The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by udaya kumar, 2023-09-06 02:51:48

SAMPLE DRAWINGS

SAMPLE DRAWINGS

A Thank


Initiative k You


1.WALL PANELING USING 18 MM MDF 2.6 MM PLY SUPPORT & WOODEN BACK SUPPORT-40*40 MM WHITE WOOD 3.TEAK VENEER FINISH AS PER CLIENT APPROVED. 4.2 CM WIDE BRASS STRIP THROUGH THE PANELS 2 CM WIDE BRASS STRIP DETAIL 05 PLAN- WALL CLADDING DETAIL 05-FRONT ELEVATION THERMOS


FIXED CNC PANELS CUT PATTERN DESIGN 18 MM BIRCH PLYWOOD WITH TEAK VENEER FINISH 18 MM MDF WITH GREY LAMINATE FINISH FINISH DETAIL 06 PLAN- WALL PATERN & STORAGE SHELF DETAIL 06-FRONT ELEVATION10018 362 12 368 18 362 18 362 18 362 18 362 18 cnc Deisgn storage shelves STAT GSM:+96894202034 Box:3651, P.C:111, Muscat, Boushar Sultanate Of Oman Email: [email protected] MAIN CONTRACTOR: MAIN CLIENT: NOTE: 1. ALL DIMENSIONS IN MM. 2. THIS DESIGN IS A PROPERTY OF MUSCATMARSHALL & WE RESERVECOPY RIGHT TO OURDESIGN WHICH CANNOT BEREPRODUCED OR MODIFIEDIN PART WITHOUT OBTAINING OUR WRITTENCONSENT. 3. DESIGNS ARE FOR INSTALLATION PURPOSESONLY. 4. DESIGNS HAVE TO BEVERIFIED ON SITE BEFOREPROCEEDING WITH ANYKIND OF WORK. DATE: 11.07.2022 SCALE: NTS DESIGN BY:- CHECKED BY:- MOHAMMED KHALFAN AL BASSAMIDESIGN:- LOCATION:- MINISTRY OF HOUSING AND URBANPLANNING VIP office Muscat Marshall Design TeamAL KHUWAIR DWG NO: MM/ML/16/10/22/VIP-ID-103REV NO DATE COMMENTS00 17/11/22 as per updated layoutFITOUT DETAILS 03


COLUMN COVERING WITH 18 MM PLYWOOD AND WHITE WOOD BACK SUPPORT 18 MM PLY WOOD SHELF DETAIL 07 PLAN- COLUMN COVERING & COFFEE PREPARE TABLE 100 MM GRANITE SKIRTING ABOVE ON PLYWOOD DETAIL 07-FRONT ELEVATION 10 Mm CORIAN TOP FINISH 2050


APPROVED PATTERN DESIGN IN SOLID WOOD PANELS 8 MM TOUGHENED GLASS 18 MM MDF PANLES/BEACH PLY PANELS WITH TEAK VENEER FINISH CNC DESIGN AND 8 MM CLEAR GLASS TOP DETAIL 08 PLAN- TEA TABLE-WAITING AREA DETAIL 08-FRONT ELEVATION GSM:+96894202034 Box:3651, P.C:111, Muscat, Boushar Sultanate Of Oman Email: [email protected] MAIN CONTRACTOR: MAIN CLIENT: NOTE: 1. ALL DIMENSIONS IN MM. 2. THIS DESIGN IS A PROPERTY OF MUSCATMARSHALL & WE RESERVECOPY RIGHT TO OURDESIGN WHICH CANNOT BEREPRODUCED OR MODIFIEDIN PART WITHOUT OBTAINING OUR WRITTENCONSENT. 3. DESIGNS ARE FOR INSTALLATION PURPOSESONLY. 4. DESIGNS HAVE TO BEVERIFIED ON SITE BEFOREPROCEEDING WITH ANYKIND OF WORK. DATE: 11.07.2022 SCALE: NTS DESIGN BY:- CHECKED BY:- MOHAMMED KHALFAN AL BASSAMIDESIGN:- LOCATION:- MINISTRY OF HOUSING AND URBANPLANNING VIP office Muscat Marshall Design TeamAL KHUWAIR DWG NO: MM/ML/16/10/22/VIP-ID-104REV NO DATE COMMENTS00 17/11/22 as per updated layoutFITOUT DETAILS 04


DETAIL 09 CEILING PLAN- RECEPTION AREA DETAIL 09-FRONT ELEVATION


RECEPTION DETAIL 09 PLAN- RECEPTION AREA ELE-A GSM:+96894202034 Box:3651, P.C:111, Muscat, Boushar Sultanate Of Oman Email: [email protected] MAIN CONTRACTOR: MAIN CLIENT: NOTE: 1. ALL DIMENSIONS IN MM. 2. THIS DESIGN IS A PROPERTY OF MUSCATMARSHALL & WE RESERVECOPY RIGHT TO OURDESIGN WHICH CANNOT BEREPRODUCED OR MODIFIEDIN PART WITHOUT OBTAINING OUR WRITTENCONSENT. 3. DESIGNS ARE FOR INSTALLATION PURPOSESONLY. 4. DESIGNS HAVE TO BEVERIFIED ON SITE BEFOREPROCEEDING WITH ANYKIND OF WORK. DATE: 11.07.2022 SCALE: NTS DESIGN BY:- CHECKED BY:- MOHAMMED KHALFAN AL BASSAMIDESIGN:- LOCATION:- MINISTRY OF HOUSING AND URBANPLANNING VIP office Muscat Marshall Design TeamAL KHUWAIR DWG NO: MM/ML/16/10/22/VIP-ID-104REV NO DATE COMMENTS00 17/11/22 as per updated layoutFITOUT DETAILS 05


WAITING AREA Cabin 1 3000 x 4000 mm vinyl fWAITING AREA storage shelves ELE-A ELE-C ELE-D ELE-B 6481 cnc design 100 NOMINAL INSULATION 50mmM STUD 0.7mm THICK @600mm C/C. 52mm TRACK 0.7mm THICK. 12mm PLY WOOD SUPPORT 12.5mm FIRE RATED GYPSUM BOARD. 50mmM STUD 0.7mm THICK @600mm C/C. INSULATION 12.5mm PLY WOOD SUPPORT 12.5mm FIRE RATED GYPSUM BOARD. T-JUNCTION DETAIL 100 NOMINAL INTERNAL WALINSULATION 100 NOMINAL 50mmM STUD 0.7mm THICK @600mm C/C. 52mm TRACK 0.7mm THICK. 12mm PLY WOOD SUPPORT 12.5mm FIRE RATED GYPSUM BOARD. CORNER DETAIL DETAILS 01 DETAILS 02DETAILS 03 DETAILS 04 DETAILS 08


