2. Perform fact findings

If you encounter any issue, please do not hesitate to contact me

Sincerely yours
Mr. C

From Mr D ([email protected])
To Team D1 & D2
Subject Performing Preliminary Investigation

Dear all system analyst,

Thank you for your hard work. I believe that you have a better
understanding on the new systems development project. Remember
that the project is important as it will help the company to improve its
business process and operations. Now the challenge begins. As a
system analysts team for this project, I would like you all to

1. Describe the project scope and constraints.
2. Perform fact findings

If you encounter any issue, please do not hesitate to contact me

Sincerely yours
Mr. D

From Mr E ([email protected])
To Team E1
Subject Performing Preliminary Investigation

Dear all system analyst,

Thank you for your hard work. I believe that you have a better
understanding on the new systems development project. Remember
that the project is important as it will help the company to improve its
business process and operations. Now the challenge begins. As a
system analysts team for this project, I would like you all to

1. Describe the project scope and constraints.
2. Perform fact findings

If you encounter any issue, please do not hesitate to contact me

Sincerely yours
Mr. E

From Mr A ([email protected])
To Team A1 & A2
Subject Fact-Finding

Dear all system analysts,

Good news. You’ve gotten off to great start at your client’s company. I am so
proud with all of you. Now I want you to use a structured approach with plenty of
modeling and documentation. Your first step is to hold a JAD session. Let me know
the member of the JAD team. Be sure to send me a copy.

You have to decide on the people to interview, set interview objectives and
prepare for, conduct and analyse interviews. I'd appreciate if you do a survey of
former and prospective customers (or existing employees) to get some input on
the new system and help you to decide the best for the new system. In addition,
we should ask former customers (or existing employees) what they liked and what
areas could be improved.

I know you'll be meeting with the JAD group. Try to make the questionnaire easy
to read, easy to understand, and easy to tabulate. If you have any questions, please
let me know. One more thought about the questionnaire -- we can't send it to
everyone, so we need a representative sample that will provide the best results.
What kind of sampling technique would you suggest? I want to get a valid cross-
section of opinions. Please send me a recommendation together with an
explanation of your reasoning.

Be sure to use the findings to prepare the system requirement checklist.

If you encounter any issue, please do not hesitate to contact me

Sincerely yours
Mr. A

From Mr B ([email protected])
To Team B1 & B2
Subject Fact-Finding

Dear all system analysts,

Good news. You’ve gotten off to great start at your client’s company. I am so
proud with all of you. Now I want you to use a structured approach with plenty
of modeling and documentation. Your first step is to hold a JAD session. Let me
know the member of the JAD team. Be sure to send me a copy.

You have to decide on the people to interview, set interview objectives and
prepare for, conduct and analyse interviews. I'd appreciate if you do a survey of
former and prospective customers (or existing employees) to get some input on
the new system and help you to decide the best for the new system. In addition,
we should ask former customers (or existing employees) what they liked and
what areas could be improved.

I know you'll be meeting with the JAD group. Try to make the questionnaire
easy to read, easy to understand, and easy to tabulate. If you have any
questions, please let me know. One more thought about the questionnaire -- we
can't send it to everyone, so we need a representative sample that will provide
the best results. What kind of sampling technique would you suggest? I want to
get a valid cross-section of opinions. Please send me a recommendation
together with an explanation of your reasoning.

Be sure to use the findings to prepare the system requirement checklist.

If you encounter any issue, please do not hesitate to contact me

Sincerely yours
Mr. B

From Mr C ([email protected])
To Team C1 & C2
Subject Fact-Finding

Dear all system analysts,

Good news. You’ve gotten off to great start at your client’s company. I am so
proud with all of you. Now I want you to use a structured approach with plenty
of modeling and documentation. Your first step is to hold a JAD session. Let me
know the member of the JAD team. Be sure to send me a copy.

You have to decide on the people to interview, set interview objectives and
prepare for, conduct and analyse interviews. I'd appreciate if you do a survey of
former and prospective customers (or existing employees) to get some input on
the new system and help you to decide the best for the new system. In addition,
we should ask former customers (or existing employees) what they liked and
what areas could be improved.

I know you'll be meeting with the JAD group. Try to make the questionnaire
easy to read, easy to understand, and easy to tabulate. If you have any
questions, please let me know. One more thought about the questionnaire -- we
can't send it to everyone, so we need a representative sample that will provide
the best results. What kind of sampling technique would you suggest? I want to
get a valid cross-section of opinions. Please send me a recommendation
together with an explanation of your reasoning.

Be sure to use the findings to prepare the system requirement checklist.

If you encounter any issue, please do not hesitate to contact me

Sincerely yours
Mr. C

From Mr D ([email protected])
To Team D1 & D2
Subject Fact-Finding

Dear all system analysts,

Good news. You’ve gotten off to great start at your client’s company. I am so
proud with all of you. Now I want you to use a structured approach with plenty
of modeling and documentation. Your first step is to hold a JAD session. Let me
know the member of the JAD team. Be sure to send me a copy.

You have to decide on the people to interview, set interview objectives and
prepare for, conduct and analyse interviews. I'd appreciate if you do a survey of
former and prospective customers (or existing employees) to get some input on
the new system and help you to decide the best for the new system. In addition,
we should ask former customers (or existing employees) what they liked and
what areas could be improved.

I know you'll be meeting with the JAD group. Try to make the questionnaire
easy to read, easy to understand, and easy to tabulate. If you have any
questions, please let me know. One more thought about the questionnaire -- we
can't send it to everyone, so we need a representative sample that will provide
the best results. What kind of sampling technique would you suggest? I want to
get a valid cross-section of opinions. Please send me a recommendation
together with an explanation of your reasoning.

Be sure to use the findings to prepare the system requirement checklist.

If you encounter any issue, please do not hesitate to contact me

Sincerely yours
Mr. D

From Mr E ([email protected])
To Team E1
Subject Fact-Finding

Dear all system analysts,

Good news. You’ve gotten off to great start at your client’s company. I am so
proud with all of you. Now I want you to use a structured approach with plenty
of modeling and documentation. Your first step is to hold a JAD session. Let me
know the member of the JAD team. Be sure to send me a copy.

You have to decide on the people to interview, set interview objectives and
prepare for, conduct and analyse interviews. I'd appreciate if you do a survey of
former and prospective customers (or existing employees) to get some input on
the new system and help you to decide the best for the new system. In addition,
we should ask former customers (or existing employees) what they liked and
what areas could be improved.

I know you'll be meeting with the JAD group. Try to make the questionnaire
easy to read, easy to understand, and easy to tabulate. If you have any
questions, please let me know. One more thought about the questionnaire -- we
can't send it to everyone, so we need a representative sample that will provide
the best results. What kind of sampling technique would you suggest? I want to
get a valid cross-section of opinions. Please send me a recommendation
together with an explanation of your reasoning.

Be sure to use the findings to prepare the system requirement checklist.

If you encounter any issue, please do not hesitate to contact me

Sincerely yours
Mr. E