PPM

Cavendish - Asset Schedule Rev B

Reference/Description Description Location/Serving (25 Qty Manufacturer Model No. Maintenance Interval
Characters)
Domestic Water Services DHWS 1 Grundfos MAGNA3 25-120 N 180 Annually
Recirculating Pump BCWS Plant Room 1 Dewy Water Special Annually
Cold Water Storage Tank DHWS 2 GMS TFE-110(x)/1000 Annually
Packaged Plate Heat Exchangers (integral pump) BCWS Plant Room 1 Grundfos Hydro GTI-E 1 X CME 5-3 Annually
CAT 5 Booster Set BCWS Basement Plant Room 1 Grundfos Hydro MPC-E 3 CRIE15-5 U2 D-A-A-GHJ Annually
Booster Set CWS Plant Room 1 Hydrotec HydroDOS HD550G (Warranty valid with Hydrotec Chemicals Only) Half Yearly
Chloine Dioxide Dosing Unit (Inc Gas Alarm) CWS Tank Room 1 Arro Valves Arrow Midi 2A AB 230V
Retail Break Tank & Booster Tank Room Service with Veolia?
Heating Services MTHW Retail Bin Store 1 Veolia Veolia Veolia Package to be agreed
Main MTHW Plate Heat Exchangers - FI MTHW 1 Veolia Veolia Annually
MTHW Plate Heat Exchangers LTHW B1 Plant Room 2 Grundfos TPE 100-130/4-A-F-A-BQQE Annually
Primary Pumps - FI LTHW Plant Room 2 Grundfos TPE 65-250/2-A-F-A-BQQE Annually
CT Pumps - FI LTHW B1 Plant Room 2 Grundfos MAGNA3 40-150 F 250 Annually
CT to DHW Pumps - FI LTHW B1 Plant Room 1 Grundfos TPED 40-430/2-A-F-A-BQQE Annually
Primary Pump (Retail) LTHW B1 Plant Room 1 Grundfos TPED 40-430/2-A-F-A-BQQE Annually
Secondary Pump (Retail) LTHW Plant Room 2 BSS Vexo XPOT BOSS Annually
Air Dirt Seperators, Dosing Pot - FI LTHW Plant Room 1 Grundfos PHD C150 Annually
Pressurisation Unit (FI) LTHW FI Plantroom - Basement 1 Grundfos PHD C250
Pressurisation Unit (Retail) LTHW B1 Plant Room 21 Quinn HI-LO ROUND TOP Annually
Radiators LTHW B1 Plant Room 1 Kampmann Katherm NT Annually
Trench Heating LTHW Site Wide 1 Warmafloor Annually
Underfloor Heating Manifold LTHW Recpetion 1 Warmafloor (Grundfos) Alpha 2L 15-60 Annually
Underfloor Heating Pump LTHW Reception 1 Warmafloor Annually
Underfloor Heating Manifold LTHW Reception 1 Warmafloor (Grundfos) Alpha 2L 15-60 Annually
Underfloor Heating Pump LTHW Atrium 2 Teddington Tubus 2-V-225-N Annually
Overdoor Air Curtain LTHW Atrium 1 Teddington Saphir-1-220-N
Overdoor Air Curtain LTHW FI L10 Entrance 2 BSS Vexo XPOT BOSS Weekly checks, service package to be agreed with manufacture - minimum annual service
Air Dirt Seperators, Dosing Pot LTHW SCC L10 Entrance 30 Oventrop Oventrop Weekly checks, service package to be agreed with manufacture - minimum annual service
General Control Valves FI Plantroom - Basement Annually
Chilled Water Services CHW Various Plant Areas 2 Trane RTAF 280 HSE XLN Annually
Chillers CHW 1 Trane RTAF 190 HSE XLN Annually
Chiller (Integral Primary Pump) CHW Roof 2 Grundfos TPE 150-110/4-A-F-A-BQQE Annually
Primary Pumps FI CHW Roof 2 Grundfos TPE 150-220/4-A-F-A-BQQE Annually
Secondary Pumps FI CHW Plant Room 1 Grundfos TPED 125-130/4-A-F-A-BQQE
Secondary Pump (Retail) CHW Plant Room 1 Grundfos PHD C150 Quarterly Filter Check & Annual Service
Pressurisation Unit (FI) CHW Plant Room 2 Grundfos PHD C250 Quarterly Filter Check & Annual Service
Pressurisation Unit (Retail) CHW Plant Room 30 Oventrop Oventrop Quarterly Filter Check & Annual Service
General Control Valves Plant Room Quarterly Filter Check & Annual Service
Ventilation Services Ventilation Various 44 Ability Projects MAT270-SB Quarterly Filter Check & Annual Service
Fan Coil Units Ventilation 70 Ability Projects MAT270-SB Quarterly Filter Check & Annual Service
Fan Coil Units Ventilation Level 50 70 Ability Projects MAT270-SB See below components
Fan Coil Units Ventilation Level 40 66 Ability Projects MAT270-SB Half Yearly
Fan Coil Units Ventilation Level 30 2 Ability Projects MAT270-SB Half Yearly
Fan Coil Units Ventilation Level 20 1 Ability Projects MAT270-SB Half Yearly
Fan Coil Units Ventilation Level 10 1 Air Handling Systems AHS16339-01-0 Annually
AHU (Unit 1) Ventilation Level 00 1 Comefri NPL630S4C6EFF20750 Annually
Supply Fan Ventilation Roof 1 Comefri NPA630-C6EFF20550 Weekly Check
Extract Fan Ventilation Roof 1 Air Handling Systems SH1-NL-SV-2800-SD-V1-A1-5,W2970,H2970,SHM-ErP-2018.00 Weekly Check
Recouperator Ventilation Roof 1 Air Handling Systems P40-16AC 1R-38T-2865A-6.0Pa Cu/Al-RHS Quarterly Service package to be agreed
Heating Coil Ventilation Roof 1 Air Handling Systems P40-16AR 2R-38T-2850A-4.0Pa Cu/Al-RHS See below components
Cooling Coil Ventilation Roof 30 Aeropleat G4
Panel Filter Ventilation Roof 15 Basic Flo F7
Bag Filter Ventilation Roof 1 HygroMatik SLE 45
Humidifier Ventilation Roof 1 Air Handling Systems AHS16339-02-0
AHU (Unit 2) Roof
Roof
34692/PRC/E1/DRAFT
Page 1 23/01/2019