GSM:+96894202034 Box:3651, P.C:111, Muscat, Boushar Sultanate Of Oman Email: [email protected] MAIN CONTRACTOR: MAIN CLIENT: NOTE: 1. ALL DIMENSIONS IN MM. 2. THIS DESIGN IS A PROPERTY OF MUSCATMARSHALL & WE RESERVECOPY RIGHT TO OURDESIGN WHICH CANNOT BEREPRODUCED OR MODIFIEDIN PART WITHOUT OBTAINING OUR WRITTENCONSENT. 3. DESIGNS ARE FOR INSTALLATION PURPOSESONLY. 4. DESIGNS HAVE TO BEVERIFIED ON SITE BEFOREPROCEEDING WITH ANYKIND OF WORK. DATE: 09.28.2022 SCALE: NTS DESIGN BY:- CHECKED BY:- MOHAMMED KHALFAN AL BASSAMIDESIGN:- LOCATION:- minstery of house VIP office Muscat Marshall Design TeamAL KHUWAIR INTERIOR LAYOUTDWG NO: MM/ML/16/10/22/VIP-IR-LA-101REV NO DATE COMMENTS00 17/10/22 as per sitecondition 01 18/10/22 changes as perclient 02 26/10/22 changes asupdated layoutRECEPTION Cabin 2 732 floor coffee table 1063 4120 x 4000 mm 5018 30 475 30 293 205 30 50 632 50 0 03 07/11/22 updated as perclient commentscnc design strorage shelf INSULATION 50mmM STUD 0.6mm THICK @600mm C/C. 52mm TRACK 0.6mm THICK. 12mm PLY WOOD SUPPORT 12.5mm FIRE RATED GYPSUM BOARD. LL - FIRE RATED DETAILS 05 DETAILS 07 DETAILS 06 DETAILS 09


CLIENT APPROVED CNC WALL PATERN DESIGN ELEVATION -A ELE-A STORAGE SHELF EXISTING WINDOWS CURTAIN AS PER CLIENT APPROVED AS PER CLIENT APPROVED CNC WALL PATERN DESIGN STORAGE SHELF MDF WALL CLADDING ELEVATION -C ELE-C ELEVATION -B ELE-B 313 323 18 323 18 308 1810 GREY COLUR FNISH MDF THERMOSTAT GREY COLUR FNISH MDF


F.F.L. GSM:+96894202034 Box:3651, P.C:111, Muscat, Boushar Sultanate Of Oman Email: [email protected] MAIN CONTRACTOR: MAIN CLIENT: NOTE: 1. ALL DIMENSIONS IN MM. 2. THIS DESIGN IS A PROPERTY OF MUSCAT MARSHALL & WE RESERVECOPY RIGHT TO OUR DESIGN WHICH CANNOT BEREPRODUCED OR MODIFIEDIN PART WITHOUT OBTAINING OUR WRITTENCONSENT. 3. DESIGNS ARE FOR INSTALLATION PURPOSESONLY. 4. DESIGNS HAVE TO BE VERIFIED ON SITE BEFOREPROCEEDING WITH ANYKIND OF WORK. DATE: 11.17.2022 SCALE: NTS DESIGN BY:- CHECKED BY:- MOHAMMED KHALFAN AL BASSAMI DESIGN:- LOCATION:- VIP office Muscat Marshall Design TeamAL KHUWAIR DWG NO: MM/ML/16/10/22/VIP-ELE-101 REV NO DATE COMMENTS00 17/10/22 as per site condition 01 18/10/22 changes as per client 02 26/10/22 changes as updated layout MANAGER TABLE MDF WALL CLADDING 2 CM WIDTH BRASS STRIP STORAGE SHELVES ELEVATIONLAYOUT ELEVATION -D ELE-D MINISTRY OF HOUSING ANDURBAN PLANNING


12 MM MDF PANEL-CNC DESIGN 6 MM MIRROR GLASS 12 V - 3000 K WHITE DIMMABLE ,WATERPROOFLED STRIP LIGHT 12 MM BIRCH PLYWOOD -CNC DESIGN AS PER CLIENT APPROVED 6 MM MIRROR GLASS 1.SOFA CUSHION-POLYTHERE OR FABRIC -DOWN WITH REMOVABLE FABRIC 2.USING 30x30 MM WOOD BACK SUPPORT 3.USING 50 x 30 MM WOOD TOP SUPPORT 4. 6 MM FLEXIBLE PLY BACK COVERING 5. 12 MM PLY USING TOP FASCIA 6. 18 MM WOOD USING FRONT FASCIA (CNC CUT DESIGN AS PER CLIENT APPROVED) 7.TEAK VENEER FINISH AS PER CLIENT APPROVED CNC WALL PATEN DESIGN AS PER CLIENTSECLETCION DETAIL 01-FRONT ELEVATION


630 1040 1850 30 475 30 270 205 30 50 530 50 50 x 30 MM WOOD SUPPORT 18 MM MDF /WOODEN PANELS WITH TEAK VENEER FINISH 18 MM MDF /WOODEN PANELS ,PLANT BOX WITH 10 CM WALL, TEAK VENEER FINISH 18 18 18 DETAIL 02 COLUMN COVERING USING 18MM MDF WITH TEAK VINEER FINISH 2 CM BRASS STRIP PLAN-COLUMN CLADDING DETAIL 02-FRONT ELEVATION 100 MM SKIRTING FITOUT DETAILS 01GSM:+96894202034 Box:3651, P.C:111, Muscat, Boushar Sultanate Of Oman Email: [email protected] MAIN CONTRACTOR: MAIN CLIENT: NOTE: 1. ALL DIMENSIONS IN MM. 2. THIS DESIGN IS A PROPERTY OF MUSCATMARSHALL & WE RESERVECOPY RIGHT TO OURDESIGN WHICH CANNOT BEREPRODUCED OR MODIFIEDIN PART WITHOUT OBTAINING OUR WRITTENCONSENT. 3. DESIGNS ARE FOR INSTALLATION PURPOSESONLY. 4. DESIGNS HAVE TO BEVERIFIED ON SITE BEFOREPROCEEDING WITH ANYKIND OF WORK. DATE: 11.07.2022 SCALE: NTS DESIGN BY:- CHECKED BY:- MOHAMMED KHALFAN AL BASSAMIDESIGN:- LOCATION:- MINISTRY OF HOUSING AND URBANPLANNING VIP office Muscat Marshall Design TeamAL KHUWAIR DWG NO: MM/ML/16/10/22/VIP-ID-101REV NO DATE COMMENTS00 17/11/22 as per updated layout


1.WALL PANELLING USING 18 MM MDF 2.6 MM PLY SUPPORT & WOODEN BACK SUPPORT-40*40 MM WHITE WOOD 3.TEAK VENEER FINISH AS PER CLIENT APPROVED. 4.2 CM WIDE BRASS STRIP THROUGH THE PANELS 2 CM THICK BRASS STRIP DETAIL 03 PLAN- WALL CLADDING DETAIL 03-FRONT ELEVATION 100 MM SKIRTING


storage shelves FIXED CNC DESIGN - 18 MM BIRCH PLYWOOD PANELS WITH TEAK VENEER FINISH 18 MM MDF WITH GREY LAMINATE FINISH DETAIL 04 PLAN- WALL PATERN & STORAGE SHELF DETAIL 04-FRONT ELEVATION cnc Deisgn GSM:+96894202034 Box:3651, P.C:111, Muscat, Boushar Sultanate Of Oman Email: [email protected] MAIN CONTRACTOR: MAIN CLIENT: NOTE: 1. ALL DIMENSIONS IN MM. 2. THIS DESIGN IS A PROPERTY OF MUSCATMARSHALL & WE RESERVECOPY RIGHT TO OURDESIGN WHICH CANNOT BEREPRODUCED OR MODIFIEDIN PART WITHOUT OBTAINING OUR WRITTENCONSENT. 3. DESIGNS ARE FOR INSTALLATION PURPOSESONLY. 4. DESIGNS HAVE TO BEVERIFIED ON SITE BEFOREPROCEEDING WITH ANYKIND OF WORK. DATE: 11.07.2022 SCALE: NTS DESIGN BY:- CHECKED BY:- MOHAMMED KHALFAN AL BASSAMIDESIGN:- LOCATION:- MINISTRY OF HOUSING AND URBANPLANNING VIP office Muscat Marshall Design TeamAL KHUWAIR DWG NO: MM/ML/16/10/22/VIP-ID-102REV NO DATE COMMENTS00 17/11/22 as per updated layoutFITOUT DETAILS 02


