201
The straight line geometry of The Atrium Entrance.
202
Damien and the construction team on site.
203
204
The steel structure and straight line geometry of The Hotel Rear Facade.
205
The completed Hotel Rear facade and glazing.
206
The bamboo layout using straight line geometry of The Exhibition Building.
207
The cast concrete ceiling of The Exhibition Building showing the bamboo impression using straight line geometry.
208
The cast concrete ceiling of The Exhibition Building showing the bamboo impression using straight line geometry and a skylight vent clad in ceramics.
209
The cast concrete ceiling of The Exhibition Building showing the bamboo impression using straight line geometry.
210
The entire structure of The Central Tower is created from straight line geometry.
211
Showing the straight line geometry withing the Central Tower glazing.
212
The straight line formwork on The Design Studio roof.
213
The straight line geometry on the Design Studio joiner.
CONSTRUCTION TECHNIQUES
Using Spiral Geometry
214
Early Sketches of Marisfrolg’s Spiral Ramps.
215
216
Marisfrolg’s spiral vehicle ramp.
217
The steel structure and formwork of the Marisfrolg’s spiral vehicle ramp.
218
The steel structure and formwork of the interior Atrium ramp.
219
The concrete structure of the Marisfrolg’s spiral vehicle ramp.
THE PEOPLE ON SITE
That Made This Project Happen
220
221
222
Ash climbing The Design Studio roof for material and layout inspection.
223
The Li Brothers working on cladding for the Gatehouse.
224
A skilled craftsman working on the joiner of The Design Studios.
225
Lesley on the roof of The Design Studios.
226
Mr Li on the roof of The Design Studios.
227
Mr Li, Mr Jo and Damien on the roof of The Design Studios with the Solarium in the background.
228
Ash demonstrating to craftspeople and their children the cladding on the Gatehouse.
229
Damien and the contractors working on the cladding for The Solarium.
230
Fred, Damien and the contracting team on site by the roof of The Design Studios.
231
A skilled craftsman working on the cladding of The Hotel facade.
232
Damien inspecting the roof cladding of The Design Studios.
233
Damien, Mr Jo, Ash and Mr Li inspecting the layout of the roof materials on The Design Studios.
234
Ash starting the mosaic for a seat by The Hotel.
235
A skilled craftswomen taking her break on a seat by The Hotel.
236
Ash and the Li Brothers working on the terracotta mosaic for the Central Tower Entrance.
237
James and Mr Li starting a 1:1 material study on the Hotel’s rear facade.
238
Skilled craftspeople on site.
239
Damien and James on site.
240
Ash, Damien and the Li Brothers working on The Central Tower Entrance Canopy.
241
Material details - The Central Tower Entrance Canopy.
242
Material details - Damien inspecting the terracotta tiles and ceramics on The Design Studios ceiling in preparation for the concrete pour.
243
Material details - A skilled craftsman placing the terracotta tiles for the ceiling layout. Skilled craftsmen on the roof of The Design Studios.
244
Ash and Damien and the skilled craftsmen on site.
245
Fred, Di, Damien and Leon (Project Engineer) on site with the contractors.
246
Mr Jo on the scaffolding on The Atrium Entrance roof.
247
Damien inspecting the facade fenestration for The Design Studios.
248
Fred and a skilled craftsman on site.
249
Fred, Damien and Griff with Ms Zhu and Mr Yao and the Marisfrolg team in front of The Manufacturing and Administration Building during construction.
THE MARISFROLG CAMPUS
250