Reference/Description Description Location/Serving (25 Qty Manufacturer Model No. Maintenance Interval
Characters)
Supply Fan Ventilation 1 Comefri NPA630-C4EFF10750 Half Yearly
Extract Fan Ventilation Roof 1 Comefri NPA630-C6EFF20550 Half Yearly
Recouperator Ventilation Roof 1 Air Handling Systems SH1-NL-SV-2850-DS-V1-A1-5,W3050,H3050,SHM-ErP-2018.00 Half Yearly
Heating Coil Ventilation Roof 1 Air Handling Systems P40-16AC 1R-38T-2860A-6.0Pa Cu/Al-RHS Annually
Cooling Coil Ventilation Roof 1 Air Handling Systems P40-16AR 2R-38T-2850A-4.0Pa Cu/Al-RHS Annually
Panel Filter Ventilation Roof 30 Aeropleat G4 Weekly Check
Bag Filter Ventilation Roof 15 Basic Flo F7 Weekly Check
Humidifier Ventilation Roof 1 HygroMatik SLE 45 Quarterly Service package to be agreed
AHU (Unit 3) Ventilation Roof 1 Air Handling Systems AHS16339-03-0 See below components
Supply Fan Ventilation Roof 1 Comefri NPA450-C4EFF10400 Half Yearly
Extract Fan Ventilation Roof 1 Comefri NPA450-C4EFF10220 Half Yearly
Recouperator Ventilation Roof 1 Air Handling Systems SH1-LL-SV-1850-SD-V1-A1-5,W1990,H1990,SHM-ErP-2018.00 Half Yearly
Heating Coil Ventilation Roof 1 Air Handling Systems P40-16AC 1R-28T-1865A-6.0Pa Cu/Al-RHS Annually
Cooling Coil Ventilation Roof 1 Air Handling Systems P40-16AR 2R-28T-1860A-3.0Pa Cu/Al-RHS Annually
Panel Filter Ventilation Roof 16 Aeropleat G4 Weekly Check
Bag Filter Ventilation Roof 8 Basic Flo F7 Weekly Check
Humidifier Ventilation Roof 1 HygroMatik SLE 45 SLE 45
AHU (Unit 4) Ventilation Roof 1 Air Handling Systems AHS16339-04-0 See below components
Supply Fan Ventilation Roof 1 Comefri NPA450-C4EFF10550 Half Yearly
Extract Fan Ventilation Roof 1 Comefri NPA450-C4EFF10300 Half Yearly
Recouperator Ventilation Roof 1 Air Handling Systems SH1-LL-WV-1500-CS-V1-A1-5,W1600,H1600-ErP-2018.00 Half Yearly
Heating Coil Ventilation Roof 1 Air Handling Systems P40-16AC 1R-21T-1525A-6.0Pa Cu/Al-RHS Annually
Cooling Coil Ventilation Roof 1 Air Handling Systems P40-16AR 2R-21T-1515A-4.0Pa Cu/Al-RHS Annually
Panel Filter Ventilation Roof 6 Aeropleat G4 Weekly Check
Bag Filter Ventilation Roof 12 Basic Flo F7 Weekly Check
Humidifier Ventilation Roof 1 HygroMatik SLE 45 SLE 45
AHU (Unit 5) Ventilation Roof 1 Air Handling Systems AHS16339-05-0 See below components
Supply Fan Ventilation Roof 1 Comefri NPA500-C4EFF10400 Half Yearly
Extract Fan Ventilation Roof 1 Comefri NPA450-C4EFF10300 Half Yearly
Recouperator Ventilation Roof 1 Air Handling Systems SH1-LL-WV-1350-CS-V1-A1-5,W1450,H1450-ErP-2018.00 Half Yearly
Heating Coil Ventilation Roof 1 Air Handling Systems P40-16AC 1R-21T-1375A-3.0Pa Cu/Al-RHS Annually
Cooling Coil Ventilation Roof 1 Air Handling Systems P40-16AR 2R-21T-1365A-4.0Pa Cu/Al-RHS Annually
Panel Filter Ventilation Roof 6 Aeropleat G4 Weekly Check
Bag Filter Ventilation Roof 12 Basic Flo F7 Weekly Check
Humidifiers Ventilation Roof 1 HygroMatik SLE 45 Quarterly Service package to be agreed
AHU (Unit 6) Ventilation Roof 1 Air Handling Systems AHS16339-08-0
Supply Fan Ventilation Roof 1 Comefri NPA500-C4EFF10400 See below components
Extract Fan Ventilation Roof 1 Comefri NPA450-C4EFF10300 Half Yearly
Recouperator Ventilation Roof 1 Air Handling Systems SH1-LL-WV-1350-CS-V1-A1-5,W1450,H1450-ErP-2018.00 Half Yearly
Heating Coil Ventilation Roof 1 Air Handling Systems P40-16AC 1R-21T-1375A-3.0Pa Cu/Al-RHS Half Yearly
Cooling Coil Ventilation Roof 1 Air Handling Systems P40-16AR 2R-21T-1365A-4.0Pa Cu/Al-RHS Half Yearly
Panel Filter Ventilation Roof 6 Aeropleat G4 Annually
Bag Filter Ventilation Roof 12 Basic Flo F7 Weekly Check
AHU (Retail Unit 1) Ventilation Roof 1 Air Handling Systems AHS16339-06-0 See below components
Supply Fan Ventilation Roof 1 Comefri NPA630-C4EFF11100 Half Yearly
Extract Fan Ventilation Roof 1 Comefri NPA630-C4EFF10550 Half Yearly
Recouperator Ventilation Roof 1 Air Handling Systems ST1-NL-WV-2200-CS-V1-A1-3,W2300,H2300-ErP-2018.00 Half Yearly
Heating Coil Ventilation Roof 1 Air Handling Systems P40-16AC 1R-28T-2265A-4.0Pa Cu/Al-RHS Half Yearly
Panel Filter Ventilation Roof 16 Aeropleat G4 Annually
Bag Filter Ventilation Roof 8 Basic Flo F7 Weekly Check
AHU (Retail Unit 2) Ventilation Roof 1 Air Handling Systems AHS16339-07-0
Supply Fan Ventilation Roof 1 Comefri NPA800-C6EFF21850
Extract Fan Ventilation Roof 1 Comefri NPA710-C6EFF21100
Recouperator Ventilation Roof 1 Air Handling Systems ST1-NL-SV-2600-SD-V1-A1-3,W2770,H2770,SHM-ErP-2018.00
Heating Coil Ventilation Roof 1 Air Handling Systems P40-16AC 1R-33T-2615A-4.0Pa Cu/Al-RHS
Panel Filter Ventilation Roof 20 Aeropleat G4
Bag Filter Ventilation Roof 10 Basic Flo F7
Roof
34692/PRC/E1/DRAFT Page 2
23/01/2019

