Week 8 51
INTI CENTER OF ART AND DESIGN
ADS2888 Industry Placement LOG SHEET
Name & Student I.D HUI SHUET YEE J19031674
Supervisor's Name NABILA WAWAN
Company Myra (OIB)
Week:8 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUPERVISOR'S VERIFICATION
( 10/5/21 ) ( 11/5/21 ) ( 12/5/21 ) (13/5/21 ) ( 14/5/21 ) ( 15/5/21 )
DAY AND DATE
HARI RAYA
After receiving some
DETAILED Since there are a lot Today, I created a feedback on the HARI RAYA DAY OFF
DESCRIPTION OF of videos waiting in short animated clip animation I did
DAILY TASKS: queue for edit at this (via After Effects) that yesterday, i did some
PROJECT NAME time, and i was feeling will be put into retouching as there
DUTIES a lot more confident Ramadan Challenge's were a few
TASKS with my video editing final video. The amendments needed.
ACHIEVED skills already, I purpose of it was to Then, I was asked to
GOALS offered to help take help quickly explain design an Instagram
charge of fully editing the rules of the post as the ideas I
Joel's videos. So, I challenges. Then, I propose yesterday
was blessed to be was drafting a few was approved by my
trusted on this new content ideas supervisor. Starting
responsibility and that could be shared today, I was
started my tasks right on Myra's social encouraged to start
away. By the end of media as well as writing and drafting
the day, I managed to proposing design out my own contents
complete 60% of the ideas for the posts. for social media too
edits for one of the After that, i helped to instead of just helping
videos. (Q&A video review and trim the with the designs. This
about home raw footages that we has been a personal
insurance) have collected from goal of mine that i'm
Ramdan challenge. so happy to achieve
during this internship.
52 Week 9
INTI CENTER OF ART AND DESIGN
ADS2888 Industry Placement LOG SHEET
Name & Student I.D HUI SHUET YEE J19031674
Supervisor's Name NABILA WAWAN
Company Myra (OIB)
Week:9 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUPERVISOR'S VERIFICATION
( 17/5/21 ) ( 18/5/21 ) ( 19/5/21 ) (20/5/21 ) ( 21/5/21 ) ( 15/5/21 )
DAY AND DATE
DAY OFF
Spent most of my day I started off the day Today, I was asked to There were a few I carried on with the
with making some design a voucher
today editing the Q&A final amendments for template for Myra's animated elements video editing for
Joel's Q&A video (that monthly "greencard"
video for Joel from I completed winners. Greencards that I had to create via ChindianGainz'
yesterday) after are something like
where I left off last receiving feedback virtual collectable After Effects today. workout videos from
from the team. After points for doing
week, which I that, I moved on to good/performing well These elements where I left off
planning and drafting at work, that will be
managed to complete out more content given through our would be used in yesterday. I then
ideas for Myra's social company's
during late afternoon. media. Then, I communication app ChindianGainz' managed to complete
designed a post titled called "Slack".Later
DETAILED Then, I proceed to "WFH: level up your that day, I designed a workout videos that editing all 3 of the
productivity". I post for Instagram
DESCRIPTION After Effects and decided to share this titled "set-up ideas for we shot at Myra Alam workout videos later in
OF DAILY content so that i can your desk". I wanted
TASKS: created a short share some simple to share this as 2 weeks ago. I the afternoon. After
tips and tricks that will content because it is
PROJECT NAME animated clip that help boost productivity proven that having a created elements like that, I proceed to draft
DUTIES for people who are clean and tidy work
TASKS would be use in all of working from home desk helps keeps us a countdown timer out more content
ACHIEVED Joel's videos. like myself. motivated and stay
creative. and a human body ideas for Myra's social
GOALS Unfortunately, i diagram that shows media. I also
couldn't get as much the area of the managed to get 1
done today as i muscles worked for instagram post design
planned to because i each different workout done before the day
had some personal moves. I also helped ends. I feel so
errands to run for my the editor to edit some accomplished for able
family so I was away parts of the workout to complete so much
for about 2 hours. videos afterwards. work in a day.
