WZS BinaRaya Company Profile

WZS BinaRaya Company Profile

WZS Binaraya Sdn. Bhd.

(A wholly owned subsidiary of WZ Satu Bhd)
LEVEL 9, BLOCK 4, MENARA TH PLAZA SENTRAL,
JALAN STESEN SENTRAL 5, KL SENTRAL,
50470 KUALA LUMPUR
PHONE : 603-8964 6000 FAX : 603-8964 6001
EMAIL : [email protected]

COMPANY PROFILE

1

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

ABOUT US WZS Binaraya Sdn Bhd [Registration No. 200701015682 (773689-D)] (“Binaraya”)
is a wholly owned subsidiary of WZ Satu Berhad, a Bumiputra controlled public
listed company. Binaraya is a 4 Star Scoring Bumiputra civil engineering and
building contractor, registered under G7 with the Construction Industry
Development Board (“CIDB”) and holds a Grade C1 (Bekalan Air) license with
Suruhanjaya Perkhidmatan Air Negara (“SPAN”). Binaraya obtained its quality
standard recognition, achieving its ISO 9001 certification since 2012 and is highly
committed to fulfilling our Clients’ quality expectations.

Binaraya has a paid up capital of RM46.5 million. Since its establishment in 2008 ,
it has completed numerous structural and civil infrastructural projects totalling to
RM1.4billion. Currently, Binaraya has an outstanding order book of approximately
RM400 Million.

Binaraya is supported by a strong and highly experienced management team
comprising people with a wealth of technical experience of handling major
projects and possessing advanced machinery to enable it to undertake various
complex engineering projects. Binaraya is committed to contributing positively to
the construction industry, always providing innovative solutions and providing
construction services of the highest quality in a safe and responsible manner.

2

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPANY Company Name : WZS BINARAYA SDN BHD
INFORMATION Company Reg. No. : 200701015682 (773689-D)
Business Address : Level 9, Block 4, Menara TH Plaza Sentral,
Jalan Stesen Sentral 5, KL Sentral,
Contact Information : 50470 Kuala Lumpur
Telephone :
Facsimile : 603-8964 6000
E-mail : 603-8964 6001
Website [email protected]
www.wzsbinaraya.com
Holding Company :
Date of Incorporation : WZ Satu Berhad
Type of Business : 17 May 2007
Authorised Capital : Construction of Building and Civil Engineering Works
Paid-Up Capital : RM106,500,000.00
Board of Directors : RM106,500,000.00
1) Tan Sri Dato’ Sri Mohamad Norza Bin Zakaria
Company Secretary : 2) Tengku Dato’ Sri Uzir bin Tengku Dato’ Ubaidillah
Company Auditor : 3) En. Suhaimi Bin Badrul Jamil
Financial Banker :
Securities Services (Holdings) Sdn Bhd
Certification : Baker Tilly Monteiro Heng PLT
United Overseas Bank (M) Berhad , OCBC Bank (Malaysia) Berhad,
Citibank Berhad , AFfin Bank Berhad
Sijil Kontraktor Kerja (Taraf Bumiputera)
CIDB Grade G7
DAS Certification ISO 9001:2015

3

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

ORGANISATION
CHART

4

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

CURRENT PROJEK PENSWASTAAN LEBUHRAYA BERTINGKAT SUNGAI BESI - ULU KELANG PACKAGE
PROJECTS SUKE CB2 - CONSTRUCTION AND COMPLETION OF MAINLINE AND OTHER ASSOCIATED
WORKS FROM CH. 15000 TO CH. 16700

Project Value : RM63 mil
Contract Duration : 12 Months
Main Sub-Contractor : Hasrat Sedaya Sdn Bhd
Main Contractor : Zelan - Hasrat Sedaya Consortium
Client : Turnpike Synergy Sdn Bhd

The project consists of pre-casting and launching of crosshead beam segments and alpha-beams,
over total length of 1.7km viaduct. Key challenges in this project is pre-casting of hollow box type
segmental crosshead beams, and launching the precast elements on tall piers of approximately
33m above ground.

