The individuals on our team have decades of experience working on FSU’s campus delivering
successful projects of all sizes. We understand how to avoid the critical issues associated
with working on an occupied campus around students, faculty, and staff. Our knowledge of
FSU’s campus is important as you evaluate our firm’s capabilities on future projects.
We want to emphasize the relationship of our on-site team and their ability to work
together. Below is our team, most of whom have worked together side-by-side on FSU’s
campus. Besides the experience they bring to the project as individuals, the fact that they
have worked collectively on major and minor projects is an important strength.
On the right, you will find lists of successfully completed FSU projects by our Team
Members.
OUR TEAM
VANESSA PAUL ASHLEY JASON
VICE PRESIDENT GENERAL SENIOR LEAD
& PROJECT SUPERINTENDENT ESTIMATOR SUPERINTENDENT
MANAGER Oversee all on-site Proactive support Sequence trade
Manage every field operations, during pre- contractor work on-
aspect of the sequencing and construction to site daily, providing
project as the schedule during assess project quality control,
construction point construction scope and safety, and field
of contact including and provide develop project level communication
contracts, pay constructibility estimates and with client point-of-
requests, schedule analysis. cost options. contact.
updates, and close-
out.
KNO WLEDGE OF THE
FSU Campus
ABATEMENT PROJECTS JOC PROJECTS
Kasha Laboratory Building Fine Arts Laser Ventilation
Cawthon Hall EAP Building Carpet & Paint
Landis Hall Law Library A/C Replacement
Ruby Diamond Concert Hall Mendenhall B HVAC
Westcott Building Smoke Stack Restoration
MAJOR PROJECTS
Ruby Diamond Concert Hall MINOR PROJECTS
Westcott Building Garage #5
Landis Hall Tucker Civic Center
Cawthon Hall Fine Arts Building
Montgomery Hall Housewright Building
Wellness Center Kuersteiner Building
Leach Center Diffenbaugh Building
Law Advocacy Center Dodd Lecture Hall
College of Medicine Jennie Murphree Hall
Kasha Laboratory Building Johnston Hall
King Life Sciences Suwanee Room
Cage Wash Pepper Building
Challenger Center Askew Student Life Building
Classroom Building Crenshaw
Rogers Hall
STUDIES Mike Long Track
Strozier Library Alumni Center
College of Business President’s House
Student Union Phase I Salley Hall
Alumni Village Westside Courts
Storm Risk College of Medicine
EOAS University Center Building C
Kellogg Building Cage Wash
New Residence Halls Psychology Building
Wellness Center
Eppes Building
EXPERIENCE ON THE
FSU Campus
5 JOC PROJECTS 20
YEARS
Southern Standard has
Ashley, and Wayne have
five projects in progress Vanessa, Paul, Jason,
been working for FSU
in the new JOC Program for over twenty years.
since it began last year.
26
MINOR PROJECTS
Our Team Members
13 STUDIES have completed 26
Minor Projects on FSU’s
Campus.
MAJOR PROJECTS 8 Our Team Members
have conducted eight
Our Team Members studies on buildings at
FSU, including one for
have completed 13 the Strozier Library.
Major Projects on
FSU’s Campus, while
working for other
firms.
$300mil
DOLLARS
Collectively, our Team Members have
completed over $300,000,000 worth
of work for FSU.
MAJOR
MAJOR
MINOR
MINOR
STUDIES
STUDIES
JOC
JOC
EXISTING VCT FLOORING
EXISTING V CT FLOORING
& BOOK STACKS
& BOOK ST ACKS
EXISTING CARPET
EXISTING CARPET
& BOOK ST ACKS
& BOOK STACKS
ALLED AROUND
CARPET INST
CARPET INSTALLED AROUND
BOOK STACKS
REQUIRES ASBESTOS
RE QUIRES ASBEST O S BOOK ST ACKS
ABATEMENT
ABA TEMENT
Strozier
Library
MOBILIZATION APPROACH
• COORDINATE SCHEDULE TO USER GROUP FUNCTIONS
• MULTI-PHASED PROJECT
• EARLY PROCUREMENT OF LEAD TIME MATERIALS
• ASSIST USER FURNITURE & EQUIPMENT RELOCATION
• SEPARATE ACCESS ROUTES FOR ABATEMENT & CONSTRUCTION ACTIVITIES
• SCHEDULE MATERIAL DELIVERIES DURING LOW VISITOR DAYS & TIMES
• RESTRICT NOISY ACTIVITIES TO AFTER HOURS
• OCCUPIED FACILITY
• OCCUPIED CAMPUS
• OFF SITE PARKING
SAMPLE SCHEDULE
Sequence
Should abatement of the existing flooring tile and mastic be included in the project scope
of work, it will be necessary to separate abatement activities from construction activities.