- PLAN-ROUND TABLE SCALE 1:16 - A - DETAILSCALE 1:2 1 - ELEVATION SCALE 1:16 A - PLANSCALE - - ELESCALEAB


SUB CONTRACTOR: NOTE: SCALE: 1:16 @A3 CHECKED BY:- DESIGN: FURNITURE LAYOUT LOCATION:- DATE: 16.08.2022 DESIGN BY:- THOMAS INTERNATIONALTRADING LLC GSM:+968 94541830Box:1131, P.C:130, Muscat, Al kHUWAIRSultanate Of Oman Email: [email protected] CONTRACTOR: ALLIED GLOBAL PROJECTS LLC 18th November Street Box:A5887, Muscat, Sultanate Of Oman TITLE :- ROUND MEETING TABLE & RECTANGULAR MEETING TABLE REVISION :- 00 N:MEETING TABLE 1:16 A EVATION E 1:16 - ELEVATION SCALE 1:16 B -1 DWG NO:- TH-FR-LA.05-16/8/22


- PLAN@COUNTER TOP LEVELSCALE 1:20 - AC - ELEVATION SCALE 1:20 A - ELEVATION SCALE 1:20 B


SUB CONTRACTOR: NOTE: SCALE: 1:20 @A3 CHECKED BY:- DESIGN: FURNITURE LAYOUT LOCATION:- DATE: 16.08.2022 DESIGN BY:- THOMAS INTERNATIONALTRADING LLC GSM:+968 94541830Box:1131, P.C:130, Muscat, Al kHUWAIRSultanate Of Oman Email: [email protected] B - ELEVATION SCALE 1:20 c -1 - DETAIL SCALE 1:2 1 MAIN CONTRACTOR: ALLIED GLOBAL PROJECTS LLC 18th November Street Box:A5887, Muscat, Sultanate Of Oman TITLE :- SENIOR EXECUTIVE TABLEREVISION :- 00 DWG NO:- TH-FR-LA.01-16/8/22


- PLAN@COUNTER TOP LEVEL SCALE 1:20 - AC - ELEVATION SCALE 1:20 A -1 - DETSCAL1


SUB CONTRACTOR: NOTE: SCALE: 1:20 @A3 CHECKED BY:- DESIGN: FURNITURE LAYOUT LOCATION:- DATE: 16.08.2022 DESIGN BY:- THOMAS INTERNATIONALTRADING LLC B - ELEVATION SCALE 1:20 B MAIN CONTRACTOR: ALLIED GLOBAL PROJECTS LLC TITLE :- STAFF WORK STATION6 PEOPLES REVISION :- 00 TAIL LE 1:2 DWG NO:- TH-FR-LA.04-16/8/22


DRAWER DRAWER - PLAN@COUNTER TOP LEVSCALE 1:20 - AC - ELEVATION SCALE 1:20 A - DETAILSCALE 1:2 1


DRAWER DRAWER SUB CONTRACTOR: NOTE: SCALE: 1:20 @A3 CHECKED BY:- DESIGN: FURNITURE LAYOUT LOCATION:- DATE: 16.08.2022 DESIGN BY:- THOMAS INTERNATIONALTRADING LLC GSM:+968 94541830Box:1131, P.C:130, Muscat, Al kHUWAIRSultanate Of Oman Email: [email protected] B - ELEVATION SCALE 1:20 B MAIN CONTRACTOR: ALLIED GLOBAL PROJECTS LLC 18th November Street Box:A5887, Muscat, Sultanate Of Oman TITLE :- STAFF WORK STATION4 PEOPLES REVISION :- 00 -1 DWG NO:- TH-FR-LA.03-16/8/22


LEGEND W QMS W W W W W W PRODUCED BY AN AUTODESPRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT SK EDUCATIONAL PRODUCT


NEMMARA, KERALA AVITIS SPECIALITYHOSPITAL NEMMARA Mr. PRAMOD MANGHAT & Mr. PRASANTH MANGHATPROPOSED AVITIS HOSPITALFALSE CEILING LAYOUT GROUND FLOOR PLANSD-ASH-AR-FC-106 SmardYOUR VISION. OUR MOTIVATION 545/6,Sabari Enclave, BPL Koottupatha, Palakkad-678007. Ph : 0491-2570191 E-mail : [email protected] modular conceptsVI/766-1, Sabari Enclave BPL Jn., Kootupatha Chandranagar P.O Palakkad - 678007 email- [email protected] NOTES: W W SK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESPRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


NEMMARA, KERALA AVITIS SPECIALITYHOSPITAL NEMMARA Mr. PRAMOD MANGHAT & Mr. PRASANTH MANGHATPROPOSED AVITIS HOSPITALFALSE CEILING LAYOUT LOWER BASEMENT SD-ASH-AR-FC-106 SmardYOUR VISION. OUR MOTIVATION 545/6,Sabari Enclave, BPL Koottupatha, Palakkad-678007. Ph : 0491-2570191 E-mail : [email protected] modular conceptsVI/766-1, Sabari Enclave BPL Jn., Kootupatha Chandranagar P.O Palakkad - 678007 email- [email protected] NOTES: LEGEND 01 Wifi & camera location UD RK 22/02/2018 W W


GL1 041 GL2 042 L K 7 8 ST-01 MARBLE FINISH CP-04 FLOOR CARPET MT-03 METAL INSERT D 06 FOR BLOCKWORK REF.TTC-RRH-CD-250-SD-100-031 FOR BLOCKWORK REF.TTC-RRH-CD-250-SD-100-031 FOR BLOCKWORK REF.TTC-RRH-CD-250-SD-100-031 E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPGE:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG E:\ROTANA HOTEL\ARAM\Aram Cutting List as per Slabs Public Areas\2. 107 GF Lift Lobby\1. Tundra Light.JPG CR 100mm EXPANSION JOINT GUEST CORRIDOR 107 FFL +2.700 100mm EXPANSION JOINT FFL + 6.600m ST-01 MARBLE SKIRTING FCL + 9.200m MT-03 METAL FINISH SF-01 SHAGREEN PANELS FB-18 FEBRIC BOOTH UPHOLSTERY ST-02 MARBLE FINISH SFLScale 01 - GUEST CORRIDOR & LIFT LOBBY (107) FLOORING @ 0 LEVEL 1 : 25 Scale 02 - ELEVATION A 1 : 25 PRODUCED BY AN AUTODPRODUCED BY AN AUTODESK STUDENT VERSION DESK STUDENT VERSION