1.

5

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

CURRENT MEMBINA PERSIMPANGAN BERTINGKAT DARI LEBUHRAYA TAPAK CADANGAN
PROJECTS PEMBANGUNAN BERCAMPUR DI ATAS LOT 68054 (PT8959), MUKIM TANJONG 12, DAERAH
KUALA LANGAT, DAN DUA JEJAMBAT MERENTASI LEBUHRAYA, OLEH TETUAN GAMUDA
LAND (T12) SDN BHD

Project Value : RM68 mil
Contract Duration : Section 1 - 12 Months , Section 2 - 12 Months

Main Contractor : Mujur Minat Sdn Bhd
Client : Gamuda Land (T12) Sdn Bhd

The project consists of 2 sections as follows:
Section 1 - approximately 1km two-lane carriageway bridge structure.
Section 2 - approximately 0.82km dual two carriageway bridge structure.
The project comprises of reinforced concrete spine beam and box girder bridge across ELITE
Highway. The box girder spans at maximum length of 64m across ELITE Highway, and are
constructed in-situ by balanced cantilever method.

2.

6

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

CURRENT CADANGAN PEMBANGUNAN PERUMAHAN DI ATAS LOT PT 98631 HINGGA PT 98642 DAN PT
PROJECTS 98650 HINGGA PT 99958 (FASA 1) DAN PT 98629 HINGG PT 98630, PT 99191 HINGGA PT 99760
DAN PT 99958 (FASA 2), BENUH RENDANG, MUKIM KUALA KUANTAN, DAERAH KUANTAN,
PAHANG DARUL MAKMUR - BUILDING & INFRASTRUCTURE WORKS

Project Value : RM73.5 mil
Contract Duration : 24 Months
Main Contractor : Sinergi Dayang Sdn Bhd
Client : PR1MA Corporation Malaysia

The project consists of 2 phases as follows includes the construction of all the infrastructure
works.
Phase 1 - 217 units of double-storey and 306 units of single-storey terrace houses
Phase 2 - 763 units of double-storey terrace houses

3.

7

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

CURRENT DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION, TESTING,
PROJECTS COMMISSIONING AND MAINTENENANCE OF THE ELECTRIFIED DOUBLE TRACK FROM
GEMAS TO JOHOR BAHRU
- BRIDGE WORKS FOR SECTION 2 – GENUANG TO PALOH (CH605.550 – CH647.900)

Project Value : RM133.5 mil
Contract Duration : 17 Months
Main Contractor : Syarikat Pembenaan Yeoh Tiong Lay Sdn Bhd
Client : Keretapi Tanah Melayu Berhad

The scope of work involves the construction of 18 structures from substructure to super-
structure. Out of the 18 structures, 17 are bridges, which consist of 10 river bridges (BRV), 6
road over bridges (ROB), 1 road under bridge (RUB) and 1 vehicular box culvert. The
structures are located in different locations from North to South approximately 40km.

4.

8

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

CURRENT DESIGN, CONSTRUCTION, SUPPLY, INSTALLATION, COMPLETION, TESTING,
PROJECTS COMMISSIONING AND MAINTENENANCE OF THE ELECTRIFIED DOUBLE TRACK FROM
GEMAS TO JOHOR BAHRU
- BRIDGE WORKS FOR SECTION 4 – RENGGAM TO KULAI (CH690.150 – CH724.700)

Project Value : RM102 mil
Contract Duration : 12 Months
Main Contractor : Syarikat Pembenaan Yeoh Tiong Lay Sdn Bhd
Client : Keretapi Tanah Melayu Berhad

The scope of work involves the construction of 18 structures from substructure to super-
structure. Out of the 18 structures, 17 are bridges, which consist of 10 river bridges (BRV), 6
road over bridges (ROB), 1 road under bridge (RUB) and 1 vehicular box culvert. The
structures are located in different locations from North to South approximately 40km.