Reference/Description Description Location/Serving (25 Qty Manufacturer Model No. Maintenance Interval
Characters)
Toilet Extract Fan 01 Ventilation 1 Sovereign Air Movement SOV-VT-6 / Z00000200 Annually
Toilet Extract Fan 02 Ventilation Roof 1 Sovereign Air Movement SOV-VT-5 / Z00001978 Annually
Toilet Extract Fan 03 Ventilation Roof 1 Sovereign Air Movement SOV-VT-7 / Z00000501 Annually
Toilet Extract Fan 04 Ventilation Roof 1 Sovereign Air Movement TD-160-100-T Annually
Diry Extract - Retail Ventilation Recpetion Toilet 1 Sovereign Air Movement Twin Fan SOV-VT-8-TWIN
Air Heat Recovery Unit Ventilation Retail Areas 1 Air Handling Systems AIR HRU4-P-SR-X-FCS-WH-X Half Yearly
Grilles, Diffusers & Louvres Ventilation Management Suite - Level 00 1008 Trox LVS, AE, SDW Annual Clean
Attenuators - FI Ventilation Site Wide 94 Allaway Acoustics SP, SL, PL Annually
Attenuators - Retail Ventilation Site Wide 14 Allaway Acoustics SP Annually
VAV Boxes - FI Ventilation Site Wide 55 Trox TZ-Silenzio, TVJD-Easy Annually
CAV Boxes - FI Ventilation Site Wide - FI 5 Trox END-00-P1 Annually
VAV Boxes (Supply, Extract, D Extract) - Retail Ventilation Site Wide - FI 22 Trox TZ-Silenzio, TVJD-Easy Annually
Site Wide
Motorised Smoke Dampers - Actionair Addressable Damnper Panel Ventilation 1 Actionair Actionair LNS4 Annually
Motorised Smoke Dampers - Actionair Addressable Dampers Ventilation Management Suite - Level 00 129 Actionair Smokeshield Annually
Site Wide - FI Actionair LNS1
Motorised Smoke Dampers - Actionair Addressable Damnper Panel Ventilation 1 Actionair Smokeshield Annually
Motorised Smoke Dampers - Actionair Addressable Dampers Ventilation Management Suite - Level 00 5 Actionair 0160 Series Annually
Fire Dampers - Within Fire Barriers Ventilation Site Wide - Retail 62 Advanced Air Smoke Shield Annual Test
Fire Dampers - Retail Ventilation Level 20-50 FI 27 Advanced Air Annual Test
Smoke Ventilation Services Site Wide - Retail JM Aerofoil / HTM63JM/31/2/3/26
Basement FI Extract Fans Smoke Clearance FSD-TD Series Half Yearly
Basement FI Discharge Damper Smoke Clearance Plant Room 2 Flaktwoods SmokeShield Half Yearly
Basement FI Smoke Dampers Smoke Clearance Site Wide 2 BSB Type C Half Yearly
Basement FI Attenuators Smoke Clearance Site Wide 28 Action Air JMv Aerofoil / HT100JMv/31/4/5/24 Half Yearly
Car Park Extract Fans Smoke Clearance Site Wide 4 Flaktwoods JTv Slim Line / 31JTv-3SL-UBD-ISL Half Yearly
Car Park Impulse Fans Smoke Clearance Car Park 3 Flaktwoods Type C Half Yearly
Car Park Attenuators Smoke Clearance Car Park 5 Flaktwoods JM Aerofoil / HTM63JM/31/2/3/26 Half Yearly
Atrium Extract Fans Smoke Clearance Car Park 3 Flaktwoods Type C Half Yearly
Atrium Smoke Vent Attenuators Smoke Clearance Plant Room 2 Flaktwoods FSD-TD Series Half Yearly
Atrium Smoke Vent Discharge Damper Smoke Clearance Site Wide 4 Flaktwoods Series 54 Half Yearly
Atrium Smoke Vent Dampers Smoke Clearance Site Wide 2 BSB JM Aerofoil / HTM63JM/31/2/3/26 Half Yearly
Smoke Shaft Fans Smoke Clearance Level 20 & Roof 2 ADS Roof Open Sky louvre ventilator / OSREN0611/T/Q/UA Half Yearly
Stair Core 1 Smoke Ventilators Smoke Clearance Roof 2 Flaktwoods Type C Half Yearly
Stair Core 1 Smoke Vent Attenuators Smoke Clearance Roof 1 ADS FSD-TD Series Half Yearly
Stair Core 1 Smoke Vent Discharge Damper Smoke Clearance Roof 2 Flaktwoods Series 54 Half Yearly
Stair Core 1 Smoke Vent Smoke Damper Smoke Clearance Core 1 All levels 1 BSB Roof Open Sky louvre ventilator / OSREN0611/T/Q/UA Half Yearly
Stair Core 3 Smoke Ventilators Smoke Clearance Roof 7 ADS Type C Half Yearly
Stair Core 3 Smoke Vent Attenuators Smoke Clearance Roof 1 ADS FSD-TD Series Half Yearly
Stair Core 3 Smoke Vent Discharge Damper Smoke Clearance Roof 2 Flaktwoods Series 54 Half Yearly
Stair Core 3 Smoke Vent Smoke Damper Smoke Clearance Roof 1 BSB JM Aerofoil / HTM63JM/31/2/3/26 Half Yearly
Basement Retail Smoke Extract Fans Smoke Clearance Core 3 All levels 7 ADS FSD-TD Series Half Yearly
Basement Retail Smoke Discharge Damper Smoke Clearance Level 10 Plantroom 2 Flaktwoods SmokeShield Half Yearly
Basement Retail Smoke Dampers Smoke Clearance Level 10 Plantroom 1 BSB Type C Half Yearly
Basement Retail Smoke Attenuators Smoke Clearance Level B1 - 10 16 Action Air ADS Half Yearly
Basement Retail Smoke Clearance System Panel Smoke Clearance Level 10 Plantroom 4 Flaktwoods Weekly Test Simulation, Annual Service
Sprinkler System Level 10 Plantroom 1 ADS Armstrong Pumps
Sprinkler System (Pumps Electric) Sprinkler System Armstrong Pumps Weekly Test, Monthly - Service Monthly from LPC Certificated company
Sprinkler System (Pumps Diesal) Sprinkler System Sprinkler Plant Room 1 Armstrong Pumps Tyco Weekly Test, Monthly - Service Monthly from LPC Certificated company
Sprinkler System (Valves) Sprinkler System Sprinkler Plant Room 2 Armstrong Pumps Balmoral Weekly Test, Monthly - Service Monthly from LPC Certificated company
Sprinkler Tank Sprinkler System Sprinkler Plant Room 1 Tyco Project Fire Ltd Annually
Car Park/Service Yard - Isolation valve (dry installation valve set) Sprinkler System Sprinkler Plant Room 1 Balmoral Tanks Project Fire Ltd 6 Monthly Test
Basement - Zone 1 - Zonecheck Sprinkler System Car Park 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 00 - Zone 1 - Zonecheck Sprinkler System Basement 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 00 - Zone 2 - Zonecheck (Retail Unit) Sprinkler System Level 00 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 00 - Zone 3 - Zonecheck (Retail Unit) Sprinkler System Level 00 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 00 - Zone 4 - Zonecheck (Retail Unit) Sprinkler System Level 00 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 00 - Zone 5 - Zonecheck (Retail Unit) Sprinkler System Level 00 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 10 - Zone 1 - Zonecheck Sprinkler System Level 00 1 Project Fire Ltd 6 Monthly Test
Level 10 1 Project Fire Ltd Page 3