ST-01 MARBLE FINISH FB-18 FEBRIC BOOTH UPHOLSTERY ST-02 MARBLE FINISH ST-01 MARBLE FINISH MR-03 GOLD ANTIQUE MIRROR SF-01 SHAGREEN PANELS SF-01 SHAGREEN PANELS SF-01 SHAGREEN PANELS LT-12 WALL LAMP LT-12 WALL LAMP D 06 L K ST-01 MARBLE FINISH EXPANSION JOINT ELEV. FOR DETAIL REF. TTC/RRH/CD-250/SD/100/292 VERTICAL EXPANSION JOINT CR AL SEDRAH REAL ESTATE H09 - AL MOUJ RAYHAAN BY ROTANA Date: DRAWN Date CHECKED Date APPROVED DRAWING TITLE REV. ORIGINAL SCALE SIZEAS SHOWN CLIENT : A1SAM AK TTC/RRH/CD-250/SD/900/000 0029/Jul/2021 PS Drawing No: SHOP DRAWING S.No Description Rev Date 01 Issued For Approval 00 29/Jul/202129/Jul/2021 29/Jul/2021 PROJECT : PROJECT MANAGEMENT : CONSULTANT : www.atkinsglobal.comTel: Fax: Atkins PO Box 2985 PC 112 Ruwi Sultanate of Oman +968 2456 6188+968 2456 6199MAIN CONTRACTOR : Trading and Contracting CO.LLCP.O. BOX-1829, P.C.-112, SULTANATE OF OMAN e-mail: [email protected] Website: www.teejan.com TEL. NO. 24594641/24593560/24594470 FAX(968) 24593442 KEY PLAN GUEST LOBBY 107 GUEST LOBBY 112 1. DO NOT SCALE FROM THE DRAWINGS. 2. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES UNLESS NOTED3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANTGENERAL NOTES: CONTRACT DRAWING REV. DESCRIPTION IFC DRAWING REFERENCE FLOOR PT-01 PAINT FINISH FINISHING SCHEDULE ST-01 MARBLE FINISH ST-01 MARBLE FINISH (TUNDRA GREY MARBLE, STAIN RESISTANT, SEALED ) ST-01 MARBLE FINISH (TUNDRA GREY MARBLE, STAIN RESISTANT, SEALED ) CEILING SKIRTING WALL CP-04 FLOOR CARPET MT-03 METAL INSERT F18 COMBINED CODE (ST-01+CP-04+MT-03) ST-02 NOIR SAINT LAURENT MARBLE, STAIN RESISTANT, SEALED SF-01 SHAGREEN PANELS MT-03 METAL FINISH W13 COMBINED CODE (ST-01+ST-02+SF-01+MT-03) 5154627-ATK-Z1-GF-DR-A-1001 P9 0 LEVEL FLOORPLAN 953-DD-ID-02-107-001 01 0 LEVE LIFT LOBBY FURNITURE & FLOORING953-DD-ID-02-107-002 02 CEILING ELEVATION & WALL FINISHES LAYOUT953-DD-ID-02-107-003 02 ELEVATION LAYOUT 953-DD-ID-06-0PA-007 01 BUILT-IN SEATING LAYOUT S.No 1 STRUCTURAL OPENING SIZEWIDTH HEIGHTDOOR TYPE DOOR SCHEDULE D-06 (FIRE RATED) 1600 2600 953-DD-ID-08-100-001 00 DOOR SCHEDULE SHEET 01 OF 05 953-DD-ID-03-0PA-001 01 TYPICAL FLOOR DETAIL 953-DD-ID-08-200-002 00 DOOR SCHEDULE SHEET 02 OF 06 0 LEVEL TYPICAL LIFT LOBBY (107,112) SHAGREEN PANEL DETAIL LAYOUTDESK STUDENT VERSION PRODUCED BY AN AUTODPRODUCED BY AN AUTODESK STUDENT VERSION


C.R: 1222804, P.O. Box: 3615, P.C:111, Ghubra, Oman. GSM: +968 94202034, Email: [email protected]:05/09/2022WORK AGREEMENT This agreement is made and entered into as of the date of grant set forth basedonthecollaboration with Marine Engineering & Technical Services Herein After, Muscat Marshall is represented as the First Party and Marine Engineering &Technical Services as the Second Party. Scope of Works Work related to Electrical lights Installation, , Floor LVT laying (without materials -laborcharges only) in the Rayhan Rotana Hotel, by Sedrah, Al Mouj. List in details: SF-03, TL-02, TL-13, LT-08, LT-39, LT-12, LT-41, LT-42, LT-43, LT-44, LT-45, LT-10, LT-10-1, LT-34.LT-34-1. GENERAL CONDITIONS The total amount to be provided by the Second Party will be 1250 OMR only. The first party will provide the advance 50% of total amount. The second Party will start the work the immediately after receiving the advance andcomplete within the time line give All the labors must hold valid Visa/Labor Card during the period of this agreement. TheSecond party shall be fully responsible for the cost and consequence due to any violationoflabors rules in Oman The quality of work delivered will meet the Shopping Mall standards and there will benocompromise on work and perfection. This agreement will be made with mutual understanding with both the parties Both the parties must maintain complete records of all activities undertaken in connection


C.R: 1222804, P.O. Box: 3615, P.C:111, Ghubra, Oman. GSM: +968 94202034, Email: [email protected] this subcontract, including quality, health, and safety. Confidentiality of information concerning company projects, projects value, client’sdetails, products may not disclose to anyone without our permission. If any damage to first party reputation/name will lead to immediate terminationof thecontract by first party. COMMENCEMENT OF CONTRACT & Project Value The contract shall become effective and operative from the date of this agreement is signedbyboth the parties on Installation of Lightings, LVT flooring, , on contract basis and Agreement Value of OMR 1250/-. Signed in acceptance of the terms and conditions stated herein. Muscat Marshall Marine Engineering &Technical ServicesChief Executive Officer Contractor Mr. Mohammad Al Bassami Manu Sathyarajan _____________________ --------------------------------------- (First Party) (Second Party)


Marble tiles 25 26 26 Marble tiles 27 28 28 293030Marble tiles ELEVATION F 31 32 32 Marble tiles ELEVATION G 31 32 32 Marble tiles ELEVATION H 5 20 33 34 34 Scale 01 - GROUND FLOOR SHAGREEN PANEL PLAN 1 : 25 18 MM MDF PANELS WITH FABRICATED SHAGREEN LEATHER 670 5 980 5 985 5 680 5 5 855 5 1145 5290 310 670 1980 3550 36150 820 5 805 5 805 5 795 3250 285 3103801350 3" x 1.6" WHITE WOOD BACK SUPPORT ON WALL 9MM PLYWOOD SUPPORT ABOVE ON WOODEN SUPPORT 18 MM PLYWOOD SUPPORT ON WALL 3" x 1.6" WHITE WOOD BACK SUPPORT ON WALL 9MM PLYWOOD SHEET FIXING ABOVE ON WOODEN SUPPORT 18 MM PLYWOO/MDF BATTEN FIXING AT 9MM PLYWOOD 100 785 100 18 MM MDF PANELS WITH FABRICATED SHAGREEN LEATHER 18 MFABLEAB - C D E F855 Scale 02 - SECTIONAL ELEVATION B 1 : 25 50 1260 5 5 1410 15 295 20 5 Scale 02 - SECTIONAL ELEVATION C 1 : 25 285 5 20 Scale 02 - SECTIONAL20 5 310 Scale 02 - SECTIONAL ELEVATION F 1 : 25 Scale 02 - SECTIONAL ELEVATION G 1 : 25 Scale 02 - SECTIONAL ELEVATION H 1 : 25 380 5 20 205 380 1260 4000 660 310 E


