PROPOSED PULAU CAREY BULK TERMINAL (PCBT) ON PART OF LOT PT
359 MUKIM JUGRA, DAERAH KUALA LANGAT, SELANGOR DARUL
EHSAM FOR YAYASAN SELANGOR
TRILINK BULK TBTSB
TERMINAL SDN BHD
(TBTSB)
Introduction
Yayasan Selangor – Investment Arm of
Selangor Government, which will lease the
land for the project for rental & Royalty
TBTSB
TRILINK BULK TERMINAL SDN. BHD. -
Concept Initiation, Design and Project
Management of Tank Farm Projects
Implementation YAYASAN Lease land in
Organization SELANGOR return for
Structure rental and
Royalty
Financing arrangement
on need-to-need basis TRILINK BULK TERMINAL Financing Financing and
Bank advisory
Provide partnership TBTS SDN BHD (TBTSB) requirements
for financing bank for project
B
To provide all local
coordination services EPCC OPTIONAL SERVICES
Contractor
Office space for rental Finance, build, own,
operate and transfer
Feasibility study
report Build and operate
Build
CAREY ISLAND CHOICE FOR
TANK FARM
Out of Major
Fault Zone
CAREY ISLAND CHOICE FOR
TANK FARM
Out of Major
Fault Zone
Tsunami
Safe
Crude Oil
Petroleum products
Out of Major CAREY ISLAND CHOICE FOR
Fault Zone TANK FARM
Tsunami Main Entrance
Safe intMoathineESntrtraaitnsce
Strategic into the Straits
Location
Crude Oil
Petroleum products
Out of Major CAREY ISLAND CHOICE FOR
Fault Zone TANK FARM
Tsunami Main Entrance
Safe into the Straits
Strategic
Location
Comfortable
Span Outside
World’s Busiest
Shipping Routes
Out of Major CAREY ISLAND CHOICE FOR
Fault Zone TANK FARM
Seawater
Level
Tsunami Ship 20m
Safe
Sand
Strategic > (20m + bed
Location 10%)
Comfortable Span
Outside World’s
Busiest Shipping
Routes
Draft > 24m
Customers 1 Long & Short term storage
Income Source
2 Pumping, jetty piping, inter
1 Oil producers for crude oil tank
3 Jetty and marine facility
Oil refineries for storage 4 Short-term storage
2 prior to delivery
45 Heating 6 Blending
Oil buyers for temporary
3 storage 7 Product circulation
8 Clean water supply
Big oil corporations, countries and
4 refineries giants - long time storage
9 Shipyard and naval services
Implementation Phases
Phase I
1st Year
Soil Testing, Funding
Arrangements
Land Matters Feasibility EIA Hydraulic
Study Studies,
Basic Engg
Implementation Phases
Phase II Testing,
Commissioning
2nd -5th
& Start-up
Year
Procurement
Infra, Phase I Tank
Utilities, & Farm
Support
Facilities
Detail Phase II
Engineering Tank Farm
Implementation Phases
Phase III
End Off
5th Year
OPERATION
Storage Crude Oil Total
Products Capacity
5 x 60,000m3 : 540,000 MT
and 800,000MT
Capacities Jet/Kero/Gasoline
8 Bay Truck
5 x 10,000m3 + 4 x 10,000m3 : 90,000MT Center
MDO / Cutter
6 x 10,000m3 : 60,000MT
Fuel Oil
4 x 10,000m3 : 40,000MT
Chemicals
4 x 5,000m3 : 20,000MT
LPG Bottleing and Storage
10 x 5,000m3 : 50,000MT
location of Tank
Farm Site
LOT PT359
SUPPORT
FACILITIES
J
E
T
T
Y
TANK FARM
location of Tank
Farm Site
Location of
SBM
location of Tank 5km
Farm Site
Relative location of SBM @ 36m Tank
SBM dpth Farm
Layout of SBM MANGROVE JETTY
PRESSSURE PUMP
Proposed Road and AFRM
Bridge 2 Linkages
VLCC
Schematic of Import
and Export Points
Mainland
PLEM
location of Tank
Farm Site
Relative location of
SBM
Layout of SBM
Proposed Road and
Bridge 2 Linkages
Schematic of Import
and Export Points
Single Buoy
Mooring
Satellite View
to PROPOSED SITE
Conclusion
1 Seller’s Market Business
Creation of high level skill
2 jobs for Selangor
3 Surrounding areas
infrastructure development
4 Attractive Cash Flow
Projection