34692/PRC/E1/DRAFT 23/01/2019

Reference/Description Description Location/Serving (25 Qty Manufacturer Model No. Maintenance Interval
Characters)
Level 10 - Zone 2 - Zonecheck Sprinkler System 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 10 - Zone 3 - Zonecheck (Retail Unit) Sprinkler System Level 10 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 10 - Zone 4 - Zonecheck (Retail Unit) Sprinkler System Level 10 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 10 - Zone 5 - Zonecheck (Retail Unit) Sprinkler System Level 10 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 20 - Zone 1 - Zonecheck Sprinkler System Level 10 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 20 - Zone 2 - Zonecheck Sprinkler System Level 20 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 20 - Zone 3 - Zonecheck Sprinkler System Level 20 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 30 - Zone 1 - Zonecheck Sprinkler System Level 20 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 30 - Zone 2 - Zonecheck Sprinkler System Level 30 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 30 - Zone 3 - Zonecheck Sprinkler System Level 30 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 40 - Zone 1 - Zonecheck Sprinkler System Level 30 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 40 - Zone 2 - Zonecheck Sprinkler System Level 40 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 40 - Zone 3 - Zonecheck Sprinkler System Level 40 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 50 - Zone 1 - Zonecheck Sprinkler System Level 40 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 50 - Zone 2 - Zonecheck Sprinkler System Level 50 1 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Level 50 - Zone 3 - Zonecheck Sprinkler System Level 50 2 Project Fire Ltd Project Fire Ltd 6 Monthly Test
Dry Riser Level 51
Core 1 Dry Riser Dry Riser JD Fire Ltd Weekly Visual, Half Yearly Inspection, Yearly Hydraulic Test
Core 2 Dry Riser Dry Riser Core 1 1 JD Fire JD Fire Ltd Weekly Visual, Half Yearly Inspection, Yearly Hydraulic Test
Core 3 Dry Riser Dry Riser Core 2 1 JD Fire JD Fire Ltd Weekly Visual, Half Yearly Inspection, Yearly Hydraulic Test
Metering System Core 3 1 JD Fire
Water Meters - FI Metering MWN, JSC Master C+, JS Smart + Monthly Reading, Annually Inspection/Clean
Heat Meters - FI Metering Site Wide 23 Apator Superstatic 440 Monthly Reading, Annually Inspection/Clean
Electric Meters - FI Metering Site Wide 49 Sontex PM5110, PM5111, PM8240 Monthly Reading, Annually Inspection/Clean
Water Meters - Yorkshire Water (Retail) Metering Site Wide 164 Schneider Yorkshire Water Meters
Heat Meters (Retail) Metering Basement 9 Yorkshire Water Meters Superstatic 440 Monthly Reading, Annual Inspection/Clean
Electric Meters (Retail) Metering Various 15 Sontex PM5110, PM5111, PM8240 Monthly Reading, Annual Inspection/Clean
Electric Meters - Retail Units (BREEAM Only) Metering Various 17 Schneider PM5110 Monthly Reading, Annual Inspection/Clean
HV Switchgear Retail Units 8 Schneider
2000kVA Transformer Switchgear 2000kVA Cast Resin Schneider Transformer 6 Monthly Check, Annual Service & Clean
HV Switch Switchgear Basement - FI Transformer Room 1 Schneider - E&I HV Switch CN2-T1 inc Vip 300 6 Monthly Check, Annual Service & Clean
Main LV Switchgear Basement - FI Transformer Room 1 Schneider - E&I
LV Switchboard SB1 Switchgear E&I SB1 Quarterly Inspection - Annual Clean-Service
LV Switchboard SB2 Switchgear Basement FI Switchroom 1 E&I & Schieder Devices E&I SB2 Quarterly Inspection - Annual Clean-Service
LV Switchboard SB3 Switchgear Roof Riser Cap Switchroom 1A 1 E&I & Schieder Devices E&I SB3 Quarterly Inspection - Annual Clean-Service
Retail Landlord Panel SB4 Switchgear Roof Riser Cap Switchroom 1A 1 E&I & Schieder Devices E&I SB4 Quarterly Inspection - Annual Clean-Service
Retail Landlord Life Safety Panel Switchgear Basement FI Switchroom 1 E&I & Schiederr Devices E&I SB5 Quarterly Inspection - Annual Clean-Service
Load Bank Test Unit Switchgear Retail Generator Room 1 E&I & Schiederr Devices Load Bank Unit Quarterly Inspection - Annual Clean-Service
Busbar Link Transformer to SB1 Main LV Distribution Basement Car Park 1 E&I & Schiederr Devices KT 3200A Quarterly Inspection - Annual Clean-Service
Busbar Link SB1 to Generator Connection Main LV Distribution Basement FI Switchroom 1 Schnedier KT 3200A Quarterly Inspection - Annual Clean-Service
Busbar Riser C1 Main LV Distribution Basement FI Switchroom 1 Schnedier Canalis 400a Quarterly Inspection - Annual Clean-Service
Busbar Riser C2 Main LV Distribution Core 1 1 Schnedier Canalis 400a Quarterly Inspection - Annual Clean-Service
Busbar Riser C3a Main LV Distribution Core 2 1 Schnedier Canalis 400a Quarterly Inspection - Annual Clean-Service
Busbar Riser C3b Main LV Distribution Core 3a 1 Schnedier Canalis 400a Quarterly Inspection - Annual Clean-Service
Distribution Boards Core 3b 1 Schnedier
DB Chiller Plantroom SP & L LV Distribution 8W TPN Quarterly Inspection - Annual Clean-Service
DB Roof Lighting LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB Roof Small Power LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C1A/B1/ESS/PLANT/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C1A/B1/ESS/PLANT/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C1A/B1/ESS/ENT/MECH LV Distribution As reference 1 Schneider Acti 9 Isobar 10W TPN Quarterly Inspection - Annual Clean-Service
DB/C1A/L10/ESS/ENTRANCE/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C1A/L10/ESS/ENTRANCE/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 8W TPN Quarterly Inspection - Annual Clean-Service
DB/C1A/L50/FIRE CORE LV Distribution As reference 1 Schneider Acti 9 Isobar 8W TPN Quarterly Inspection - Annual Clean-Service
DB/C1B/L20/ESS/Core LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 12W TPN Quarterly Inspection - Annual Clean-Service
DB/C1B/L20/N-ESS/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C1B/L20/N-ESS/Mech LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
As reference 1 Schneider Acti 9 Isobar
34692/PRC/E1/DRAFT Page 4
23/01/2019

