The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by alex.mckenna, 2018-11-15 09:43:18

Seadrill_West Capella_RigBrochure_v1.1

Seadrill_West Capella_RigBrochure_v1.1

WEST CAPELLA

Samsung 10,000 Rig

SEADRILL – YOUR PARTNER WEST CAPELLA KEY FACTS
OF CHOICE
Built/year Samsung Heavy Variable load 20,000 mt Drilling / 16,500
WE ARE SEADRILL, ONE OF THE Industries/ 2008 mt Transit
WORLD’S LARGEST INTERNATIONAL Top drive 2 x NOV HPS 1000 Rated for
OFFSHORE DRILLING CONTRACTORS 907 mt Accomodation 180
Dimensions Hoisting Capacity, 2 x 860
We operate the youngest fleet of all the major offshore drillers; Riser kW AC Liquid mud 1,055 M3
fit for shallow, mid, deep and ultra-deepwater, in both benign BOP Motors, Max. Continuous storage Rated for 517 Bar
and harsh environments. Torque Mass oil
106,364 nm storage
Our fleet has the scale, flexibility and global footprint to meet
the needs of all operators. Our Western and Eastern Hemisphere 228 m Long / 42 m Wide Sack storage 5,000 Sacks
operating structure enables us to provide a specialist, targeted
and coordinated service in all the major offshore markets. Shaffer ft-h 27.43 m Length
0.5334 m OD 10.16 ID
Safety underpins everything we do. Nothing is more important Boost Line
to us than the health, safety and security of our people. We NOV 47.625 cm 6 RAM NXT
have a highly-trained and capable team with over 40 years of 1,034 Bar
experience and a proven track record in rig delivery, upgrade
and reactivation. WEST CAPELLA TRACK RECORD

INTRODUCTION TO THE WEST CAPELLA APR 2009 EXECUTED 7YRS CAMPAIGN
- APR 2016 IN NIGERIA
The West Capella is a 6th generation Samsung, 10,000 fsw rated,
ultra-deepwater drillship with operational history offshore Africa. JUN 2017 OBTAINED THE INDUSTRY’S FIRST ABS
AUG 2017 MPD CLASS NOTATION
Lorem ipsum dolor sit amet, id possim lobortis eum, sale noster NOV 2017 LARGEST CEMENT JOB FOR TOTAL
no duo, ut eam laoreet convenire. In enim atqui dignissim sea. - JAN 2018 WORLDWIDE ON THE 20” CASING
Te ius choro exerci, sea et tempor omnesque iracundia, reque JAN 2018 SECTION IN CYPRUS
eloquentiam mediocritatem ne vis. Ex doming detraxit eum, JUN-JUL 2018 DEEPEST WATER DEPTH THE RIG
mei ne audiam delicata, at augue dissentiunt vix. AUG 2018 HAS OPERATED – 2,800 METERS,
PETRONAS GABON

6 YEARS LTI FREE ANNIVERSARY
FASTEST TIME ON MPD DEPLOYMENT
(26HRS) & RETRIEVAL (15HRS) IN
SEADRILL MPD FITTED RIGS DURING
REPSOL CAMPAIGN IN ARUBA
1,360 DAYS WITHOUT A
RECORDABLE INJURY


Click to View FlipBook Version