AXIANERGY INVITES YOU TO THE
COMMEMORATIVE
CEREMONY
OF EPCC FOR NPS36
PULAU INDAH LATERAL
PIPELINE PROJECT
(TULIP)
6 APRIL 2021 FOUR SEASONS
2.00 PM HOTEL
KUALA LUMPUR
EPCC ("TULIP")
TULIP is a codename for NPS36 Pulau Indah
Lateral Pipeline project by PETRONAS Gas
Berhad (PGB). The project consists of a new
42km underground pipeline connecting the
existing pipelines of Peninsular Gas Utilisation
(PGU) II to a new power plant located in Pulau
Indah by Pulau Indah Power Plant Sdn Bhd
(PIPP). PIPP plans to build and operate and a
1000-1200 MW dual-fired combined cycle gas
turbine (CCGT) utilising natural gas as main
fuel and distillate as back up fuel. Suruhanjaya
Tenaga has agreed the natural gas will be
supplied by PGB via TULIP pipeline.
Axianergy (M) Sdn Bhd has been awarded with
the contract to engineer, procure,
install/construct and commission (EPCC) the
TULIP project which schedule to receive its
first gas on 24 December 2022.
TIME AGENDA
1400 Ceremony Begin
1405 Opening speech by Emcee & Doa Recitation
1410 Safety Moment
1415 Quality Moment
1420 Opening Remarks by;
- M. Shafidz Yasin
(Managing Director, Axianergy Sdn Bhd)
-Noor Ilias Mohd Idris
(Vice President Group Project Delivery, Project Delivery
& Technology PETRONAS)
-A. Aziz Othman
(Vice President Gas & Power,
PETRONAS Gas Berhad)
1520 Commemorative Session
1530 Closing speech by Emcee
1535 Photography Session & Hi-Tea
1600
Adjourn
COMMITTEE
ANATI AQILAH ABDUL RAHMAN
+60 12 709 0476
AHMAD NUR QAMARI MOHD AZHARI
+60 12 244 8400
AEIFFAH NUR KAMSHAH
+60 19 636 7943