The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by amal_azizan, 2018-12-16 04:35:21

1-43

1-43

ARCHITECTURE
PORTFOLIO //
2013 - 2018

Amalina Azizan



01 – 02 RUMAH KENANGA, RAWANG
// 2017 - 2018
03 – 04
CORNER LOT HOUSE
05 RENOVATION, CHERAS // 2018
06
07 - 10 CAT HOUSE, CHERAS // 2018

11 - 14 BBQ STATION, CHERAS // 2018

15 – 16 CORNER LOT HOUSE
RENOVATION, RAWANG // 2018
17
18 SEMI-D HOMESTAY, RAWANG
// 2018

SEMI-D HOUSING UNIT,
KUALA TERENGGANU // 2018

3 UNITS VILLA, SUNGKAI // 2017

WATER GARDEN AIR WELL,
PUNCAK ALAM // 2017 – 2018

19 IIUM WAQF ‘ILM // 2018

20 ISLAND KITCHEN FOR RUMAH
KENANGA // 2018

21 - 28 THE URBAN POLYTECHNIC OF
29 - 32 PETALING STREET // 2016
33 - 34
35 – 36 OFFICE TOWER, JALAN IMBI
37 - 38 // 2015

ECO CAFE, UNIVERSITY OF
MALAYA // 2015

STUDENT HOUSING, UNIVERSITY
OF MALAYA // 2014

TRAVELLERS HOTEL,
KUALA LUMPUR // 2013

RUMAH A private residential for a family of 6, located at the small valley in
KENANGA, Kampung Kenanga, Rawang, The double storey bungalow consists of
RAWANG // 6 bedrooms and 4 bathrooms, double volume living room surrounded
2017-2019 by fish pond, wet and dry kitchen connected directly to dining area,

STAGE : UNDER CONSTRUCTION as well as private swimming pool next to master bedroom. The
project is expected to complete on March 2019.

FRONT ELEVATION SIDE ELEVATION

// 01

Rumah Kenanga, Rawang // 02

CORNER LOT HOUSE
RENOVATION, CHERAS
// 2018

STAGE : COMPLETED

Preliminary Sketches

// 03

Corner Lot House Renovation, Cheras // 04

CAT HOUSE,
CHERAS //
2018

STAGE : COMPLETED

Cat House, Cheras // 05

BBQ STATION,
CHERAS //
2018

STAGE : COMPLETED

BBQ Station, Cheras // 06

CORNER LOT HOUSE
RENOVATION,
RAWANG //
2018

STAGE : IDEA

EXISTING
FAMILY HALL

NEW EXTRA
BEDROOM

BALCONY

NEW MASTER NEW MASTER
BATHROOM BEDROOM

FIRST FLOOR PLAN
TOTAL NEW BUILT AND

EXTENDED AREA :
48.97 m2 (527 sqft)

* Renovation of existing master
bedroom for a new extra bedroom.

The new master bedroom and
bathroom are built above the car

porch. There is a long verandah
facing the side road attached to the
new master bedroom and family area.

// 07

OPTION 1

Corner Lot House Renovation, Rawang // 08

OPTION 2

// 09

OPTION 3

Corner Lot House Renovation, Rawang // 10

SEMI-D
HOMESTAY,
RAWANG //
2018

INTERIOR DESIGN PROJECT
STAGE : IDEA

GROUND FLOOR 1ST
1. MAIN ENTRANCE PROPOSAL
2. RECEIVING SPACE
8 19
with console table 7 17
3. LIVING ROOM as
10 9 6 18
gathering area 11 4 12
4. TV AREA as family
5
area
5. GARDEN ENTRANCE 3 13
6. DINING AREA & 2 14
15
PANTRY 1
7. WET KITCHEN with 16

washing machine
8. STORE reserved for

owner
9. UTILITY AREA for

guest used
10. BATHROOM 1
11. BEDROOM 1 for 2 pax

UPPER FLOOR
12. FAMILY AREA with

beds for 3 pax
13. MASTER BEDROOM

for 2 to 4 pax
14. MASTER BATHROOM
15. STORAGE for extra

mattresses (2 pax)
16. OUTDOOR BALCONY
17. BEDROOM 3 for 2 pax
18. BEDROOM 4 for 2 pax
19. BATHROOM 2