Reference/Description Description Location/Serving (25 Qty Manufacturer Model No. Maintenance Interval
Characters)
DB/C1B/L20/N-ESS/SP LV Distribution 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C1B/L30/ESS/Core SP LV Distribution As reference 1 Schneider Acti 9 Isobar 24W TPN Quarterly Inspection - Annual Clean-Service
DB/C1B/L30/N-ESS/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C1B/L30/N-ESS/MECH LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C1B/L30/N-ESS/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C1B/L40/N-ESS/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C1B/L40/N-ESS/Mech LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C1B/L40/N-ESS/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C1B/L50/N-ESS/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C1B/L50/N-ESS/Mech LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C1B/L50/N-ESS/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C2B/L20/ESS/Core LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 8W TPN Quarterly Inspection - Annual Clean-Service
DB/C2B/L20/N-ESS/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C2B/L20/N-ESS/Mech LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C2B/L20/N-ESS/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C2B/L30/ESS/Core SP LV Distribution As reference 1 Schneider Acti 9 Isobar 12W TPN Quarterly Inspection - Annual Clean-Service
DB/C2B/L30/N-ESS/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C2B/L30/N-ESS/Mech LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C2B/L30/N-ESS/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C2B/L40/N-ESS/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C2B/L40/N-ESS/Mech LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C2B/L40/N-ESS/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C2B/L50/N-ESS/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C2B/L50/N-ESS/Mech LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C2B/L50/N-ESS/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/00/ESS/SEC/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/00/ESS/SEC/MECH LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/00/ESS/SEC/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/B1/N-ESS/POST RM/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/B1/N-ESS/POST/RM/MECH LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/B1/N-ESS/POST/RM/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/L00/N-ESS/GYM/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/L00/N-ESS/GYM/MECH LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/L00/N-ESS/GYM/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/L10/N-ESS/SCC/SPL LV Distribution As reference 1 Schneider Acti 9 Isobar 12W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/L20/N-ESS/SCC/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/L20/N-ESS/SCC/MECH LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/L20/N-ESS/SCC/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 8W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/L30/N-ESS/SCC/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/L30/N-ESS/SCC/MECH LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/L30/N-ESS/SCC/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 8W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/L40/N-ESS/SCC/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/L40/N-ESS/SCC/MECH LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3A/L40/N-ESS/SCC/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 8W TPN Quarterly Inspection - Annual Clean-Service
DB/C3B/L20/ESS/Core LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 8W TPN Quarterly Inspection - Annual Clean-Service
DB/C3B/L20/N-ESS/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3B/L20/N-ESS/Mech LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3B/L20/N-ESS/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3B/L30/ESS/Core SP LV Distribution As reference 1 Schneider Acti 9 Isobar 18W TPN Quarterly Inspection - Annual Clean-Service
DB/C3B/L30/N-ESS/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3B/L30/N-ESS/Mech LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3B/L30/N-ESS/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3B/L40/N-ESS/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3B/L40/N-ESS/Mech LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3B/L40/N-ESS/SP LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3B/L50/N-ESS/LTG LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3B/L50/N-ESS/Mech LV Distribution As reference 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
As reference
34692/PRC/E1/DRAFT Page 5
23/01/2019

