The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by GPS N44 Jemoreng, 2021-11-22 08:57:44

5 TAHUN JUANDA JAYA

Buku

5 TAHUN DATO’ MURSHID DIRAJA
2.3 MAJLIS DAERAH MATU DAN DARO

2.3.1 PEMBERSIHAN 20 SUNGAI DI MATU – RM2.0 JUTA

47

5 TAHUN DATO’ MURSHID DIRAJA

2.3.1 PEMBERSIHAN 20 SUNGAI DI MATU – RM2.0 JUTA (sambungan)

48

5 TAHUN DATO’ MURSHID DIRAJA

2.3.2 CADANGAN MENAIKTARAF PANTAI KUALA MATU (FASA 1) – RM8.8 JUTA

49

5 TAHUN DATO’ MURSHID DIRAJA

2.3.3 CADANGAN MENAIKTARAF PANTAI KUALA MATU (FASA 2) – RM7.2 JUTA
(BELUM BERMULA)

50

5 TAHUN DATO’ MURSHID DIRAJA

2.3.4 CADANGAN MENAIKTARAF PANTAI KUALA MATU (FASA 3)
PROPOSED REST HOUSE AND PUBLIC CARPARK AT KUALA MATU
(FASA 3) (RnR JALAN PESISIR) – RM4.9 JUTA (BELUM BERMULA)

51

5 TAHUN DATO’ MURSHID DIRAJA

2.3.5 MENAIKTARAF PASAR PENJAJA TIAN MATU – RM500,000.00

52

5 TAHUN DATO’ MURSHID DIRAJA

2.4 JABATAN BEKALAN AIR LUAR BANDAR SARAWAK

2.4.1 SARAWAK WATER SUPPLY GRID PROGRAMME – STRESSED AREA
PROPOSED REPAIR OF SUBMERSIBLE RAW WATER PUMP AT
JEMORENG WATER TREATMENT PLANT – RM441,000.00

Repair of existing submersible
raw water pump at Jemoreng
Water Treatment Plant

53

5 TAHUN DATO’ MURSHID DIRAJA

2.4.2 IMPROVEMENT WORKS TO KUALA MATU AND OYA WATER SUPPLY,
MUKAH
i) THE PIPELINE TOWARDS EXISTING KUALA MATU HIGH LEVEL TANK
AND BOOSTER FACILITIES MATU WATER TREATMENT PLANT &
ii)EXTENSION OF PIPELINE FROM SMK OYA TO KAMPUNG BAKONG
JUNCTION, OYA – RM5,978,135

Laying of 280mm pumping
main from Old Matu Water
Treatment Plant to Kuala
Matu High Level Tank

54

5 TAHUN DATO’ MURSHID DIRAJA

2.4.2 IMPROVEMENT WORKS TO KUALA MATU AND OYA WATER SUPPLY,
MUKAH
i) THE PIPELINE TOWARDS EXISTING KUALA MATU HIGH LEVEL TANK
AND BOOSTER FACILITIES MATU WATER TREATMENT PLANT &
ii)EXTENSION OF PIPELINE FROM SMK OYA TO KAMPUNG BAKONG
JUNCTION, OYA – RM5,978,135 (sambungan)

DI crossing for pumping main from Old Matu Water
Treatment Plant to Kuala Matu High Level Tank

Cleaning and improvement work at Kuala Matu
High Level Tank

New Booster pump and Main Switch Board at Old
Matu Water Treatment Plant

55

5 TAHUN DATO’ MURSHID DIRAJA

2.4.3 REHABILITATION WORKS FOR JEMORENG WATER TREATMENT PLANT,
MUKAH DIVISION - RM835,000.00

Repainting work, replacement of filter media
and cleaning of sedimentation tank at Jemoreng

Water Treatment Plant

56

5 TAHUN DATO’ MURSHID DIRAJA

2.4.3 REHABILITATION WORKS FOR JEMORENG WATER TREATMENT PLANT,
MUKAH DIVISION - RM835,000.00 (sambungan)

Cleaning of aerator at Jemoreng Water
Treatment Plant

Rehabilitation of raw water pump piping

57

5 TAHUN DATO’ MURSHID DIRAJA

2.4.4 MODIFICATION WORK TO EXISTING 2 UNIT SCRAPPER SYSTEM AT
JEMORENG WATER TREATMENT PLANT – RM97,800.00

Installation of new scrapper
system at Jemoreng Water
Treatment Plant

58

5 TAHUN DATO’ MURSHID DIRAJA

2.4.5 REPLACEMENT OF PUMP SET, GENERATOR SET AND MECHANICAL
& ELECTRICAL EQUIPMENT AT VARIOUS WATER TREATMENT PLANT,
BOOSTER STATION AND RAW WATER INTAKE FOR MUKAH DIVISION
(WORK ORDER NO. 4) – RM10,106,357.00