Southern Standard has had success creating separate access to each of the floors by
designating separate stairwells and zones for abatement and construction.
Our team plans to begin work on the 3rd floor before proceeding to the 2nd floor so we
work our trades out of the building rather than backtracking over completed work. After
the removal of the existing furniture and book stacks, it will be necessary to perform
selective demolition so that the abatement crews can access the existing ACM flooring and
mastic. Once the lab tests are complete and we receive the all clear that it is safe to occupy
the abated floor, the remainder of the construction activities may progress.
2020
Act Description Orig Rem Early Early
ID Dur Dur Start Finish APR MAY JUN JUL
30 06 13 20 27 04 11 18 25 01 08 15 22 29 06
GENERAL CONDITIONS
100 Mobilize 1d 1d 01APR20 01APR20 Mobilize
500 Release Order for Flooring - Lead Time 20d 20d 01APR20 28APR20 Release Order for Flooring - Lead Time
3RD FLOOR
1000 User Book Cull Complete 0 0 01APR20 User Book Cull Complete
1010 Relocate Book Stacks 7d 7d 01APR20 09APR20 Relocate Book Stacks
1020 Selective Demolition 7d 7d 08APR20 16APR20 Selective Demolition
1030 Flooring Abatement 7d 7d 17APR20 27APR20 Flooring Abatement
1032 Receive ALL CLEAR Abatement Testing 3d 3d 23APR20 27APR20 Receive ALL CLEAR Abatement Testing
1035 Core Drill for Floor Outlets 2d 2d 28APR20 29APR20 Core Drill for Floor Outlets
1040 Painting 5d 5d 28APR20 04MAY20 Painting
1050 Electrical - Rough In/Trim Out Floor Outlets 8d 8d 30APR20 11MAY20 Electrical - Rough In/Trim Out Floor Outlets
1060 Install Flooring 7d 7d 06MAY20 14MAY20 Install Flooring
1070 Final Cleaning 2d 2d 14MAY20 15MAY20 Final Cleaning
1080 Punchlist 3d 3d 15MAY20 19MAY20 Punchlist
2ND FLOOR
2000 User Book Cull Complete 0 0 08APR20 User Book Cull Complete
2010 Relocate Book Stacks 7d 7d 08APR20 16APR20 Relocate Book Stacks
2020 Selective Demolition 7d 7d 15APR20 23APR20 Selective Demolition
2030 Flooring Abatement 7d 7d 24APR20 04MAY20 Flooring Abatement
2032 Receive ALL CLEAR Abatement Testing 3d 3d 30APR20 04MAY20 Receive ALL CLEAR Abatement Testing
2035 Core Drill for Floor Outlets 2d 2d 05MAY20 06MAY20 Core Drill for Floor Outlets
2040 Painting 5d 5d 05MAY20 11MAY20 Painting
2050 Electrical - Rough In / Trim Out Floor Outlets 8d 8d 07MAY20 18MAY20 Electrical - Rough In / Trim Out Floor Outlets
2060 Install Flooring 7d 7d 13MAY20 21MAY20 Install Flooring
2070 Final Cleaning 2d 2d 21MAY20 22MAY20 Final Cleaning
2080 Punchlist 3d 3d 22MAY20 26MAY20 Punchlist
CLOSEOUT
3000 Substantial Completion 0 0 26MAY20 Substantial Completion
3010 Final Completion 0 0 24JUN20 Final Completion
Start date 01APR20 Early bar
Finish date 24JUN20 Progress bar
Data date 01APR20 Southern Standard Construction Critical bar
Run date 30MAR20 FSU - Strozier Library Summary bar
Page number 1A Start milestone point
© Primavera Systems, Inc. Finish milestone point