Drawings

Drawings

UP LP DO NOT SCALE FROM THIS DRAWING.

LP ALL DIMENSIONS TO BE CHECKED ON SITE.

TC FOR REFERENCED VIEWS REFER TO SPS- BMD- 00- DR- A
WO SERIES OF DRAWINGS

IC Notes

* MEWP Delivery Point 1. Roof access is for inspection & minor maintenance tasks only i.e. window and
gutter cleaning. Any other work is to be suitably risk assessed.

2. Operatives must always maintain 3 points of contact on roof access ladders.

3. Specialist maintenance sub-contractor to determine preferred SPB / MEWP for
the specific maintenance task in hand and to suit the building and site constraints.
For the purposes of this drawing, the following model has been assumed:
Self Propelled Boom (SPB) Spec:
(Based on NiftyLift HR21 2x4 20.8m Self Propelled)
Working Height - 20.8m
Unrestricted Working Outreach at 225kg - 12.8m
Width - 2.27m
Length - 6.7m
Stowed Height - 2.15m

4. Structural engineer to ensure all floor constructions are suitable for loadings of
MEWP's.

5. Structural Engineer & Landscape Architect to ensure all external ground
constructions are suitable for loadings of MEWP.

6. Landscape Architect to ensure MEWP access allowed for to full perimeter of
building. Refer to above machines technical specification for turning radius and
further machine info.

7. REFER TO MAINTENANCE & ACCESS STATEMENT FOR FURTHER
INFORMATION.

Legend

1. Window / door cleaning undertaken from floor level.
Conventional cleaning methods to be used within manual reach zone both internally
& externally. Water fed extendable pole to be used for high level glazing externally.
Indoor water fed extendable pole to be used for high level glazing internally.

2. Gutter / hoppers / vertical glazing to be cleaned from within MEWP cage. MEWP
to have sufficient out-reach to cantilever over building as necessary. Conventional
cleaning methods to be used within manual reach zone and/or water fed extendable
pole.

3. Rooflight to be cleaned from within MEWP cage with water fed extendable pole.
MEWP to have sufficient out-reach to cantilever over building as necessary. Internal
side of rooflight to be cleaned from first floor level with internal extendable water fed
pole.

4. Gutter accessed from first floor openable window / door. Level anti-slip walkways
provided along full length of gutters. Stepped anti-slip walkway provided up and over
ridge. Fall restraint system to full extent of walkways.

R2266

R7994

R3700
R3800

R3800 UP
R8031

MOOREHOUSE GROVE

C01 JM 22/06/18 GK Final Construction Issue.

P03 GK 04/07/17 JM Plans updated, Stage 4 Issue
P02 GK 27/03/17 JM Plans updated, Stage 3 Issue

Rev By Date Chkd Description

Suitability Code (as defined in BS1192) P0 00 - Ground Floor Maintenance & Access project Shakespeare Primary School
Work in Progress (WIP)
S0 - Work In Progress S2 - Suitable for Information Published Documentation (Contractual) BAM Design Ltd title Maintenance & Access Strategy purpose of issue
Shared (Non- Contractual) S4 - Suitable for Stage Approval A1, A2, A3, Etc - Approved and accepted as stage complete An operating company of - Ground Floor
S1 - Suitable for Co-ordination S6 - Suitable for PIM Authorisation B1,B2,B3, Etc, - Partially signed off with minor comments from the Client BAM Construct UK Ltd
S3 - Suitable for Review & comment D2 - Suitable for Tender scale As indicated @ A1 drawn JM BAM job no. drg. status
S5 - Not Used D4 - Suitable for manufacture/procurement Published for AIM Acceptance Architecture
S7 - Suitable for AIM Authorisation CR - As Construction Record Documentation Interior Design date 12/12/16 checked GK 4692 CR
WIP to Published (Non-Contractual) 3D Visualisation
D1 - Suitable for Costing Feasibility Studies project code originator volume level type role number rev.
D3 - Suitable for Contractor Design Structural Engineering
Environmental Services SPS-drg / doc ref. BMD- Z1- 00- DR- A- 15380 C01
Building Information Modelling

Centrium Business Park
Griffiths Way, St Albans
Hertfordshire, AL1 2RD

01727 894200
[email protected]
www.bam.co.uk

GUTTER DO NOT SCALE FROM THIS DRAWING.