Rewiring Work at Old Matu Water Treatment Plant

New pump set for Old Matu Water Treatment Pump

59

5 TAHUN DATO’ MURSHID DIRAJA

2.4.6 IMPROVEMENT AND REPLACEMENT WORKS TO BOTH WATER
TREATMENT FACILITIES & RETICULATION SYSTEMS AT MATU AND
IGAN, MUKAH (WORK ORDER NO. 6) – RM64,750,397.00

New Booster Station at Igan

Laying of Submarine pipe across Batang Igan River

60

5 TAHUN DATO’ MURSHID DIRAJA

2.4.6 IMPROVEMENT AND REPLACEMENT WORKS TO BOTH WATER
TREATMENT FACILITIES & RETICULATION SYSTEMS AT MATU AND
IGAN, MUKAH (WORK ORDER NO. 6) – RM64,750,397.00 (sambungan)

Laying of 450mm DI pipe from Igan Booster to Matu

61

5 TAHUN DATO’ MURSHID DIRAJA

2.4.6 IMPROVEMENT AND REPLACEMENT WORKS TO BOTH WATER
TREATMENT FACILITIES & RETICULATION SYSTEMS AT MATU AND IGAN,
MUKAH (WORK ORDER NO. 6) – RM64,750,397.00 (sambungan)

Laying of 225mm HDPE pipe to Kpg. Kebuaw,
Matu

Construction of new Matu high level tank at
Bruan, Matu

62

5 TAHUN DATO’ MURSHID DIRAJA

2.4.6 IMPROVEMENT AND REPLACEMENT WORKS TO BOTH WATER
TREATMENT FACILITIES & RETICULATION SYSTEMS AT MATU AND IGAN,
MUKAH (WORK ORDER NO. 6) – RM64,750,397.00 (sambungan)

AC pipe replacement at Kpg Tian to Kpg Sekaan
Kecil, Matu

AC pipe replacement at Kpg Berjaya, Matu

63

5 TAHUN DATO’ MURSHID DIRAJA

2.4.6 IMPROVEMENT AND REPLACEMENT WORKS TO BOTH WATER
TREATMENT FACILITIES & RETICULATION SYSTEMS AT MATU AND
IGAN, MUKAH (WORK ORDER NO. 6) – RM64,750,397.00 (sambungan)

AC pipe replacement at Kpg Bawang, Matu

AC pipe replacement at Igan Sub-District

Repainting work at Old Matu Water Treatment Plant

64

5 TAHUN DATO’ MURSHID DIRAJA

2.4.6 IMPROVEMENT AND REPLACEMENT WORKS TO BOTH WATER
TREATMENT FACILITIES & RETICULATION SYSTEMS AT MATU AND
IGAN, MUKAH (WORK ORDER NO. 6) – RM64,750,397.00 (sambungan)

Replacement of existing permaglass tanks at Old
Matu Water Treatment Plant

65

5 TAHUN DATO’ MURSHID DIRAJA

2.4.6 IMPROVEMENT AND REPLACEMENT WORKS TO BOTH WATER
TREATMENT FACILITIES & RETICULATION SYSTEMS AT MATU AND
IGAN, MUKAH (WORK ORDER NO. 6) – RM64,750,397.00 (sambungan)

Construction of 2 nos. of stores at Old Matu
Water Treatment Plant

Construction of 2 nos. of stores at Old Matu
Water Treatment Plant

Rewiring work at Tian Water Treatment Plant

66

5 TAHUN DATO’ MURSHID DIRAJA

2.4.7 PROPOSED KPG DARO HIGH LEVEL TANK & LAYING OF GRAVITY MAIN
FROM JEMORENG TO KUALA MATU HIGH LEVEL TANK, MUKAH
DIVISION – RM13,833,116.00

Laying of 450mm gravity main from Jemoreng to
Kuala Matu High Level Tank

2.4.8 PROJEK BEKALAN AIR LUAR BANDAR (BALB) SISTEM RETIKULASI
TAHUN 2016 NEGERI SARAWAK ZON 8 – MUKAH - RM5,566,000.00
Pipe jointing at Kpg Kuala
Matu Hilir, Matu