Week 10 53
INTI CENTER OF ART AND DESIGN
ADS2888 Industry Placement LOG SHEET
Name & Student I.D HUI SHUET YEE J19031674
Supervisor's Name NABILA WAWAN
Company Myra (OIB)
Week:10 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUPERVISOR'S VERIFICATION
( 24/5/21 ) ( 25/5/21 ) ( 26/5/21 ) (27/5/21 ) ( 28/5/21 ) ( 29/5/21 )
DAY AND DATE
Today, I designed and
Designed and wrote Spent most of my day wrote out the contents Started off my day by I started editing the
designing 7 different for a post about editing another 15 second video for
out the contents for 2 video thumbnails from repurposing glass second teaser video Joel's video about
all the videos that we bottles. This post is to like what I did home insurance which
posts today. 1 of it have filmed to date encourage people to yesterday, but this I managed to get 60%
(that are done and get involved with time it's for of the video done by
which is about ready to go). After recyling and crafting. Apronfools. Next, I late afternoon. Then, I
that, I designed a post Next, I made some had to help out my helped the
benefits of sleeping for Wesak Day. It is a ammendments to the colleague with some videographer with
post with greetings as thumbnails that I works that has to be some quick animation
DETAILED early, while the other well as with a fun fact helped designed done via Photoshop. works via AfterEffects.
about this festival. yesterday. Before the The elements will be Before the day ends, I
DESCRIPTION one is a series or Before the day ends, day ends, I managed used in a post later managed to design
OF DAILY the videographer and to edit a short 15 on. Then, i managed and write the content
TASKS: easy dessert recipe I hopped on a call second teaser video to design and also for one new Instagram DAY OFF
together and for Myra's write the content for a post. It is a post about
PROJECT NAME for begginers to try at brainstormed for more collaboration with new post about tips on organizing
DUTIES content ideas. ChindianGainz. This interior styling ideas your kitchen sheleves.
TASKS home. Then, I made teaser video is to help using mirrors.
ACHIEVED some ammendments hype up our followers
GOALS to the animated intro
for our YouTube
videos. I had to
change the
background colors
and title name for it.
for this event.
54 Week 11
INTI CENTER OF ART AND DESIGN
ADS2888 Industry Placement LOG SHEET
Name & Student I.D HUI SHUET YEE J19031674
Supervisor's Name NABILA WAWAN
Company Myra (OIB)
Week:11 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUPERVISOR'S VERIFICATION
( 31/5/21 ) ( 1/6/21 ) ( 2/6/21 ) (3/6/21 ) ( 4/6/21 ) ( 5/6/21 )
DAY AND DATE
Firstly, some My first task for today
was to design a post
ammendments were regarding the
extension of the HOC
needed for the post I campaign. Since this Spent my morning My main focus for
was uplanned, I had today was content
designed yesterday. to do some research Adjustments were writing a copy of planning and
and fact checks about designing. I managed
Then, I was asked to the topic on the spot needed for the HOC subtitles on Google to add 4 new ideas +
before I start drafting content copies to the
prepare 7 different 15 out the copies as well post I designed sheets for Joel's Q&A social media calendar.
as ddesigning it. Then, I helped
second teaser videos Then, i made some yesterday. Then, I video. This is done so designed 2 new posts
slight ammendments for Instagram. 1 of it
for all of the videos to the teaser videos i spent most of my day that me senior could which is about space-
edited yesterday. saving furnitures and
which were fully After that, I joined a editing a new video check on any DIY shoe
meeting to get briefed refresheners. After
DETAILED edited and are ready on Myra's new for Joel. This is a fun mistakes before I add that, I decided to
branding campaign design 2 different
DESCRIPTION to go (Apronfools and called "Bring Myra and informative Q&A them into the final thumbnails for Joel's
OF DAILY Home". I am so glad videos: Personal
TASKS: ChindianGainz). and happy that I was video, so I had a lot of video. While waiting insurance FAQ + DAY OFF
able to be part of the Home insurance Q&A.
PROJECT NAME These will be used as planning behind this fun editing it. for comments, I
DUTIES huge campaign.