Reference/Description Description Location/Serving (25 Qty Manufacturer Model No. Maintenance Interval
Characters)
DB/C3B/L50/N-ESS/SP LV Distribution 1 Schneider Acti 9 Isobar 6W TPN Quarterly Inspection - Annual Clean-Service
DB/C3B/L60/FIRE CORE LV Distribution As reference 1 Schneider Acti 9 Isobar 8W TPN Quarterly Inspection - Annual Clean-Service
DB B1-1 LV Distribution As reference 1 Schneider Acti 9 Isobar 8+8 TPN Quarterly Inspection - Annual Clean-Service
DB LL OFFICE LV Distribution Basement - Retail 1 Schneider 6+6 SPN Quarterly Inspection - Annual Clean-Service
DB/C4/10-1 LV Distribution Level 00 - Retail 1 Schneider 8+14 TPN Quarterly Inspection - Annual Clean-Service
M&E Plantroom DB1 LV Distribution Basement - REtail 1 Schneider 8+8 TPN Quarterly Inspection - Annual Clean-Service
Retail Plant Room DB LV Distribution Basement - Retail 1 Schneider 8+8 TPN Quarterly Inspection - Annual Clean-Service
Sprinkler DB LV Distribution Level 10 Plantroom - Retail 1 Schneider 18W TPN Quarterly Inspection - Annual Clean-Service
Automatic Transfer Switches Basement - Retail
Automatic Transfer Switch Stair - Core 1 (Smoke) ADS Quarterly Inspection - Annual Clean-Service
Automatic Transfer Switch Stair - Core 3 (Smoke) EM LV Distribution Core 1 - L50 Stair Core 1 ADS ADS Quarterly Inspection - Annual Clean-Service
Automatic Transfer Switch - Core 1 Fire Core DB EM LV Distribution Risr Cap Core 3 1 ADS OTM C8D Quarterly Inspection - Annual Clean-Service
Automatic Transfer Switch - Core 3 Fire Core DB EM LV Distribution Core 1 - L50 Stair Core 1 E&I Engneering Ltd OTM C8D Quarterly Inspection - Annual Clean-Service
Automatic Transfer Switch - Lift 1A EM LV Distribution Core 3 - L60 Stair Core 1 E&I Engneering Ltd OTM C8D Quarterly Inspection - Annual Clean-Service
Automatic Transfer Switch - Lift 3A EM LV Distribution Core 1 - L50 Stair Core 1 E&I Engneering Ltd OTM C8D Quarterly Inspection - Annual Clean-Service
Automatic Transfer Switch - Atrium Smoke Extract EM LV Distribution Core 3 - L60 Stair Core 1 E&I Engneering Ltd ADS Quarterly Inspection - Annual Clean-Service
Automatic Transfer Switch - Smoke Curtains EM LV Distribution Roof Plantroom - Adj Core 2 1 ADS OTM C8D Quarterly Inspection - Annual Clean-Service
Automatic Transfer Switch - Car Park EM LV Distribution Level 10 Entrance 1 E&I Engneering Ltd ADS Quarterly Inspection - Annual Clean-Service
Automatic Transfer Switch - Retail Smoke Clearance EM LV Distribution Basement Generator Room 1 ADS ADS Quarterly Inspection - Annual Clean-Service
Automatic Transfer Switch - FI Smoke Clearance EM LV Distribution Level 10 Plantroom 1 ADS ADS Quarterly Inspection - Annual Clean-Service
Surge Protection EM LV Distribution Basement Plantroom 1 ADS Ciroprotec Annual Inspection
LV Busbar Surge Protection Site Wide DB's etc 80 Ciroprotec
Lighting and Power Busbar 25A Dual Circuit Buscom Trunking Annual Inspection & Clean
Lighting and Power Busbar LV Busbar Level 20 Lot Legrand Electrak 25A Dual Circuit Buscom Trunking Annual Inspection & Clean
Lighting and Power Busbar LV Busbar Level 20 SCC office space Lot Legrand Electrak 25A Dual Circuit Buscom Trunking Annual Inspection & Clean
Lighting and Power Busbar LV Busbar Level 30 Lot Legrand Electrak 25A Dual Circuit Buscom Trunking Annual Inspection & Clean