Pipe jointing at Kpg. Pergau, Matu

67

5 TAHUN DATO’ MURSHID DIRAJA

2.4.9 MUKA SAUH LOJI RAWATAN AIR JEMORENG – RM700,000.00

68

5 TAHUN DATO’ MURSHID DIRAJA
2.5 MAJLIS ISLAM SARAWAK

2.5.1 PEMBINAAN MASJID DAERAH MATU – RM12.0 JUTA

69

5 TAHUN DATO’ MURSHID DIRAJA

2.5.1 PEMBINAAN MASJID DAERAH MATU – RM12.0 JUTA (sambungan)

70

5 TAHUN DATO’ MURSHID DIRAJA

2.5.1 PEMBINAAN MASJID DAERAH MATU – RM12.0 JUTA (sambungan)

71

5 TAHUN DATO’ MURSHID DIRAJA

2.5.2 PEMBINAAN MASJID KUALA MATU – RM15.0 JUTA

72

5 TAHUN DATO’ MURSHID DIRAJA

2.5.2 PEMBINAAN MASJID KUALA MATU – RM15.0 JUTA (sambungan)

Kerja-kerja menambak tanah tapak Masjid Kuala Matu

Masjid Kuala Matu bakal dilengkapi balai cerap

• 2020-07-30T14:39:31+08:00
MUKAH: Masjid Kuala Matu bakal dilengkapi dengan
kemudahan balai cerap apabila ia siap kelak.
Menurut Ahli Dewan Undangan Negeri (ADUN)
Jemoreng Datuk Dr Juanda Jaya, ia untuk kemudahan
melihat anak bulan khususnya bagi bahagian Zon Tengah
Sarawak.
"Kita belum ada kemudahan balai cerap bagi zon tengah
dan ini merupakan cadangan saya dan telah mendapat
kelulusan," katanya kepada Utusan Borneo ketika meras-
mikan Padang Futsal Kuala Matu, hari ini.
Balai cerap itu katanya terletak di kawasan Kuala Matu
yang strategik iaitu di tepi Laut China Selatan.
Selain pembinaan masjid baharu, terdapat juga rancan-
gan membuat tebingan hakisan ombak untuk kawasan
tepi pantai Kuala Matu dan juga mewujudkan 40 lot
kedai penjaja.
Semua kemudahan itu nanti katanya selain kemudahan
penduduk sekitar Kuala Matu, juga sebagai kemudahan
para pelawat di kawasan itu.
"Saya amat optimis Kuala Matu dapat dijadikan kawa-
san tarikan pelancong jika semua kemudahan ini nanti
disiapkan," ujarnya lagi
.
Turut hadir Pegawai Daerah Matu Wan Hipni Wan Mo-
hamad Ketua Kaum Kampung Hilir Kuala Matu Kadar@
Kadir Adi.