TASKS CTA posts on our Surprisingly, I moved on to
ACHIEVED Instagram to attract
managed to get 80% designing a post
GOALS more viewers on our of the edits to be done about trendy interior
YouTube channel. before the day ends. color moodboards. I
Then, something Also, I had a short was also asked to
tradgic happened to huddle with the brainstorm for more
me as i lost the video videographer to social media content
file from last Friday's brainstorm some new ideas by adding them
edit. Thankfully, i was video content ideas. to the social media
told that it is okay and calendar.
i can move on to
another video.
Week 12 55
INTI CENTER OF ART AND DESIGN
ADS2888 Industry Placement LOG SHEET
Name & Student I.D HUI SHUET YEE J19031674
Supervisor's Name NABILA WAWAN
Company Myra (OIB)
Week:12 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUPERVISOR'S VERIFICATION
( 7/6/21 ) ( 8/6/21 ) ( 9/6/21 ) (10/6/21 ) ( 11/6/21 ) ( 12/6/21 )
DAY AND DATE
DAY OFF
I had to make some Our team gathered for
ammendments to the We had a team meeting a dry run for Townhall
in the morning to later. Townhall is a
copies for the content I've listed out some discuss about company gathering
tomorrow's virtual held every 3 months to
ideas that I've added visual ideas for Bring Townhall on Google openly talk about
Meet. Me and the other revenues, new targets,
to social media Myra Home's ad 2 interns were asked to new culture theme and
take part in hosting it as many more. We don't
calendar last week. I campaign storyboard. well. This a very exciting normally hold
and I went on to editing townhalls virtually, but
also added new Afterwards, I went on 2 teaser vidoes for Joel we were tied to do so
like how I did for the due to FMCO. After
content ideas while I to have a discussion other partnering lunch, the entire
vendors. Then, I also company of 120+
was at it. Since it is about it with the team. edited the video I shot people gathered on
yesterday. Next, I Google Meet as
DETAILED National best friend's Then, I took a video of managed to add 2 more Townhall starts. My
DESCRIPTION content ideas and its part of hosting was to
OF DAILY day today, I was asked myself in Instagram copies onto social talk about video
TASKS: media calendar. After contents as well as
PROJECT NAME AGONG'S to stitch up a short but reels format (30 that, I went on with showcasing them
DUTIES BIRTHDAY designing 2 new posts together with the
TASKS fun video that will be seoonds) to talk about for social media. videographer as i was
ACHIEVED involved in all of the
GOALS posted on Instagram home education. This
later today. The is a 5 part series that
footages of the video i'll be filming and
were shot back in April editing for this 2
when we were visiting weeks. Lastly, I had to
Myra Putra's site and make some
sales gallery. Then, I ammendments to
managed to finish up Joel's video
Joel's home insurance thumbnails using both
Q&A video by adding AI and Photoshop.
in the subtitles before
the day ends. productions.
56 Week 13
INTI CENTER OF ART AND DESIGN
ADS2888 Industry Placement LOG SHEET
Name & Student I.D HUI SHUET YEE J19031674
Supervisor's Name ELIZABETH ANG
Company Myra (OIB)
Week:13 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUPERVISOR'S VERIFICATION
( 14/6/21 ) ( 15/6/21 ) ( 16/6/21 ) (17/6/21 ) ( 18/6/21 ) ( 19/6/21 )
DAY AND DATE
DAY OFF
In the morning, I
I managed to edit an continued
IG reel video before
DETAILED lunch today. It is a I was told to focus on I spent my morning Today, my focus is brainstorming for new
DESCRIPTION follow up video for the content writing and editing the IG reel purely on designing content ideas and
OF DAILY first part of planning for social video I shot and content planning. posted them on
TASKS: homebuying video media as my yesterday. Then, I I managed to social media
PROJECT NAME guide (5 part series) internship will be proceeded to design designed 3 posts calendar. Then, I
DUTIES that I shot last week. coming to an end 2 new posts for social throughout the day moved on to
TASKS After that, I designed soon. This is done so media. 1 of it which for the first time here designing and writing
ACHIEVED and wrote the content that I'll be able to was about "increase and I'm very proud of the copies for 2 new
GOALS for a post about "Fun push out more vegetable intakes that new social media posts. 1
online games". This designs in one go painlessly" as it will achievement. of which is about
is a fun post to once the contents are be "national eat your Everyone seems to "household items you
remind Myra's approved. Then, I veggies day" be impressed at my didn't know you
followers to stay continued shooting tomorrow. Since this momentum as well. 2 needed" while the
connected (virtually) an IG reel for the 5 was a last minute of the posts are home- other one is a post
with the people part series for plan, I had to write living related contents sharing the benefits
around them even homebuying guide. the copies for it on - "Affordable of taking breaks.
