Access_and_Maintenance_Strategy

Access_and_Maintenance_Strategy

+6925 Notes:

+11580 +11580 +11000 Fixed dining FF&E to be The use of this data by the recipient acts as an agreement of the following statements. Do
+11580 +11580 +11000 temporarily moved for not use this data if you do not agree with any of the following statements:-
+10450 access to high level works All drawings are based upon site information supplied by third parties and as such their
+11000 accuracy cannot be guaranteed. All features are approximate and subject to clarification
by a detailed topographical survey, statutory service enquiries and confirmation of the
+10525 legal boundaries.
The controlled version of this drawing should be viewed in DWF or PDF format not DWG
+10510 or other formats. All prints of this drawing must be made in full colour.
Where this drawing has been based upon Ordnance Survey data, it has been reproduced
+10525 under the terms of Ryder Licence No. 100000144. Reproduction of this drawing in whole
or in part is prohibited without the prior permission of Ordnance Survey.
MEWP delivery point MEWP delivery point Do not scale the drawing. Use figured dimensions in all cases. Check all dimensions on
site. Report any discrepancies in writing to Ryder before proceeding.
CDM - Level 00 External CDM - Level 00 Internal
CDM SITE STRATEGY & MAINTENANCE KEY:
1 : 500 1 : 500
Typical floor to soffit level is 3325 mm unless noted otherwise. In
+6900 general, location devices such as PECO lift and NANO SP Plus will
+6925 provide access to soffits / ceiling zones.
+6900
+6900 Indicative access route for Genie Z-34/22 IC boom lift
+6900
+6925 Indicative zone denoting double/triple height space to
be accessed by Genie AWP-36S for maintenance.
CDM - Level 01 Dimension noted in red indicates distance from FFL to
underside of structural soffit (worst case)
1 : 500
Indicative access route to access double/triple height
space serviced by Genie AWP-36S lift for maintenance

Indicative areas of circulation to upper levels (via lift)
to access double/triple height space serviced by
Genie AWP-20S lift for maintenance

Indicative zone denoting double height space at
upper levels to be accessed by Genie AWP-20S for
maintenance. Dimension noted in red indicates
distance from FFL to underside of structural soffit
(worst case)

Rooflights over void and stairs to be accessed by
temporary scaffold

All or part of access to windows obstructed by fixed
FF + E - indoor water feed pole system to be used for
internal cleaning. Remote opening system e.g.
teleflex to be used for opening lights

Areas of temporary boarding required to protect
grassed areas

Indicative cranage points for roof top plant
replacement requirements TBC by M&E Engineer
and Landscape Architect

Reach and wash location

Glazed surface in void to be cleaned via access
platform from below or window vacuum
extension pole system
Parapet providing greater than 1100mm guarding

Guardrail

Indicative walkway formed from paving slabs to
hot melt roof

Roof Access point

Step Over Point

Graphical representation of Genie
Z-34/22 IC Boom Lift

Graphical representation of Genie AWP
36S / AWP 20S

CDM - Level 02 CDM - Roof Revision Date Drawn By

1 : 500 1 : 500 P1 30/05/18 FHAR

First Issue

rev by date chkd amendments

project

PSBP2 CF North East Batch A The English Martyrs
School and Sixth Form

drawing title

CDM, Access and Maintenance Strategy

job no. scale drawn by Checked by date

3206:01 As indicated FHAR GSE 16/05/18

drawing reference (project code - originator - volume - level - type - role - number - suitability - revision)

140867 -RYD -00 -00 -DR -A -35001 -S0 -P1