20.0° [L30/555] Non penetrative safety ALL DIMENSIONS TO BE CHECKED ON SITE.
guardrail to single ply roof area.
10.0° FOR REFERENCED VIEWS REFER TO SPS- BMD- ZZ- DR- A
Ship ladder from first floor SERIES OF DRAWINGS
GUTTER plant room to allow access
DN to roof via manual access Notes
hatch.
Minimum1100mm high 1. Roof access is for inspection & minor maintenance tasks only i.e. window and
parapet to perimeter gutter cleaning. Any other work is to be suitably risk assessed.

2. Operatives must always maintain 3 points of contact on roof access ladders.

3. Specialist maintenance sub-contractor to determine preferred SPB / MEWP for
the specific maintenance task in hand and to suit the building and site constraints.
For the purposes of this drawing, the following model has been assumed:
Self Propelled Boom (SPB) Spec:
(Based on NiftyLift HR21 2x4 20.8m Self Propelled)
Working Height - 20.8m
Unrestricted Working Outreach at 225kg - 12.8m
Width - 2.27m
Length - 6.7m
Stowed Height - 2.15m

4. Structural engineer to ensure all floor constructions are suitable for loadings of
MEWP's.

5. Structural Engineer & Landscape Architect to ensure all external ground
constructions are suitable for loadings of MEWP.

6. Landscape Architect to ensure MEWP access allowed for to full perimeter of
building. Refer to above machines technical specification for turning radius and
further machine info.

7. REFER TO MAINTENANCE & ACCESS STATEMENT FOR FURTHER
INFORMATION.

Legend

1. Window / door cleaning undertaken from floor level.
Conventional cleaning methods to be used within manual reach zone both internally
& externally. Water fed extendable pole to be used for high level glazing externally.
Indoor water fed extendable pole to be used for high level glazing internally.

2. Gutter / hoppers / vertical glazing to be cleaned from within MEWP cage. MEWP
to have sufficient out-reach to cantilever over building as necessary. Conventional
cleaning methods to be used within manual reach zone and/or water fed extendable
pole.

3. Rooflight to be cleaned from within MEWP cage with water fed extendable pole.
MEWP to have sufficient out-reach to cantilever over building as necessary. Internal
side of rooflight to be cleaned from first floor level with internal extendable water fed
pole.

4. Gutter accessed from first floor openable window / door. Level anti-slip walkways
provided along full length of gutters. Stepped anti-slip walkway provided up and over
ridge. Fall restraint system to full extent of walkways.

DN

PRF RF1 - Roof Maintenance & Access

GUTTER Note: Door required from
GUTTER first floor to access roof.

25.0° Level anti-slip walkway GUTTER Stepped anti-slip R 12800
along length of gutter. GUTTER walkway to
Fall restraint system.
pitched roof.
Level anti-slip walkway
along length of gutter. MEWP

15.0° GUTTER

25.0°

15.0°

R 12800

GUTTER

MEWP

P1 01 - First Floor Maintenance & Access

C01 JM 22/06/18 GK Final Construction Issue.
P03 GK
P02 GK 11/07/17 JM Stage 4 Issue
27/03/17 GK Plans updated, Stage 3 Issue
Rev By
Date Chkd Description

Suitability Code (as defined in BS1192) project Shakespeare Primary School
Work in Progress (WIP)
S0 - Work In Progress S2 - Suitable for Information Published Documentation (Contractual) BAM Design Ltd title Maintenance & Access Strategy purpose of issue
Shared (Non- Contractual) S4 - Suitable for Stage Approval A1, A2, A3, Etc - Approved and accepted as stage complete An operating company of - First Floor & Roof
S1 - Suitable for Co-ordination S6 - Suitable for PIM Authorisation B1,B2,B3, Etc, - Partially signed off with minor comments from the Client BAM Construct UK Ltd
S3 - Suitable for Review & comment D2 - Suitable for Tender scale As indicated @ A1 drawn JM BAM job no. drg. status
S5 - Not Used D4 - Suitable for manufacture/procurement Published for AIM Acceptance Architecture
S7 - Suitable for AIM Authorisation CR - As Construction Record Documentation Interior Design date 12/12/16 checked GK 4692 CR
WIP to Published (Non-Contractual) 3D Visualisation
D1 - Suitable for Costing Feasibility Studies project code originator volume level type role number rev.
D3 - Suitable for Contractor Design Structural Engineering
Environmental Services SPS-drg / doc ref. BMD- Z1- ZZ- DR- A- 15381 C01