5.

9

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

CURRENT CONSTRUCTION OF EARTHWORKS AND INFRASTRUCTURE WORKS FOR KEDAH RUBBER
PROJECTS CITY (KRC) PHASE 1 (PACKAGE 1) AT LOT PT 2192, MUKIM PADANG TERAP KIRI, DAERAH
PADANG TERAP, KEDAH DARUL AMAN

Project Value : RM122 mil
Contract Duration : 12 Months
Client : Northern Corridor Implementation Authority (NCIA)

The project involved 3,200,000 cu.m of earth fill to prepare platform for Kedah Rubber City. It also
includes the construction of infrastructure works, ground water tank and upgrading of 2 rivers.

6.

10

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED THE CONSTRUCTION AND COMPLETION OF WEST COAST EXPRESSWAY FOR PACKAGE
PROJECTS WORKS FOR SECTION 3, 4, 5, 8 AND 9
THE CONSTRUCTION AND COMPLETION OF PART OF WEST COAST EXPRESSWAY SECTION 9
MAINLINE WORKS FROM KG. LEKIR INTERCHANGE TO CHANGKAT CERMIN INTERCHANGE

Project Value : RM499 mil
Contract Duration : 40 Months
Main Contractor : IJM Construction Sdn. Bhd.
Client : West Coast Expressway Sdn. Bhd.

The project is Section 9 of West Coast Expressway, which is from Kg. Lekir Interchange to Changkat
Cermin Interchange. The 30km of 2-lane dual carriageway consisting of 4 interchanges, 13 ROB
(Road Over Bridge) and 6 RUB (Road Under Bridge).

11

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED PRIVATISATION OF LEBUHRAYA PERSISIRAN PANTAI BARAT (TAIPING – BANTING)
PROJECTS CONSTRUCTION AND COMPLETION OF PART OF CIVIL WORKS FOR SECTION 10 - CHANGKAT
CERMIN INTERCHANGE TO BERUAS INTERCHANGE

Project Value : RM181 mil
Contract Duration : 30 Months
Main Contractor : Q Bena – Prisma Simfoni JV
Client : West Coast Expressway Sdn Bhd

This project consists of the construction of 20km of West Coast Expressway, which is from Changkat
Cermin Interchange to Beruas Interchange. The project involved 3.20Mil cu.m earthworks and 5
bridges.

12

WZS BINARAYA SDN BHD OUR WATER RELATED PROJECTS

(A wholly owned subsidiary of WZ Satu Bhd)

We specialize in the design, engineering, construction, installation, testing and
commissioning of water and ancillary services . Among the major projects we have
successfully completed are:

Design and construction of water tank and
installation of water pipes :

i) Water reticulation system involving the supply and
lay of m.s. water pipe ranging from 150mm diameter
to 450mm diameter pipe in a total length of 8.7km.

ii) Construction of 570,000 gallon elevated water tank
and 190,000 gallon suction tank

For a housing development project in Kuantan, Pahang.

Relocation of water pipes:
The water works in this project includes relocation of water pipe ranging from
1200mm diameter to 300mm pipe at 8 locations with line stop connection.
Part of the major works include pipe jacking thru existing Ipoh-Lumut
Highway with a total length of 450m. Various piping material were used in
conjunction with the existing pipes, ie M.S. pipe, ductile iron pipe and uPVC
pipes.The value of works is approximately RM42.0 Million.
For the West Coast Expressway Sdn Bhd.

13

WZS BINARAYA SDN BHD The diversion and relocation of water pipes:
This project requires the diversion and relocate of MS pipes for
(A wholly owned subsidiary of WZ Satu Bhd) a length of 1km for Lembaga Air Perak in a value of works
approximately RM3.0 Million.
Construction of water tank and the supply and For the West Coast Expressway Sdn Bhd
laying of water pipes:
The water works includes: 14
i) Supply and laying m.s. water pipe ranging from

300mm diameter to 900mm diameter pipe and
pipejacking of 900mm diameter pipe
ii) Construct 12million litter capacity R.C. ground
water tank.

