MEWP delivery point MEWP delivery point Notes:
CDM - Level 00 External +9875 +9875 +11500 The use of this data by the recipient acts as an agreement of the following statements. Do
+6900 not use this data if you do not agree with any of the following statements:-
1 : 500 +11500 All drawings are based upon site information supplied by third parties and as such their
+6000 accuracy cannot be guaranteed. All features are approximate and subject to clarification
+11500 +5950 by a detailed topographical survey, statutory service enquiries and confirmation of the
+8690 legal boundaries.
+8690 The controlled version of this drawing should be viewed in DWF or PDF format not DWG
or other formats. All prints of this drawing must be made in full colour.
+6275 Where this drawing has been based upon Ordnance Survey data, it has been reproduced
under the terms of Ryder Licence No. 100000144. Reproduction of this drawing in whole
CDM - Level 00 Internal or in part is prohibited without the prior permission of Ordnance Survey.
Do not scale the drawing. Use figured dimensions in all cases. Check all dimensions on
1 : 500 site. Report any discrepancies in writing to Ryder before proceeding.
CDM SITE STRATEGY & MAINTENANCE KEY:
Typical floor to soffit level is 3350 mm unless noted otherwise. In
general, location devices such as PECO lift and NANO SP Plus will
provide access to soffits / ceiling zones.
Indicative access route for Genie Z-34/22 IC boom lift
Indicative zone denoting double/triple height space to
be accessed by Genie AWP-36S for maintenance.
Dimension noted in red indicates distance from FFL to
underside of structural soffit (worst case)
Indicative areas of circulation through building to
access double/triple height space serviced by Genie
AWP-36S lift for maintenance.
Indicative areas of circulation to upper levels (via lift)
to access double/triple height space serviced by
Genie AWP-20S lift for maintenance.
All or part of access to windows obstructed by fixed
FF + E - indoor water feed pole system to be used for
internal cleaning. Remote opening system e.g.
teleflex to be used for opening lights
Indicative cranage points for roof top plant
replacement requirements TBC by M&E Engineer
and Landscape Architect
Reach and wash location
Glazed surface in void to be cleaned via access
platform from below or waterfed pole system
Parapet providing greater than 1100mm guarding
Guardrail
Indicative walkway formed from paving slabs to
hot melt roof
Roof Access point
Step Over Point
Graphical representation of Genie
Z-34/22 IC Boom Lift
Graphical representation of Genie AWP
36S / AWP 20S
CDM - Level 01 CDM - Level 02 CDM - Roof P02 JDa 13/02/2018 ALo Roof walkway updated to rectify clashes with MEP
model
1 : 500 1 : 500 1 : 500
P01 SCON 26/01/2018 GSE First Issue
rev by date chkd amendments
project
PSBP2 CF North East Batch A
Kepier, Houghton le Spring
drawing title
CDM, Access and Maintenance Strategy
job no. scale drawn by Checked by date
3206:00 As indicated SCOA SCON 10/27/17
drawing reference (project code - originator - volume - level - type - role - number - suitability - revision)
137262 -RYD -00 -ZZ -DR -A -35001 -S0 -P02