when we're stucked Lastly, I helped the the spot as well as tablewares and Then, I also managed
at home. After that, i video editor to designing it. After where to get them", to shoot a quick IG
had some time to animate the outro for that, I managed to "Ideas on decorating reel for the 5 part
spare so i decided to one of Concrete design 1 more post your balcony" and the series before hoping
brainstorm for more Dezign's video via about a tip on saving last and final one is on to a team meeting.
content ideas and AfterEffects. electricity at home for Father's day wish We played games
post in on social before calling it a day. + a fun fact about this and shared our
media calendar. festival. individual
achievements in the
past week as a team
bonding session.
Week 14 57
INTI CENTER OF ART AND DESIGN
ADS2888 Industry Placement LOG SHEET
Name & Student I.D HUI SHUET YEE J19031674
Supervisor's Name ELIZABETH ANG
Company Myra (OIB)
Week:14 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUPERVISOR'S VERIFICATION
( 21/6/21 ) ( 22/6/21 ) ( 23/6/21 ) (24/6/21 ) ( 25/6/21 ) ( 26/6/21 )
DAY AND DATE
DETAILED I've decided to shoot Today, our team END OF INTERNSHIP
DESCRIPTION and edit part 4 of the headed back to the
OF DAILY IG reel homebuying office in the morning to
TASKS: video guide over the send our goodbyes
PROJECT NAME weekend to save time because it's
DUTIES because my internship coincidentally the last
TASKS is coming to an end day of work for Nabila
ACHIEVED already. Then, I (my supervisor) and I. I
GOALS continued designing had to go back to the
and writing the copies office to pack my
for 2 new posts for filming equipments.
social media. 1 of Even though it's the
which was about "crafty end of my internship,
hobbies that you i've already decided to
should try at home" stay and continue
while the other one is working for Myra as a
tips on managing your part time graphic
monthly income. I've designer because I felt
also decided to go all like I've haven't learned
out and OT tonight and enough yet. Myra has
managed to shoot and been unbelievably
edit the final part of the forgiving and kind to
IG reels and so i'll be me and which I wish to
offically done with my stay around with the
tasks on my timeline. awesome team for a
little longer.
DOCUMENTATION
58
First Site Visit
59
60 VP Day Storyboadring
Myra Alam VP Day Shoot
61
Video Flow + MoodboardMYRA X CONCRETE DESIGN
Filming date: 17th April 2021
Location: Empire City Damansara
Time: 10am- 2pm
Concept of video:
Minimal, grey and white. Hints of greenery.
Video 1
The basics of pottery making (white/grey cement)
No camera setups required, only hand held footages to achieve raw and aesthetic feels.
Reference:
https://www.youtube.com/watch?v=JOko1ygjPwk&ab_channel=august%26february
https://www.youtube.com/watch?v=pvOEcZCQjbk&ab_channel=JesseRichards
Video 2
Colour pigment ft. Myra
Requires 1 main camera setup on the tripod (centered, upfront). Could be a close up on just the
hands while carrying out pigmentation. The other camera will be hand held, shooting from
different angles around the set to achieve aesthetic shots. Faces will be shown in this video,
casual small talks are okay during shoot to achieve a relaxed vibe. Short intro and outro lead by
Myra.
Reference:
https://www.youtube.com/watch?v=gkQWvqwmQGA
62
Myra X Concrete Dezign
63
64 Social Media Calendar
Pinterest Board
65
66 Youtube Thumbnail Design
Animation
67
Content Design
68
69
HUI SHUETYEE J19031674
INDUSTRY WORK PLACEMENT REPORT