Supply and laying of water pipes :
The water related works in this project is supply and
lay 600mm diameter MS pipe in a length of 3.0km
including pipe rack for river crossing. The value of
water works is RM2.0 Mil.
For the East Coast Economic Region Development
Council project

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

Construction of sewerage treatment plant and elevated
water tank and the supply and laying of water pipes:

The project involved 700,000 cu.m of earth fill to prepare
platform for Pasir Mas Halal Park. It also includes the
construction of infrastructure works, 6,500PE sewerage
treatment plant and elevated water tank with the capacity
of 250,000 gallons.
The works related to water are including:
i) Supply and lay of 4.7km m.s. pipe and HDPE pipe
ii)Construct of 250,000 gallons elevated water tank and 7,000

gallons suction tank c/w pump house, pump sets, control
panel, valves, specials and telemetric systems

Relocation of water pipes:
This project requires the relocation of water pipes ranging
from 150mm diameter to 800mm diameter m.s. water
pipe complete with associated valves, fittings and
other ancillary works. The value of water works involved
is RM6.0 Mil.
For the For the East Coast Economic Region
Development Council project

15

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

Construction of water tank, supply & laying of water
pipes and pipe jacking:

The scope of works of water works in this project
includes:-
i) The construction of 2.0mil gallon R.C. elevated water

tank
ii) Supply and lay of 600mm diameter m.s. water pipe

in a total length of 10km.
iii) Pipe jacking work of 1600mm diameter water pipe

crossing the main Jabor road.

Design and construction of sewerage treatment plant,
and water tank :
This project consists of 1.10Mil cu.m sand fill, infrastructure
works, 20,000PE sewerage treatment plant and elevated
water tank with the capacity of 250k gallons.
The laying of approximately 3.8km m.s. water pipe ranging from
200mm diameter to 300mm diameter pipe to provide water to
the industrial area. An elevated water tank has been constructed
to store 250k gallons water for the usage of the industrial park.
A suction tank c/w pump house with 165m3/hr pumps sets,
Magflow Meter, Control Panel and all electrical and mechanical
system was installed. The value of water services is amounting
to RM10 Million.

16

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED THE PROPOSED CONSTRUCTION AND COMPLETION OF THE KPC PORT LINK ROAD IN
PROJECTS KUANTAN PORT CITY, PAHANG DARUL MAKMUR FOR THE EAST COAST ECONOMIC REGION
DEVEPLOMENT COUNCIL (ECERDC)
PACKAGE 4 – MCKIP MAIN ACCESS ROAD AND UTILITIES FOR MALAYSIA - CHINA KUANTAN
INDUSTRIAL PARK (MCKIP) FROM CH.2400 TO CH.4630

Project Value : RM20 mil
Contract Duration : 19 Months
Main Contractor : FajarBaru Builder Sdn Bhd
Client : East Coast Economic Region Development Council

The project is construction of internal road connecting Malaysia-China Kuantan Industrial Park
to Lebuhraya Pantai Timur 2. The major scope of works are earthworks, ground improvement and a
3-span bridge.