Lighting and Power Busbar LV Busbar Level 30 SCC office space Lot Legrand Electrak 25A Dual Circuit Buscom Trunking Annual Inspection & Clean
Lighting and Power Busbar LV Busbar Level 40 Lot Legrand Electrak 25A Dual Circuit Buscom Trunking Annual Inspection & Clean
Lighting and Power Busbar LV Busbar Level 40 SCC office space Lot Legrand Electrak 25A Dual Circuit Buscom Trunking Annual Inspection & Clean
Generator LV Busbar Level 50 Lot Legrand Electrak
FI Generator C150D5 2 x Service Visits Annually, 1 x Oil Sample, Monthly Simulation-Test
Bulk Fuel Tank & Duplex Pumps Generator Roof 1 Cummins supplied by GMI Bespoke Mild Steel Enclosure Annual Check, Fuel Sampling If Required?
Load Bank Testing Facility Generator Basement - Fuel Store 1 GMI Power E&I LB1 Annual Test
Retail Generator Generator Basement - adj HV Room 1 E&I C110D5 2 x Service Visits Annually, 1 x Oil Sample, Monthly Simulation-Test
Lighting, EM Lighting & Control - FI Generator Basment Generator Room 1 Cummins supplied by GMI
Luminaire A RC360B W30L120 1xLED36S/840 CPC PIP Annual Clean
Luminaire A Lighting Level 20 - 50 1325 Philips RC360B W30L120 1xLED36S/840 CPC PIP Annual Clean
Luminaire AE Lighting 291 Philips RC360B W30L120 1xLED36S/840 CPC PIP ELD Annual Clean
Luminaire AE Emergency Lighting Level 20 - 40 SCC office space 214 Philips RC360B W30L120 1xLED36S/840 CPC PIP ELD Annual Clean
Luminaire B Emergency Lighting 60 Philips DN130B 1xLED20S/840 PSED-E II WH ALU Annual Clean
Luminaire B Lighting Level 20 - 50 362 Philips DN130B 1xLED20S/840 PSED-E II WH ALU Annual Clean
Luminaire BE Lighting 66 Philips DN130B 1xLED20S/840 PSED-E II WH ALU ELD Annual Clean
Luminaire BE Emergency Lighting Level 20 - 40 SCC office space 189 Philips DN130B 1xLED20S/840 PSED-E II WH ALU ELD Annual Clean
Luminaire B1 Emergency Lighting 33 Philips DN571B LED40S/840 PSED-E C WH Annual Clean
Luminaire B1 Lighting RReeffeerr ttoo DDrraawwiinnggss SCC office 17 Philips DN571B LED40S/840 PSED-E C WH Annual Clean
Luminaire B1E Lighting space 11 Philips DN571B LED40S/840 PSED-E C ELD3 WH Annual Clean
Luminaire B1E Emergency Lighting 10 Philips DN571B LED40S/840 PSED-E C ELD3 WH Annual Clean
Luminaire B2E Emergency Lighting RReeffeerr ttoo DDrraawwiinnggss SCC office 3 Philips DN130B LED20S/840 PSED-E EL3 II WH Annual Clean
Luminaire B3 Emergency Lighting space 6 Philips DN571B LED40S/840 PSED-E C PG WH Annual Clean
Luminaire B3E Lighting 1 Philips configure emergency (ELD3), then add 910503586401 Annual Clean
Luminaire C Emergency Lighting RReeffeerr ttoo DDrraawwiinnggss SCC office 3 Philips WT120C L1200 1xLED40S/840 Annual Clean
Luminaire C Lighting space 108 Philips WT120C L1200 1xLED40S/840 Annual Clean
Luminaire CE Lighting 3 Philips WT120C L1200 PSD 1xLED40S/840 ELD Annual Clean
Luminaire CE Emergency Lighting RReeffeerr ttoo DDrraawwiinnggss SCC office 242 Philips WT120C L1200 PSD 1xLED40S/840 ELD Annual Clean
Luminaire C2E Emergency Lighting space 12 Philips WT120C LED18S/840 PSU L600 EL3 Annual Clean
Luminaire C3 Emergency Lighting 58 Philips WT120C LED18S/840 PSU L600 Annual Clean
Luminaire C4 Lighting Refer to Drawings 7 Philips WT120C LED60S/840 PSD L1500 Annual Clean
Lighting 3 Philips
34692/PRC/E1/DRAFT Refer to Drawings Page 6