TOTAL NO. OF GUEST :
13 – 15 GUESTS

GROUND UPPER
FLOOR FLOOR

// 11

LIVING
ROOM

Living room (ground floor)

TV
AREA

TV area (ground floor)

Semi-D Homestay, Rawang // 12

KPDAPDAIAKTIARWIRNCNINENETWIEIAHCANTTTRREEHG&&YYNTEN

Dining area (ground floor)

WET
KITCHEN

Wet kitchen (ground floor)

// 13

MASTER
BEDROOM

FAMILY
AREA

Family area (upper floor)

Semi-D Homestay, Rawang // 14

SEMI-D HOUSING UNIT,
KUALA TERENGGANU //
2018

STAGE : IDEA

// 15

Semi-D Housing Unit, Kuala Terengganu // 16

WATER GARDEN
AIR WELL,
PUNCAK ALAM //
2017-2018

STAGE : COMPLETED

Water Garden Air Well, Puncak Alam // 17

3 UNITS VILLA,
SUNGKAI //
2017

STAGE : IDEA

3 Units Villa, Sungkai // 18

ISLAND KITCHEN
FOR RUMAH
KENANGA //
2018

PRODUCT DESIGN
STAGE : UNDER CONSTRUCTION

Island Kitchen for Rumah Kenanga // 19

IIUM WAQF ‘ILM ENGRAVED TEXT
// 2018 ON TIMBER
PANEL
PRODUCT DESIGN
STAGE : COMPLETED

TRANSPARENTAC
RYLIC A3 POSTER
PANEL

MILD STEEL
STRUCTURE

DECORATIVE
ACRYLIC PANEL
ON TRANPARENT
ACRYLIC BOX

IIUM Waqf ‘Ilm // 20

THE URBAN
POLYTECHNIC OF
PETALING STREET //
2016

RIBA President’s Medal 2016 :
Selected Entry

// 21

The Urban Polytechnic of Petaling Street // 22

// 23

The Urban Polytechnic of Petaling Street // 24

// 25

The Urban Polytechnic of Petaling Street // 26

// 27

The Urban Polytechnic of Petaling Street // 28

OFFICE TOWER,
JALAN IMBI //
2015

4TH YEAR, SEMESTER 2

1 2 3 4
vertical internal external
zoning elevated circulation circulation
tower

5 6 7 8
lift core auditorium double skin
break tank

9 10 11 12
building rainwater green
overhang solar harvesting pocket
panel
// 29

Office Tower, Jalan Imbi // 30

// 31

Office Tower, Jalan Imbi // 32

ECO CAFE, The project explores the design of a sustainable low technology building.
UNIVERSITY OF The ”off the grid” cafe should be thermally comfortable by passive design
MALAYA //
2015 strategy, renewable of the heat waste and solar energy, self-sufficient
and non-reliant on some main public infrastructures, generating its own
4TH YEAR, SEMESTER 2 sources of energy, harvesting and purifying waste and rain water for own

water supply, and able to grow its own food supply.

// 33

Eco Cafe, University of Malaya // 34

STUDENT HOUSING,
UNIVERSITY OF
MALAYA //
2014

4TH YEAR, SEMESTER 1 :
GROUP PROJECT

SECTION

// 35

Student Housing, University of Malaya // 36

TRAVELLERS HOTEL,
KUALA LUMPUR //
2013

3TH YEAR, SEMESTER 2 :
FINAL PROJECT

// 37

Travellers Hotel, Kuala Lumpur // 38



Graduate Architect

+6019 759 5771
[email protected]
No. 10, Jalan KE 2/2, Amethyst 2
Kota Emerald, 48000 Rawang
Selangor Darul Ehsan, Malaysia


Click to View FlipBook Version