17

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED THE PROPOSED CONSTRUCTION AND COMPLETION OF KUANTAN PORT EXPANSION
PROJECTS EXTERNAL INFRASTRUCTURE WORKS, KUANTAN PAHANG
PACKAGE 2: ACCESS ROADS AND BRIDGE TO PORT, UPGRADING THE EXISTING DRAIN C AND
ALL ASSOCIATED WORKS

Project Value : RM105 mil
Year Completion : 2018
Main Contractor : FajarBaru Builder Sdn Bhd
Client : East Coast Economic Region Development Council

The project is construction and upgrading the existing FR3 Road to provide port access to the New
Deep Water Terminal (NDWT) and the existing North Entrance. The scope of work consists of:-
Construction of New Port Road to New Deep Water Terminal (NDWT)
Construction of 440m length Elevated Bridge to Kuantan Port
Upgrading of the existing FR3 Road to dual-two carriageway

18

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED CADANGAN HOSPITAL (268 KATIL) KUALA KRAI, KELANTAN (REKA DAN BINA)
PROJECTS FASA 2 : KERJA BANGUNAN DAN LAIN-LAIN KERJA BERKAITAN

Project Value : RM239 mil
Year Completion : 2018
Main Contractor : Pembinaan SPK Sdn Bhd
Client : Kementerian Kerja Raya

The project is construction new hospital in 40 hectar at Mukim Kuala Pahi, which is located 5km
from the old hospital. The project involves the construction of 11 wards with 268 beds, 8 operation
rooms, 8 delivery rooms and treatment centres.

19

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED DUTA-ULU KELANG EXPRESSWAY (DUKE) PHASE 2, SECTION 1 – SRI DAMANSARA LINK
PROJECTS THE CONSTRUCTION AND COMPLETION OF BRIDGE STRUCTURE FOR MAINLINE 1 (ML1-PIER
1 TO PIER 45, RAMP 1 & RAMP 2 - RP2/6 TO RP2/15) & (ML1-PIER 46 TO PIER 82 & RAMP 2-RP2/1
TO RP2/5H

Project Value : RM111 mil
Year Completion : 2017
Main Contractor : Pembinaan Sahabatjaya Sdn Bhd
Client : Konsortium Lebuhraya Utara-Timur (KL) Sdn Bhd

The project is part of the extension of Sri Damansara Link of Duke Expressway Phase 2. The
package is approximately 3km elevated viaduct of dual carriageway over the existing Jalan Taman
Bukit Maluri. The scope of work includes construction of pilecap, piers, casting and launching of
prestressed T-beam and segmental crosshead up to deck slab.

20

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED MAIN ROAD REALIGNMENT, EARTHWORKS AND SOIL NAILING WORKS TO PROPOSED
PROJECTS RESORT DEVELOPMENT AT LOT PT374 & 375, MUKIM PADANG MAT SIRAT DAERAH
LANGKAWI, KEDAH DARUL AMAN

Project Value : RM20.5 mil
Year Completion : 2016
Client : Tropicana Langkawi Beach Resort Sdn Bhd

The project is realignment of the existing main road. The scope of work includes 1km site clearing,
earthworks and slope stabilization works. The site is located within hilly terrain that consists of
500,000 cu.m earth cutting, including hacking of rock, controlled blasting and 10,000 sq.m of soil
nailing work.

21

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED THE PROPOSED CONSTRUCTION AND COMPLETION OF KPC PORT LINK ROAD IN KUANTAN
PROJECTS PORT CITY, PAHANG DARUL MAKMUR : PACKAGE 2 - MCKIP MAIN ACCESS ROAD AND
PRIMARY INFRASTRUCTURE AND UTILITIES FOR MALAYSIA-CHINA KUANTAN INDUSTRIAL
PARK (MCKIP) DEVEPLOMENT

Project Value : RM42.8 mil
Year Completion : 2016
Main Contractor : FajarBaru Builder Sdn Bhd
Client : East Coast Economic Region Development Council

The project involved the construction of internal linkage road for MCKIP with necessary utilities
which include drainage, water supply and street lighting. The project also includes the
construction of 2.0mil gallon R.C. elevated water tank and pipe jacking work of 1600mm diameter
water pipe crossing the main Jabor road.