380 Marble tiles Marble tiles 315 5 20 29 30 30 Marble tiles ELEVATION H 33 34 34 JOB No. DRAWN Date CHECKED Date APPROVED DRAWING TITLE REV.ORIGINAL SCALE SIZE1:50 A0TTC/RRH/CD-250/SD/900/000 00Drawing No: SAM AK CD-250 11/Jul/2021 11/Jul/2021 SHOP DRAWING MAIN CONTRACTOR: PROJECT MANAGEMENT: CLIENT: PROJECT: CONSULTANT: S.No Description Rev DateAL SEDRAH REAL ESTATE H09 - AL MOUJ RAYHAAN BY ROTANA www.atkinsglobal.comTel: Fax: Atkins PO Box 2985 PC 112 Ruwi Sultanate of Oman+968 2456 6188+968 2456 6199 Trading and Contracting CO.LLCP.O. BOX-1829, P.C.-112, SULTANATE OF OMAN e-mail: [email protected] Website: www.teejan.com TEL. NO. 24594641/24593560/24594470 FAX(968) 24593442 ALL DIMENSION ARE IN MM ONLY FIGURED DIMENSIONS TO BE FOLLOWED - SCALED DIMENSIONS OFDRAWINGS WILL NOT BE PERMITTED GENERAL NOTES : 1. 2. REFER THIS DRAWINGS ONLY FOR BLOCK WORK LAYOUTS, FOR OTHER DETAILS REFER TOSEPARATE RELEVANT DRAWINGS. 3. 01 Issued For Approval 00 11/Jul/2021KEY PLAN PS CONTRACT DRAWING REV. DESCRIPTION IFC DRAWING REFERENCE 5154627-ATK-Z1-GF-DR-A-1001 P9 0 LEVEL FLOOR PLAN 953-DD-ID-02-168-001 01 FURNITURE LAYOUT 01 FURNITURE & FLOORING LAYOUT01 FLOORING LAYOUT 01 CEILING LAYOUT 01 POWER LAYOUT 02 ELEVATION A & B LAYOUT GROUND FLOOR RECEPTION LOBBY & TAE LOUNGESHAGREEN PANEL DETAIL LAYOUT953-DD-ID-02-168-002 953-DD-ID-02-168-003 953-DD-ID-02-168-004 953-DD-ID-02-168-006 953-DD-ID-02-168-007 953-DD-ID-02-168-008 01 ELEVATION C & D LAYOUT 670 300 1390 430 5 820 5 820 5 835 2920 MM MDF PANELS WITH BRICATED SHAGREEN ATHER 18 MM MDF PANELS WITH FABRICATED SHAGREEN LEATHER 18 MM MDF PANELS WITH FABRICATED SHAGREEN LEATHER G H L ELEVATION D 1 : 25 Scale 02 - SECTIONAL ELEVATION E 1 : 25 50 1260 5 1260 5 1410 15 Scale 02 - SECTIONAL ELEVATION I 1 : 25 I 660 660 660 5 20 SECTIOANAL DETAILS 01 Scale 02 - SECTIONAL DETAILS 01 1 : 25 18 MM MDF PANELS WITH FABRICATED SHAGREEN LEATHER 18 MM MDF BATTEN 9MM PLYWOOD SHEET FIXING ABOVE ON WOODEN SUPPORT 1.6" x 1.6" WHITE WOOD BACK SUPPORT ON WALL


LiftEntrance Shower & Toilet (G) Discussion Pods Entrance Existing Electrical Panel Accessible toilet C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S2 S2 S2 S2 C4 C5F1 F1 F1 F1 F1 F1A F1A F3 F3 F11 F13 F12 F12 F12 F12 B1 S3 S3 S3 P1 P1 P1 F8 F7 F8 PROJECT: UJJIVAN SMALL FINANCE BANK CLIENT: TITLE: FIRST FLOOR CCTV LAYOUT SHEET NO: UJ-S14 REV NO: 01 DRAWN BY: DATE: UD 17 AUG 2020CHECKESROFFICE DESIGN - ANNEX 2: UJJIVAN UPDATED AS PER NEW INTERIOR LAYOUT


Fire Exit e Lobby Toilet & Shower (L) Pantry Discussion Pods Entrance Meeting Room C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 C4 C5 C5 F1 F1 F1 F1 F1 F1 F1 F1A F2 F11 F8 F7 F4 S3 S3 S3 S3 C2 C2 C2 C2 C2 C2 B1 F8 CAMERA DETAILS 1 CAMERA 2 CABLE LINE ED BY: NOTES: DESIGN CONSULTANTS: 1.ALL DIMENSIONS ARE IN MM 2.ALL DRAWINGS ARE TO BE READ AND NOT SCALED. 3.ALL DIMENSIONS MUST BE VERIFIED ON SITE PRIOR TO FABRICATION. 4.ANY DIMENSIONAL CHANGES OBSERVED MUST BE BROUGHT TO THE NOTICE OF THE DESIGN TEAM IMMEDIATELY.


CLIENT VODAFONE PROJECT VODAFONE RETAIL SHOP-SALALAH GARDENS MALL,SALALAH,OMAN Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS REF 1 Preparation of concept development to detailed design drawings, Production and approvals 1 item INC INC 2 Preparation of construction design creation and Shop drawings of the MEP services layouts, sprinkler, air, IT/AV layouts, and CCTV positioning in RCP, provision of load schedules and calculations, landlord approvals etc 1 item INC INC 3 Preparation of ROD/workshop drawings for all elements 1 item INC INC 4 Allow for fixture development and prototyping for approval 1 item INC INC 5 Preparation of all necessary Operation and Maintenance manuals 1 item INC INC 6 Preparation of as-built drawings and consolidation for client 1 item INC INC 7 Preparation of a Engineering Shop drawings/Working/Fabrication drawings for required changes 1 item INC INC 8 Authorities Approval as per the layout changes for minor modifictions 1 item INC INC List of any additional scope of works identified from drawings OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS REF A Preliminaries 1 Site supervision 1 item 2 Site protection 1 item 3 Carting away of strip out and ongoing removal of rubbish from site,all demolitions wastes removal from site ,Project Insurances,gate passes, deposits and professional fees and any other entrance and charegeable fees. 1 item B Mobilisation 1 Mobilization Charges 1 item List of any additional scope of works identified from drawings OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS A Demolition Works 1 Demolition works of Shop No #00-184 refer -existing & proposed layouts & as per Site visit 1 item 2 Removal of Existing Gypsum wall cladding,Existing wooden wall partitions,Existing Glass partitions and all other fitout fixtures. 1 item 3 Removal of all Civil works,Block wall,locker room & door, and other fixtures 1 item 4 Removal of all Existing Gypsum ceiling Hvac Grills,Lightings,Sprinklers, & MEP Fittings 1 item List of any additional scope of works identified from site OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS A SIGNAGES 1 Shop entrance Hanging signage - frosted acrylic Letter signage in brand colour and logo 3100 MM From FFL fixed with 25x25mm aluminium black powdercoated frame..#Refer design drawings(shop drawings and details should be submitted by contractor ) signage base ht be 3100 mm ht item 2 Shop entrance standing Light Box -Acrylic Light box signage in brand colour and logo fixed with 25x25mm aluminium black powdercoated frame With necessary Electical wirings and power..#Refer 3D Designs (shop drawings and details should be submitted by contractor ) Size: 1000 x 1800 Nos B SHOP FRONT DESIGN 1 Roller shutter - Motorised roller shutter to shop front opening (refer to drawing: contractor detail) - Clear plexiglas mechanical roller shutter with powdercoated shutter guides. Keybox and controller to shopfront/As per MAF approval 2 Shopfront cladding - Vodafone Red Finish Back painted glass- 8mm thick with internal framework as required as per design...#Refer to design drawings(contractor should be confirm the dimensions from site.) Sqm List of any additional scope of works identified from site OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS A PARTITION WALLS/WALL CLADDING/WALL FINISHES 1 Wall Cladding Refer to drawings list: -2023-MML/VDFNE-SAL Refer to drawings list: - 1.0 DETAILED DESIGN Vodafone is open to alternative specification/material suggestions based on technical requirements, lead times or local market availability providing that they are in keeping with the original concept intent and clearly marked in the comments area of this schedule, otherwise all specifications will be assumed as per drawings All accuracy of calculations in the below document are the responsibility of the Contractors, any changes should be clearly marked and highlighted CONTRACTOR INPUT Contractors are entitled to exclude items from their scope although this should be clearly marked in the comments section and not deleted from the schedule Any additional items identified that the respondent notes should be clearly added in the relevant section 4.0 SHOPFRONT Sub Total : VODAFONE -Salalah Gradens Mall - Shop-00-xxxx #- Rev 02- **General notes**:- Sub Total : 2.0 PRELIMINARIES 3.0 DEMOLITIONS & ALTERATIONS Sub Total : It is the responsibility of the Contractors to refer to drawings and accurately measure dimensions/volumes All pricing in OMR Total : 5.0 WALL PARTITIONS & WALL FINISHES #Confidential