73

5 TAHUN DATO’ MURSHID DIRAJA

2.5.3 CADANGAN BINA BARU SURAU KAMPUNG BERJAYA & SURAU KAMPUNG
SEJAHTERA, DAERAH MATU – RM1.0 JUTA

74

5 TAHUN DATO’ MURSHID DIRAJA
2.6 JABATAN PERTANIAN SARAWAK

2.6.1 PROJEK DI BAWAH JABATAN PERTANIAN SARAWAK

75

5 TAHUN DATO’ MURSHID DIRAJA

2.6.1 PROJEK DIBAWAH JABATAN PERTANIAN SARAWAK (sambungan)

76

5 TAHUN DATO’ MURSHID DIRAJA

2.6.1 PROJEK DIBAWAH JABATAN PERTANIAN SARAWAK (sambungan)

77

5 TAHUN DATO’ MURSHID DIRAJA

2.7 SARAWAK ENERGY BERHAD

2.7.1 CADANGAN PROJEK LAMPU JALAN DI DAERAH MATU, BAHAGIAN
MUKAH – RM1.1 JUTA

78

5 TAHUN DATO’ MURSHID DIRAJA
2.8 LAND CUSTODY AND DEVELOPMENT AUTHORITY

2.8.1 PUSAT KOMERSIAL DAERAH MATU – RM16.7 JUTA

79

5 TAHUN DATO’ MURSHID DIRAJA

2.8.1 PUSAT KOMERSIAL DAERAH MATU – RM16.7 JUTA (sambungan)

Kerja-kerja menambak tanah di atas tapak telah siap sepenuhnya

80

5 TAHUN DATO’ MURSHID DIRAJA

2.8.1 PUSAT KOMERSIAL DAERAH MATU – RM16.7 JUTA (sambungan)

81

5 TAHUN DATO’ MURSHID DIRAJA

2.8.2 IGAN SERVICE CENTRE, MUKAH – RM33.6 JUTA

82

5 TAHUN DATO’ MURSHID DIRAJA

2.8.2 IGAN SERVICE CENTRE, MUKAH – RM33.6 JUTA (sambungan)

83

5 TAHUN DATO’ MURSHID DIRAJA
2.9 HOUSING DEVELOPMENT CORPORATION

2.9.1 PROJEK RUMAH SPEKTRA PERMATA IGAN (22 UNIT) – RM16.0 JUTA

84

5 TAHUN DATO’ MURSHID DIRAJA

2.9.2 PROJEK RUMAH SPEKTRA PERMATA TIAN (20 UNIT) – RM16.0 JUTA

85

5 TAHUN DATO’ MURSHID DIRAJA
2.10 PEJABAT DAERAH

2.10.1 PROJEK PEMBINAAN 8 TABIKA KEMAS DAERAH MATU (PROJEK CSR
PETRONAS) – RM1.18 JUTA

86

5 TAHUN DATO’ MURSHID DIRAJA

2.10.1 PROJEK PEMBINAAN 8 TABIKA KEMAS DAERAH MATU (PROJEK CSR
PETRONAS) – RM1.18 JUTA (sambungan)

87

5 TAHUN DATO’ MURSHID DIRAJA
2.11 PEJABAT PEMBANGUNAN PERSEKUTUAN SARAWAK

2.11.1 THE CONSTRUCTION OF THREE (3) UNIT OF I-BEAM BRIDGES TO KPG
KEBUAW IGAN, MATU – RM900,000.00

88

“Menjamin

KKK EEEGMSEATMKAI LMBAUINLRGAAA NNN
Sarawak”
#S a r a w a k u n t u k s e m u a
semuauntukSarawak
BAB 3
PROJEK PROGRAM
TRANSFORMASI LUAR
BANDAR
(RTP)

89



5 TAHUN DATO’ MURSHID DIRAJA
3.1 PROJEK RTP N.44 JEMORENG TAHUN 2017

3.1.1 PEMBESARAN JALAN KAMPUNG BAWANG TIAN, MATU – RM500,000.00

3.1.2 BAIKPULIH DAN NAIKTARAF LORONG BELAKANG, KAMPUNG MASJID,
SEKAAN BESAR, MATU – RM180,000.00

91

5 TAHUN DATO’ MURSHID DIRAJA

3.1.3 BAIKPULIH TITI DAN JETI RUMAH DIANA, SUNGAI ILAS,MATU –
RM100,000.00

3.1.4 BAIKPULIH TITIAN BELIAN RH. MERING, TELOK DELOH, BTG IGAN,
MATU – RM130,000.00

3.1.5 BINA BARU TITIAN KE KILANG SAGU, TIAN, MATU – RM80,000.00

92

5 TAHUN DATO’ MURSHID DIRAJA

3.1.6 BINA BARU JETI DAN TITIAN BELIAN BERDEKATAN RUMAH PN. SARIMAH
KG KEBUAW, IGAN, MATU – RM100,000.00

3.1.7 PROJEK MENAMBAK KAWASAN TAPAK PERKUBURAN KAMPUNG
SEKERANG, IGAN, MATU – RM200,000.00

93

5 TAHUN DATO’ MURSHID DIRAJA

3.1.8 NAIKTARAF JAMBATAN BERDEKATAN RUMAH AHMAD B. SUHAI, KG
LOBA BALU, MATU – RM160,000.00

3.1.9 BAIKPULIH DAN NAIKTARAF JAMBATAN SUNGAI NAGA, KG.JEMORENG,
MATU – RM200,000.00

94

5 TAHUN DATO’ MURSHID DIRAJA

3.1.10 BINA BARU TITI KONKRIT DI JALAN MASUK KG. TIAN, MATU (FASA 2)
– RM750,000.00

3.1.11 BAIKPULIH PUSAT SUMBER JKKK CINA, KG KUALA MATU, MATU –
RM100,000.00

3.1.12 NAIKTARAF DAN BAIKPULIH BALAIRAYA KUALA MATU, MATU –
RM200,000

95

5 TAHUN DATO’ MURSHID DIRAJA

3.1.13 BINA BARU SAMBUNGAN PARIT KONKRIT DI JALAN KG TENGAH DAN
KG SEKERANG, IGAN, MATU – RM150,000.00

3.1.14 MEMBINA CULVERT DAN PARIT KONKRIT BERDEKATAN RUMAH
FATIMAH BT. MAHSEN, KG KUALA MATU HULU, MATU – RM100,000.00

3.1.15 BAIKPULIH DAN NAIKTARAF TEMPAT LETAK KERETA AWAM DEWAN
SUARAH MATU – RM160,000.00

96


Click to View FlipBook Version