22

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED THE PROPOSED CONSTRUCTION AND COMPLETION OF KPC PORT LINK ROAD IN KUANTAN
PROJECTS PORT CITY, PAHANG DARUL MAKMUR : PACKAGE 1 - ELEVATED DIAMOND INTERCHANGE TO
MALAYSIA-CHINA KUANTAN INDUSTRIAL PARK (MCKIP) AND UPGRADING OF SG. ULAR
INTERCHANGE

Project Value : RM47 mil
Year Completion : 2016
Main Contractor : FajarBaru Builder Sdn Bhd
Client : East Coast Economic Region Development Council

Malaysia-China Kuantan Industrial Park (MCKIP) is the first Malaysia National Industrial Park
joint developed by both Malaysia and China. As part of this programme, WZS BINARAYA SDN BHD is
involved in the construction and completion of KPC Port Link Road.The scope of work consists of:-
a)Construction of an elevated diamond interchange over the existing Jabor Bypass to MCKIP.
b)Upgrading of Sg. Ular Interchange
c)Construction of signature monument for MCKIP measuring 52m length, 4m width and 8m
height.

23

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED SECOND PENANG BRIDGE LAND EXPRESSWAY PACKAGE 2A
PROJECTS PROJEK MENAIKTARAF BAYAN LEPAS EXPRESSWAY DARI BATU MAUNG KE JAMBATAN

Project Value : RM124.1 mil
Year Completion : 2016
Main Contractor : UEM Construction Sdn Bhd
Client : Jambatan Kerja Raya Malaysia

This project involved construction of 3km bridge over the existing Bayan Lepas Expressway in Batu
Maung, Penang. The main span crossing river consists of in-situ balanced-cantilever box girder
with span configuration of 107+170+107m, constructed using form traveller above live traffic.

24

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED CADANGAN PEMBANGUNAN 2 BLOK KONDOMINIUM 39 TINGKAT DAN 38 TINGKAT (534 UNIT) YANG MENGANDUNGI 3
PROJECTS TINGKAT PODIUM TEMPAT LETAK KERETA DAN 2 TINGKAT BESMEN TEMPAT LETAK KERETA DI ATAS LOT PT26199 (LOT
ASAL 1891 & 1892), JALAN KIARA 3 DAN JALAN KIARA 4, MONT’ KIARA, MUKIM BATU, WILAYAH PERSEKUTUAN, KUALA
LUMPUR - EXECUTION AND COMPLETION OF EARTHWORKS, SOIL NAILING, PILING AND BASEMENT STRUCTURE WORKS

Project Value : RM34.5 mil
Year Completion : 2015
Main Contractor : Aston Star Sdn Bhd
Client : Sunrise Pioneer Sdn Bhd

This project involved construction of basement for MK22 Condominium. Scope of works included
earthworks to form a 10m deep basement, jack-in spun pile and retaining wall

25

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED ULU JELAI HYDROELECTRIC PROJECT - ACCESS ROAD TO LEMOI INTAKE AND BRIDGE OVER
PROJECTS SUNGAI LEMOI, CAMERON HIGHLAND, PAHANG DARUL MAKMUR

Project Value : RM16.5 mil
Year Completion : 2014
Main Contractor : Salini Malaysia Sdn Bhd
Client : Tenaga Nasional Berhad

The project consists of the construction of 4.5km access road to Lemoi Intake, single span bridge,
slope stabilization and drainage works.

26

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED ELECTRIFIED DOUBLE TRACKING PROJECT BETWEEN IPOH AND PADANG BESAR :
PROJECTS DRAINAGE WORKS SECTION N1 – SUB-PACKAGE S1 (BUKIT KETRI TO PADANG BESAR) AND
SUB-PACKAGE S2 (ARAU TO BUKIT KETRI)

Project Value : RM17.5 mil
Year Completion : 2014
Main Contractor : MMC-Gamuda Joint Venture
Client : Keretapi Tanah Melayu Berhad

The project consists of construction of surface drains, pipe culvert and box culvert crossing the
Double Track Line.