1.1 Supply, prepare and Installation of Water proof and fire resistant Gypsum wall cladding 75- 100 mm thickness including proper white wood support or 12mm plywood mounted to one side of metal stud framework, plasterboard wallboard affixed taped and jointed with emulsion finish using all necessary materials, equipment, tools and providing necessary services to walls.(qty to be referred from provided AutoCAD Drawings showing proposed ) 4.0 m ht- 43 rmt Sqm 1.2 Supply, prepare and Installation of Water proof and fire resistant Gypsum wall partition 100 mm thickness including proper white wood support or 12mm plywood mounted to both sides of metal stud framework, plasterboard wallboard affixed taped and jointed with emulsion finish using all necessary materials, equipment, tools and providing necessary services to walls.(qty to be referred from provided AutoCAD Drawings showing proposed ) 4.0 m ht- 26 rmt Sqm 1.3 Supply, prepare and Installation of 12 mm toughened glass partition using Saudi guardian Brand as per 3d images including metal framework, using all necessary materials, equipment, and tools and providing necessary services to walls.(qty to be referred from provided AutoCAD Drawings showing proposed ) .4.0 m htSqm 2 Paint Finish 2.1 Supply, prepare and apply one coat acrylic emulsion primer, two coats Stucco filler and finish off with two coats of Vinyl matt emulsion paint. including all necessary surface preparation, priming using all necessary materials, equipment, tools and services to walls.(qty to be referred from provided AutoCAD Drawings showing proposed ).Brand :Jotun,Colur code: 7637 Exhale - Grey Finish(bluish-green tone with a hint of grey running) 4.0 m ht Sqm 2.2 Supply and Installation of Vodafone approved Brand stickers on the gypsum wall as per shown 3d images (qty and measure ment to be referred from provided AutoCAD Drawings showing proposed ) 4.0 m ht Sqm 3 Wall Finish 3.1 Supply and Installation of Living Green Moss walls with necessary ply backing as per shown 3d images (qty and measure ment to be referred from provided AutoCAD Drawings showing proposed ) 3.5 m ht Sqm 3.2 Supply and Installation of 100mm w Oak veneered MDF frame/border at the moss wall with indirect lighting provision as per shown 3d images (qty and measure ment to be referred from provided AutoCAD Drawings showing proposed ) Rm 3.3 Supply and Installation of Sound proof Acoustic wall paneling Grey colour with Necessary wall supports and indirect lighting provision as per shown 3d images (qty and measure ment to be referred from provided AutoCAD Drawings showing proposed ) 4.0 m ht 3.4 Supply and Installation of striped Oak veneered MDF wall paneling as per shown 3d images (qty and measure ment to be referred from provided AutoCAD Drawings showing proposed ) Sqm 3.5 Supply and Installation of Vodafone Logo as per 3d Design for Moss wall. 1 Nos List of any additional scope of works identified from site OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS 1 Supply & Installation of 12 mm toughened glass door-using Saudi Guardian Brand , as per the proposed Images and Detailed Design Drawings shared. 1.1 Front Door-D1-1650 X 2200 mm ht 1.00 Nos 1.2 Door-D2-900 X 2200 mm ht 4.00 Nos 2 Supply & Installation of sound proof wooden finish door at the side enetrance , as per the proposed Images and Detailed Design Drawings shared. 2.1 Door-D2-900 X 2200 mm ht 1.00 No OMR 0.00 OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS 1.1 Supply & Installation of laminated mdf box partition for Gaming Lounge with shelves with oak wood finish, as as per the proposed Images and Detailed Design Drawings shared. Location: next to Gaming pods -(350L x 1000 D x 2000 H )Sizes in MM Nos OMR 0.00 1.2 Supply & Installation of Gaming Cabin lounges ,Oak wood finish frame for the LED screen and counter with lighting provision to be made with necessary support/framing as required.(qty and measure ment to be referred from provided AutoCAD Drawings showing proposed ) Gaming cabin-1800 L x 300 D x 750 H ) Sizes in MM item OMR 0.00 1.3 Supply & Installation of Acccessories pod/cabin,Wall Display Unit-Specialist joinery wall unit and rail system to display products on shelves, low level storage and high level AV displays (AV screen not in scope)opaque storage,tranparent Storage, using Brackets,Corian solid panels,using all necessary materials, equipment, tools and providing necessary AV & electrical Services.(qty to be referred from provided AutoCAD Drawings showing) 1 Nos(1500L x 1800 H)Sizes in MM item OMR 0.00 1.4 Supply and installation of storage unit In Training Room with solid surface top-1 Nos(2400L x 800 H)Sizes in MM item OMR 0.00 1.5 Supply and installation of storage unit In Server & Storage Room-2 Nos(1650 L x 400 D x 2100 H) Sizes in MM item OMR 0.00 1.6 Supply and installation of Under cabinet and Overhead Cabinet,with granite counter top In Pantry area Under cabinet (2400+2100 L x 600 D x 850 H) Overhead Cabinet (2400+2100 L x 350 D x 900 H) item OMR 0.00 List of any additional scope of works identified from site OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS A FLOOR FINISHES-refer to drawings flooring layout 1 Supply & fixing of Floor Tiles RAK-surface 2.0 -120x60 CM GLAZED PORCELAIN TILES. Location: Retail area ,Pantry Sqm Total : 8.0 FLOORS FINISHES Total : 6.0 DOORS & WINDOWS 7.0 JOINERY #Confidential