Refer to Drawings

RReeffeerr ttoo DDrraawwiinnggss SCC office
space

RReeffeerr ttoo DDrraawwiinnggss SCC office
space

Refer to Drawings

Refer to Drawings

Refer to Drawings

23/01/2019

Reference/Description Description Location/Serving (25 Qty Manufacturer Model No. Maintenance Interval
Characters)
Luminaire C4E Emergency Lighting 14 Philips WT120C LED60S/840 PSD L1500 EL3 Annual Clean
Luminaire C6E Emergency Lighting Refer to Drawings 3 Philips WT120C LED40S/840 PSU L1200 EL3 Annual Clean
Luminaire D Lighting Refer to Drawings 1 Philips WL120V LED16S/830 PSD MDU WH Annual Clean
Luminaire DE Emergency Lighting Refer to Drawings 140 Philips WL120V PSD LED16S/840 ELD Annual Clean
Luminaire DE Emergency Lighting Refer to Drawings 24 Philips WL120V PSD LED16S/840 ELD Annual Clean
Luminaire T Lighting Refer to Drawings 20 Philips RC360B G2 LED34S/840 PSD W60L60 CPC W Annual Clean
Luminaire TE Emergency Lighting Level B1 & 00 6 Philips RC360B G2 LED34S/840 PSD W60L60 CPC ELP3 Annual Clean
Luminaire EX01 SH Emergency Lighting Level B1 & 00 8 Philips SAVONA ACRYLIC LEGEND ARROW LEFT Annual Clean
Luminaire EX01 WM Emergency Lighting Refer to Drawings 6 Philips SM BOX EM LED SIGN DALI - Arrow Left Annual Clean
Luminaire EX02 SH Emergency Lighting Refer to Drawings 5 Philips SAVONA ACRYLIC LEGEND ARROW RIGHT Annual Clean
Luminaire EX02 WM Emergency Lighting Refer to Drawings 4 Philips SM BOX EM LED SIGN DALI - Arrow Right Annual Clean
Luminaire EX03 SH Emergency Lighting Refer to Drawings 19 Philips Recess Mount Blade Exit Sign AU BS5499 Annual Clean
Luminaire EX03 WM Emergency Lighting Refer to Drawings 79 Philips SM BOX EM LED SIGN DALI - Arrow Up Annual Clean
Luminaire EX04 SH Emergency Lighting Refer to Drawings 1 Philips SAVONA ACRYLIC DOUBLE-SIDED SIGN DOWN Annual Clean
Luminaire EX05 SH Emergency Lighting Refer to Drawings 16 Philips SAVONA ACR DOUBLE SIDED SIGN LEFT RIGHT Annual Clean
Luminaire Signs Emergency Lighting Refer to Drawings 49 Philips R BL EM LED SIGN DALI Annual Clean
Luminaire F General Lighting Refer to Drawings TBC Optelma Quad 46 Annual Clean
Luminaire F1 General Lighting Front Entrance Level 10 TBC Osram LINEAlight Flex Annual Clean
Luminaire F2 General Lighting Core 1 Lobbies 10-50 TBC Osram LINEAlight Flex Annual Clean
Luminaire K General Lighting Core 1 Lobbies 10-50 10 Duluce Roam P2 Annual Clean
Luminaire P Feature Lighting Level 30&40 5 Wever Ducre 3.0W LED Copper Plated 1800-2850k Annual Clean
Luminaire R General Lighting Reception Desk 24 Erco Gecko Annual Clean
Luminaire RE Emergency Lighting Atrium Level 40 6 Erco Gecko (with 3 hour emergency battery back) Annual Clean
Luminaire V General Lighting Atrium Level 40 TBC Trilux LINEAlight Flex Annual Clean
Luminaire HE Emergency Lighting Refer to Drawings - Core Mirrors 15 Southgate Lighting Southgate Ployhedron LED Annual Clean
Lighting Control Front End (FI) General Lighting Roof Terrace Level 50 1 Philips Philips Lighting Control Annual Service & Maintenance
Lighting, EM Lighting & Controls - Retail Security Room Level 00
Luminaire C Annual Clean
Liuminaire CE General Lighting Refer to drawings 98 Philips WT120C L1200 1xLED40S/840 Annual Clean
Luminaire C2 Emergency Lighting Refer to drawings 120 Philips WT120C L1200 PSD 1xLED40S/840 ELD Annual Clean
Luminaire C2E General Lighting Refer to drawings 13 Philips WT120C LED18S/840 PSU L600 Annual Clean
Luminaire C4 Emergency Lighting Refer to drawings 4 Philips WT120C LED18S/840 PSU L600 EL3 Annual Clean
Luminaire C4E General Lighting Refer to drawings 32 Philips WT120C LED60S/840 PSD L1500 Annual Clean
Luminaire C3 Emergency Lighting Refer to drawings 44 Philips WT120C LED60S/840 PSD L1500 EL3 Annual Clean
Luminaire C6E General Lighting Refer to drawings 4 Philips WT120C LED18S/840 PSU L600 Annual Clean
Luminaire DE Emergency Lighting Refer to drawings 12 Philips WT120C LED40S/840 PSU L1200 EL3 Annual Clean
Lighting Control Front End (Retail) Emergency Lighting Refer to drawings 36 Philips WL120V PSD LED16S/840 ELD Annual Service & Maintenance
Fire Alarm General Lighting Security Room Level 00 1 Philips Philips Lighting Control
Fire Alarm Panels (Circa XXX Devices) Weekly Simulation, Quarterly Inspection, Annual Service
Disabled Refuge & WC Alarm Fire Alarm FCC 5 UTC Ziton ZP2
Disabled Refuge & WC Panels Weekly Simulation, Quarterly Inspection, Annual Service
Public Address & Voice Alarm Disabled Refuge FCC 4 Baldwin Boxall Omnicare 48way
Public Address System - FI & Retail PAVA Weekly Simulation, Quarterly Inspection, Annual Service
Lightning Protection System & Earthing Basement FI & Retail Rack 2 Baldwin Boxall Virgil System Racks - Zoned
Lightning Bonds Rooms Bailey International Lightning Protection Annual Test
Earth Nests Gen & HV-LV Furse Annual Test
CCTV Lightning Site Wide 25 BSaeirlveiyceIns ternational Lightning Protection Furse
Milestone Integration Lightning Site Wide 3 Services Half Yearly
Axis Cameras Half Yearly
Access Control Security Level 00 Management Suite 1 Axix 9002 TBC
Access Control System Security Retail Landlord Areas 27 Axis Various P & M Series TBC Half Yearly
Access Control Doors Half Yearly
Intercom Security Retail Landlord Areas 1 CEM AC2000 TBC
Intercom Stations Security Retail Landlord Areas 12 CEM AC2001 TBC Half Yearly
Intruder Alarm System
Intruder Alarm System - Approx 30 Points Security Retail Landlord Areas 2 Helios IP Verso TBC Half Yearly
Intruder Alarm - Each SCC Unit Half Yearly
Security Retail Landlord Areas 30 Galaxy MK7 TBC
34692/PRC/E1/DRAFT Security Level 20,30,40 3 Galaxy MK7 TBC