27

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED PROJEK SAMBUNGAN SUNGAI BESI (BEE) - RC WORKS FOR BRIDGE BR8 (MRR 2 LINK)
PROJECTS

Project Value : RM9.1 mil
Year Completion : 2014
Main Contractor : Road Builder Sdn. Bhd.
Client : Lembaga Lebuhraya Malaysia

This work package is construction of superstructure for Bridge BR8 with total length of 622mm

28

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED PROJEK SAMBUNGAN SUNGAI BESI (BEE) – RC WORKS FOR BRIDGE BR9, BR10, BR11 AND BR12
PROJECTS (PANDAN LINK)

Project Value : RM11.4 mil
Year Completion : 2014
Main Contractor : Road Builder Sdn. Bhd.
Client : Lembaga Lebuhraya Malaysia

This work package consists of construction of 4 bridges, with total length of 766m. This project
serves as Pandan Link of Lebuhraya Sungai Besi.

29

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED ELECTRIFIED DOUBLE TRACKING PROJECT BETWEENIPOH AND PADANG BESAR :
PROJECTS EARTHWORK AND ASSOCIATED WORKS PACKAGE N1-SUB PACKAGE S1 (CH140.00 TO
CH157.00)

Project Value : RM41.2 mil
Year Completion : 2013
Main Contractor : MMC-Gamuda Joint Venture
Client : Keretapi Tanah Melayu Berhad

This project involved 200,000cu.m of earth excavation, removal of 500,000cu.m of unsuitable
material and filling with imported material, laying of 17km of subballast and reclaiming 3ha land
of existing pond.

30

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED ELECTRIFIED DOUBLE TRACKING PROJECT BETWEEN IPOH AND PADANG BESAR : PACKAGE
PROJECTS N3 – BRIDGE WORKS (RB18 & RB19)

Project Value : RM3.3 mil
Year Completion : 2013
Main Contractor : MMC- Gamuda Joint Venture
Client : Keretapi Tanah Melayu Berhad

This project consists of the construction and completion of 2 number river bridges crossing Sg.
Pengkala Kundur and Sg. Kedah.

31

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED THE PROPOSED CONSTRUCTION AND COMPLETION OF PACKAGE 1 (110 ACRES)
PROJECTS EARTHWORKS AND INFRASTRUCTURE WORKS FOR THE THE DEVELOPMENT OF PHASE2,
AUTOMATIVE INDUSTRIAL PARK, PEKAN PERAMU, PAHANG DARUL MAKMUR

Project Value : RM55.7 mil
Year Completion : 2012
Main Contractor : FajarBaru Builder Sdn.Bhd.
Client : East Coast Economic Region

This project consists of 1.10Mil cu.m sand fill, infrastructure works, 20,000PE sewerage treatment
plant and elevated water tank with the capacity of 250,000 gallons.

32

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED PROPOSED CONSTRUCTION AND COMPLETION OF EARTHWORKS AND INFRASTRUCTURE
PROJECTS WORKS FOR PASIR MAS HALAL PARK, PHASE 1 IN LOT PT9942 IN GUAL TAMBUN, MUKIM
APAM, DAERAH GUAL PERIOK, JAJAHAN PASIR MAS, KELANTAN DARUL NAIM.

Project Value : RM32.4 mil
Year Completion : 2012
Main Contractor : FajarBaru Builder Sdn.Bhd.
Client : East Coast Economic Region

This project involved 700,000 cu.m of earth fill to prepare platform for Pasir Mas Halal Park. It also
includes the construction of infrastructure works, 6,500PE sewerage treatment plant and elevated
water tank with the capacity of 179,000 gallons.