2 Supply & fixing of Mall Pop up flooring at the entrance. Sqm 3 Supply & fixing of Wooden LVT flooring oak wood Finish as per 3d design including all costs .Location: Training area Sqm 4 Supply and install of 6mm Carpet with approved colour power & data services to suit layout detailed in drawing - Small power plan Sqm 5 Supply and install flush fitting 10mm satin stainless steel threshold strips between demise and flooring areas. LS 6 Supply and laying 100mm thk cement screed to existing floor to receive new floor finish Sqm 7 Self leveling for LVT flooring & Carpet. Sqm List of any additional scope of works identified from drgs OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS A CEILING WORKS -refer to drawings ceiling layout 1 Gypsum Board Ceiling 1.1 Supply & Installation of Gypsum board false ceiling-12 mm fire rated.(Design attached) Sqm 1.2 Supply & Installation of 50 X 25 box Sections support for the Mdf panels ceiling,MDF slats 200 mm space below the gypsum ceiling as per design. item 1.3 Supply & Installation of 600 x 600 mm gypsum tiles as per 3d design .(Design attached) Sqm 2 Paint to Ceiling 2.1 Supply and application of Jotun white paint finish to gypsum ceiling and Metal frames LS 2.2 Supply & Installation of access door panels (Hinged type) for MEP services Nos 3 Ceiling Vodafone logo 3.1 Supply and Installation of Vodafone Neon Logo as per 3d Design. Size: 2000 x 2750 LS List of any additional scope of works identified from drgs OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS 1.1 Supply & fixing of Consultation table with wheel base to be made of Fire Resistant MDF and finished with Corian top .Length 1700mm Nos 1.2 Supply & fixing of Brands Display table with wheel base to be made of MDF and finished with veneer. Includes corean counter top with necessary cutting for electrical wires. Nos 1.3 Supply of Visitors seating-chair.Red fabric Nos 1.4 Supply of Gaming chairs Nos 1.5 Supply of training area seating chair-swiss Fabric Folding chair Nos 1.6 Supply of Storage area Lockers with digital controller. Nos 1.7 Supply of Double door fridge at the Pantry Brand - Kelon / Model No. - KRD-60WRS Nos 1.8 Supply & fixing of Meeting room table with solid surface top and SS leg. Dia 1000mm Nos 1.9 Supply & fixing of Meeting room chairs. Nos 2 Supply & fixing of 2 seater fabric sofa. Length 2200 Nos List of any additional scope of works identified from drgs OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS A Electrical Works (complete associated electrical works to be considered as per proposed layout, standards and mall guidelines). Prior to Quote Contractor to visit the site and verify the site condition in conjunction with the drawings, BoQ, Mall Guidelines and Vodafone guidelines. Any descripancies/queries shall be raised and clarified prior submission of the quotations. Contractor to Assume/Consider any required items/materials for the successful funtioning of the systems to be implemented. Contractor to Follow Garden Mall Technical Criteria for the Material Speciffication & Brands Approved. 1 Electrical Services-refer to drawing reflected ceiling plan/small power plan 1.1 Allow for all necessary electrical load calculations to suit the store power requirements item 1.2 Allow for relocation of DB item 1.3 Supply, Installation, Testing & Commissioning of small power points, outlets with HD PVC Conduit above ceiling, Floor, Wall Cladding, GI Conduit in Open areas, Wiring, supports, tray/trunking, Labelling, Identification and necessary accessories etc. complete required for a fully functional system to comply with the drawings, DB Schedule and mall guidelines. Required Spares & DLP Period of 1 year to be considered. LS 1.3.1 13A Switched Double Socket Outlet. Nos 1.3.2 Floorbox with 1Nos Switched Double Socket, 1 Nos Data RJ 45. Nos 1.3.3 20A SPN Isolator for Roller shutter Nos 1.3.4 20A SPN Isolator for Signage Light Nos 1.3.5 Analog/Digital Timer for Signage & Shop Front Light Control Nos 1.3.6 Electrical Power Point & Wiriing for FCU Nos 1.4 Supply, Installation, Testing & Commissioning of 12 Way TPN Distribution board with Isolator, RCCB, MCBs, RCDs, DB Dressing, Terminations, Cable laid in Tray from the Mall Isolator as per the drawings, DB Schedule and mall guidelines. Ls 1.5 Metalic Platform for Mall isoaltor, Sigange Isolator, Roller Shutter Isolator for the Safe Access During Maintenance as per site condition. Ls 1.6 Testing & Commissioning of the system with Megger Test Report, Live Test Report, etc. Ls 1.7 Preparation & Submission of As Built Drawings. Ls 9.0 CEILING FINISHES 11.0 ELECTRICAL SERVICES 10.0 FURNITURES Total : Total : Total : #Confidential


Contractor to List out and price any additional scope of works identified from drgs or site OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS A Electrical Works (complete associated electrical works to be considered as per proposed layout, standards and mall guidelines). Prior to Quote Contractor to visit the site and verify the site condition in conjunction with the drawings, BoQ, Mall Guidelines and Vodafone guidelines. Any descripancies/queries shall be raised and clarified prior submission of the quotations. Contractor to Assume/Consider any required items/materials for the successful funtioning of the systems to be implemented. Contractor to Follow Gardens mall Technical Criteria for the Material Speciffication & Brands Approved. 1 Supply, Installation, Testing & Commissioning of light points with HD PVC Conduit above ceiling, Floor, Wall Cladding, GI Conduit in Open areas, Wiring, supports, tray/trunking, Labelling, Identification and necessary accessories etc. complete required for a fully functional system to comply with the Vodafone Lighting Guidelines, drawings, DB Schedule and mall guidelines. Required Spares & DLP Period of 1 year to be considered. 1.1 L1 Nos 1.2 L2 Nos 1.3 L3 Nos 12.0 LIGHTING WORKS Total : #Confidential


1.4 L4 Nos 1.6 LED Strip Lights for the Vodafone Logos as per drawings and 3D views Ls 1.7 Supply, Installation, Testing & Commissioning of Emergency/Exit light points with GI Conduit, Fire Resistanat Wires, supports, tray/trunking, Labelling, Identification and necessary accessories etc. complete required for a fully functional system to comply with the PACDA guidelines, drawings, DB Schedule and mall guidelines. Required Spares & DLP Period of 1 year to be considered. item 2 Light Fixtures Supply, Install, Testing & Commissioning of Light Fixtures as per Vodafone Lighting Guidelines, drawings, 3D Views. Required Spares & DLP Period of 1 year to be considered. 2.1 L1 Nos 2.2 L2 Nos 2.3 L3 Nos 2.4 L4 Nos 2.6 LED Strip Lights for the Vodafone Logos as per drawings and 3D views Ls 2.7 Emergency Lights: LED Recessed circular type emergency light 50mm Dia with Self Contaiined 3 hours Battery Back ( PACDA Approved). Lux level to meet PACDA guidelines. Nos 2.8 Exit Light: LED Exit Sign, Mainatained Type Self-Contained 3 Hours Battery Back up (PACDA Approved) Nos Preparation & Submission of As Built Drawings. item Contractor to List out and price any additional scope of works identified from drgs or site OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS A ELV/IT/CCTV Works (complete associated works to be considered as per proposed layout, standards and mall guidelines). Prior to Quote Contractor to visit the site and verify the site condition in conjunction with the drawings, BoQ, Mall Guidelines and Vodafone guidelines. Any descripancies/queries shall be raised and clarified prior submission of the quotations. Contractor to Assume/Consider any required items/materials for the successful funtioning of the systems to be implemented. Contractor to Follow Gardens mall Technical Criteria for the Material Speciffication & Brands Approved. 1 CCTV: Supply, Install, Testing & Commissioning of CCTV System with 5MP IP Cameras, NVR, HDD, Rack Cabinet, Monitor,Cat 6 Cabling, Conduits, Trunking, Patching, RJ45 jacks, etc, Labelling, Identification and all accessories required for a complete functional CCTV system without black/grey spots in coverage as per drawing and standards. HDD Stoarage capacity shall be for a period of 3 months. Required Spares & DLP Period of 1 year to be considered. bRAND -HIKVISION Ls 6 Nos 2 IT/DATA: Supply, Install, Testing & Commissioning of Data,WiFi points, WiFi Access points, RJ45 terminals, modules, Cat 6 Cabling, Conduits,trunking, Pacth Panel, Pacth cords, etc. and Labelling, Identification all accessories, fittings required for the a fully functinal system as per drawings and standards. Required Spares & DLP Period of 1 year to be considered. Ls 3 SPEAKERS: Supply, Install, Testing & Commissioning of 6W ceiling mounted speaker (Brand: Bose) Color matching with the fitout design (Approved by Vodafone/fitout Designer) with the controller and Amplifier accessible through USB, Bluetooth, AUX, MiC options, wiring, conduits, interfaced with mall fire alarm evacuation system. Ls 4 Metalic Platform for Fiber Connection/Mall Wifi Access Point for the Safe Access During Maintenance as per site condition. Ls 5 Preparation & Submission of As Built Drawings. Ls Contractor to List out and price any additional scope of works identified from drgs or site OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS A Video/Led screen (complete associated works to be considered as per proposed layout, identifid guidelines and Drawings and 3D design). Prior to Quote Contractor to visit the site and verify the site condition in conjunction with the drawings, BoQ, Mall Guidelines and Vodafone guidelines. Any descripancies/queries shall be raised and clarified prior submission of the quotations. Contractor to Assume/Consider any required items/materials for the successful funtioning of the systems to be implemented. Contractor to Follow Gardens mall Technical Criteria for the Material Speciffication & Brands Approved. 1 Constant Led display Box at customer lounge area above gaming pod-3500 x 2200 mm in Size 2 Constant Led display screen at customer lounge area ,Remote store -320 x 640 mm in Size No 3 Led display screen at Training area -5000 x 3500 mm in Size 4 Supply and installation of of Samsung, 55 Inch Smart LED TV UHD-4K, UA55AU7000UXZN -wall mounted TV Or Similar Quality,at meeting room ,approved by client including all materials, wastage and labour etc. No 5 Led display screen at Waiting area -3000 x 2000 mm in Size 6 Felipi pantone colour wheel with led light fixed ,3000 mm Dia at customer lounge area,as per 3d design Contractor to List out and price any additional scope of works identified from drgs or site OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS Total : 14.0 VIDEO /DISPLAY LED SCREEN Total : 13.0 ELV/IT /CCTV WORKS Total : 15.0 FIRE ALARM & FIRE FIGHTING WORKS #Confidential


A FIRE ALARM & FIRE FIGHTING Works (complete associated works to be considered as per proposed layout, PACDA Approval standards and mall guidelines). Prior to Quote Contractor to visit the site and verify the site condition in conjunction with the drawings, BoQ, Mall Guidelines and Vodafone guidelines. Any descripancies/queries shall be raised and clarified prior submission of the quotations. Contractor to Assume/Consider any required items/materials for the successful funtioning of the systems to be implemented. Contractor to Follow Gardens mall Technical Criteria for the Material Speciffication & Brands Approved. 1 Fire Alarm: Relocation and commissioning of existing Addressable type Fire Alarm system with Smoke Detectors (Above & Below Ceiling ), Fire Rated Cabling, Manual Call points, Sounder, Flasher, Remote Indicators, FACP, GI Conduiting, etc supports, fittings, Labelling, Identification and accessories required for a fully functional system interfaced with mall fire alarm system as per PACDA Approved drawings, PACDA guidelines and Mall guidelines. The proposed fire alarm system shall be the same as mall's existing system. Ls 2 Fire Fighting: Relocation and commissioning of existing Fire Fighting sprinkler network (Above & Below Ceiling) with GI Sch 40 pipes, fittings, quick response sprinklers, U/L listed drain valve, supports, Labelling, Identification, any accessories required for a fully functional system interfaced with the mall systems as per PACDA Approved drawings, Mall Guidelines, PACDA Guidelines. Ls 3 Interfacing charges for coordinating with the mall facility team and interfacing tenant fire alarm/fire fighting systems with the mall systems. Ls 4 Fire Consultant & Authority Approval fees/charges and Obtaininig the PACDA design and final approval. Ls 5 Metalic Platform for IFUs, Drain Valave & Sprinkler Connection Point for the Safe Access During Maintenance as per site condition. Ls Preparation & Submission of As Built Drawings. item Contractor to List out and price any additional scope of works identified from drgs or site OMR 0.00 Item Description Quantity Unit Unit Price (OMR) Total Price (OMR) REMARKS A HVAC DUCT Works (complete associated works to be considered as per proposed layout, standards and mall guidelines). Prior to Quote Contractor to visit the site and verify the site condition in conjunction with the drawings, BoQ, Mall Guidelines and Vodafone guidelines. Any descripancies/queries shall be raised and clarified prior submission of the quotations. Contractor to Assume/Consider any required items/materials for the successful funtioning of the systems to be implemented. Contractor to Follow Gardens mall Technical Criteria for the Material Speciffication & Brands Approved. 1 DUCT: Supply, Install, Testing & Commissioinig of Phenolic type PI Duct fabricated as per sizes in the drawings, with acoustic insulation liner (upto 3m), with supports, plenum boxes, VCDs, Flexible ducts, Ring VCD etc, Labelling, Identification for a fully functional system as per drawings and mall guidelines. Sqm 2 GRILLE/DIFFUSERS: Supply, Install, Testing & Commissioning of 2 slots linear diffuser color matching with the fit out design flow and quantity as per drawings and mall guidelines. Ls 3 AIR BALANCING: Allow for Air Balalncing and Submit Report after the installation as per the design drawings and mall guidelines. Ls 4 Metalic Platform for BTUs, FCU, for the Safe Access During Maintenance as per site condition. Ls Preparation & Submission of As Built Drawings. Ls Contractor to List out and price any additional scope of works identified from drgs or site OMR 0.00 1 DETAILED DESIGN 2 PRELIMINARIES 3 DEMOLITIONS & ALTERATIONS 4 SHOPFRONT 5 WALL PARTITIONS & WALL FINISHES 6 DOORS & WINDOWS 7 JOINERY 8 FLOORS FINISHES 9 CEILING FINISHES 10 FURNITURES 11 ELECTRICAL SERVICES 12 LIGHTING WORKS 13 ELV/IT/CCTV WORKS 14 VIDEO/LED DISPLAY SCREEN 15 FIRE ALARM & FIRE FIGHTING WORKS 16 HVAC WORKS ALL ITEMS MENTIONED ABOVE ARE SUBJECTED TO PRIOR CLIENT SIDE APPROVAL BASED ON MAR SUBMITTALS & LOCAL MARKET AVAILIBITY (Ref: ) 16.0 HVAC WORKS Total : SUMMARRY OMR 0.00 Total : OMR 0.00 OMR 0.00 OMR 0.00 OMR 0.00 OMR 0.00 Total : OMR 0.00 OMR 0.00 OMR 0.00 OMR 0.00 OMR 0.00 OMR 0.00 OMR 0.00 OMR 0.00 OMR 0.00 OMR 0.00 OMR 0.00 #Confidential


Click to View FlipBook Version