33

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED ELECTRIFIED DOUBLE TRACKING PROJECT BETWEEN IPOH AND PADANG BESAR : PACKAGE
PROJECTS N3 – ROAD OVER BRIDGE – ROB10 (JALAN MENGKUDU) AND ROB12 (JALAN TELUK WANJAH)

Project Value : RM34.5 mil
Year Completion : 2013
Main Contractor : MMC – Gamuda Joint Venture
Client : Keretapi Tanah Melayu Berhad

This project consists of construction of ROB10 (5 spans land bridge with total length of 180m) at
Jalan Mengkudu and ROB12 (16 spans land bridge with total length of 550m) at Jalan Teluk
Wanjah. Both bridges are in the middle of Alor Setar Town. The ROB12 subcontract consists of
Design and Build of a dual-two carriageway elevated bridge on a single pier structure with 2.8m
diameter bored pile foundation, precast T-beam, RE Wall and all other associated works. It is the
first bridge in Malaysia supported in a single large diameter bored pile foundation.

34

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

COMPLETED ELECTRIFIED DOUBLE TRACKING PROJECT BETWEEN SEREMBAN – GEMAS: CONSTRUCTION
PROJECTS AND COMPLETIONOF VIADUCT (KM502.600 – KM535.500)

Project Value : RM9.3 mil
Year Completion : 2010
Main Contractor : FajarBaru Builder Sdn. Bhd.
Client : Keretapi Tanah Melayu Berhad

Construction of the longest viaduct of Electrified Double Tracking Project Between Seremban-
Gemas with the length of 600m.

20.

35

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

LIST OF PLANT DESCRIPTION YEAR OF CAPACITY QUANTITY
& EQUIPTMENT MANUFACTURE
10MT x 12m Span ‘A’ Shaped Travelling Gantry Crane 10 tonnes 1
2013
10MT x 25m Span ‘A’ Shaped Travelling Gantry Crane 10 tonnes 2
2013
80MT x 12m Span ‘A’ Shaped Travelling Gantry Crane 80 tonnes 1
2013
Rough Terrain Crane, Kato KR25H-V3 25 tonnes 8
Excavator – Volvo EC330BLC 2011 250 HP
Excavator – Sumitomo LS25800F J2 2013 230 HP 2
Excavator – Komatsu PC300 2004 230 HP 2
Excavator – Caterpillar 320 2003 320 HP 3
Backhoe – 580M Series 2 1
Lorry 2008 – 2010 4 x 4 wheel 5
Lorry (Water browser) 2015 5 tonnes 10
Lorry Crane 2010 10 tonnes 5
Lorry Tipper 10 tonnes 3
Lorry Tipper 2014 – 2016 11 tonnes 46
Trailer 14 tonnes 2
Roller Compactor – Sakai SV520D 2016 44 tonnes 2
Compactor – Dynapac CA252D 2010 2
Skylift – Boom length 26m 2011 5 tonnes 1
Forklift 2010 3.5 tonnes 4
Forklift 42mm Ø 2
Bar Bending and Bar Cutting Machine 1
Welding Machine – Miller DX500 175 cfm 9
Air Compressor 5
10

36

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

AWARDS & • Kementerian Kerja Raya Malaysia (Bumiputera Status)
RECOGNITION • CIDB Malaysia Perolehan Kerja Kerajaan
• CIDB Malaysia Gred G7
• CIDB Malaysia SCORE 4 Star
• Sijil Kontraktor Penyiap from Kementerian Kerja Raya Malaysia
• Kementerian Kewangan Malaysia
• Suruhanjaya Perkhidmatan Air Negara (IPA Jenis C1)
• Unit Perancang Ekonomi (UPEN) Selangor
• Sime Darby Approved Vendor
• DAS Certification ISO 9001:2015

37

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

AWARDS &
RECOGNITION

38

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

AWARDS &
RECOGNITION

39

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

AWARDS &
RECOGNITION

40

WZS BINARAYA SDN BHD

(A wholly owned subsidiary of WZ Satu Bhd)

AWARDS &
RECOGNITION

41

WZS BINARAYA SDN BHD 42

(A wholly owned subsidiary of WZ Satu Bhd)

AWARDS &
RECOGNITION